saeopp priority 1 training proposed changes to upward bound, ub math/science & veteran’s ub...

33
SAEOPP Priority 1 SAEOPP Priority 1 Training Training Proposed Changes to Upward Bound, Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB UB Math/Science & Veteran’s UB Annual Performance Report Annual Performance Report

Upload: corey-waters

Post on 28-Dec-2015

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

SAEOPP Priority 1 TrainingSAEOPP Priority 1 Training

Proposed Changes to Upward Bound, Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB UB Math/Science & Veteran’s UB

Annual Performance ReportAnnual Performance Report

Page 2: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Lourdes ZavalaLourdes Zavala

Data/Tech CoordinatorData/Tech Coordinator

Center for Educational Access Center for Educational Access and Outreachand OutreachColorado State UniversityColorado State University

Fort Collins, COFort Collins, CO

[email protected]

Page 3: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Session Overview Session Overview

Detailed review of the Annual Performance Detailed review of the Annual Performance Report (APR) and Prior Experience (PE) Report (APR) and Prior Experience (PE) Criteria for UB Programs. Criteria for UB Programs.

Page 4: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Presentation MaterialsPresentation Materials

Review of APR ChangesReview of APR Changes Field by field comparison table (Section II Field by field comparison table (Section II

Record Structure)Record Structure) COE Response to Draft UB APRCOE Response to Draft UB APR General InstructionsGeneral Instructions Section I – Project Identification, Section I – Project Identification,

Certification and WarningCertification and Warning

Page 5: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Recent Recent Changes Changes

Recent Recent Changes Changes

New New Standardized Standardized

ObjectivesObjectives

Absolute Absolute Priority Priority

ImplementedImplemented

Review of Review of Data Data

CollectedCollected

New Grant New Grant CycleCycle

Discontinued Discontinued APR FormAPR Form

Page 6: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Proposed ChangesProposed Changes

Number fields reducedNumber fields reduced New fields implemented New fields implemented Restructuring, reformatting and Restructuring, reformatting and

Renumbering of fieldsRenumbering of fields Removal of Section IIIRemoval of Section III Submissions in Excel or CSV formatSubmissions in Excel or CSV format New online data tool for APR submissionNew online data tool for APR submission

Page 7: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report
Page 8: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Annual Performance ReportAnnual Performance ReportTwo Sections:Two Sections:

I.I. Project Identification, Certification, and Project Identification, Certification, and WarningWarning

II.II. Participant RecordsParticipant Records

Page 9: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

I. Project IdentificationI. Project Identification

Award numberAward number Project name, addressProject name, address Report periodReport period Project characteristicsProject characteristics Data Entry PersonData Entry Person Certification/WarningCertification/Warning

*Report not complete until Section I is faxed

Page 10: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

II. Participant RecordsII. Participant Records

Participant Records will be used to measure the extent to which you have accomplished your standardized objectives and to assess your projects prior experience. From your records the department will determine:

• Number of students served, including the selection criteria

•The measured growth in student’s academic skills/competencies

•Retention, enrollment and persistence

Page 11: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Descriptive InformationDescriptive Information Selection CriteriaSelection Criteria Assessment of SkillsAssessment of Skills Services DeliveredServices Delivered Postsecondary OutcomesPostsecondary Outcomes

56 Fields for UB & UBMS56 Fields for UB & UBMS39 Fields for Vet UB39 Fields for Vet UB

Page 12: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Fields SummaryFields Summary

1-231-23 21-2721-27 28-4128-41 48-5648-56

Description Information:

ID, Demographic, Entry Info, ExpectedGrad Date

Vet Recruitment, Vet Schedule, Disabilities

Info Related to Absolute Priority:

Outcomes:

PSE Enrollment and Persistence

Participation status, GPA, Graduation, retention, academic proficiency

Vet Call to Active Duty, Retention, Improved Scores on Tests

ALL = Batch Year ALL = Batch Year 20072007

1-1-2525

31-3931-3926-3026-30UBUBVUBVUB

42-4742-47

Services:

Workstudy, Employ, Cult Act, Comm Serv, LEP Instruction, Math Acad

Page 13: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

New Fields – UB & UBMSNew Fields – UB & UBMSColumn Name Description/Content

Ethnic New category for reporting Ethnicity for students of Hispanic/Latino origin

RaceCD Replaces EthnicityCD; used in conjunction with field 10 (Ethnic)

UBMSPart For UBMS Participants; identifies whether student has participated in a regular UB project or other TRIO or TRIO-like programs.

