S2000M: International Specification for Material ManagementRelatore:Giulio SchiavoLeonardo S.p.A. CSS&T Logistic EngineeringE-mail: [email protected]: www.leonardocompany.com
2
Working experience:
ASD S2000M & IPS Specifications:• SSG (Strategic Standardization Group) Member for Italian Industry• Certified Trainer for S2000M Specification - Material Management• S2000M Steering Committee Member for Italian Industry• S2000M Provisioning Working Group (PWG) Member
LEONARDO Aircraft Division:• Digital Solutions & Innovation for Customer Support & Services• Obsolescence Manager for Eurofighter & C-27J Programs
Perimeter of expertise:15 years of experience for a multi-national enterprise in Aerospace & Defence.
Geographical work experience: Italy, with experience in multi-national collaboration Programs
Key knowledge areas: • Integrated Product Support • IPS Specifications Development & Interoperability • Digital Solutions & Innovation for Product Support • Obsolescence Management
Giulio Schiavo
Leonardo Aircraft Division
Master Degree in Aerospace Engineering Politecnico di Torino,
Turin (Italy)
Speaker Presentation
S2000M Introduction
ASD/AIA specification S2000M (S2000M) defines thematerial management processes and procedures to beapplied in support of military and non-military products.
It forms part of a common, interoperable, international ASDSuite of Integrated Product Support (IPS) specifications,which is prepared in concert by the Aerospace and DefenceIndustries Association of Europe (ASD) and the AerospaceIndustries Association of America (AIA).
Throughout the years, the S2000M has been revised severaltimes. The latest published version is Issue 6.1 of 01 March2017 and is composed by 844 pages.
This issue as well as the older issues of S2000M areavailable for download from:
www.s2000m.org
3
Position of S2000M within the AIA-ASD IPS S-Suite
Main inputs from:
Design
S3000L (LSA) (1)
Main outputs to: S1000D (IPD) (2)
Users (IPL/SPL, CPL, Materials)
4
(1) Interface Specification S2000X (input data to S2000M): work in progress.(2) Interface Specification S1000X (input data to S1000D) Issue 0.1 published in Dec. 2020; Issue 1.0 planned for April 2021.
5
S2000M Governance Structure & Participating Organizations
S2000MSteering Committee
PWG MSWG IOTWG
Responsibility for maintaining S2000M is vested in the Steering Committee, which comprises one Military and one Industry voting representative from each Nation concerned in the preparation and use of the Spec.Subordinate to the SC, are three working groups: PWG: Provisioning Working Group (Ch.1 - Ch.2) MSWG: Material Supply Working Group (Ch.2 - Ch.3) IOTWG: InterOperability & Technology Working
Group (Ch.4)
Membership SC S2000M - Industry and Military (MoDs and Agencies) ParticipationActive members: AUT (Ind & Mil), GER (Ind & Mil), ITA (Ind), SPA (Ind), UK (Mil), Agencies (NSPA, NETMA, OCCAR)“Silent” members: ITA (Mil), FRA (Ind & Mil), SP (Mil), BEL (Ind & Mil), UK (Ind), SVE (Ind & Mil); USA (Ind & Mil), TUR (Mil)
5
DMEWG
S2000M Development History
• Issue 2.1 (1992) and Issue 3.0 (1998): Defined the material management processes and procedures to beused in support of aircraft and other aerospace airborne and ground equipment supplied to militarycustomers; still used by some international projects (e.g. Eurofighter, NH90, A400M Provisioning).
• Issue 4.0 (2005): Revised the S2000M to include the business processes and data requirements applicableto any military product (e.g. Land & Sea Defense Programs); in use for A400M Material Supply and NATOAGS.
• Issue 6.1 (2017): Revised the S2000M again for the support of both military product and non-militaryproduct; a set of XML messages was introduced, based on the objective to support exchange of data withother IPS disciplines.
• Issue 7.0 (2021): Will introduce new Chapter 2 & 3 modelling, PBL and ITAR information; MALE RPAS andFCAS are planning to use.
