I-49 North Segment K Project Segmental Concrete Girder Design
2013 Louisiana Transportation Conference Session 58
Craig Finley, P.E., Finley Engineering Group, Inc., Tallahassee, FLDurk Krone, P.E., TRC Engineers, Inc., Baton Rouge, LA
I-220 at Russell Road
I-49 over MLK Drive
Ramp SE
Ramp EN
Ramp WN
-
7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013
2/20
Results you can rely on
AGENDA
2
Site Location Corridor
Project Team
Timeline for Development of Segment K
Site Plan Bridges to be Designed in Segmental Segmental Design
Project Specific Design Features
Segmental Construction Details
Closing Remarks & Questions
-
7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013
3/20
Results you can rely on
ARKANSAS
SITE LOCATION
3
185 MILES TO
DALLAS, TX
T
E
X
A
S
M
I
S
S
I
S
S
I
P
P
I
PROJECTSITE
LAFAYETTEBATONROUGE
NEWORLEANS
-
7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013
4/20
Results you can rely on
CORRIDOR
4
SEGMENTS A JALL UNDER
CONSTRUCTION
OR COMPLETED
SEGMENT K
-
7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013
5/20
Results you can rely on
PROJECT TEAM
5
Louisiana DOTD Baton Rouge, LA
o Joachim C. Umeozulu, P.E. Project Managero Paul Vaught, III, P.E. Bridge Design Project Manager
TRC Engineers Baton Rouge, LAo Durk Krone, P.E. Principal / Project Manager
o Michael Paul, P.E. Deputy Project Manager
Finley Engineering Group Tallahassee, FLo Craig Finley, P.E. Project Principal
o Jerry Pfuntner, S.E., P.E. Project Manager / Designer
Touchstone Architects Tallahassee, FLo Bradley Touchstone, AIA - Principal
NTB Associates Shreveport, LAo Paul Rossini, PLS President/CEO
o Dexter Grogan, P.E. Bridge Design
AFJM, Inc. Shreveport, LAo E.L. Skip James, Jr. Director of Transportationo Elba Hamilton, P.E. Project Engineer
BRIDGE
DESIGN
ROADWAY DESIGN
-
7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013
6/20
Results you can rely on
TIMELINE FOR DEVELOPMENT OF SEGMENT K
DATEJUNE 6, 2006
MAY 25, 2007
AUGUST 2, 2010
JULY 7, 2011
JANUARY 5, 2012
JANUARY 2, 2013
EVENT
TRC received Notice-to-Proceed for Preliminary
Bridge Design
Project placed on-hold
Supplement No. 1 Notice-to-ProceedDOTD, ASBI, TRC Discuss potential
implementation of segmental bridge construction
DOTD/TRC Discussed the steps needed to
develop final plans for the implementation ofsegmental bridge design for 3 ramp structures.
DOTD issued Advanced Notice-to-Proceed to TRC
6
-
7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013
7/20Results you can rely on
Site Plan Bridges to be Designed in Segmental
7
I-220 at Russell Road
I-49 over MLK Drive
Ramp SE
Ramp EN
Ramp WN
-
7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013
8/20Results you can rely on
A SEGMENTAL BRIDGE
8
Is A Construction Technique.with Design Implications
SEGMENTAL DESIGN
-
7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013
9/20Results you can rely on
SEGMENTAL DESIGN
9
3 Bridges, 700 Segments, 271,000 sf. Deck Area Span for Lengths 120 to 260, radius 550 (Ramp WN)
3 Roadway Cross Sections 31.5, 35.5, and up to 52 wide
Pier Heights of 20 to 90
Foundations and Access
Aesthetics Without Cost
Best Practices Approach
SEGMENTAL DESIGN CHALLENGES
-
7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013
10/20Results you can rely on
SEGMENTAL DESIGN
10
Precast Segmental Balanced Cantilever, Erected by Cranes
Combination of Haunched and Constant Depth Segments
One Set of Casting Machines
External Post-Tensioning with Diabolos
Best Practices Good Experience
SEGMENTAL DESIGN SOLUSTIONS
-
7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013
11/20Results you can rely on
PROJECT SPECIFIC DESIGN FEATURES
11
Project Design Criteria
LADOTD BDM with some extras
Principal Stress Requirement 3fc
Shear AASHTO LRFD and Segmental Guide Specifications
Analysis Software
3-D Time Dependent
Serviceability and Maintainability
Tendon Replacement and Bearing Replacement
Load Rating
FEATURES-SEGMENTAL DESIGN
-
7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013
12/20Results you can rely on
SEGMENTAL CONSTRUCTION DETAILS
12
Precast Segmental Construction
PRECASTING
-
7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013
13/20Results you can rely on
SEGMENTAL CONSTRUCTION DETAILS
13
Forms to Accommodate Width and Depth Differences
PRECASTING MACHINES
-
7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013
14/20Results you can rely on
SEGMENTAL CONSTRUCTION DETAILS
14
5 Segment Types 1 Form Set
SEGMENT TYPES
-
7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013
15/20Results you can rely on
SEGMENTAL CONSTRUCTION DETAILS
15
Balanced Cantilever Construction
SEGMENT ERECTION
-
7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013
16/20Results you can rely on
SEGMENTAL CONSTRUCTION DETAILS
16
External Post-Tensioning and Diabolos
EXTERNAL PT
zzzz
-
7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013
17/20Results you can rely on
SEGMENTAL CONSTRUCTION DETAILS
17COMPLETED BRIDGE
-
7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013
18/20Results you can rely on
CLOSING REMARKS & QUESTIONS
Site Location Corridor
Timeline for Development of Segment K
Project Team Site Plan Bridges to be Designed in Segmental
Segmental Design
Project Specific Design Features
Segmental Construction Details
18
-
7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013
19/20Results you can rely on
QUESTIONS
19
-
7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013
20/20
20
Durk Krone, P.E., PrincipalTRC Engineers, Inc.
8550 United Plaza Boulevard, Suite 502
Baton Rouge, LA 70809
T: 225.216.7483
Follow us LinkedIn Twitterwww.trcsolutions.com
Craig Finley, Jr., P.E., PrincipalFinley Engineering Group, Inc.
1589 Metropolitan Boulevard
Tallahassee, FL 32308-3776
T: 850.894.1600
Follow Us Like Us
www.finleyengineeringgroup.com
Speaker Information
http://www.linkedin.com/company/7886http://twitter.com/TRC_Companieshttp://www.trcsolutions.com/http://www.linkedin.com/company/2478743http://www.facebook.com/pages/Finley-Engineering-Group-Inc-FINLEY/105667859557110http://www.finleyengineeringgroup.com/http://www.linkedin.com/company/2478743http://www.linkedin.com/company/2478743http://www.facebook.com/pages/Finley-Engineering-Group-Inc-FINLEY/105667859557110http://www.finleyengineeringgroup.com/http://www.finleyengineeringgroup.com/http://www.facebook.com/pages/Finley-Engineering-Group-Inc-FINLEY/105667859557110http://www.linkedin.com/company/2478743http://www.trcsolutions.com/http://twitter.com/TRC_Companieshttp://www.linkedin.com/company/7886