salem saeed hussain alyamiusaimisteel.com/arabic/data/careers/cv/1076.pdfconducted training for new...

7
1 | Page Curriculum Vitae SALEM SAEED HUSSAIN ALYAMI Nationality: SAUDI Date of birth: 06/09/1975 Mobile: 0592600150 & 0553116597 Email [email protected] & [email protected]. & [email protected] OBJECTIVE POSITION: COMPANY: WORK : EXPERIENCE I am Seeking for a better opportunity with high level that can enhance my experience and knowledge while I’m getting those via 18 years from the career of jobs. Human Resources Officer IT IS COMPANY 10/05/2106 Integrated Technologies For Industrial Services Co. 1- Following up passport office issues ( renewal, issuing and transferring if there) 2- Labor office website ( issuing sadad permits to renewal and issuing new iqamas) 3- Issuing E.R or final exit through Muqeem, iqama renewal online. 4- Following traffic police and issuing driving licenses. 5- Following labor office issue. 6- Following up HRDF. 7- Following up visit visa and invitation requests on MOFA website if there. 8- Preparing monthly salary timesheets. 9- Following up permanent visas process (sending letters to Zelal office – emailing agencies). 10- Following up Tamm service (issuing company’s penalties – istemar’s renewal). 11- Doing medical insurance. The attached are the most important lists which I prepared before and follow up through them.

Upload: others

Post on 28-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SALEM SAEED HUSSAIN ALYAMIusaimisteel.com/arabic/data/careers/cv/1076.pdfConducted Training for new inspector and laboratory technician Submitted other report as required by QA/QC

1 | P a g e C u r r i c u l u m V i t a e

SALEM SAEED HUSSAIN ALYAMI

Nationality: SAUDI

Date of birth: 06/09/1975 Mobile: 0592600150 & 0553116597

Email [email protected] & [email protected]. & [email protected]

OBJECTIVE

POSITION: COMPANY:

WORK :

EXPERIENCE

I am Seeking for a better opportunity with high level that can enhance my

experience and knowledge while I’m getting those via 18 years from the

career of jobs.

Human Resources Officer

IT IS COMPANY 10/05/2106

Integrated Technologies For Industrial Services Co.

1- Following up passport office issues ( renewal, issuing and transferring if there) 2- Labor office website ( issuing sadad permits to renewal and issuing new iqamas) 3- Issuing E.R or final exit through Muqeem, iqama renewal online. 4- Following traffic police and issuing driving licenses. 5- Following labor office issue. 6- Following up HRDF. 7- Following up visit visa and invitation requests on MOFA website if there. 8- Preparing monthly salary timesheets. 9- Following up permanent visas process (sending letters to Zelal office – emailing

agencies). 10- Following up Tamm service (issuing company’s penalties – istemar’s renewal). 11- Doing medical insurance.

The attached are the most important lists which I prepared before and follow up

through them.

Page 2: SALEM SAEED HUSSAIN ALYAMIusaimisteel.com/arabic/data/careers/cv/1076.pdfConducted Training for new inspector and laboratory technician Submitted other report as required by QA/QC

2 | P a g e C u r r i c u l u m V i t a e

POSITION: COMPANY:

WORK :

EXPERIENCE

POSITION: COMPANY:

WORK :

EXPERIENCE

QA/QC

POSITION: COMPANY:

WORK :

EXPERIENCE

QA/QC

IT IS COMPANY 08/02/2106

Integrated Technologies For Industrial Services Co.

NDT Technician

Inspection of pipe line with ARAMCO Co. as per the procedure

Of inspection system

1-NDT -INSPECTION

2-X-REY- INSPECTION

3-UTT-INSPECTION

As per the specifications & standard of ARAMCO.

QA/QC& Safety In charge

Modern factory of steel re bars industrial company

Supervising online of all process inspection as per procedure of products as per

ASTM & A615 , BS 4449, GS06/ISO 6935 OF BLACK BAR,CR.HR.& Coating

Standard: ASTM A775/A775M, ASTM A934/A934M AS PER ARAMCO Instruction of epoxy line process of fusion bonded epoxy

coated rebar. LAB SYSTEM:

1-Gel time testing.

2-online holiday detectors in the process during production 3- moisture contact testing

4- Surface measurement test of steel rebar 5-tensile testing

6-hardnees testing

7-microscop analysis 8-inspectro analysis of steel and iron

9- Bend test 10-Inspection of all process during production as per the procedure

Collecting reports and submitting to GM .

Conducted Training for new inspector and laboratory technician

Submitted other report as required by QA/QC & HSE DEP.

Submitted other report as closing every year, as per procedure

QC Supervisor

Group five company (GP5) FROM 04/08/2014- 10/01/2016

Procucte steel iron pipes. Supervising Online process inspection

Collecting reports and submitting to GM .