6
S2000M Main Users
7
ProjectMilitary User
ITALYEurofighter Typhoon Y
AW101 Civil & Mi litary Y
A109 Civil & Military Y
AW139 Y
AW169
AW189
NH90 Y
A109LUH Mili tary
AB205 Mi litary Y
AB206 Civil & Military Y
AB212 Mili tary Y
AB412 Civil & Military Y
CH47C Mili tary (Ital ian) Y
AH-129C/AH-129D Mil itary (Italian & Foreign) Y
AW159
NH-500 Y
Cannone Navale 127/64 Oto Melara
Sistema di Comando Control lo e Navigazione EI Y
NATO AGS Y
TORNADO (partial usage) Y
Eurocopter Tiger
A400M
RAFALE
S2000M Purpose• The S2000M defines the processes, the
procedures and provides the information fordata exchange to be used for spares andsupport materials management throughoutthe whole lifecycle of a Product.
• The S2000M purpose is to standardize thebusiness relationship between two or moreparties (e.g. Customer and Contractor) byproviding:
8
S2000M Purpose• The S2000M defines the processes, the
procedures and provides the information fordata exchange to be used for spares andsupport materials management throughoutthe whole lifecycle of a Product.
• The S2000M purpose is to standardize thebusiness relationship between two or moreparties (e.g. Customer and Contractor) byproviding:
the data elements
9
DATA ELEMENT DEFINITION
DATA ELEMENT NAME breakdownElementEssentiality
TEI / ACRONYM ESC
FORMAT n1
XML DATA TYPE simpleType, basic data type: decimal minimum length: 1 maximum length: 1 minimum value: 0 maximum value: 9
SUB DATA ELEMENTS --
ATTRIBUTE(S) --
USAGE
Chap 1 (Provisioning)
DESCRIPTION/PURPOSE
Indicates whether a part is essential to the operation of a Product (eg Weapon System, Aircraft, Engine, Ship or other like Product).
CODE(S)
1 Product cannot be operated with the part unserviceable 2 Product can sometimes be operated with the part unserviceable 3 Product can always be operated with the part unserviceable
REMARK(S)
This data element is to be used for spares Provisioning only. The use and application of this data element is to be agreed at the beginning of the Project. When its use is agreed it has to be provided for all items with figureItemReasonForSelection other than 0.
EXAMPLE(S)
--
S2000M Purpose• The S2000M defines the processes, the
procedures and provides the information fordata exchange to be used for spares andsupport materials management throughoutthe whole lifecycle of a Product.
• The S2000M purpose is to standardize thebusiness relationship between two or moreparties (e.g. Customer and Contractor) byproviding:
the data elements the process flows
10
Extended ProcessFlow ChartCONTRACTOR CUSTOMER (HOME) NCB TIMESCALE
GUIDANCE CONFERENCE
PRE-ASSESSMENT MEETING (If required)
PREPARE DRAFT PROVISIONING DATA / ILLUSTRATIONS
ISSUE DRAFT PROVISIONING DATA / ILLUSTRATIONS
PREPARE FORMAL PROVISIONIG DATA INCORPORATING NSNsAND AGREED OBSERVATIONS
REVIEW DRAFT IPROVISIONING DATA / ILLUSTRATIONS. RAISE OBSERVATIONS IF NECESSARY
ISSUE OBSERVATIONS TO ALL CONCERNED
PREPARE/ISSUE MASTER PROVISIONING DATA /
ILLUSTRATIONS RECEIVE MASTER PROVISIONING DATA /
ILLUSTRATIONS. RAISE OBSERVATIONS IF
NECESSARY
QUANTIFY SPARES AND PLACE ORDERS I.A.W. CHAPTER 3
SCREEN FOR EXISTING NSNs. INITIATE CODIFICATION FOR
NEW ITEMS
ADVISE AVAILABLE NSNs
SUPPLY MISSING NSNs
PREPARE/DISTRIBUTE CORRECTIONS IF REQUIRED
21 Calendar Days
DISTRIBUTE CONSOLIDATED OBSERVATION LIST AND
FORMAL PROVISIONING DATA / CHANGED ILLUSTRATIONS
RECEIPT CONSOLIDATED OBSERVATION LIST. RESPOND
TO FORMAL/COL (MASTER/PAM)
7 Calendar Days
7 Calendar Days(or longer if PAM is
required)
7 Calendar Days
14 Calendar Days
Presentation and Update of Presentation
Reco
mm
ende
d tim
e-sc
ale.
