Engineering Procedure SAEP-1151 18 November 2012Inspection Requirements for ContractorProcured Materials and Equipment
Document Responsibility: Inspection Engineering Standards Committee
Saudi Aramco DeskTop Standards
Table of Contents
1 Scope............................................................... 2
2 Conflicts and Deviations.................................. 2
3 Applicable Documents..................................... 2
4 Definitions and Acronyms................................ 3
5 Instructions....................................................... 4
6 Responsibilities................................................ 7
7 Technical Support............................................ 7
Appendix A - Minimum Inspection Levels............... 8
Appendix B - Special Materials Requirements..… 21
Appendix C – Index…………………………….….. 22
-
8/19/2019 SAEP-1151
2/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 2 of 22
1 Scope
This document, together with the purchase order and appropriate project specificationsdefine the minimum mandatory inspection requirements for project Contractor materialsand equipment.
2 Conflicts and Deviations
2.1 Any conflicts between this standard and other applicable Mandatory SaudiAramco Engineering Requirement (MSAER) shall be resolved in writing bythe Company through the Manager, Inspection Department of Saudi Aramco,
Dhahran.
2.2 Direct all requests to deviate from this standard in writing to the CompanyRepresentative, who shall forward such requests to Manager, InspectionDepartment of Saudi Aramco, Dhahran according to the internal company
procedure SAEP-302, “Instructions for Obtaining a Waiver of a Mandatory
Saudi Aramco Engineering Requirement.”
3 Applicable Documents
All references mentioned below shall be considered part of this document to the extent
specified herein and shall be of the latest issue (including all revisions, addenda, and
supplements) unless stated otherwise.
3.1 Saudi Aramco References
Saudi Aramco Engineering Procedures
SAEP-302 Instructions for Obtaining a Waiver of a Mandatory
Saudi Aramco Engineering Requirements
SAEP-1150 Inspection Coverage on Projects
Other Document
Schedule Q Quality Requirements
3.2 Industry Codes and Standards
International Organization for Standardization
ISO 9001:2008 Quality Management Systems - Requirements
ISO 10005 Quality Management Systems - Guidelines forQuality Plans
http://standards/docs/SAEP/PDF/SAEP-302.PDFhttp://standards/docs/SAEP/PDF/SAEP-302.PDFhttp://standards/docs/SAEP/PDF/SAEP-302.PDFhttp://standards/docs/SAEP/PDF/SAEP-302.PDFhttp://standards/docs/SAEP/PDF/SAEP-302.PDFhttp://standards/docs/SAEP/PDF/SAEP-1150.PDFhttp://standards/docs/SAEP/PDF/SAEP-1150.PDFhttp://standards/docs/SAEP/PDF/SAEP-1150.PDFhttp://standards/docs/SAEP/PDF/SAEP-302.PDFhttp://standards/docs/SAEP/PDF/SAEP-302.PDF
-
8/19/2019 SAEP-1151
3/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 3 of 22
ISO 19001 Guidelines for Quality Management Systems
Auditing
4 Definitions and Acronyms
Quality System: Organizational structure, procedures and processes are resources
needed to implement quality management.
Mandatory Hold Point: An inspection point, defined in an appropriate document, beyond which an activity must not proceed without the approval of a designated
organization or authority.
Witness Point: An inspection point, defined in an appropriate document, beyond
which an activity can proceed after notifying the designated organization or authority.
Review Point: A review point, defined in an appropriate document, is the point atwhich a work activity cannot proceed without first ensuring the review and approval of
applicable documents or personnel qualifications by a designated organization or
authority.
Quality Assurance (QA): All the planned and systematic activities implemented
within the quality system, and demonstrated as needed, to provide adequate confidencethat an entity will fulfill requirements for quality.
Quality Control (QC): The operational techniques and activities that are used to fulfill
requirements for quality.
Quality Control Procedure (QCP): A QCP is a documented procedure detailing the processes necessary to complete a specific work activity.
PIM: Pre-Inspection Meeting
Inspection & Test Plan (ITP): An ITP is a document based on the detailed
manufacturing, fabrication and, construction program and identifies each processdescription. The ITP will set out related sequence of activities to be inspected,
examined and tested, and includes the following:
1) Lists the relevant approved procedures for a particular material, component,
assembly, and/or, type of work.
2) Identification of requirements for documents and acceptance criteria as applicable.
3) Roles and responsibilities of all involved parties.
RIO: Responsible Inspection Office
-
8/19/2019 SAEP-1151
4/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 4 of 22
Project Quality Manager (PQM): The senior Inspection Representative responsible
for coordinating all inspection requirements on behalf of the Inspection Department
with PM throughout all project phases.
QM: Project Quality Manager
SAIR: Saudi Aramco Inspection Representative
VID: Saudi Aramco Vendor Inspection Division
NDT: Non-Destructive Testing
5 Instructions
5.1 Contractor Purchase Requisition
5.1.1 Purchase requisition originators shall identify the applicable fabrication& inspection requirements. The minimum inspection requirements
stated in approved requisition shall be reflected in purchase orders.
5.1.2 Purchase requisition originators may also modify the content of a codedSA-175 form for certain purchase orders provided the following
procedure is followed:
5.1.2.1 If the modification is to delete or modify an inspection activity
specified in Mandatory Saudi Aramco Engineering
Requirements, a waiver shall be duly obtained as per SAEP-302 against applicable standards before altering the coded SA-175
form.
