Salton Sea Species Conservation Habitat
Workshop • June 10, 2010
![Page 2: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/2.jpg)
2
Provide Stakeholders the opportunity to guide the direction of the SCH Project
Meeting Purpose
![Page 3: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/3.jpg)
3
Agenda
Introductions
Goals and objectives
Critical screening criteria
Construction challenges
![Page 4: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/4.jpg)
4
Introduction of Presentation Team
Rick Davis – Davis Group
Arturo Delgado – California Department of Fish and Game
Ramona Swenson – ENTRIX, Inc.
Rob Thomson – ENTRIX, Inc.
Vince Thompson – Ducks Unlimited
![Page 5: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/5.jpg)
Species Conservation Habitat Project Goals and Objectives
![Page 6: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/6.jpg)
6
Need for SCH Project
Declining surface water elevation will lead to loss of Salton Sea habitat
Increasing salinity will lead to fishery collapse
Fishery collapse will result in loss of forage base for fish-eating birds
![Page 7: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/7.jpg)
7
SCH Project Purpose
SCH will provide conservation measures while the Legislature determines long-term action
Provides replacement for some near-term habitat losses as sea levels decline
Target: piscivorous bird species present in 2010 and dependent on the Sea for:
Foraging – fishery resourcesEssential habitat components – foraging, nesting, roosting, loafingViability of a significant portion of their population
![Page 8: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/8.jpg)
8
Goals and Objectives
Goal 1: Develop a range of aquatic habitats that will support fish and wildlife species dependent on the Salton Sea
ObjectivesProvide adequate foraging habitat for piscivorous (fish-eating) bird speciesDevelop habitats required to support piscivorous bird speciesSupport a sustainable, productive aquatic communityProvide suitable water quality for fishMinimize adverse effects to desert pupfishMinimize risk of seleniumMinimize risk of disease/toxicity impacts
![Page 9: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/9.jpg)
9
Goals and Objectives
Goal 2: Develop and refine information needed to successfully manage the SCH Project through an adaptive management process
ObjectivesIdentify uncertainties in achieving the objectivesDesign science-based means to test alternatives and reduce uncertaintyDevelop and implement a monitoring planDevelop a decision-making frameworkProvide proof-of-concept for future restoration efforts
![Page 10: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/10.jpg)
10
Questions and Feedback
Goal 1:Develop a range of aquatic habitats that will support fish and wildlife species dependent on the Salton Sea
Goal 2:Develop and refine information needed to successfully manage the SCH Project through an adaptive management process
Do you agree with these goals and objectives?
Are we missing any others?
![Page 11: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/11.jpg)
Species Conservation Habitat ProjectCritical Screening Criteria
![Page 12: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/12.jpg)
12
Screening Criteria
Two types of screening criteriaExclusionary criteria
Factors essential to the successful completion of the SCH Project
Evaluative criteriaFactors considered in comparing Project components and alternativesNot necessarily cause for elimination
Construction and operational costs
Environmental considerations
Other
![Page 13: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/13.jpg)
13
Critical Screening Criteria
Exclusionary criteria used to begin refining the range of potential sitesExclusionary criteria are
Adequate water supply (quantity, quality, and seasonal availability) Available water rightsAvailable land
Three general locations being considered
![Page 14: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/14.jpg)
14
Three Generalized Alternative Locations
![Page 15: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/15.jpg)
15
Available Land – Whitewater River
![Page 16: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/16.jpg)
16
Available Land – New River
![Page 17: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/17.jpg)
17
Available Land – Alamo River
![Page 18: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/18.jpg)
18
Questions and Feedback
Are these the right criteria?
Are there others we should consider?
![Page 19: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/19.jpg)
Species Conservation Habitat Project
Construction Challenges
![Page 20: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/20.jpg)
20
Construction of SCH Ponds
Construction may occur in areas between -228 and -234 msl
Exposed playa with high groundwaterShallow flooded areasWater a few feet deep
![Page 21: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/21.jpg)
21
Potential Site Conditions
Examples of conditions that may be encountered during berm construction
Exposed moist but relatively firm soilsShallow flooded relatively firm soilsShallow flooded soft mucky soilsWater a few feet deep with soft or firm soils
Examples of water control structure installationLocalized dewatering Structure support in soft soils
![Page 22: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/22.jpg)
22
Receding Sea Water Surface
![Page 23: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/23.jpg)
23
Example – Moist, relatively firm soilsEquipment
Low ground pressure tractors with carry-all scrapers
MethodExcavate, haul and place with the same piece of equipment
Haul distanceShort to Medium
Relative costLow
Building Berms on Exposed Playa
![Page 24: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/24.jpg)
24
Low Ground Pressure Tractors
![Page 25: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/25.jpg)
25
Example – Shallow water, relatively firm soilsEquipment
Excavators, low ground pressure dump trucks, bulldozers
MethodExcavate and load, haul with dump trucks, spread with dozers
Haul distanceShort to long
Relative CostHigh
Building Berms in Shallow Water
![Page 26: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/26.jpg)
26
Excavator, Load, and Haul
![Page 27: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/27.jpg)
27
Dump and Spread
![Page 28: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/28.jpg)
28
Building Berms in Shallow Water
Example –Shallow water, soft mucky soilsEquipment
Amphibious excavators
MethodExcavate and drop
Haul distanceAdjacent
Relative CostHigh
![Page 29: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/29.jpg)
29
Amphibious Excavators
![Page 30: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/30.jpg)
30
Building Berms in Deeper Water
Example – 2 feet of water, soft or firm soilsEquipment
Derrick barge with clamshell bucket
MethodExcavate and drop
Haul distanceAdjacent
Relative CostMedium
![Page 31: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/31.jpg)
31
Derrick Barge Clamshell Bucket
![Page 32: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/32.jpg)
32
Layer Height Depends on Strength
![Page 33: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/33.jpg)
33
Hydraulic Dredge
![Page 34: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/34.jpg)
34
Site Dewatering
![Page 35: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/35.jpg)
35
Water Control Structure
![Page 36: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/36.jpg)
36
Structure Site Dewatering
![Page 37: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/37.jpg)
37
Structure Support in Soft Soils
![Page 38: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/38.jpg)
38
Functional Wetland Management
![Page 39: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/39.jpg)
39
Next Step – Design Considerations
Preliminary Geotechnical Investigation
Sample and test soils at potential project sitesPrevious investigations have not sampled locations around the river deltas
Assess construction feasibility at potential sites
Preliminary Berm Stabilization Alternatives
Examples of design solutions to be consideredSource of embankment materialDewateringBase stabilization with geogridsBerm stabilization with geotubes
![Page 40: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/40.jpg)
40
Questions and Feedback
Are there other issues we should address?
![Page 41: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/41.jpg)
41
Contact Information
DFG Contact:Kim Nicol, Environmental Program Manager
California Department of Fish and Game78078 Country Club Drive, Suite 109Bermuda Dunes, CA 92203(760) 200-9178 [email protected]
USACE Contact:Lanika Cervantes, Project Manager
San Diego Section, Regulatory DivisionU.S. Army Corps of Engineers - Los Angeles District6010 Hidden Valley Road, Suite 105Carlsbad, CA 92011(760) [email protected]
![Page 42: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/42.jpg)
42
SCH Project Website
www.water.ca.gov/saltonsea
![Page 43: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/43.jpg)
43
USGS Ponds
![Page 44: Salton Sea Species Conservation Habitat Workshop June 10, 2010](https://reader033.vdocuments.us/reader033/viewer/2022051820/56649e615503460f94b5c9a6/html5/thumbnails/44.jpg)
44
USGS Pond Construction