Can
be
agre
ed o
ther
wise
on
a ca
se-b
y-ca
se b
asis
or a
t the
star
t of t
he p
roje
ct (
Dec
ision
to
be m
ade
at G
uida
nce
Conf
eren
ce)
S2000M Purpose• The S2000M defines the processes, the
procedures and provides the information fordata exchange to be used for spares andsupport materials management throughoutthe whole lifecycle of a Product.
• The S2000M purpose is to standardize thebusiness relationship between two or moreparties (e.g. Customer and Contractor) byproviding:
the data elements the process flows
the relevant transactions for data exchange
11
S2000M Content
The S2000M is organized into the following chapters:• Chapter 1 - Provisioning• Chapter 2 - Spare Parts List
• Chapter 3 - Material Supply• Chapter 4 - Communication Techniques
• Chapter 5 - Data Dictionary• Chapter 6 - Definitions, Abbreviations and
Reference Documents• S2000M Chapter 1 XML Schemas
• S2000M Chapter 2 + 3 + 4 XML Schemas
12
S2000M ContentChapter 1 Provisioning• Provisioning is the process of selecting support items and spares, necessary for the support of all categories of
Products. • This chapter defines the process and specifies the data, formats and transmission procedures to be used in
providing provisioning information to the Customer.
• It also provides the database from which IPC (Illustrated Parts Catalogue) or IPDP (Illustrated Parts Data Publication) are produced.
13
S2000M Content
Chapter 1 Provisioning• The Provisioning chapter (Chapter 1) consists of the
following five elements:• Chapter 1.0 Provisioning, general: General
remarks, instructions and business rules concerning Provisioning as per S2000M.
14
DATA ELEMENT NAME TEI /
ACR
ON
YM
Draf
t
Form
al
Mas
ter
Upda
te(1
)
Rest
ate
Part
Orie
nted
Pro
visio
ning
Pro
ject
Mes
sage
(Bas
elin
e)
Loca
tion
Orie
nted
Pro
visio
ning
Pro
ject
Mes
sage
(B
asel
ine)
Part
Orie
nted
Pro
visio
ning
Pro
ject
Mes
sage
(Upd
ate)
Loca
tion
Orie
nted
Pro
visio
ning
Pro
ject
Mes
sage
(Upd
ate)
Prov
ision
ing
Prog
ram
Mes
sage
CODR
EQ M
essa
ge
Tailo
rizat
ion
Poss
ible
Appl
icab
ility
- Sp
are
Appl
icab
ility
- No
n Sp
are
Business Rule
Message Data - Provisioning Project Message Data
messageIdentifier DRS M M M M M X X X X X M - n/a
n/a
MessageSender TOD M M M M M X X X X X M - n/a
n/a
MessageRelationship DRR n/a
n/a
n/a C C - - X X - - - n/
a n/a
Shall be provided when reference to a previous incoming or outgoing message is required. Else shall not be there.
MessageReceiver ADD M M M M M X X X X X M - n/a
n/a
messageCreationDate DRD M M M M M X X X X X M - n/a
n/a
messageLanguage LGE M M M M M X X X X X M - n/a
n/a
messageContentStatus MCS M M M M M X X X X X M . n/a
n/a
remarkText RMK C C C C C X X X X X C - n/a
n/a
Data Element shall be provided when free text in association with Provisioning Data data transmission is to be provided.
informationExportTradeControl IEC C C C C C X X X X X C n/a
n/a
Shall be provided when data within the transmission is subject to export or trade control and use of this data element has been agreed between Customer and Contractor at the start of the project. Rules for use and codes to be used must also be agreed at the start of the project.
productIdentifier MOI M M M M M X X X X X M - n/a
n/a
provisioningProjectIdentifier IPP M M M M M X X X X X M - n/a
n/a
provisioningProjectStatus ISS M M M M n/a X X X X X - - n/
a n/a
provisioningProjectSubject IPS M M M M M X X X X X M - n/a
n/a
provisioningProjectTypeOfPresentation FID M M M M M X X X X - M - n/
a n/a
If provisioningProjectTypeOf Presentation (FID) is S, MOV needs to be provided. If item's application is
S2000M ContentChapter 1 Provisioning• The Provisioning chapter (Chapter 1) consists of the following
five elements:• Chapter 1.1 Initial Provisioning List (IPL): This chapter covers the
Provisioning Program presentation, the presentation of a baseline for a Product (IPL) as well as the update of that presentation.