5.1.2.2 If the modification is to delete or add an inspection activity notexplicitly stated in Mandatory Saudi Aramco Engineering
Requirements such as witnessed tests, certification requirements
etc., which are indicated in the coded SA-175 form, concurrenceshall be obtained from the Saudi Aramco inspection
representative (SAIR) before altering the SA-175 form.
5.2 Inspection and Test Plan
5.2.1 The vendor and/or sub-vendors shall prepare detailed ITP’s for allassigned equipment and materials in accordance with all relevant Saudi
Aramco inspection forms (SA 175 Forms), Schedule Q and purchase
orders.
5.2.2 ITP shall provide:-
http://standards/docs/SAEP/PDF/SAEP-302.PDFhttp://standards/docs/SAEP/PDF/SAEP-302.PDFhttp://standards/docs/SAEP/PDF/SAEP-302.PDFhttp://standards/docs/SAEP/PDF/SAEP-302.PDF
-
8/19/2019 SAEP-1151
5/22
-
8/19/2019 SAEP-1151
6/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 6 of 22
SA-175 form to cover the inspection and testing of the assembled
packaged and skid mounted equipment.
5.4 Minimum Inspection Levels
5.4.1 Inspection levels shall be assigned on project Contractor’s materials and
equipment to specify the minimum amount of inspection coverage
deemed necessary by Saudi Aramco to ensure that a product or serviceconforms to specifications at a specific supplier's and/or sub-supplier's
factory or fabrication site.
5.4.2 The following system of coding the level of planned inspections shall beused to define the inspection requirements:
Level 0: Documentation requirements only; no vendor inspection
required.
Level 1: Only final inspection is required prior to shipping.
Level 2: Includes pre-inspection meetings, one or moreunspecified “in progress” surveillance visit/s, all witnessand hold points, final inspection, and release for
shipment.
Level 3: Includes pre-inspection meetings, one or more
unspecified “in progress” surveillance visits, all witness
and hold points, final inspection, and release forshipment. Inspections shall be on a regular basis (daily,
weekly or bi-weekly).
Level 4: Resident inspector continually monitoring the work.
5.4.3 Minimum inspection levels for project Contractor’s materials andequipment are indicated in Appendices A and B of this procedure.
5.4.4 VID provides quality monitoring and inspection support for projects in
accordance with approved ITP. SAIR will determine which purchase
orders and vendor activities to be monitored on the basis of the criticality
of the materials/ equipment and past performance of selectedmanufacturers.
5.4.5 Inspection levels might be elevated or lowered by SAIR on case by case
basis, based on criticality of procured materials, performance of
selected manufacture, qualification of Contractor’s inspector,.. etc.
-
8/19/2019 SAEP-1151
7/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 7 of 22
5.4.6 In case of materials/ equipment not listed in below table, the SAIR will
determine the appropriate inspection level.
6 Responsibilities
6.1 SAIR and/or PQM is responsible to verify the assignment of appropriate level of
inspection. He is also responsible to determine the level of inspection for none
listed materials/ equipment.
6.2 Contractor is responsible to propose the proper level of inspection in accordancewith this procedure and/or other contractual documents.
6.3 RIOs are responsible to provide monitoring inspection services when requested
by the SAIR.
6.4 VID Management will insure the timely review and issuance of the revisedversion of this procedure.
6.5 SAIR is responsible to escalating to SAIR’s management any repetitive major
observations from the same vendor for any further actions.
7 Technical Support
For technical support or enquiry regarding this procedure, contact current VID/QMUsupervisor or VID Superintendent.
Revision Summary18 November 2012 New Saudi Aramco Engineering Procedure.
-
8/19/2019 SAEP-1151
8/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 8 of 22
Appendix A
Minimum Inspection Levels
CLASS IR
CODE DESCRIPTION
INSPECTION
LEVELS R EMARKS
01
175 General template for special inspection form
010200 HIC Testing: Pressure Vessel Steels and Storage tanks 2
010210 HIC Testing: ANSI/ASTM/API 5L Line Pipe 2
010300PIPE: High Frequency Welded Line Pipe, Class B, NPS 4
and larger.3
010400
PSL2 HFW PIPE: High Frequency Welded Steel Line
Pipe, Classes B & C, outside diameter 114.3 mm (NPS 4)
and larger.
3
010600
PIPE: Carbon Steel; Seamless or Longitudinal Seam
Submerged-Arc Welded; Purchased Small Quantities in
accordance with 01-SAMSS-038.1
010700PIPE: Beveled End, Seamless or Submerged Arc Welded,
Straight or Spiral Seam Carbon Steel Pipe3
017010PIPE: Carbon Steel for On-Plot Piping, seamless or
welded, straight seam.3
010800PIPE: Beveled End, Seamless or Welded, Straight Seam,
Stainless Steel Pipe3
010900 PIPES: Nickel Alloy Pipes 3
011000 PIPE: CRA Clad or Lined Steel Pipe 3
011100 CRA Clad Pipe Spools 3
012000
PIPE & FITTINGS: Fiberglass; TRP (Glass-Fiber-
Reinforced Thermosetting Resin) & RPMP (Glass-Fiber-
Reinforced Plastic-Mortar).2
012500CONCRETE MORTAR LINING: for Internal Surfaces
of Line Pipe and Fittings.2
012200
PIPE: Heavy Duty Polytetrafluoroethylene (PTFE) and
Perfluoroalkoxy (PFA) Lined Carbon Steel Pipe and
Fittings 2
012800CONCRETE WEIGHT COATING: For Line Pipe Used
Underwater.1
013100PIPE: Fabrication of Spools; Carbon, Alloy, High
Strength Special, Low and High Temperature Steels
3
013200 Induction Pipe Bends 3
014300
TUBES: for Condensers, Tubular Heat-Exchangers, and
Similar Heat Transfer Apparatus, Seamless cold-drawn
low-carbon steel; 1/8” to 3” outside diameter. 2
PIM is not
applicable
014301
TUBES: for Condensers and Heat Exchangers, Externally
Helical, Integrally Finned Aluminum-alloy Seamless with
finned or un-finned ends, with continuous fins, or with un-
finned sections; up to 2 in. outside diameter.
