s1725 building s1725, area map, map # 2. buildling s1725, site map, map # 2 s1725
TRANSCRIPT
S1725
BUILDING S1725, AREA MAP, MAP # 2
BUILDLING S1725, SITE MAP, MAP # 2
S1725
ROOM # 5
BUILDING S1725 SKETCH # 1
ROOM # 1
Room
#
1A
ROOM # 1B
ROOM # 2
ROO
M # 2A
ROOM # 3 ROOM # 4 ROOM # 6
ROOM # 6A
ROOM # 7
ROOM #
7AROOMC #
7BROOM #
7C
ABATE ASBESTOS TILE & MASTIC
=WATER FOUNTAINS LOCATION (2EA)
Residual asbestos containing mud on pipe fittings in room 6a
BUILDING S1725 WINDOW REPLACEMENT & HANDICAP RAMPS, SKETCH # 2
=Demo existing windows and install new windows with obscured glass
=Demo existing windows and install new windows with non obscured glass
ROOM #1
ROOM #3 ROOM #4 ROOM #5
ROOM #7
V
HANDICAP RAMPS (5 EA)
= Handicap Ramps
Shower Area
BUILDING S1725 DOOR REPLACEMENT, SKETCH # 3
vv
vv v
v
vv
1 2
3
45
6
7
89
10
ROOM # 1
ROOM # 3 ROOM # 4 ROOM # 5
ROOM #
7
= Door Replacement Locations (10 ea)
= Emergency Light locations (9ea)
Double Doors centered on windows above.
= Lighted Box Lights
DRESSSING ROOM # 2
MENS HEAD ( room # 2)
WOMENS HEAD (room # 6)
DRESSING ROOM # 1
Refinish int. plywood wall with
Luan. Trim & paint .
Room #7 install (1) 40 gallon electric water heater.Install new hot water lines from WH to shower valves in 7B. Insulate as specified in SOW.
New Urinals & Urinal Partitions
New Toile
t Parti
tions &
TOILETS
Re-Finish ceiling with specialized finish matching the specialized finish on the walls in room 1A
ROOM #1
ROOM
1A
ROOM #1B
Re-Finish floor with specialized floor covering material
BUILDING S1725, ROOM 1, 1A, &1B CEILING & WALL FINISH, TOILET PARTITIONS, URINAL SCREENS , SKETCH # 4
ROOM 2AROOM 2
TOILETS & TOILET PARTITIONS
URINAL &
URINAL
Partitions
BUILDING S 1725, NEW LOCATION FOR FIXTURES IN ROOM 2A, SKETCH # 5
SINK, T
OW
EL &
SOAP D
ISPENSO
R
RE-FINISH WALLS, & CEILINGS WITH SPECIALIZED FINISH & REFINISH FLOORS
BABY CHANGING STATION
BUILDING S1725, NEW LOCATION FOR FIXTURES IN ROOM 6A,, SKETCH # 6
RE-FINISH WALLS, & CEILINGS WITH SPECIALIZED FINISH & REFINISH FLOORS
SINKS,SOAP& TOWEL DISPENSERS
ROOM # 7
BUILDING S1725, LOCATION FOR NEW FIXTURES ROOM # 7 SKETCH # 7
RE-FINISH WALLS, & CEILINGS WITH SPECIALIZED FINISH & REFINISH FLOORS
RE-FINISH WALLS, & CEILINGS WITH SPECIALIZED FINISH
NEW ASPHALT PAVEMENT
EXISTING PAVEMENT
BUILDING S1725 NEW PAVEMENT, SKETCH # 8
Existing TreesLevel, add topsoil and grade to (2) existing drains
ROOM # 5
BUILDING S1725 , EXPANSION JOUNTS, SKETCH # 9
ROOM # 1
Room
#
1A
ROOM # 1B
ROOM # 2
ROO
M # 2A
ROOM # 3 ROOM # 4 ROOM # 6
ROOM # 6A
ROOM # 7
ROOM #
7AROOMC #
7BROOM #
7C
BLEACHER AREA
BLEACHER AREA
BLEACHER AREA
=ALL EXPANSION JOINTS TO BE REPOINTED
PAINT ALL PREVIOUSLY PAINTED STAIR TREADS
=
REPRESENTS EXPANSION JOINTS AT BASE OF ENTIRE REAR OF BUILDING
Paint Stadium interior wall same as existing color
Power and clean flooring in all rooms
Bleacher area F Repair 4 cracks in concrete. 1 crack in aisle btwn E and F
Bleacher area ERepair 1 crack in concrete
E
F
CD
Bleacher Area DRepair 2 cracks in concrete
Bleacher area C Repair 2 cracks in concrete.1 crack in aisle btwnC and D
Bleacher Area ARepair 3 cracks in concrete
Bleacher Area BRepair 5 cracks in concrete
B
A
BUILDING S1725, PAINT GUARDRAIL, SKETCH # 10
BUILDING S1725 DOOR LOCKS, SKETCH # 11