sajjad waseem

7
MUHAMMAD SAJJAD WASEEM  Father Name Father Name MUHAMMAD MUMTAZ MUHAMMAD MUMTAZ N.I.C # 38402- 9795602-3 Nationality: Pakistani Date of Birth: 15 Augest, 91. Domicile: Sargodha (Punjab) Religion: Islam Marital Status: Single Mobile no 0302-3509445  Address Coloni Mahar Abad , Teh Sahi wall , Sargodha Pakistan Career Objective  As piring for a challenging and responsible position in the field of engineering that would be conductive for my professional growth and to imp lement var ious techn ical man agement and dec isi on mak ing skills acquired during and illustrious academic carrier Education  DIPLOMA IN ELECTRICAL FROM FASALABAD MATRICU LATION FROM SARGODHA BOARD  Latest Job HUITONG TECHNOLOGY (HT) 2 Presently working as a SENIOR T ECH in Huitong Technology

Upload: iftikhar-ahmed

Post on 05-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

8/2/2019 sajjad waseem

http://slidepdf.com/reader/full/sajjad-waseem 1/7

MUHAMMAD SAJJAD WASEEM 

Father NameFather Name MUHAMMAD MUMTAZMUHAMMAD MUMTAZ

N.I.C # 38402-9795602-3

Nationality: Pakistani

Date of Birth: 15 Augest, 91.

Domicile: Sargodha (Punjab)

Religion: Islam

Marital Status: Single

Mobile no 0302-3509445

 Address Coloni Mahar Abad , Teh Sahi wall

, Sargodha Pakistan

Career Objective

  Aspiring for a challenging and responsible position in the field of 

engineering that would be conductive for my professional growth and

to implement various technical management and decision makingskills acquired during and illustrious academic carrier 

Education

 DIPLOMA IN ELECTRICAL FROM FASALABAD

MATRICULATION FROM SARGODHA BOARD

 

Latest Job

HUITONG TECHNOLOGY (HT)

2 Presently working as a SENIOR TECH in Huitong Technology

8/2/2019 sajjad waseem

http://slidepdf.com/reader/full/sajjad-waseem 2/7

(Sub-Con of ZTE) on CM-PAK project since last 09 months upto date.

3 (Operations and Maintenance, Rollout of ZTE Equipment)4 On Airing sites by taking E1 at backward5 On Airing more than one site on single E1.6 Dip Switches Configuration.7 Troubleshooting of BTS ZXJ8112 (VSWR, AEM, Cell break).8 Troubleshooting of BTS ZXJ8018 (VSWR, AEM, Cell break).9 Trouble shooting, Hardware fault detection10 Conducting CQT (Call Quality Test) at operational sites.11

12 Huawei Techonologies- Pakistan

13 South/Central Region

14 Transmission Supervisor- Warid Telecom Project 

15 Transmission rollout activities of Phase-3, Phase-5 and ongoing Phase 6.

16 Site Installation supervision, subcon management and QCreport preparation.

17 Survey conduction for PTCL and Wateen locations.

18 MW link installation and supervision for NEC and Huawei

MW equipment on both SDH and PDH links.19 Media commissioning and patching in DTES and Wateen for 

 Abis traffic.

20 BTS site intergration and expansion.

21 Coordination between Warid/Huawei projects team andPTCL or Wateen staff.

22 2004–2006International Systems of Engineering & Services(InterSES) Central Region

23Senior Technician

24 Installation of PDH & SDH Microwave Links involvingMicrowave Radios, Add Drop Multiplexers & modem Cards etc.

25 Perform Line Of Sight Surveys (LOS) for MW Hops.

26 Conducting Bit Error Rate Tests for PDH & SDH links.

27 Conducting ATP’s With Customers and troubleshooting of 

8/2/2019 sajjad waseem

http://slidepdf.com/reader/full/sajjad-waseem 3/7

Microwave Links using PNMT & Hyper Terminal

28 1 Excellent team member with proven ability to Lead.

29 Experties at installation of NEC MW Equipments: Pasolink,Pasolink+, Pasolink MX and NEO for PDH, SDH, STM, XPICSystems in Ufone Phase 3, Phase 4, Warid Phase 2 /3/5/6.

30 Installation of Siemens equipment: SRAL (PDH Radio) andSRA 4 (SDH Radio) for Siemens /Telenor Project Phase 2.

31 Working knowledge of Huawei Indoor and Outdoor BTS312/3012A/3012AE along with complete cabling and DIP

switch settings.

32 MOBILINK QUALITYCONTROL/ASSURANCE.

33 MOBILINK (GSM) EXPENSION PROJECT.

34 TELENOR (GSM) EXPENSION

PROJECT.BBJBBJHB\\\\\\\\\\\\\\\\\

8/2/2019 sajjad waseem

http://slidepdf.com/reader/full/sajjad-waseem 4/7

8/2/2019 sajjad waseem

http://slidepdf.com/reader/full/sajjad-waseem 5/7

8/2/2019 sajjad waseem

http://slidepdf.com/reader/full/sajjad-waseem 6/7

35 WARID PHASE 6 EXPANSION PROJECT

References

36 R eferences will be provided as per requirement of organization

8/2/2019 sajjad waseem

http://slidepdf.com/reader/full/sajjad-waseem 7/7

Final Year Project

Design & Simulation of Tele-Info and Tele-Switching

Term Projects

37 Study of SCADA system

38 Investigation of RADAR System

39 Study of GSM

Computer Skills/ Abilities

40 Microsoft Windows (98, 2000, XP)

41 Microsoft Office

42 MATLAB as a Design & Analysis tool

References

43 References will be provided as per requirement of organization