2PIM is not
applicable
-
8/19/2019 SAEP-1151
9/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 9 of 22
CLASS IR
CODE DESCRIPTION
INSPECTION
LEVELS R EMARKS
014400
CONDENSER TUBES: Seamless tube and ferrule stock
of copper and various copper alloys up to 31/8” inchinclusive, in diameter for use in surface condensers,
evaporators, and heat exchangers.
2PIM is notapplicable
017800
PIPE: Seamless 1” and Larger; and Straight Seam
Submerged Arc Welded 16” and Larger; for Low
Temperature Service.3
018000High Density Polyetheline (HDPE) pipe , spool, and
fittings1
018200PIPE: Seamless or Welded; Carbon or Alloy Steel; A312;
A335; A376; A430 or A524.1
019500PIPE: High Temperature, ASTM A-369; A-426; A-451,
or A-660.1
019800
PIPING: Auxiliary; For Mechanical Equipment
Associated with Compressors, Pumps, Fans, Turbines andGears.
2
02
022500SPECTACLE PLATES, SPACERS, BLANKS & ALL
FLANGES NOT COVERED BY 02-SAMSS-11 0
022501FLANGES: WELDNECK, BLIND FLANGES ;
FORGED STEEL & ALLOY 2
PIM is not
applicable
022502 FLANGES: Nickel Alloy 2
023400
PIPE COMPONENTS: Low Temperature Service,
Wrought Carbon Steel and Alloy Steel; Seamless &
Welded Construction; Includes elbows, tees, welding
outlets, reducers, caps, bosses, couplings, unions,
bushings, swaged nipples, pipe nipples, stub ends, blind
flanges, spectacle plates, spacers & slip blinds. Sizes ³¾”.
2PIM is not
applicable
023800
INTEGRAL INSULATING JOINTS / SPOOLS and
FLANGES: For Cathodic Protection; ASME B16.5
Service Pressure Ratings of Class 150 to 15002
PIM is not
applicable
026100
FITTINGS: Pipe, Butt Welding; Grade WPB Wrought
Carbon Steel & High Strength Fittings; Seamless or
Welded; Suitable for wet, sour service. Excludes cast
fittings, corrosion resistant alloy fittings and pipe bends.
1
026400
FITTINGS: For Use In HOT TAP and/or Stopple
Operations; Wet & Sweet Sour Services; Include - Split
Tees, Stopple Fittings, Full Encirclement Saddles, Flanges,
Lock-O-Ring (LOR) Flanges.
1
026500 FITTINGS: Alloy Steel (Including Stainless Steel) 2
PIM is not
applicable
026600 Weld Overlayed Flanges, Fittings and spool pieces 2PIM is not
applicable
026800
TRAP: SCRAPER: Permanent Scraper Traps for Line
Sizes >4”, for Pressure Ratings of Class 150 to 1500.
Applies to Water or Hydrocarbon Services, Onshore and
Offshore.
3
-
8/19/2019 SAEP-1151
10/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 10 of 22
CLASS IR
CODE DESCRIPTION
INSPECTION
LEVELS R EMARKS
03 030100
STOCKIST SUPPLIED INSPECTABLE
MATERIALS 1
04
043600
VALVES: Metallic; Includes gate, globe, angle, check,
needle, ball, plug, piston, butterfly, and choke; Excludes
Control, safety-relief, relief, surge relief, solenoid, pilot (&
other valves classified under SAMS Class 34), wellhead
valves under SAMS Class 45 and API 6A 10,000 psi
valves, non-metallic and Low Severity Valves.
3
043601
VALVE: Low Severity, utility service in cast iron, brass
material, and butterfly valves. Excluding high
performance butterfly valves.0
045600
VALVES & CHOKES: API SPEC 6A 10,000 PSI ³ 1
13/16”; For Use in Sour Wet Services Downstream of the
Wellhead and Tree Assembly.
3
06 060100 GASKETS: Metal, Spiral-Wound or Jacketed. 1
07
070200 MANILA OR NYLON ROPE 0
070600 WIRE OR WIRE ROPE 0
071300Sling: Using Chain, Wire Rope, Manila, Nylon, Polyester,
Polypropylene or Synthetic Webbing2
08
080100 HOSES: Marine Oil; Offshore Tanker Loading. 2
080101HOSES: Oil Suction and Discharge Services; For Dock
Tanker Loading.2
09
090100
SCAFFOLD PLANK: Wood, for Use with all
Scaffolding except where restricted by load limitations or
other site conditions1
090200 LUMBER: Wood Piles, Timbers and Ties 1
090700 DOORS: Wood Flush, Solid Core, Fire Rated 0
091300 COATING: Shop Applied, Internal or External. 3
091400 COATING: Shop Applied; For Drilling Tubulars. 3
091450
COATING: SHOP APPLIED; For Wellhead Equipment
That Includes: Casing Heads, Spools (Casing & Tubing),
Bonnets, Valves, Flanges and All Related Wellhead
Components, Onshore and/or Offshore.
