    I-49 North Segment K Project Segmental Concrete Girder Design

    2013 Louisiana Transportation Conference Session 58

    Craig Finley, P.E., Finley Engineering Group, Inc., Tallahassee, FLDurk Krone, P.E., TRC Engineers, Inc., Baton Rouge, LA

    I-220 at Russell Road

    I-49 over MLK Drive

    Ramp SE

    Ramp EN

    Ramp WN

  • 7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013

    2/20

    Results you can rely on

    AGENDA

    2

    Site Location Corridor

    Project Team

    Timeline for Development of Segment K

    Site Plan Bridges to be Designed in Segmental Segmental Design

    Project Specific Design Features

    Segmental Construction Details

    Closing Remarks & Questions

  • 7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013

    3/20

    Results you can rely on

    ARKANSAS

    SITE LOCATION

    3

    185 MILES TO

    DALLAS, TX

    T

    E

    X

    A

    S

    M

    I

    S

    S

    I

    S

    S

    I

    P

    P

    I

    PROJECTSITE

    LAFAYETTEBATONROUGE

    NEWORLEANS

  • 7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013

    4/20

    Results you can rely on

    CORRIDOR

    4

    SEGMENTS A JALL UNDER

    CONSTRUCTION

    OR COMPLETED

    SEGMENT K

  • 7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013

    5/20

    Results you can rely on

    PROJECT TEAM

    5

    Louisiana DOTD Baton Rouge, LA

    o Joachim C. Umeozulu, P.E. Project Managero Paul Vaught, III, P.E. Bridge Design Project Manager

    TRC Engineers Baton Rouge, LAo Durk Krone, P.E. Principal / Project Manager

    o Michael Paul, P.E. Deputy Project Manager

    Finley Engineering Group Tallahassee, FLo Craig Finley, P.E. Project Principal

    o Jerry Pfuntner, S.E., P.E. Project Manager / Designer

    Touchstone Architects Tallahassee, FLo Bradley Touchstone, AIA - Principal

    NTB Associates Shreveport, LAo Paul Rossini, PLS President/CEO

    o Dexter Grogan, P.E. Bridge Design

    AFJM, Inc. Shreveport, LAo E.L. Skip James, Jr. Director of Transportationo Elba Hamilton, P.E. Project Engineer

    BRIDGE

    DESIGN

    ROADWAY DESIGN

  • 7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013

    6/20

    Results you can rely on

    TIMELINE FOR DEVELOPMENT OF SEGMENT K

    DATEJUNE 6, 2006

    MAY 25, 2007

    AUGUST 2, 2010

    JULY 7, 2011

    JANUARY 5, 2012

    JANUARY 2, 2013

    EVENT

    TRC received Notice-to-Proceed for Preliminary

    Bridge Design

    Project placed on-hold

    Supplement No. 1 Notice-to-ProceedDOTD, ASBI, TRC Discuss potential

    implementation of segmental bridge construction

    DOTD/TRC Discussed the steps needed to

    develop final plans for the implementation ofsegmental bridge design for 3 ramp structures.