Conducted Training for new inspector and laboratory technician

Submitted other report as required by QA/QC DEP.

Submitted other report as closing every year, as per procedure

1- Milling

I controled the section of milling before start production For the application of quality standards to

Page 3: SALEM SAEED HUSSAIN ALYAMIusaimisteel.com/arabic/data/careers/cv/1076.pdfConducted Training for new inspector and laboratory technician Submitted other report as required by QA/QC

3 | P a g e C u r r i c u l u m V i t a e

POSITION: COMPANY:

WORK :

EXPERIENCE

QA/QC

QA/QC

international as per specifications of Chemical mixture .

Observantion the mill during start welding as per procedure.

2 - ULTRASOUND

we are Control to solve the problems before expansion like crack or any defect from mill.

3-Bevel

we are checke the pipes Dimensional measurement as per specifications.

4-Repair Section.

Check the pipes the need repair after bevel before start hydro testing.

5- Hydro test. We are observe that the process of water pressure, according to standard . 6- UT. We are checking as per standard 7- X-REY We are checking as per standard 8- Final inspection QC. We are check all the pipes like Dimension & Marking. As per procedure. 9- LAB. We are checking the tensiale & hardness& Microstructure Analysis using microscope & spectro analysis as per specifications. 10- Chemicals Analysis & test Microstructure Analysis using microscope, Molten Chemical Composition before

and after Magnesium treatment using.

EagleBurgmann KSA.: FROM 07/07/2013 TO 09/07/2014

QC/QA Supervisor

Product Mechanical seal & Seal Supply Systems& Gaskets& Expansion Joints

Supervising Online process inspection

Collecting reports and submitting to GM .

Conducted Training for new inspector and laboratory technician

Submitted other report as required by QA/QC & HSE DEP.

Submitted other report as closing every year, as per procedure.

Follow-up with Quality Department

1. Follow-up the Quality Standard Assurance Department. 2. Collecting reports from production lines inspectors. 3. Organizing the weekly work Times for inspectors. 4. Assistant to get Certificates such as (ISO&TUV) Certificate. 5. Follow-up and Inspection ability. 6. Test the entire row Material & Analysis from the suppliers before using. 7. Supervising the spectral analysis of metals and the approval of the corresponding product

specifications as per procedure.

Page 4: SALEM SAEED HUSSAIN ALYAMIusaimisteel.com/arabic/data/careers/cv/1076.pdfConducted Training for new inspector and laboratory technician Submitted other report as required by QA/QC

4 | P a g e C u r r i c u l u m V i t a e

POSITION: COMPANY:

WORK :

EXPERIENCE

QA/QC

POSITION: COMPANY:

WORK :

EXPERIENCE

QA/QC

QC/QA In charge

INDIPCO [ FAL GROUP ]

GRADE: 9

EXPERIENCE: DEC 05, 2009 up to01/02/011

DEPARTMENT QUALITY CONTROL

Duties and Responsibilities:

QA/QC head (In charge):

Supervising Online process inspection

Collecting reports and submitting to GM .

Conducted Training for new inspector and laboratory technician

Submitted other report as required by QA/QC & HSE DEP.

Submitted other report as closing every year, as per procedure.

Follow-up with Quality Department Follow-up the Quality Standard Assurance Department. 1. Collecting reports from production lines inspectors. 2. Organizing the weekly work Times for inspectors. 3. Assistant to get Certificates such as (ISO&TUV) Certificate. 4. Follow-up and Inspection ability. 5. Test all the row Material & Analysis from the supplier before using.

6.Supervising the spectral analysis of metals and the approval of the corresponding product specifications Accordance with the procedures The ability to control the:

Laboratory. Test Mechanical (tensile-hardness) & chemicals (micro-spectro analysis -Mixture of chemicals such as nitric acid with ethanol obsolete – test pH value,

1- Clay Content, Sand Equivalent), Inspections line. The team is organized according to administration to the quality department

2- Control the production as per procedure.

Sr. QC /QA Technician SADIP [ AMAINTIT GROUP ] GRADE: 5

EXPERIENCE: March 23, 1995to 2009

DEPARTMENT QUALITY CONTROL

Duties and Responsibilities:

Collecting reports and submitting to QA/QC Engineer

Conducted Training for new inspector and laboratory technician

Dimensions and Visual Inspection of pipes, cores and moulds

Submitting report of any non-conformance in the processes

Submitted other report as required by QA/QC Engineer

Laboratory Technician:

Microstructure Analysis using microscope, Molten Chemical Composition before

and after Magnesium treatment using

spectroscopy, Analysis of raw materials such as SAND used in core making and

cement lining (Analysis consist of Granulometry, moisture content, pH value,

Clay Content, Sand Equivalent), and Bituminous Paint (Analysis consist of

Density, Dry Extract, and Ash Content), Tensile Testing and Brinell Hardness

Page 5: SALEM SAEED HUSSAIN ALYAMIusaimisteel.com/arabic/data/careers/cv/1076.pdfConducted Training for new inspector and laboratory technician Submitted other report as required by QA/QC

5 | P a g e C u r r i c u l u m V i t a e

MELTING

FINISHING

Testing

Preparing mixture of Ethanol and Nitric Acid used for Microstructure analysis

As per procedure.