3
091900
COATING: SHOP APPLIED, For Tanks, Piping,
Pipelines (and Associated Appurtenances & Fittings),
Structures, Process Equipment, Internal & External;
Onshore, Offshore and/or Sub sea.
3
092000
COATING: SHOP APPLIED (Electrostatic Spray);
Fusion Bonded Epoxy on Deformed and Plain Steel
Reinforcing Bars.2
PIM is not
applicable
092100COATING: SHOP APPLIED; Application of Composite
Fluropolymer / Ceramic Coatings to Fasteners.0
-
8/19/2019 SAEP-1151
11/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 11 of 22
CLASS IR
CODE DESCRIPTION
INSPECTION
LEVELS R EMARKS
092200
COATING: Shop Applied; Extruded 3-Layer
Polypropylene & 3-Layer P.E. Polyethylene ExternalCoating for Line Pipe.
3
10 100100
FASTENERS: Alloy or Stainless Steel Nuts & Bolting
Materials: Bars, Bolts, Screws, Studs, Stud Blots, & Wire;
for use in High or Low Temperature Services.2
PIM is not
applicable
12
120100STEEL STRUCTURES: (Excludes Offshore Structures
and Pre-engineering Metal Buildings).3
120200 BUILDING: Metal; One Story, Pre-engineered. 3
120400DOORS AND FRAMES: Steel; Fire Rated or Blast
Resistant.1
120500 TOWER: Communication. 2
120700 FENCING: Security, Fabricated Gates 1
121400
STRUCTURAL PLATES ROLLED SHAPES,
TUBULARS: Carbon Steel or Carbon Manganese Steel,
For Fixed Offshore Platforms.1
121600FIBER REINFORCED PLASTICS (FRP) Grating and
FRP Components0
121900 BUILDING: Pre-fabricated. 3
13
130300 GEAR UNITS: Special purpose. 3
130900COUPLING: Shaft, Special Purpose. Applicable only to
couplings transferring 2000 HP and above.0
131000 GEAR UNITS: General Purpose 1
14
140200TRANSFORMER: Distribution; Pad-Mounted,
Compartmental-Type, Self-cooled, Three-Phase.1
140300TRANSFORMERS: Power; 3 Phase, Dry Type,
501 KVA and Larger.1
140400TRANSFORMER: Distribution; Overhead Type, Self-
Cooled, Single-Phase and Three-Phase.1
140500 TRANSFORMERS: Power; Oil Filled, 60 Hz. 2
142100 WOOD: Utility Pole. 2
142101 WOOD: Cross Arm or Cross Braces. 2
15
150100SUBMARINE POWER CABLE 5 KV THROUGH115 KV: Designed to AEIC, IEC and ICEA
Specifications.2
150200
MEDIUM VOLTAGE POWER CABLE: Solid
Dielectric Insulated Cables for Rated Voltages of 5 kV
through 35 kV1
150300
HIGH VOLTAGE POWER CABLE: High Pressure
Pipe Type, and Low and Medium Pressure Self-Contained
Liquid Filled.2
-
8/19/2019 SAEP-1151
12/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 12 of 22
CLASS IR
CODE DESCRIPTION
INSPECTION
LEVELS R EMARKS
150400
HIGH VOLTAGE POWER CABLE: Solid Dielectric
Insulated Cables for Rated Voltages of 69 kV through138 kV
2
16
160100
POWER CIRCUIT BREAKER SWITCHGEAR and
DRAWOUT POWER CIRCUIT BREAKERS: Metal-
Enclosed, Low Voltage2
160200 INDOOR SWITCHBOARD-LOW VOLTAGE 2
160300INDOOR CONTROLGEAR: High Voltage, Built to
Either IEC or NA, 50 or 60 Hz, 3 Phase up to 4160 volts.2
160400 CONTROL SWITCHBOARDS 2
160500SWITCHGEAR: Metal-Clad, Air Insulated, Indoor,
1 to 38 KV.2
160600METAL ENCLOSED BUS: Indoor and Outdoor; Self-Cooled, Non-segregated-phase, Rated up to and including
34.5 KV.1
160700SF6 GAS INSULATED CIRCUIT BREAKERS,
OUTDOOR - 34.5 KV THROUGH 230 KV2
162000
INDOOR CONTROLGEAR: Low Voltage, Built to
Either IEC or NA, 50 or 60 Hz, 3 Phase up to 480 volts, or
Single Phase up to 277 volts.2
162600
SWITCHGEAR: Load Interrupting, Manually Operated,
Pad Mounted, Circuit Breakers & Fuses,
1 KV Through 36 KV.2
162700
OUTDOOR SWITCHRACK: Low Voltage, Built to
Either IEC or NA, 50 or 60 Hz, 3 Phase up to 480 volts, or
Single Phase up to 277 volts.