15
CSN ISN IND PNR DESCRIPTION APPLICABILITY RTX
00001101 000 00A 1 J00020000-801 PRODUCT, FIGHTER AIRPLANE (SS/TS)
00001101 001 00A 2 J00020001-801 AIRPLANE, FIGHTER (SS) 00001102 000 00A
00001101 001 05A 2 J00020002-801 AIRPLANE, FIGHTER (TS) 00001103 000 00A
00001102 000 00A 1 J00020001-801 AIRPLANE, FIGHTER (SS)
.
. 2 Instal lation Drawings (SS)
00001102 010 00A 2 J53220001-801 CENTRE FUSELAGE (SS) 53201101 000 00A
00001103 000 00A 1 J00020002-801 AIRPLANE, FIGHTER (TS)
.
. 2 Instal lation Drawings (TS)
00001103 010 00A 2 J53220002-801 CENTRE FUSELAGE (TS) 53201101 000 05A
IPP C04190071
PRODUCT, FIGHTER AIRPLANE
FIGURE 01
FIGURE 02
FIGURE 03
Go To IPP C04190044
FUEL SYSTEM EXAMPLE
532011 01 007 PN J28020010-801 (SS)532011 01 008 PN J28020011-801 (TS)C04190044INSTALLATION FUEL SYSTEM
280011 01 000 00A PN J28020010-801 (SS)280011 01 000 05A PN J28020011-801 (TS)C04190010INSTALLATION FUEL SYSTEM
280011 01 001 00A C04190010PN J28220014-801 (TS)INSTALLATION FUEL SYSTEM TWIN SEATER
280011 01 002 00AC04190010PN J28220000-801 (SS/TS)INSTALLATION FUEL SYSTEM GROUND REFUEL AVIONIC BAY TWIN SEAT
280011 01 003 00AC04190010PN J28220020-801 (TS)INSTALLATION FUEL LINE AVIONIC BAY TWIN SEAT
280011 01 004 00A C04190010PN J28220003-801 (SS/TS)VENT AND PRESSURISATION
280011 01 005 00AC04190010PN J28020005-801 (SS/TS)INSTALLATION FUEL SYSTEM WING/EXT BAY
282111 02 000 00A C04190014PN J28220014-801 (TS)INSTALLATION FUEL SYSTEM TWIN SEATER
282011 01 000 00A C04190013PN J28220000-801 (SS/TS)INSTALLATION FUEL SYSTEM GROUND REFUEL AVIONIC BAY TWIN SEAT
282111 03 000 00AC04190014PN J28220020-801 (TS)INSTALLATION FUEL LINE AVIONIC BAY TWIN SEAT
281411 01 000 00AC04190012PN J28220003-801 (SS/TS)VENT AND PRESSURISATION
282211 01 000 00A C04190015PN J28020005-801 (SS/TS)INSTALLATION FUEL SYSTEM WING/EXT BAY
281411 01 120 00AC04190012PN FRH250012VALVE, STOP-CHECK
IPPN0117B0013PN FRH250012 VALVE, STOP-CHECK
282011 02 000 00AC04190013PN FRH250017PVALVE, STOP-CHECK
282011 01 005 00A C04190013PN FRH250017PVALVE, STOP-CHECK
532011 01 000 PN J53220001-801 (SS)532011 01 000 PN J53220002-801 (TS)C04190044GA CENTRE FUSELAGE
000011 02 010 PN J53220001-801 (SS)000011 03 010 PN J53220002-801 (TS)C04190071GA CENTRE FUSELAGE
.
.
.
.
.
.