EntryHighRiskGPA GPA for newly admitted high risk students. Indicate if student had a GPA lower or higher than a 2.5 at time of selection.

EntryAlgebra Indicates whether student completed pre-Algebra, Algebra, or Geometry by the end of grade eight or if student was recruited early in grade nine and was taking algebra or geometry in that grade.

ProjRetain Indicates whether the student continued to participate and was retained in the program such that the student subsequently participated in the next academic year 2008-09.

DegreeDT Date of Undergraduate degree. Can provide midpoint day of 15 if day is not known. E.g. 06/15/2008

PSEStatusFall Indicates if student is enrolled in Fall 2007.

PSEStatusFullYr Indicates if student was enrolled in postsecondary education in Spring 08; Summer 08 or Fall 08; this will measure if student enrolled by the fall term immediately following their expected graduation date during budget period (2007-08).

PSEPersist Indicates whether student continued their enrollment in postsecondary education. If student was enrolled in Fall 2007, Spring 2008, Summer 2008 AND Fall 2008; then this student would have contributed to the project’s success in meeting this persistence objective.

Page 14: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Second Comment PeriodSecond Comment PeriodField #: Column Name: Description/Content:11 Race1 Y/N - Participant identified as American Indian/Alaskan Native

12 Race2 Y/N – Participant identified as Asian13 Race3 Y/N – Participant identified as Black or African American

14 Race4 Y/N – Participant identified as White15 Race5 Y/N – Participant identified as Native Hawaiian or Other Pacific

Islander23 ExpHSGradCohort Replaces ExpHSGrad (Expected HS graduation date)- Requires

year of graduation rather than a date. Will require need for all previous year’s records to be updated.

54 PSEEnrollObj Replaces PSeStatusFall; Requires identification of those students who were in the 2008 graduation cohort that enrolled in postsecondary education by Fall 2008 term.

55PSEPersistDenom Replaces PSEStatusFullYr; Requires identification of thoswe

students who were in the 2007 graduation cohort that enrolled in postsecondary education by Fall 2007 term.

56 PSEPersistNum Replaces PSEPersist; Requires identification of those students who were in the 2007 graduation cohort that enrolled in postsecondary education in the Fall 2007 term and are now enrolled in the Fall term 2008.

Upward Bound/Upward Bound Math-Science New Fields:

Page 15: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

New Fields = VUBNew Fields = VUBField # Column Name Description/Content

10 VetEthnic New category for reporting Ethnicity for students of Hispanic/Latino origin

11 VetRaceCD Replaces EthnicityCD; used in conjunction with field 10 (Ethnic)

15 VetSchedule Scheduled completion date for VUB program.

22 VetLastSerDate Date of last service for all participants no longer being served

29 VetDegreeDT Date of Undergraduate degree. Can provide midpoint day of 15 if day is not known. E.g. 06/15/2008

30 VetPSEStatus Indicates if student was enrolled during the budget period 2007-08..

31 VetPSEPersist Indicates whether student continued their enrollment in postsecondary education in the Fall 2008. If student was enrolled in Fall 2008; then this student would have contributed to the project’s success in meeting this persistence objective.