2
165000ADJUSTABLE FREQUENCY DRIVE SYSTEM –
1 KV AND ABOVE2
PIM is not
applicable
17
170200
MOTORS, ELECTRIC: Severe Duty Totally Enclosed
Squirrel Cage Induction Motors to 500 HP, 4000 V or
Below, and Explosion Proof Motors.1
170300
MOTORS: Form-Wound, Squirrel-cage Induction
250 HP and Larger, or Brushless Synchronous 500 HP and
Larger.2
170301
GENERATORS: Brushless, Synchronous, Continuous
Duty, 3 Phases, 60 Hertz, 600 to 6500 KVA, Built to
ANSI/NEMA MG1-22.3
170400
DIESEL ENGINE GENERATOR SETS: Stationary or
Potable, Rated From 35 KW up to and Including 2000
KW. This is not Applicable to Shipboard Marine
Installations.
2
170700RECTIFIERS: Conventional (Tap Adjustable) or Phase
Controlled.1
171300 GALVANIC ANODES: For Cathodic Protection. 2PIM is not
applicable
171400IMPRESSED CURRENT ANODES: For Cathodic
Protection.2
PIM is not
applicable
-
8/19/2019 SAEP-1151
13/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 13 of 22
CLASS IR
CODE DESCRIPTION
INSPECTION
LEVELS R EMARKS
171500CABLE: 600 Volts MAX., for Cathodic Protection.
0
172500BATTERY CHARGER / RECTIFIER: Rated output >
100 ADC.1
173100POWER SUPPLY, PHOTOVOLTAIC (PV): For
Cathodic Protection.1
173400UNINTERRUPTIBLE POWER SUPPLY (UPS)
SYSTEMS: Rated output power > 10 kVA.1
173700
AUXILIARY ELECTRICAL SYSTEMS: As provided
on custom-engineered, factory-assembled and pre-wired
equipment skids.2
173800 STATIONARY BATTERIES. 0
18 180300 FIBER OPTIC CABLE 2
22
220200 FLOAT: For Submarine Oil Hose, 12" to 24" Diameter. 2
220300CHAIN, ANCHOR CHAIN, SHACKLES or
SWIVELS.0
220500BUILDING AND INSPECTION OF A
HYDROGRAPHIC SURVEY VESSEL (LAUNCH)2
23
230100
DISTRIBUTED CONTROL SYSTEM (DCS):
Equipment and Associated Software; Excludes Advanced
Control Systems, Field Instrumentation, Auxiliary
Systems, Remote Terminal Units, and Management
Information Systems.
2
230200
SUPERVISORY CONTROL and DATA
ACQUISITION (SCADA) SYSTEM 2
230300TERMINAL MANAGEMENT SYSTEMS (TMS)
EQUIPMENT AND ASSOCIATED SOFTWARE2
230400 Remote Terminal Unit 2
27
270200
PACKAGED WATER-COOLED CENTRIFUGAL
CHILLERS: Primarily for Comfort Air Conditioning,
Ranging from 80-700 Tons. (Excluded Air Cooled
Package Units for Process Applications, Direct Process
Chilling Applications and Units That Utilize Reciprocating
or Helical Screw Compressors).
2
270300
DIRECT EXPANSION AIR CONDITIONING
SYSTEMS: For Offshore Facilities, 10-Ton Cooling
Capacity and Over.
2
270500Damper: Fire, Smoke & Combination Fire Smoke
Dampers0
30 300100DIESEL ENGINES: Reciprocating, Compression-
Ignition.1
-
8/19/2019 SAEP-1151
14/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 14 of 22
CLASS IR
CODE DESCRIPTION
INSPECTION
LEVELS R EMARKS
31
310100
ROTARY MULTIPHASE PUMP (TWIN-SCREW
AND PROGRESSIVE CAVITY TYPE): API 676 2
310200 MECHANICAL SEALS FOR PUMPS 1
310300 PUMPS: Rotary Per API 676 0
310400 PUMPS: Positive Displacement Reciprocating. 0
310500PUMPS: Centrifugal, Horizontal, End Suction Single
Stage, or Vertical In-line.0
310510MOLTEN SULFUR PUMPS: Centrifugal, Horizontal
and Vertical0
310520 PUMPS: Sealless 0
310530 Turbine, Hydraulic Recovery, MFR STD 0
310600 PUMP: API, Centrifugal. 3
310610 Turbine, Hydraulic Recovery, API STD 2
310700 FIRE PUMPS: Centrifugal, Horizontal and Vertical 0
310800HELICAL-AXIAL MULTIPHASE PUMP: API 610
(Modified)2
310900PUMPS: Submersible, Bowl Type, Including Electric
Motors.0
311400PUMPS: Jet Fuel Additives Injection, Product Hydraulic
Turbine Driven2
311500
PUMPS: Positive Displacement, Controlled Volume,
Diaphragm & Packed Plunger Types. (Excluded:
Diaphragm Pumps using Mechanical Actuation)0
311800COMPRESSOR : Reciprocating, for Process Air or Gas
Service1
311850COMPRESSOR : Reciprocating, in plant & Instrument
Air Service0
311900 COMPRESSOR: Centrifugal 3
311901AIR COMPRESSOR: Centrifugal, Constant Speed,
Packaged, Integrally Geared, Including Accessories.3
312000 COMPRESSOR: Integrally Geared, Centrifugal. 3
312200
COMPRESSOR: Screw, Packaged Air Compressors.
This Does Not Apply To Compressors With Rated Flow
Less Than 250 SCFM1
312400 COMPRESSOR: Rotary, for General Refinery Service. 3
312600 DRY GAS SEALS FOR GAS COMPRESSORS 1
313100HOISTS OR OVERHEAD CRANES: Lifting Capacity
Over 5000 Kg.2
313800
CENTRIFUGAL FLUOROCARBON
REFRIGERATION UNITS: For Industrial / Process
Applications, on & Offshore. This Does Not Apply to
Refrigeration Units for Utility Service.
