8/12/2019 SAIC-P-3005 Rev 4
http://slidepdf.com/reader/full/saic-p-3005-rev-4 1/3
B2
Channel erector system components (Unistrut or similar) used to supportcable tray and other electrical equipment shall be fabricated fromstructural grade steel conforming to one of the following latest ASTMspecifications:a) A 570 GR 33b) A 653 GR33 (Unistrut Spec. Guide 2.02 A)
SAES-P-104Sec. 8.10.1
B3
All fittings shall be fabricated from steel conforming to one of thefollowing ASTM specifications:
A 575, A 576, A 36 or A 635(Unistrut Spec. Guide 2.02 B)
SAES-P-104Sec. 8.10.1
A. General Requirements
A1 Electrical materials shall be new and unused.Schedule G
Sec. 2
A2
Electrical materials shall be in accordance with the Saudi
Aramco-approved project-specific design drawings, diagrams,schedules, lists, databases, and associated documents.
Schedule GSec. 2
A3 Electrical materials shall be free of damage.Schedule Q
Att. lV
B1 All strut components must be supplied by a single manufacturer.(Unistrut Spec. Guide 1.02 B.2)
SAES-P-104Sec. 8.10.1
B. Specific Requirements for Channel, Strut, and Support Materials
Electrical materials shall be traceable from the manufacturer andsupplier through delivery, storage, fabrication, erection, installation,repair, modification and use.
A5Electrical materials shall be identified by using tags, stamps, colorcoding, stencils or labels. The location and method of identification shallnot affect the function or quality of the materials.
Schedule Q Att. lV
A6Schedule Q
Att. lV
A4Electrical materials shall conform to all applicable requirements,standards, and specifications prior to release to be used as part of thework.
Schedule Q Att. lV
SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER
ELECT
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
General - Channel, Strut, and Support Materials - MaterialReceiving
SAIC-P-3005
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2010) Rev 4 31-Mar-10
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.
SCHEDULED INSPECTION DATE & TIME
ITEMNo.
LAYOUT DRAWING NUMBER
PLANT NO.
REFERENCE PASS FAIL RE-INSP DATE
MH's SPENT TRAVEL TIMEQUANTITY INSP.
WORK PERMIT REQUIRED?
N/A
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER
CONTRACTOR INSPECTION LEVELSAUDI ARAMCO INSPECTION LEVEL
ACCEPTANCE CRITERIA
31-Aug-11
ACTUAL INSPECTION DATE & TIME
EC / PMCC / MCC NO.REV. NO. PURCHASE ORDER NUMBER
SAUDI ARAMCO USE ONLY
B4
Strut system components shall be finished in accordance with one of thefollowing latest ASTM standards:a) electrolytically zinc coated per ASTM B 633 Type III SC 1b) hot dipped zinc coated to ASTM A 123 or A 153(Unistrut Spec. Guide 2.03)
SAES-P-104Sec. 8.10.1
Page 1 of 3
8/12/2019 SAIC-P-3005 Rev 4
http://slidepdf.com/reader/full/saic-p-3005-rev-4 2/3
8/12/2019 SAIC-P-3005 Rev 4
http://slidepdf.com/reader/full/saic-p-3005-rev-4 3/3
N/AACCEPTANCE CRITERIA REFERENCE RE-INSP DATEITEMNo.
PASS FAIL
ELECT
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
General - Channel, Strut, and Support Materials - MaterialReceiving
SAIC-P-3005 31-Aug-11
SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2010) Rev 4 31-Mar-10
Name, Initials and Date:Performed Inspection Work / Rework May Proceed
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED
QC Supervisor Proponent and Others
Name, Sign and Date: Quality Record Approved:
Name, Organization,Initials and Date:
T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date:T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date:Work is Complete and Ready for Inspection:
Name, Initials and Date:T&I Witnessed QC Record Reviewed Work Verified
Contractor / Third-Party Saudi AramcoConstruction Representative* PMT Representative
QC Inspector PID Representative
Page 3 of 3