000011 02 000 PN J00020001-801 (SS)000011 03 000 PN J00020002-801 (TS)C04190071AIRPLANE, FIGHTER
000011 01 000 PN J00020000-801 (SS / TS)C04190071GA OF PRODUCT
Breakdown Breakdown
RTX: 282011 02 000 00A
RTX: 282011 01 005 00A
RTX: IPPN0117B0013
CSN ISN IND PNR DESCRIPTION APPLICABILITY FAC/UOC RTX
28001101 000 00A 1 J28020010-801 INSTALLATION FUEL SYSTEM SINGLE SEATER (SS) A 53201101 007 00A
28001101 000 05A 1 J28020011-801 INSTALLATION FUEL SYSTEM TWIN SEATER (TS) B 53201101 008 00A
28001101 001 00A 2 J28220014-801 INSTALLATION FUEL SYSTEM TWIN SEATER (TS) - B - - - - 28211102 000 00A
28001101 002 00A 2 J28220000-801 INSTALLATION FUEL SYSTEM GROUND REFUEL (SS/TS) 28201101 000 00A
28001101 003 00A 2 J28220020-801 INSTALLATION FUEL LINE AVIONIC BAY (TS) - B - - - - 28211103 000 00A
28001101 004 00A 2 J28220003-801 VENT AND PRESSURISATION (SS/TS) 28141101 000 00A
28001101 005 00A 2 J28020005-801 INSTALLATION FUEL SYSTEM WING/EXT BAY (SS/TS) 28221101 000 00A
IPP C04190010
INSTALLATION FUEL SYSTEM
Go To IPP C04190013
Go To IPP C04190012
S2000M Content
Chapter 1 Provisioning• The Provisioning chapter (Chapter 1) consists of the
following five elements:• Chapter 1.2 Observations: Observations are the exchange
of information between Customer and Contractor (or vice versa) during the Provisioning Process; they are typically based on review by either party of the Initial Provisioning Lists (IPL) or updates thereof.
16
S2000M Content
Chapter 1 Provisioning• The Provisioning chapter (Chapter 1) consists of the
following five elements:• Chapter 1.3 Codification: NATO Codification covers
the processes and information flow between Industry, the NCBs (National Codification Bureaux) and the Customer for all activities related to Codification. However, S2000M can be applied without using NATO Codification.
17
S2000M ContentChapter 1 Provisioning• The Provisioning chapter (Chapter 1) consists of the following five elements:• Chapter 1.4 Structure for data exchange: This chapter defines a coherent Data Model for the data that can
be exchanged as part of the Provisioning process.
18
• partIdentifier (PID) – identifier • partName (DFP) – descr
• serializedItemTraceabilityRequirement(SIM) –class• hardwarePartSize (SUU) – 3D dimension• hardwarePartWeight (WUU) – value/unit• hardwarePartCalibrationRequirement (CMK) – (Y/N)• hardwarePartElectromagneticIncompatible (EMI) – (Y/N)• hardwarePartElectrostaticSensitive (ESS) – (Y/N)• hardwarePartElectromagneticSensitive (EMS) – (Y/N)• hardwarePartMagneticSensitive (MSE) – (Y/N)• hardwarePartRadiationSensitive (RSE) – (Y/N)• hardwarePartSpecialStorageRequirement (STR) – (Y/N)• hardwarePartHazardousClass (HAZ) –class• hardwarePartShelfLifeType (SLT) - class• hardwarePartShelfLifeLimit (SLM) – value/unit• hardware PartShelfLifeLimitAction (SLA) –class• hardwarePartTotalLifeLimit (TLF) –value/unit• hardwarePartOperationalAuthorizedLife (AUL) –value/unit
• partDemilitarizationClass (DEC) –class• securityClass (SCC) –class• partsensitiveItemClass (SIC) –class• hardwarePartPilferageClass (PSC) – class
HardwarePartAsDesigned
HardwarePartAsDesignedDesignData
HardwarePartAsDesignedControlledItemData
• partIdentifier (PID) – identifier • partName (DFP) – descr
ReplacementPartRelationship
• changeAuthorizationIdentifier (CAN) – identifier
ChangeAuthorization
UoF S2000M - Part Definition Data
• hardwarePartProvisioningCategory (ITY) –class• hardwarePartRepairability (SPC) –class• hardwarePartFitmentLevel (FTC) –class• hardwarePartScrapRate (SRA) –value/unit• timeBetweenOverhaul (TBO) –value/unit• timeBetweenScheduledShopVisits (TSV) –value/unit• contractorRepairTurnAroundTime (CRT) –value/unit
HardwarePartAsDesignedSupportData
0..*
• requirementsDefinitionNumber(AGE) – identifier
PartRequirementsDefinition
0..1
0..1
0..1
0..1
Data Field Values
HardwarePartAsDesigned
partIdentifier (PID)
partNumber (PNR) – IdentifierType FRH010038
manufacturer (MFC) – setByOrganization U9084
partName (DFP) – DescriptorType ACTUATOR, ELECTRO-MECHANICAL, ROTARY
HardwarePartAsDesignedDesignData
serializedItemTraceabilityRequirement (SIM) – ClassificationType 0
hardwarePartSize (SUU) – 3D dimension MM:011900720039
hardwarePartWeight (WUU) – value/unit GM:00300
hardwarePartCalibrationRequirement (CMK) – (Y/N) N
hardwarePartElectromagneticIncompatible (EMI) – (Y/N) N
19 19
Chapter 2 Spare Parts List• The Spare Parts List allows the Customer and Contractor to process
parts data (including commercial data elements) to allow for the processes as described in Chapter 3 (Material Supply) of the Specification without the necessity to use complete processes and transactions as described in Chapter 1 (Provisioning).