Page 16: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Second Comment PeriodSecond Comment PeriodField #: Column Name: Description/Content:11 VetRace1 Y/N - Participant identified as American Indian/Alaskan Native

12 VetRace2 Y/N – Participant identified as Asian13 VetRace3 Y/N – Participant identified as Black or African American

14 VetRace4 Y/N – Participant identified as White15 VetRace5 Y/N – Participant identified as Native Hawaiian or Other Pacific

Islander20 VetRevSchedule Provides an opportunity to revise a scheduled completion year due

to compelling circumstances21 VetRescheduleCircs Identifies the circumstances for which the scheduled completion

year has been revised22 VetReasonReschedule Identifies the reason for which the scheduled completion year has

been revised37 VetPSeEnrollObj Replaces VetPSEStatus and identifies those students who had

scheduled completion dates within the 2007-08 program year and actually enrolled in the Fall 2008

38VetPSEPersistDenom New Field; Requires identification of those students who were

enrolled postsecondary education in 2007-08.

39 VetPSEPersistNum Replaces VetPSEPersist; Requires identification of those students who were enrolled in postsecondary education in 2007-08 and continued to be enrolled in the Fall term 2008.

Veterans Upward Bound New Fields:

Page 17: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Date FieldsDate Fields

2 digits for month, 2 digits for day, two 2 digits for month, 2 digits for day, two digits for century, 2 digits for year:digits for century, 2 digits for year:

1115200711152007

*if need to estimate a date, use *if need to estimate a date, use

the 15the 15thth day (i.e. 11152007) day (i.e. 11152007)

** Use a zero before 1 digit months and days** Use a zero before 1 digit months and days

Page 18: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Formatting ChangesFormatting Changes Fields have been renumbered with deletion Fields have been renumbered with deletion

and addition of new fieldsand addition of new fields Field Type no longer necessary as “text” Field Type no longer necessary as “text”

files will no longer be accepted or uploaded files will no longer be accepted or uploaded into new tool; only Excel or CSV (comma into new tool; only Excel or CSV (comma delimited) filesdelimited) files

New tool will allow you to modify last New tool will allow you to modify last years submitted data or add new student years submitted data or add new student recordsrecords

Page 19: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

How will success be determined?How will success be determined?

Number of students served:Number of students served:

UB/UBMS: UB/UBMS: The sum of the number of students where PartCD The sum of the number of students where PartCD = 1 or 2 or 3 or 6 or 7 should equal the number of students served = 1 or 2 or 3 or 6 or 7 should equal the number of students served during the reporting period.during the reporting period.

The sum of the number of students where EligibilityCD = 1 divided by The sum of the number of students where EligibilityCD = 1 divided by the total number of students served during the reporting period will the total number of students served during the reporting period will equal the percent of students served who were both low-income and equal the percent of students served who were both low-income and first-generation.first-generation.

(Please refer to Upward Bound Changes Document. This document identifies fields of data that will support meeting a particular objective. An example is identified below:)

Page 20: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Performance Report Performance Report Submission DatesSubmission Dates

All Regular and Veterans Upward Bound All Regular and Veterans Upward Bound projects due November 30, 2008projects due November 30, 2008

Upward Bound Math/Science projects are Upward Bound Math/Science projects are due on or before December 31, 2008due on or before December 31, 2008

APR Website available November 1, 2008?APR Website available November 1, 2008?

Page 21: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Questions/SummaryQuestions/Summary

Opportunity for questions/commentsOpportunity for questions/comments

Page 22: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Prior ExperiencePrior Experience

Points awarded based on DOE’s review of Points awarded based on DOE’s review of project’s performance on Mandatory project’s performance on Mandatory Objectives Objectives

Data pulled from submitted APRs for years 1 – Data pulled from submitted APRs for years 1 – 3 of grant cycle3 of grant cycle

Five (5) points that can be earned each year for Five (5) points that can be earned each year for a total of fifteen (15) maximum pointsa total of fifteen (15) maximum points

Page 23: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Prior ExperiencePrior Experience DOE Program Officer/Specialist awards PE points DOE Program Officer/Specialist awards PE points

AFTER proposals are read & scored by readersAFTER proposals are read & scored by readers