3
-
8/19/2019 SAEP-1151
15/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 15 of 22
CLASS IR
CODE DESCRIPTION
INSPECTION
LEVELS R EMARKS
32
320200TURBINE: Steam, General Purpose or Special Purpose
3
320300
POSITIVE MATERIAL IDENTIFICATION (PMI): For ASME B31.3, B31.4, and B31.8 Piping components,
including welds, and other piping or equipment where
specified in the SAMS or Purchase Order.
2
321300 BOILER: Power; Water tube. 3
321500HIGH INTENSITY BURNER FOR SULFUR
RECOVERY UNIT COMBUSTION CHAMBER3
321900 PRESSURE VESSEL 3
321950 PRESSURE VESSEL: Small 32-SAMSS-036 3
323100 HEAT EXCHANGERS: Shell and Tubes. 3
323300 HEAT EXCHANGERS: Plate and frame 2
323400 HEAT EXCHANGERS: Electrical, Immersion-type. 3
323500 TUBE BUNDLES, SEPARATELY ORDERED. 2
323600 HEAT EXCHANGERS; AIR-COOLED. 2
323700 HEATER: Direct fired. 3
323710TUBE: Centrifugal cast austenitic steel 35% nickel 25%
chromium plus niobium1
324300COOLING TOWERS: Induced Draft, Used for
Domestic and Industrial Applications.3
324900
TANKS: Atmospheric, Steel, Within the Scope of
API-650; Except for Tanks According to Appendices F
and J of The Same Standard. 2
324901
TANKS: Low Pressure, Steel, within the Scope of
API-620. Except for Tanks According to Appendix Q and
double wall tanks according to appendix R of the Same
Standard.
2
324910TANKS: Low temperature with the scope of API-620
Appendix R2
324920TANKS ROOF: Aluminum roof with the scope of
API-650 appendix (G)2
324925TANKS ROOF: Internal floating roof as per API-650
Appendix (H) and 32-SAMSS-0052
325000 Column Trays And Packing 2PIM is not
applicable
325100TANKS: Steel; Aboveground or Underground to
API-12F, API-650 Appendix-J, UL-58, and UL-142. 3
325200
TANK: Fiberglass; Underground; UL-1316 or
ASTM D4021, Single or Double Wall; Spherical or
Horizontal.2
325300TANK: Aboveground, Fiberglass to AWWA D120,
ASTM D3299, API-12P.1
325400 REVERSE OSMOSIS SYSTEMS 3
-
8/19/2019 SAEP-1151
16/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 16 of 22
CLASS IR
CODE DESCRIPTION
INSPECTION
LEVELS R EMARKS
325500
INLET AIR FILTRATION SYSTEMS for:
COMBUSTION GAS TURBINES to 32-SAMSS-008.CENTRIFUGAL AIR COMPRESSORS to 32-SAMSS-
016; for use in both onshore and offshore environments.
Systems are limited to the automatic pulse-jet self-
cleaning type.
3
325501COMBUSTION GAS TURBINE PACKAGE: Battery
Charger/Rectifier0
325502
COMBUSTION GAS TURBINE PACKAGE:
Uninterruptible Power Supply Systems (UPS);
For Auxiliary and Control Systems0
325503
COMBUSTION GAS TURBINE PACKAGE: Coating;
Shop Applied for Inlet Filtration System Internal &
External1
325504 COMBUSTION GAS TURBINE PACKAGE: ControlSystem
1
325505
COMBUSTION GAS TURBINE PACKAGE: Coupling; Shaft, for: 1) Load Coupling [Power Generation
Units Only] 2) Auxiliary Gearbox Couple0
325506
COMBUSTION GAS TURBINE PACKAGE: Gear
Unit for: 1. Auxiliary Gearbox (Power Generation and
Mechanical Drive Units) 2. Load Gearbox(power
generation units only)
1
325507COMBUSTION GAS TURBINE PACKAGE: Heat
Exchangers; Auxiliary Systems3
325508
COMBUSTION GAS TURBINE PACKAGE: Inlet Air
Filtration Systems: For use in both on and offshore
environments
2
325509COMBUSTION GAS TURBINE PACKAGE: Instrumentation (not applicable to inlet filtration)
2
325510
COMBUSTION GAS TURBINE PACKAGE: MONITORING SYSTEMS; Vibration, Axial Position,
and Bearing Temperature. Not applicable to the driven
main pump, compressor, and gearbox in mechanical drive
gas turbine packages.