QC Inspector:

Dimensions and Visual Inspection of pipes, cores and moulds

Submitting report of any non-conformance in the processes

DEPARTMENT PRODUCTION

Position Duties and Responsibilities

Melting foramen: Collecting reports and submitting to Melting in charge

Conducted Training for new furnace operator and technician

Submitting report of any non-conformance in the processes

Submitted other report as required by Melting In charge

Furnace Operator : calculation for charge the marital to furnace Si.C.Mn Operate the furnace charge scrap & Pig iron than start heating to

Temp 1350 after that i get sample send to QC. Then I remove slag

To ready to discharge to casting

.

Magnesium Operator : I remove salage from the ladle then I put Mg

Inside the molten metal use plunger to treatment

There are calculation for add the Mg.

Production Visual Inspector: Visual inspection of all pipes after tri-grinding before

hydro-pressure testing

Marking the pipes with the appropriate Color

Overhead Crane Operator: Transferring pipes inside the plant

Bitumen Coating Operator : Coating the ductile pipes with bitumen as per procedure

Cement Lining Operator : Operating the Machine as per procedure

Hydro-Pressure Testing Op:. Operating the Machine as per procedure

Testing Qualified Pipes for Hydro-Pressure as per

procedure

Pipe Cutting Operator: Cutting pipes from spigot side due to some defect

Cutting sample for Ring Test and then making ring test

Prepared samples for Microstructure analysis and

Mechanical testing from fractured ring

Checking of the parameters of the machine before using

Zinc Operator:

Operating Zinc Coating Machine

Sticking Mylar sample for QC Testing of Zinc Coating

Cement lining: operate the machine of cement lining as per procedure

Bitumen coating: Operating the Machine as per procedure

Forklift 4,6 tons operator: Transfer the pipes from plant to yard& store& material.

Page 6: SALEM SAEED HUSSAIN ALYAMIusaimisteel.com/arabic/data/careers/cv/1076.pdfConducted Training for new inspector and laboratory technician Submitted other report as required by QA/QC

6 | P a g e C u r r i c u l u m V i t a e

EXPERIENCE

POSITION: COMPANY:

MELTING

EDUCATION

ENGLISH

COURSES

LANGUAGE

OTHER SKILLS

MELLTER 2 NSF [ALTUERQI GROUP] FROM 2005 – 2005. 6 MONTH DEPARTMENT

MELTING:

Calculation for charge the marital to furnace SI . C. MN. Al. Operate the furnace charge scrap & iron than start heating to Temp 1500 after that I get sample send to QC. Then I remove slag To ready to discharge to casting I operate the lines machine for melt the iron , also I change the Electrode after melt I change the lines after melt I repair the lining using Mg powder lining at Shutdown time. as per procedure

Deplume of English Al khobar SEP/2002

AL Khobar Secondary High School MAY/2009

Al khaleej language institute (Direct English) OCT/1997

Vocational Institute English FEB/1999

International Language English JAN/2001

Institute in Industrial & Technology English SEP/2002

I have Certificate from IADC, basic fire fighting Dec22/2013

I ahve Certificate of (TUV) QMS. 2009

QMS. Auditor as per 9001- 2002 2013

ARABIC [ fluent ]

ENGLISH [ upper intermediate ]

I can work as quality supervisor/ Inspector/Technician or any other position

because I have the ability to learn new things.

Good presentation & communication skills in English.

Good background in reading and typing reports in English.

Ability to type both English and Arabic.

Have some knowledge in PC’s software & hardware.

Good knowledge of MS Word, Excel, power point.

Strong personality and have the ability to lead team or work alone.

Page 7: SALEM SAEED HUSSAIN ALYAMIusaimisteel.com/arabic/data/careers/cv/1076.pdfConducted Training for new inspector and laboratory technician Submitted other report as required by QA/QC

7 | P a g e C u r r i c u l u m V i t a e

Ability to work under pressure of the work. With all tem

Hard worker.

Dr. Abdllumhosen Wehemer Mobile +966 568676444

Email [email protected]

Position PLANT MANAGER

Company INDIPCO

Eng. Mohammad Obeidat Mobile. +966 557512350

Email [email protected]

Position QA/QC Manager

Company INDIPCO

Be comfortable to contact me

For any farther information

THANK YOU