sambalpur parliamentary constituency

4
SAMBALPUR PARLIAMENTARY CONSTITUENCY A progressive journey since 2014 Sand Art prepared by eminent Sand Artist Padmashree Shri Sudarshan Pattnaik at Puri Beach SAMBALPUR MAP IS ONLY INDICATIVE

Upload: others

Post on 18-Dec-2021

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SAMBALPUR PARLIAMENTARY CONSTITUENCY

SAMBALPUR PARLIAMENTARY CONSTITUENCY

A progressive journey since 2014

Sand

Art

pre

pare

d by

em

inen

t Sa

nd A

rtis

t Pa

dmas

hree

Shr

i Sud

arsh

an P

attn

aik

at P

uri B

each

SAMBALPUR

MAP IS ONLY IN

DICATIVE

Page 2: SAMBALPUR PARLIAMENTARY CONSTITUENCY

A. Assembly Segments: Kuchinda, Rengali, Sambalpur, Rairakhol, Deogarh, Chhendipada & Athmallik.RAILWAY STATIONS COVERED: Hirakud, Sambalpur, Sambalpur Road, Sambalpur City, Maneswar, Sasan, Rengali, Lapanga, Rairakhol, Sargipali, Jarapada, Boinda, Hatibari, Jujomura, Charmal, Bamur, Handapa , Kerejanga & Sarla.B. WORK COMPLETED IN LAST FIVE YEARS:NEW LINES AND ELECTRIFICATION

Doubling between Rengali to Brundamal, Rairakhol to Sargipali, Sargipali to Jarapada, Hirakud to Attabira (KM 99.66) - Cost ` 386.230 Crore

Doubling between Bamur - Rairakhol (KM 13.5) - Cost ` 52.520 Crore Doubling between Attabira - Deobahal including new station at Deobahal (KM 6.00) -

Cost ` 44.680 Crore Doubling between Jarapada - Boinda (KM 15.60) - Cost ` 113.050 Crore Doubling between Rengali-Lapanga (KM 10.901) Doubling between Lapanga-Brundamal (KM 8.796) Doubling between Jharsuguda Road-Jharsuguda (KM 2.072) Doubling between Handapa-Boinda (KM 7.333) Doubling between Sargipali-Handapa (KM 14.2) Doubling between Boinda – Jarpada (KM 15.147) Doubling between Bamur-Sargipali (KM 9.47) Doubling between Godbhaga - Deobahal (KM 13.74) ambalpur to Jharsuguda Road, Bamur to Angul (KM 114.2) - Electrification between S

Cost 128.900 Crore` Electrification between Sambalpur to Attabira (KM 25)-Cost ` 37.300 Crore Electrification between Sambalpur City to Kerejang (KM 143.00) Electrification between Hirakud to Godbaga (KM 9.6)-Cost ` 11.650 Crore Electrification between Rairakho to Bamurl (KM 11.93)-Cost ` 19.310 Crore Electrification between Sambalpur Road-Sambalpur City (KM 9.27)-

Cost ` 5.774 Crore Electrification between Sambalpur City-Rairakhol (KM 72.46) - Cost ` 55.720 Crore Electrification between Jarapad-Rairakhol (KM 58.29) - Cost ` 33.800 Crore

NEW TRAINS Train No. 18109/18110 Sambalpur-Jammutawi-Sambalpur Express Train No. 78103/78104 Rourkela-Sambalpur-Rourkela Passenger Train No. 58303/58304 Sambalpur-Junagarh Road - Sambalpur Passenger Train No. 18111/18112 TATA-Yeswantapur-TATA Weekly Express Train No. 22837/22838 Hatia-Ernakulam-Hatia Weekly Express Train No. 20817/20818 Bhubaneswar-New Delhi-Bhubaneswar Rajdhani Express Extension of Train No. 18309/18310 Exress (Rourkela- Jammutawi- Rourkela)

Express upto Sambalpur having stoppage at RengaliADDITIONAL FACILITIES

Passenger Reservation Systems (PRS) provided at Sambalpur City, Rairakhol and Boinda Stations - Cost 0.030 crore`

Point of Sale machines (POS) provided at Sambalpur, Rengali, Sambalpur Road, Hirakud, Sambalpur City, Rairakhol and Boinda stations

Water Vending Machine (WVM) provided at Sambalpur station- Cost 0.080 crore` Automatic Ticket Vending Machine (ATVM) provided at Hirakud, Sambalpur Road and

Rairakhol stations- Cost 0.060 crore` Pathway for disabled persons at Rengali Station-Cost 0.055 crore` Water Coolers at Boinda Station-Cost 0.020 crore` Passenger Reservation System (PRS) at Athmallik Post Office-Cost 0.040 crore`

