SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Presented by Jason G. Souden, PE Jason G. Souden, PE Patrick Kelsey, CPSS/SC Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Christopher B. Burke Engineering, Ltd. Ltd. Wills Burke Kelsey Associates, Ltd. Wills Burke Kelsey Associates, Ltd. July 14, 2009 July 14, 2009

Upload: ella-reeds

Post on 16-Dec-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

SALT CREEK

STREAM BANK STABILIZATION

STAGE 3

Presented by Presented by

Jason G. Souden, PEJason G. Souden, PE

Patrick Kelsey, CPSS/SCPatrick Kelsey, CPSS/SC

Christopher B. Burke Engineering, Ltd.Christopher B. Burke Engineering, Ltd.

Wills Burke Kelsey Associates, Ltd.Wills Burke Kelsey Associates, Ltd.

July 14, 2009July 14, 2009

Page 2: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

2

SALT CREEK STREAM BANK STABILIZATIONSTAGE 3

• Area A – Kennedy Pond1230 feet of improved creek bank(at $119/ft)

• Area B – Central Road School 1030 feet of improved creek bank (at $325/ft)

• Area C – Homes South of Central168 feet of improved creek bank (at $ $503/ft)

• Area C (Alt) – Homes South of Central168 feet of improved creek bank(at $531/ft)

• Total Estimated Construction Cost = $705,000

Page 3: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

3

Existing Conditions : Area A - Kennedy Pond

Page 4: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

4

Existing Conditions : Area A - Kennedy Pond

Page 5: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

5

Proposed Typical Sections

Page 6: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

6

Example: Stone Toe with Emergent Plants – Kennedy Pond

Page 7: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

Example: Native Buffer Zone –Central School and Homes South of Central

Page 8: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

Example: Steep Bank with Native Buffer and Gabion –Central School and Homes South of Central

Page 9: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

9

Living with Streams & Ponds

• Drainage

• Flood Conveyance

• Flood Storage

• Habitat

• Amenity

Page 10: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

10

When we bought the house …

It had a little creek in back

The kids like to play back there

We fed the geese We dumped our grass

clippings That’s where I get rid of

brush

Now it’s a thicket The banks are eroding The geese are

everywhere. They make such a mess

What does it hurt to throw grass and branches in the creek?

Page 11: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

11

On Flooding & Erosion

Page 12: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

12

Managing Native Vegetation

The Three Phases of Life

Page 13: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

13

Birth to Toddler

Page 14: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

14

The Teenage Years

Page 15: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

15

The Golden Years

Page 16: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

16

Wildlife Habitat

Page 17: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

17

Don’t feed the Geese

Page 18: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

18

Native Plants for the Home

Flowering Plants

• Brown-Eyed Susan• Purple Coneflower• White Coneflower• Spiderwort• Tall Coreopsis• New England Aster• Smooth Blue Aster• Goldenrods

Grasses, Sedges, Rushes

• Little Bluestem• Northern Dropseed• Chair Maker’s Rush• Soft Stem Bulrush• Wooly Sedge• Crested-Oval Sedge• Fox Sedge

Page 19: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

19

GOLDENROD

PURPLE CONEFLOWER

BROWN-EYED SUSAN

TALL COREOPSIS

SPIDERWORT

SMOOTH BLUE ASTER

Page 20: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

20

FOX SEDGEWOOLY SEDGE

CHAIR MAKER’SRUSH

SOFT STEM BULRUSH

LITTLE BLUESTEMNORTHERNDROPSEED

Page 21: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

21

Protecting your investment

• Recycle grass clippings

• Notify the City if you see erosion

• Don’t dig in the bank slope of the creek

• Don’t build on the slope

• Do not place mulch on the slope

Page 22: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke

Thank YouQUESTIONS?

22