S2000M ContentsegmentHeader (1,1) sl0 template =
SPL_derived_pricing_for_SPEC messageType PL1 businessType MASTER DATA customer D00DZ contractor C0419 documentNumber AIRBUS-MD-001 UTCReference 2013-08-12T11:00:00Z productIdentifier 1BMOD primeContractNumber - quotationEffectiveDate - quotationExpiryDate - statusAdviceCode - remarks - segmentPosition (1,n) sl1 segmentSequenceNumber 1 2 partIdentifier K2523\ABC-4710 U0406\XYZ-1320 partName PUMP COLLANT LOCKING SEALANT natoStockNumber 5841992975830 8030992250248 hardwarePartUnitOfIssue EA BT hardwarePartQuantityPerUnitOfIssue - 50 hardwarePartProcurementSource K0999 C0419 partMaintenanceSolution PAOLDA PAOZAD hardwarePartRepairability 6 1 partDemilitarizationClass - - hardwarePartHazardousClass - x securityClass U U partSensitiveItemClass 4 3 hardwarePartPilferageClass I I hardwarePartContainer - - hardwarePartSize - - hardwarePartWeight - - authorizedLifeValue - - hardwarePartTotalLifeLimit - - hardwarePartElectromagneticIncompatible - - hardwarePartElectrostaticSensitive - - electromagneticSensitive - - hardwarePartMagneticSensitive - - hardwarePartRadiationSensitive - - requirementsDefinitionNumber - - serializedItemTraceabilityRequirement - - hardwarePartSpecialStorageRequirement - - recommendedSparesQuantity partUsageMeanTimeBetweenFailure partsDataMatrix segmentSubPosition (1,n) sl2 segmentSequenceNumber 1 2 serviceType reprovisioning reprovisioning hardwarePartProvisioningCategory BD CS hardwarePartPurchasingLeadTime CM\06 CM\02 minimumSalesQuantity - 20 hardwarePartStandardPackageQuanti
ty - 5
hardwarePartUnitOfIssuePrice EUR\5420.00 EUR\95.00 typeOfPrice 06 06 priceBreakInformation - - hardwarePartPackagingRequirement 4 5 deliveryCondition - - adjustableCostDetails - - hardwarePartPackagedSize - - hardwarePartPackagedWeight - - hardwarePartShelfLifeLimit CM\60 CM\12 hardwarePartShelfLifeType 2 1 hardwarePartShelfLifeLimitAction RD - contractualRepairTurnRoundTime - - .
20 20
Chapter 3 Material Supply• The Material Supply Chapter (Chapter 3) consists
of the following elements: • Pricing provides processes, procedures and
techniques for requesting quotations and providing prices using three different methods: o Single priceso Price listso Order based prices
S2000M Content
• Order Administration provides processes, procedures and techniques for placement of orders, order progression and delivery of ordered items. It supports the administration of orders for items as well as for services e.g. repair.
• Transportation provides processes, procedures and techniques for generating and forwarding transport related information.
• Invoicing provides processes, procedures and techniques for generating and forwarding invoices as well as for the invoice acceptance or invoice rejection.
21 21
S2000M Content Example 3.1: Life of an order: RFQ/Quotation (with NPA Price Acceptance) - Ordering - Delivery - Invoice, transaction 6 (Order Placement ) segmentHeader (1,1) so0 container = Ordering messageType OP1 businessType RP-SPARE customer D00DZ contractor C0419 documentNumber LOGZBW-ORD001 UTCReference 2014-02-03T09:00:00Z soldTo D00DZ hardwarePartProcurementSource C0419 segmentPosition (1,n) so1 segmentSequenceNumber 1 partIdentifier C0419\ABC-4710 hardwarePartUnitOfIssue EA primeContractNumber 4600001861 documentReference QP1\ID-AIRBUS001\C0419 ultimateDestinationCode DGYAP hardwarePartUnitOfIssuePrice EUR\27230.00 typeOfPrice 01 deliveryCondition EXW serviceType NEW ITEM segmentSubPosition (1,n) so2 segmentSequenceNumber 1 quantity 10 customerRequiredDeliveryDate 20140630 .