0
325511
COMBUSTION GAS TURBINE PACKAGE: Electric
Motors; for Auxiliary Systems(Not applicable to starter
motor)0
325512COMBUSTION GAS TURBINE PACKAGE: Starter
Motor0
325513 COMBUSTION GAS TURBINE PACKAGE: Piping &Valves; On-Skid Auxiliary Equipment
2
325514COMBUSTION GAS TURBINE PACKAGE: Pumps;
For Auxiliary Systems0
325515
COMBUSTION GAS TURBINE PACKAGE: Steel
Structures; For CGT Air Filtration & Heat Exchanger
Structures2
325516COMBUSTION GAS TURBINE PACKAGE: Atmospheric Tanks; For Auxiliary System
2
-
8/19/2019 SAEP-1151
17/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 17 of 22
CLASS IR
CODE DESCRIPTION
INSPECTION
LEVELS R EMARKS
325517
COMBUSTION GAS TURBINE PACKAGE: Turbine;
Industrial and Aero-derivative 2
325518
COMBUSTION GAS TURBINE PACKAGE: Indoor
Control Gear; Control Gear; MCC, AC & DC Control
Panels2
325519COMBUSTION GAS TURBINE PACKAGE: Batteries; For Auxiliary and Control Systems
0
326100
LUBRICATION, SHAFT SEALING AND CONTROL
OIL SYSTEMS: This form is not applicable to
Combustion Gas Turbine Lubrication Systems.3
326700FLARE SYSTEMS: Including Flare Stacks, Flare Tips,
Dry Gas Seals, and Knockout & Liquid-Seal Drums.3
327300 MIXERS: Side Entry. 2
328110REFRACTORIES: Hydraulic-Setting, Castable Systems;To be used on pressure vessels, boilers, process heaters;
HEX’s, piping and flares tips. 3
328120REFRACTORIES: Ceramic Fiber System (RCF) for
Boilers and Process Heaters.3
329000 Heat Recovery Steam Generator (HRSG) 4
34
340100VALVES: Control, Steel, General Service, Pneumatic
Operated, Up to and Including Class 600 ratings.2
340150 VALVES: Control, Steel, and Non-General Service 2
340167 Truck Loading Metering Systems 3
340168 Truck Unloading Metering Systems 3
340200 INSTRUMENTATION FOR PACKAGED UNITS 2
341000
ACTUATORS VALVE:
(a) Pneumatic Actuators ON-OFF Service to34-SAMSS-716;
(b) Electric Motor Operated Valve Actuators to34-SAMSS-718.
2PIM is not
applicable
341001
ACTUATOR VALVE HYDRAULIC: With Integral or
Remote Power Unit for Rising Stem and Quarter Turn
Valves. Excluded are Actuators for Offshore Well
Platforms and Wellhead Valves.
2PIM is not
applicable
341200ATMOSPHERIC TANK PROVER: For Use in Custody
Transfer Measurement of Hydrocarbon Liquids 3
341210 Small Volume Prover 3
341600
AUTOMATIC TANK GAUGING EQUIPMENT: (a) Float Type, Spring Motor Driven
(b) Displace Type, Servo-Motor Driven0
341700 Pressure Retaining Instruments 2
341900VALVE: Safety Relief Conventional And Balanced
Type.2
-
8/19/2019 SAEP-1151
18/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 18 of 22
CLASS IR
CODE DESCRIPTION
INSPECTION
LEVELS R EMARKS
342000VALVE: Safety Relief, Pilot Operated Types.
0
342100VALVE: Surge Relief, Gas Loaded and Pilot Operated
Types1
For packaged
skid, inspection
level will be
level 3
342800
MECHANICAL METER PROVERS: Bi-Directional
Displacement-Type; For Use In Royalty And Custody
Transfer Applications (Covers Complete Packaged And
Skid-Mounted Unit Including Pipe-Prover Valves, Locally
Installed Instruments And Auxiliary Equipment For Meter
Proving).
3
342810 Uni-Directional Meter Prover 3
342900 METER: Flow, Turbine. 1
343000 METERS: Positive Displacement, Liquid and Gas. 1
343100
INSTRUMENT CONTROL PANELS:
(a) INDOOR; To 34-SAMSSS-820 for Panels,Cabinets, Consoles and Marshalling Cabinets in
Electrically Unclassified Air-Conditioned
Buildings.
(b) OUTDOOR; To 34-SAMSSS-821 for Panels andCabinets for Locations in Electrically Classified or
Unclassified Outdoor Areas.
2
343200 CHROMATOGRAPHS: Process Gas. 0
343300
ELECTRICAL ANNUNCIATORS: Solid State Plug-in
Module Type, Suitable for Indoor and/ or OutdoorApplication. 1
343500
FIRE DETECTION AND ALARM SYSTEMS: Includes But Not Limited To, Fire Alarm Control Panels,
Associated Detectors, Manual Alarm Box Stations, Visual
& Audible Devices (Sirens, Bells, Horns, etc.), UV
Detection Systems, External Terminal Strips, Power
Supplies.