PASSENGER AMENITIES CCTV at Sambalpur Station-Cost 0.019 crore` Improvement to Circulating Area at Sargipali Station - Cost 0.200 crore` Improvement to Circulating Area at Sambalpur Station - Cost 2.310 crore` Water taps provided at Rengali Station-Cost 0.007 crore` Augmentation of water supply at stations Hatibari, Jujomura, Charmal, Bamur,

Handapa, Boinda and Kerejanga stations- Cost 3.850 crore` Foot Over Bridge (FOB) at Hirakud and Boinda stations- Cost 1.150 crore` High Mast Lighting system provided at Sambalpur, Sambalpur City and Rengali Stations - Cost 0.280 crore` Extension of Platform at Bamur Station - Cost 0.550 crore` Extension of Down platform at Garposh - Cost 0.580 croreStation ` Extension of Platforms at Hirakud, Bamur & Rairakhol Stations-Cost 1.850 crore`

SAMBALPUR PARLIAMENTARY CONSTITUENCY

INPUTS BY RAILWAYS IN SAMBALPUR PARLIAMENTARY CONSTITUENCY

Sambalpur Station Building

Wi-Fi at Sambalpur Station

Automatic Ticket Vending Machine (ATVM)

provided at Sambalpur

Rairakhol Station

Page 3: SAMBALPUR PARLIAMENTARY CONSTITUENCY

Raising and Extension of Platforms at Hirakud, Bamur and Rairakhol Stations - Cost 0.230 crore`

Concrete Surfacing of Platform at Hirakud Station - Cost 36.000 crore` Platform Shelter at Sambalpur, Lapanga, Sasan, Bamur, Rairakhol,

Jujumora, Charmal, Sargipali, Handapa, Jarapada, Boinda and Sambalpur City- Cost 2.400 crore`

Improvement of passenger amenities like Precast paved block on Platform, renovation of water booth at Garposh Station - Cost 0.750 crore`

Seating Arrangement at Sasan, Rairakhol, Sambalpur Road, Sambalpur, Hirakud, Sambalpur City, Maneswar, Charmal, Hatibari, Jujumora, Bamur, Jarapada and Boinda Stations - Cost 0.145 crore`

Signages at Sambalpur Station - Cost 0.040 crore` Urinals at Rengali, Sasan, Brundamal and Hirakud Stations - Cost . 0.200 crore` Waiting Room at Sambalpur, Rengali and Lapanga Stations - Cost 0.250 crore` Water Cooler at Sambalpur, Sambalpur Road, Hirakud and Rairakhol Stations -

Cost 0.040 crore` 01 Sanitary Napkin Vending Machine provided at Sambalpur station Counter Communication between Booking Clerk and Passenger provided at Sambalpur

and Sambalpur Road Stations Digital Clock Global Positioning System provided at Rairakhol station Train Indication Board provided at Sambalpur station Provision of escalator with ramp at Sambalpur station Opening of Food Plaza at Sambalpur station Unreserved Ticket System cum Passenger Reservation System opened at Bamur station 3 nos. of Automatic Ticketing Vending Machines (ATVM) installed at Sambalpur station Unreserved ticketing facility based on UTS on Mobile app launched for entire

Sambalpur Division Improvement of Circulating area at Godbhaga station WiFi provided at Hirakud, Sambalpur City, Maneswar, Jujumura, Hatibari, Charmal, Bamur,

Sargipali, Rairakhol, Handapa, Boinda, Jarpada, Kerjanga stations Divyang friendly toilet provided at Hirakud station Foot Over Bridge (FOB) provided at Sambalpur station 16 Nos. of additional water taps provided at Jujomura and Charmal stations Platform shed provided at Jujomura & Sarla Stations 22 Nos. additional benches provided at Jujomura, Charmal stations 5/6 line True colour Train Indication Board commissioned at Sambalpur station 3 line Train indication board and auto announcement system commissioned at Sambalpur

City, Rairkhol & Hirakud stations Improvement of Circulating area at Rengali, Bamur, Godbhaga and Hatibari stations 3 Foot Over Bridge (FOB) provided at Lapanga station Additional Automatic Ticket Vending Machine (ATVM) provided at Sambalpur station 2nd Class waiting hall of Sambalpur station developed as Integrated Waiting Lounge Catering Tea Stalls provided at Sambalpur City, StationsRairakhol and Jharsuguda Road Station Ticket Booking Agent (STBA) appointed at Godbhaga & Rengali Station Mechanized Laundry facility provided at Coaching Depot, Sambalpur 2 Escalators with ramp facility provided at platform no 1 & 2 of Sambalpur station Additional Platform Shelter provided at Sarla & Jujumara Station

TRAFFIC FACILITIES Road Under Bridge (RUB) In lieu of Level Crossing Nos. JT-11, JT-38, ST-4, ST-5, ST-10,