22 22
Chapter 6 Definitions, abbreviations and reference documents• The Glossary of Terms and Definitions is a catalogue
of all the terms utilized in S2000M. Its purpose is to identify the terms and explain their definitions to ensure a common understanding of S2000M.
S2000M ContentDATA ELEMENT DEFINITION
DATA ELEMENT NAME hardwarePartRepairability
TEI / ACRONYM SPC
FORMAT n1
XML DATA TYPE simpleType, basic data type: decimal minimum length: 1 maximum length: 1 minimum value: 0 maximum value: 9
SUB DATA ELEMENTS --
ATTRIBUTE(S) --
USAGE
Chap 1 (Provisioning) Chap 2 (Spare parts list)
DESCRIPTION/PURPOSE
Indicates whether an item is considered to be Expendable or Repairable.
CODE(S)
1 Expendable; Item typically replaced during the maintenance of the product and not economically repairable.
6 Repairable; Item subject to planned or un-planned maintenance which can be restored to acceptable operating conditions or state after damage or failure.
REMARK(S)
The hardwarePartRepairability shall be provided for all items which have a figureItemReasonForSelection (RFS) other than 0. A hardwarePartRepairability code ‘6’ item requires its separate provisioningProjectIdentifier (IPP) to be given in the FigureItemReference (RTX) field in cases where the repairable item has its own Equipment Illustrated Parts Catalogue (IPC).
EXAMPLE(S)
--
Chapter 4 Communication techniques• The purpose of this Chapter is to describe the
standards which exist for the exchange of information under the S2000M procedures.
Chapter 5 Data dictionary• The Data Dictionary is a catalogue of all the Data
Elements utilized in the S2000M. Its purpose is to identify the standardized names, definitions and attributes to ensure a common understanding and application of the data elements.
New Features into S2000M Issue 6.1
• A simplification of the Provisioning process using a common IPS Data Model for the ASD Suite of IPS Specifications.
• A simplification of the Pricing, Order Administration and Invoicing into one Material Supply Process.
• Introduction of a new SPL (Spare Parts List) message, alternative to complete Provisioning process;
• A reduction of the different types of transactions and their content.
• Use of UML Data Models provides easy interrelation/interface to the other IPS disciplines/Specifications.
• A change of the message structure to XML, where XSD (XML Schema Definition) provide structure and check rules for the XML message.
• Changes that aim to allow for easier integration of S2000M into widely used ERP systems.
23
24
Future Development of S2000M (Issue 7.0)
Corrections / minor improvements on Chapter 1 textual part and modelling (Chapter 1 Data Model was already in line with Common Data Model logics).
Modelling for Chapter 2 and 3 completely reworked to be in line with Common Data Model logics. Reworked layout in line with S-Series authoring rules.
Inclusion of Performance Based Logistics (PBL), to integrate and cover in S2000M a modern material management concept.
Addition of ITAR (and other national or international regulations).
Benefits from Usage of S2000M
25
S2000M defines optimized process, rules and common formats for Material Management activities; itcomprises all the Material Management Processes, however due to modular content can be applied alsoto specific sub-processer, if require to reduce timescales, complexity and costs.
S2000M provides processes that can be tailored to specific Program requirements; for non-complexprojects it is possible to use, instead of “full” S2000M application, simplified process and procedures.
S2000M enables sharing and exchange of information between Industries, Customers and Organizations,using a data interchange standard (based on XML) that can be easily implemented.
S2000M, when applied together with other ASD-AIA IPS Specifications, enables the re-use of dataoriginated by other processes and the delivery of structured information for other IPS processes,supporting the implementation of a common IPS data repository.
S2000M usage can support the optimization of stocks level, reduce administrative effort and, at the end,increase operational availability of systems/products.
S2000M contractualization into Product Support Contracts is recommended. Synergy between Italian Industry and MoD and participation to the Working Groups is recommended.