s1725 building s1725, area map, map # 2. buildling s1725, site map, map # 2 s1725

13
S1725 BUILDING S1725, AREA MAP, MAP # 2

Upload: irea-mullet

Post on 30-Mar-2015

222 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725

S1725

BUILDING S1725, AREA MAP, MAP # 2

Page 2: S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725

BUILDLING S1725, SITE MAP, MAP # 2

S1725

Page 3: S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725

ROOM # 5

BUILDING S1725 SKETCH # 1

ROOM # 1

Room

#

1A

ROOM # 1B

ROOM # 2

ROO

M # 2A

ROOM # 3 ROOM # 4 ROOM # 6

ROOM # 6A

ROOM # 7

ROOM #

7AROOMC #

7BROOM #

7C

ABATE ASBESTOS TILE & MASTIC

=WATER FOUNTAINS LOCATION (2EA)

Residual asbestos containing mud on pipe fittings in room 6a

Page 4: S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725

BUILDING S1725 WINDOW REPLACEMENT & HANDICAP RAMPS, SKETCH # 2

=Demo existing windows and install new windows with obscured glass

=Demo existing windows and install new windows with non obscured glass

ROOM #1

ROOM #3 ROOM #4 ROOM #5

ROOM #7

V

HANDICAP RAMPS (5 EA)

= Handicap Ramps

Page 5: S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725

Shower Area

BUILDING S1725 DOOR REPLACEMENT, SKETCH # 3

vv

vv v

v

vv

1 2

3

45

6

7

89

10

ROOM # 1

ROOM # 3 ROOM # 4 ROOM # 5

ROOM #

7

= Door Replacement Locations (10 ea)

= Emergency Light locations (9ea)

Double Doors centered on windows above.

= Lighted Box Lights

DRESSSING ROOM # 2

MENS HEAD ( room # 2)

WOMENS HEAD (room # 6)

DRESSING ROOM # 1

Refinish int. plywood wall with

Luan. Trim & paint .

Room #7 install (1) 40 gallon electric water heater.Install new hot water lines from WH to shower valves in 7B. Insulate as specified in SOW.

Page 6: S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725

New Urinals & Urinal Partitions

New Toile

t Parti

tions &

TOILETS

Re-Finish ceiling with specialized finish matching the specialized finish on the walls in room 1A

ROOM #1

ROOM

1A

ROOM #1B

Re-Finish floor with specialized floor covering material

BUILDING S1725, ROOM 1, 1A, &1B CEILING & WALL FINISH, TOILET PARTITIONS, URINAL SCREENS , SKETCH # 4

Page 7: S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725

ROOM 2AROOM 2

TOILETS & TOILET PARTITIONS

URINAL &

URINAL

Partitions

BUILDING S 1725, NEW LOCATION FOR FIXTURES IN ROOM 2A, SKETCH # 5

SINK, T

OW

EL &

SOAP D

ISPENSO

R

RE-FINISH WALLS, & CEILINGS WITH SPECIALIZED FINISH & REFINISH FLOORS

Page 8: S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725

BABY CHANGING STATION

BUILDING S1725, NEW LOCATION FOR FIXTURES IN ROOM 6A,, SKETCH # 6

RE-FINISH WALLS, & CEILINGS WITH SPECIALIZED FINISH & REFINISH FLOORS

SINKS,SOAP& TOWEL DISPENSERS

Page 9: S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725

ROOM # 7

BUILDING S1725, LOCATION FOR NEW FIXTURES ROOM # 7 SKETCH # 7

RE-FINISH WALLS, & CEILINGS WITH SPECIALIZED FINISH & REFINISH FLOORS

RE-FINISH WALLS, & CEILINGS WITH SPECIALIZED FINISH

Page 10: S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725

NEW ASPHALT PAVEMENT

EXISTING PAVEMENT

BUILDING S1725 NEW PAVEMENT, SKETCH # 8

Existing TreesLevel, add topsoil and grade to (2) existing drains

Page 11: S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725

ROOM # 5

BUILDING S1725 , EXPANSION JOUNTS, SKETCH # 9

ROOM # 1

Room

#

1A

ROOM # 1B

ROOM # 2

ROO

M # 2A

ROOM # 3 ROOM # 4 ROOM # 6

ROOM # 6A

ROOM # 7

ROOM #

7AROOMC #

7BROOM #

7C

BLEACHER AREA

BLEACHER AREA

BLEACHER AREA

=ALL EXPANSION JOINTS TO BE REPOINTED

PAINT ALL PREVIOUSLY PAINTED STAIR TREADS

=

REPRESENTS EXPANSION JOINTS AT BASE OF ENTIRE REAR OF BUILDING

Paint Stadium interior wall same as existing color

Power and clean flooring in all rooms

Bleacher area F Repair 4 cracks in concrete. 1 crack in aisle btwn E and F

Bleacher area ERepair 1 crack in concrete

E

F

CD

Bleacher Area DRepair 2 cracks in concrete

Bleacher area C Repair 2 cracks in concrete.1 crack in aisle btwnC and D

Bleacher Area ARepair 3 cracks in concrete

Bleacher Area BRepair 5 cracks in concrete

B

A

Page 12: S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725

BUILDING S1725, PAINT GUARDRAIL, SKETCH # 10

Page 13: S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725

BUILDING S1725 DOOR LOCKS, SKETCH # 11