ST-11, ST-16, ST-17, ST-20, ST-22, ST-29, ST-33, ST-42,ST-44, ST-144, ST-51, ST-55, ST-58, ST-60, ST-62,ST-73, ST-70 and ST-28 - Cost 46.500 crore`

Yard Remodelling At Hirakud, Rengali, Boinda, Handappa, Sargipali and Kesinga Stations - Cost 12.140 crore` Yard Remodelling - One additional running line at Sargipali Station - Cost 1.900 crore` Yard Remodelling- Intermediate Block Station between Handapa and Sargipali Stations - Cost 2.500 crore` Construction of Pit Lines at Sambalpur Station One Interlocked LC Gate No.ST-70 closed by providing Limited Height Subway (LHS) at Handapa station

C. ONGOING PROJECTSNEW LINES AND ELECTRIFICATION

Doubling line work between Sambalpur to Sargipali, Jarapada to Angul, Sambalpur to Hirakud and Godbhaga to Attabira (KM 113.5) - Cost 435.000 crore`

Electrification between Sambalpur to Bamur and Sambalpur to Godbhaga (KM 104.5) - Cost 126.840 crore ` New Line between Talcher - Sunakhani as a part of Talcher-Bimlagarh New Line (154KM)

Water Cooler at Sambalpur Station

Escalator with Ramp at Sambalpur

Food Plaza at Sambalpur

Page 4: SAMBALPUR PARLIAMENTARY CONSTITUENCY

Flagging off of Bhubaneswar-New Delhi Rajdhani Express via Sambalpur City, Jharsuguda & Rourkela

Mechanized laundry Dedicated at Sambalpur

ADDITIONAL FACILITIES Maneswar - Freight train maintenance facilities with routine overhauling facility for freight wagon - Cost 49.160 crore` Chakradharpur Division - Dual detection of Last Vehicle Checking Device on

A - route Rourkela to Jharsuguda - Cost 4.250 crore` Chakradharpur Division - Shifting of starters signal to 3mts beyond insulation

joint for 120 Signals - Cost 0.110 crore ` Chakradharpur Division - Replacement of over aged Batteries for OFC equipments

at 49 stations - Cost 0.110 crore` Integrated Power Supply Remote Terminal Unit at 4 Intermediate Block Hut

along with Goomty - Cost 0.280 crore` Chakradharpur Division-Reliability improvement works for reducing signal

failures - Cost 0.180 crore` Replacement of Worn Out Point machines in Chakradharpur Division -

Cost 0.130 crore` Garposh-Bamra - Extension of bridge No.57 (Jharsuguda end) and bridge No.

59 (Chakradharpur end) - Cost 6.020 crore`PASSENGER AMENITIES

Escalators at Sambalpur Station- Cost 1.000 crore` Improvement of Platform surface on Plat Form No. 1 & 2 at Kerejanga, Brundamal, Lapanga, Rengali, Sason stations and Platform

wall on Platform No- 1 & 2 at Brundamal & Sason station- Cost 0 crore` 6.13 One Lift at at Sambalpur Station - Cost 00 crore` 0.8 Improvement to circulating area, PF surface, improvement to existing waiting hall, waiting room, retiring rooms, improved toilet

facilities, drinking water arrangements etc, modular water and catering kiosks, improvement to entry concourses booking area, boundary wall fences, tactile tiles and other facilities for Divyangjan at Sambalpur Station - Cost crore` 4.450

TRAFFIC FACILITIES Road Over Bridge (ROB) At Sambalpur in lieu of Level-Crossing No. JT-25 and between Sambalpur and Hirakud in lieu of Level-

Crossing No. JT-26- Cost 73.410 crore` Road Under Bridge (RUB) at Unmanned Level Crossing no. 226 at Sonakhan-Sagra- Cost 0.940 crore` Road Under Bridge (RUB) - Limited Height Subway at Tangarmunda, Bamra Unmanned LC no. 234 - Cost 2.390 crore` Road Under Bridge (RUB) - Sonakhan - Sogra- Limited Height Subway in lieu of Unmanned LC No.227 - Cost 2.050 crore` Road Under Bridge (RUB) In lieu of Level-Crossing Nos ST-82,ST-35, ST-36, ST-37, ST-56,ST-64 and ST-41 - Cost 16.800 crore` Yard Remodelling - Maneswar Station - Cost 6.580 crore` Extension of 3 Pit Lines at Coaching Depot Sambalpur - Cost 3.360 crore`

Hon'ble Union Minister of Petroleum & Natural Gas, Skill Development & Entrepreneurship, Govt. of India Shri Dharmendra Pradhan dedicated Various Passenger Amenities like Improved Front Facade, Circulating Area, Food Plaza, Escalator & Mechanised Laundry at Sambalpur Station

Extension of Platform at Bamur Station