Maximum Proposal Score: Maximum Proposal Score: 100 proposal points awarded by readers100 proposal points awarded by readers

+ + 1515 PE points awarded by DOE PE points awarded by DOE 115 Total Proposal Score115 Total Proposal Score

Critical to get all PE points in UB/UBMS grant Critical to get all PE points in UB/UBMS grant competition competition

Page 24: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Mandatory ObjectivesMandatory Objectives

Academic Improvement:

____% of all UB participants, who at the time of entrance into the project had an expected high school graduation date during the school year, will have achieved at the proficient level during high school on state assessments in reading/language arts and math.

Page 25: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Mandatory ObjectivesMandatory Objectives

Project RetentionProject Retention::

___% of 9th, 10th, and 11th grade project ___% of 9th, 10th, and 11th grade project participants served during each school year will participants served during each school year will continue to participate in the project during the continue to participate in the project during the next school year.next school year.

Page 26: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Mandatory ObjectivesMandatory Objectives

Postsecondary EnrollmentPostsecondary Enrollment::

___% of all UB participants, ___% of all UB participants, who at the time of who at the time of entrance into the project had an expected entrance into the project had an expected graduation date during the school year,graduation date during the school year, will enroll will enroll in a program of postsecondary education by the in a program of postsecondary education by the fall term immediately following the expected fall term immediately following the expected graduation date from high school.graduation date from high school.

Page 27: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Mandatory ObjectivesMandatory Objectives

Postsecondary PersistencePostsecondary Persistence::

___% of all UB participants who enrolled in ___% of all UB participants who enrolled in a program of postsecondary education a program of postsecondary education during the fall term immediately following during the fall term immediately following high school graduation will be enrolled for high school graduation will be enrolled for the fall term of the second academic year.the fall term of the second academic year.

Page 28: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Prior Experience CriteriaPrior Experience Criteria

((1) (3 points) Whether the applicant serves the 1) (3 points) Whether the applicant serves the number of participants agreed to under the approved number of participants agreed to under the approved application;application;

(2) (3 points) The extent to which project participants (2) (3 points) The extent to which project participants have demonstrated improvement in academic skills have demonstrated improvement in academic skills and competencies as measured by standardized and competencies as measured by standardized achievement tests and grade point averages; achievement tests and grade point averages;

Academic Improvement on Standardized Tests Academic Improvement on Standardized Tests

ObjectiveObjective

Page 29: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Prior Experience CriteriaPrior Experience Criteria

(3) (3 points) The extent to which project (3) (3 points) The extent to which project participants continue to participate in the participants continue to participate in the Upward Bound Program until they complete Upward Bound Program until they complete their secondary education program;their secondary education program;

Project Retention ObjectiveProject Retention Objective

Page 30: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Prior Experience CriteriaPrior Experience Criteria

(4) (3 points) The extent to which participants (4) (3 points) The extent to which participants who complete the project, or were scheduled who complete the project, or were scheduled to complete the project, undertake programs of to complete the project, undertake programs of postsecondary education; andpostsecondary education; and

Postsecondary Enrollment ObjectivePostsecondary Enrollment Objective

Page 31: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Prior Experience CriteriaPrior Experience Criteria

(5) (3 points) The extent to which participants (5) (3 points) The extent to which participants who complete the project, or were scheduled who complete the project, or were scheduled to complete the project, succeed in education to complete the project, succeed in education beyond high school, including the extent to beyond high school, including the extent to which they (persist) graduate from which they (persist) graduate from postsecondary education programs.postsecondary education programs.

Postsecondary Persistence ObjectivePostsecondary Persistence Objective

Page 32: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Prior Experience Prior Experience

UB/UBMS PE Criteria Chart

UB/UBMS Dept of Ed PE Assessment Form

Page 33: SAEOPP Priority 1 Training Proposed Changes to Upward Bound, UB Math/Science & Veteran’s UB Annual Performance Report

Questions & AnswersQuestions & Answers