    DOTD issued Advanced Notice-to-Proceed to TRC

    6

  • 7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013

    7/20Results you can rely on

    Site Plan Bridges to be Designed in Segmental

    7

    I-220 at Russell Road

    I-49 over MLK Drive

    Ramp SE

    Ramp EN

    Ramp WN

  • 7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013

    8/20Results you can rely on

    A SEGMENTAL BRIDGE

    8

    Is A Construction Technique.with Design Implications

    SEGMENTAL DESIGN

  • 7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013

    9/20Results you can rely on

    SEGMENTAL DESIGN

    9

    3 Bridges, 700 Segments, 271,000 sf. Deck Area Span for Lengths 120 to 260, radius 550 (Ramp WN)

    3 Roadway Cross Sections 31.5, 35.5, and up to 52 wide

    Pier Heights of 20 to 90

    Foundations and Access

    Aesthetics Without Cost

    Best Practices Approach

    SEGMENTAL DESIGN CHALLENGES

  • 7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013

    10/20Results you can rely on

    SEGMENTAL DESIGN

    10

    Precast Segmental Balanced Cantilever, Erected by Cranes

    Combination of Haunched and Constant Depth Segments

    One Set of Casting Machines

    External Post-Tensioning with Diabolos

    Best Practices Good Experience

    SEGMENTAL DESIGN SOLUSTIONS

  • 7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013

    11/20Results you can rely on

    PROJECT SPECIFIC DESIGN FEATURES

    11

    Project Design Criteria

    LADOTD BDM with some extras

    Principal Stress Requirement 3fc

    Shear AASHTO LRFD and Segmental Guide Specifications

    Analysis Software

    3-D Time Dependent

    Serviceability and Maintainability

    Tendon Replacement and Bearing Replacement

    Load Rating

    FEATURES-SEGMENTAL DESIGN

  • 7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013

    12/20Results you can rely on

    SEGMENTAL CONSTRUCTION DETAILS

    12

    Precast Segmental Construction

    PRECASTING

  • 7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013

    13/20Results you can rely on

    SEGMENTAL CONSTRUCTION DETAILS

    13

    Forms to Accommodate Width and Depth Differences

    PRECASTING MACHINES

  • 7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013

    14/20Results you can rely on

    SEGMENTAL CONSTRUCTION DETAILS

    14

    5 Segment Types 1 Form Set

    SEGMENT TYPES

  • 7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013

    15/20Results you can rely on

    SEGMENTAL CONSTRUCTION DETAILS

    15

    Balanced Cantilever Construction

    SEGMENT ERECTION

  • 7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013

    16/20Results you can rely on

    SEGMENTAL CONSTRUCTION DETAILS

    16

    External Post-Tensioning and Diabolos

    EXTERNAL PT

    zzzz

  • 7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013

    17/20Results you can rely on

    SEGMENTAL CONSTRUCTION DETAILS

    17COMPLETED BRIDGE

  • 7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013

    18/20Results you can rely on

    CLOSING REMARKS & QUESTIONS

    Site Location Corridor

    Timeline for Development of Segment K

    Project Team Site Plan Bridges to be Designed in Segmental

    Segmental Design

    Project Specific Design Features

    Segmental Construction Details

    18

  • 7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013

    19/20Results you can rely on

    QUESTIONS

    19

  • 7/29/2019 S58_I-49 North Segment K Project Segmental Concrete Girder Design_LTC2013

    20/20

    20

    Durk Krone, P.E., PrincipalTRC Engineers, Inc.

    8550 United Plaza Boulevard, Suite 502

    Baton Rouge, LA 70809

    [email protected]

    T: 225.216.7483

    Follow us LinkedIn Twitterwww.trcsolutions.com

    Craig Finley, Jr., P.E., PrincipalFinley Engineering Group, Inc.

    1589 Metropolitan Boulevard

    Tallahassee, FL 32308-3776

    [email protected]

    T: 850.894.1600

    Follow Us Like Us

    www.finleyengineeringgroup.com

    Speaker Information

    http://www.linkedin.com/company/7886http://twitter.com/TRC_Companieshttp://www.trcsolutions.com/http://www.linkedin.com/company/2478743http://www.facebook.com/pages/Finley-Engineering-Group-Inc-FINLEY/105667859557110http://www.finleyengineeringgroup.com/http://www.linkedin.com/company/2478743http://www.linkedin.com/company/2478743http://www.facebook.com/pages/Finley-Engineering-Group-Inc-FINLEY/105667859557110http://www.finleyengineeringgroup.com/http://www.finleyengineeringgroup.com/http://www.facebook.com/pages/Finley-Engineering-Group-Inc-FINLEY/105667859557110http://www.linkedin.com/company/2478743http://www.trcsolutions.com/http://twitter.com/TRC_Companieshttp://www.linkedin.com/company/7886