0
343600 PIPELINES LEAK DETECTION SYSTEMS (LDS) 2
344000 PROGRAMMABLE LOGIC CONTROLLER 2
344200ESD SYSTEM: Hard Wired, Solid State (Non-
Programmable).2
344300 ESD SYSTEM: Electromagnetic Relay. 2344400
PROGRAMMABLE CONTROLLER BASED ESD
SYSTEMS: Fail - Safe, Fault - Tolerant.2
344900MONITORS: Combustible Gas or Hydrogen Sulfide,
Stationary.0
345100MONITORING SYSTEMS: Vibration, Axial Position,
and Bearing Temperature.2
345300 DENSITY METERS 0
-
8/19/2019 SAEP-1151
19/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 19 of 22
CLASS IR
CODE DESCRIPTION
INSPECTION
LEVELS R EMARKS
345400
ANALYZER: OXYGEN; Covers Flue Gas, Trace,
Dissolved On-Line or Portable Analyzers. 0
345600FLAME MONITORING SYSTEMS: For igniters and
burners used in fired equipment.1
347400ANALYZER: MOISTURE; Covers Both In-Line
(or “in-situ”) and Extractive. 0
347500AUTOMATIC SAMPLERS: for Petroleum and
Petroleum Products (See Note 2 for Exceptions).2
347600
INSTRUMENTATION AND THERMOCOUPLE
EXTENSION CABLE: For Signaling and Control
Purposes (Excluding Data Highway Cable).0
348000INSPECT TETRA DEVICES OPERATING IN
HAZARDOUS AREA0
349000
WELLHEAD CONTROL, MONITORING AND
SHUTDOWN SYSTEMS 3
45
450100 CASING AND TUBING 3
450400 DRILL PIPE 2
450500Non Heat Treated Green Tubes (Pipes & Coupling
Stock) for Casing & Tubing2
450600 CASING: API 5L Steel Grades X-42 To X-70 (Note 1) 3
450700COATING: Shop Applied, External FBE; for Drilling
Tubulars, Catholically, Protected OCTG3
450900OCTG; HIGH FREQUENCY WELDED SOLID
EXPANDABLE TUBULARS (SET)3
451400 WIRE ROPE: Includes Drill Line, Raising Line & Cable,and Wire line (Well Measuring)
1
451500 DOWN HOLE COMPLETION EQUIPMENT 2
451600 BLOWOUT PREVENTERS (BOP) HOSES 0
451700ANNULAR AND RAM TYPE BOP UNITS AND
DIVERTERS: All Working Pressure Ranges2
451900 ROTARY OR VIBRATOR HOSE 2
452000
ROTARY SWIVEL, DRILLING HOOK,
TRAVELING BLOCK OR HOOK-BLOCK
COMBINATION
2
452100 ROTARY TABLE 2
452300 DRILL COLLARS WITH INTEGRALCONNECTORS AND KELLYS
2
452400 TOP DRIVE DRILLING SYSTEM 2
453100 CEMENTS FOR WELL CEMENTING 2
453600WELLHEAD COMPONENTS: Back Pressure Valves
and Two Way Check Valves1
453700WELLHEAD COMPONENTS: Polish Nipples, Tubing
Hanger1
-
8/19/2019 SAEP-1151
20/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 20 of 22
CLASS IR
CODE DESCRIPTION
INSPECTION
LEVELS R EMARKS
453800
WELL HEAD EQUIPMENT: API 6A, PSL 1-2, Sour
Wet Service (Note 1 and 2) 3
453900WELL HEAD EQUIPMENT: API 6A, PSL 3 and 4,
Sour Wet Service (Note 1)3
453950Subsea Wellhead Drilling System (API-6A, 17D, Sour,
PSL-2 and 3)
454000
SAFETY VALVES; WELL CONTROL, KELLY
COCK STAB-IN TYPE 5K - 15K. NOT FOR H2S
SERVICE
2
454100 ACTUATOR ASSEMBLY: Hydraulic; SSV 2
454400 VALVE ASSEMBLY: Safety, Subsurface 2
454500 MUD VALVE AND LOW TORQUE VALVES 2
456000 MUD PUMPS 2
457000 MOTORS, DRILLING: A/C 2
46 460100DRILLING EQUIPMENT: Spares from other than
Original Equipment Manufacturers (OEM)0
72 720100 HYDRAULIC POWER PACK SYSTEM & PIPING 2
73 730100 ROTORS: Separately Ordered for Turbines 2
74 740100
PANTOGRAPH (OUTBOARD) CABLES: for Marine
Loading Arms, Galvanized and Non-galvanized, Size 7/8"
to 1-3/4" Nominal Diameter2
78 780000 CENTAC ROTORS - ALL STAGES (SPARES) 2
79
790700IMPELLER: Separately Ordered for API Pumps with
Rated Power Equal to or Greater than 300 HP per Stage0
791100
Re-Engineered Pump Spare Parts other than Impeller
and Casing Parts for API and Non-API Pumps.
Excluding Fire Water Pumps.
0
791200Re-Engineered Pump Casing Parts for API and Non-
API Pumps. Excluding Fire Water Pumps.2
791300Re-Engineered Pump Impeller for API and Non-API
Pumps. Excluding Fire Water Pumps2
-
8/19/2019 SAEP-1151
21/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 21 of 22
Appendix B
Special Materials Requirements
DESCRIPTIONINSPECTION
LEVELSREMARKS
HVAC Units- On shore 2 Special SA-175 is required
Skid Mounted/ Packaged Equipment 3 Multi Discipline Inspection
Chemical Injection Skid System 3 Multi Discipline Inspection
-
8/19/2019 SAEP-1151
22/22
Document Responsibility: Inspection Engineering Standards Committee SAEP-1151
Issue Date: 18 November 2012 Inspection Requirements for Contractor
Next Planned Update: 18 November 2017 Procured Materials and Equipment
Page 22 of 22
Appendix C
Index
1 Scope 2
2 Conflicts and Deviations 2
3 Applicable Documents 2
3.1 Saudi Aramco References 2
3.2 Industry Codes and Standards 2
4 Definitions and Acronyms 3
5 Instructions 4
5.1 Contractor Purchase Requisition 4
5.2 Inspection and Test Plan 4
5.3 Special SA-175 Forms 5
5.4 Minimum Inspection Levels 6
6 Responsibilities 7
7 Technical Support 7
Appendix A - Minimum Inspection Levels 8
Appendix B - Special Materials Requirements 21
Appendix C - Index 22