26TH NOVEMBER, 1993 BRISBANE CITY COUNCIL DEPARTMENT OF WATER SUPPLY AND SEWERAGE MECHANICAL AND ELECTRICAL BRANCH ELECTROLYSIS SECTION EAGLE FARM PUMPING STATION OPERATING MANUAL FOR: KARAWATHA HIGH LEVEL RESERVOIR CATHODIC PROTECTION SYSTEM. CLIENT: DEPARTMENT OF WATER SUPPLY AND SEWERAGE WATER MAINTENANCE SECTION s Cathodic Protection System - Karawatha High Level Reservoir - OM Manual Q-Pulse Id TMS1269 Active 21/07/2015 Page 1 of 19

Upload: others

Post on 11-Jan-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

26TH NOVEMBER, 1993

BRISBANE CITY COUNCIL DEPARTMENT OF WATER SUPPLY AND SEWERAGE MECHANICAL AND ELECTRICAL BRANCH ELECTROLYSIS SECTION EAGLE FARM PUMPING STATION

OPERATING MANUAL FOR:

KARAWATHA HIGH LEVEL RESERVOIR CATHODIC PROTECTION SYSTEM.

CLIENT:

DEPARTMENT OF WATER SUPPLY AND SEWERAGE WATER MAINTENANCE SECTION

s

Cathodic Protection System - Karawatha High Level Reservoir - OM Manual

Q-Pulse Id TMS1269 Active 21/07/2015 Page 1 of 19

(1.0) .

(2.0) (3.0) . ` .

(4.0) . .

(4.1) .

: (4.2) -

(43) . .

(4:4) .

(4.5) -

(4.6). .

(4.7) (4.8) :

(5.0) (6.0) (7:0)

MANUAL CONTENTS

Introduction Corrosion and Cathodic .Protection Mains Details Cathodic Protection

. Type of System Rectifier Cathode :

Anodes Test Points Associated Drawings. Associated Standards Government Regulations Peformed Testing Conclusion Maintenance

DRAWINGS

486/6/8-TB1C0030E *

486/6/8-TB1C0029E. *

(No Number) 486/6/8-TB1C0005E 486/4/8-TB010P ' 486/4/8-TB08P .

External Pipework rectifier /termination board wiring diagram.. Cathodic protection general. layout. .

Monthly Maintenance Program. Underground conduits and pit layout. .

Scour overflow :pipe details. Pipework layout plan and details. .

* denotes drawings included in manual:

Cathodic Protection System - Karawatha High Level Reservoir - OM Manual

Q-Pulse Id TMS1269 Active 21/07/2015 Page 2 of 19

(1..0) 'INTRODUCTION

Steel when immersed or . covered in water has a tendency to corrode (or rust) as the oxidized form is more stable than the metal.

Because of this, -precaution must be taken to stop, or minimize the corrosion reaction to an ,acceptable level consistent with the design life of the structure. This is normally achieved by the use of protective coatings which control the corrosion 'reaction by isolating the steel from its surrounding environment.

However, it is not practical to achieve .a perfect coating and coating damage will always occur with time Because of this, corrosion may occur at imperfections in the paint coating, causing further -deterioration in the coating as well as loss of metal.

As a result of this, the coating defects must be rectified by periodic maintenance or an additional method of protection used to prevent this deterioration and corrosion occurring.' This additional protection is achieved by the cathodic protection system.

(2.0) CORROSION AND CATHODIC PROTECTION

Corrosion is ari electrochemical process in that it is accompanied by a flow of ' electrical current.

Corrosion occurs on the surface of metals . at active - areas known as anodes, which are electrically continuous with less active or passive areas known as cathodes. The electric current flows from the anode through the electrolyte to the cathode, with the circuit being completed by the electrical continuity between the cathode and anode. In practice anodes and cathodes are generally part of the same metallic surface and individual anodic areas may be small.

In applying cathodic protection and external current is , applied to the surface so that the entire surface to be 'protected' acts as a cathode. This involves the use of an auxiliary anode and when the current flow from this anode is sufficient, . no part of the structure acts as an anode.

An external .source of direct current such as a transformer 'rectifier is used in conjunction with an anode consisting of material with a very slow corrosion rate:

While it is the flow 'of. current which achieves the cathodic protection, of the surface it is:

impractical to :measure these currents over individual anodic areas . to. determine ̀ when cathodic protection has been achieved... However, with the flow of cathodic 'protection current, the structure becomes more negative with respect to the surrounding electrolyte. Because . of this, it is possible to state values of metal /electrolyte 'potential at which corrosion .does not occur. This.. metal/electrolyte potential is generally, measured against : a standard reference electrode which allows á reproducible potential at which corrosion. does not 'occur to be quoted. "

Cathodic Protection System - Karawatha High Level Reservoir - OM Manual

Q-Pulse Id TMS1269 Active 21/07/2015 Page 3 of 19

(3.0) MAINS DETAILS

Size: Dìa 750 - Pia 600 mild steel cement lined:

Coating: Low density fusion banded polyethylene outer coating.

Length: 0.1 km

Location: Karáwatha High :Level Reservoir Kárawatha 4117 UBD 54 H6.

Construction Drawings: 486/4/8-TB08P to 486/418-TB010P

Cathodic Protection System - Karawatha High Level Reservoir - OM Manual

Q-Pulse Id TMS1269 Active 21/07/2015 Page 4 of 19

(4.0) CATHODIC PROTECTION DETAILS

(4.1) Type of Cathodic Protection: Impressed Current.

Rectifier: Standard, 32V. Volt, 15 amp direct current output enclosed in a stainless steel: switchboard.' Rectifier has à 240V supply from the :distribution _ switchboard.Rectifer is located on the first- flóór against the handrails.

(4.3) Cathode: The cathode points are lòcated on top of the pipe, resevoir side of the inlet and outlet valves,- scour valve and overflow. The cathode point is

° where the cabling from the rectifier is attached to the structure under cathodic protection.

(4.4) Anodes: One 1500 x 75mm silicone iron anode was installed approximately 29:0 metres from the inlet valve pit in a vertical bed. The anodes were first backfilled . with cokebreeze thereby improving anode - ground resistance. The anodes are identified by a marker pit and label. Refer attached drawing.

(4.5) Test Points: Test points are installed on cathodically protected structures to enable testing to ensure full protection of the mains. On these pipes, eight . test points have been installed and bought back to the distribution switchboard. Refer to attached drawing.

(4.6) . Associated. Drawings: Cathodic Protection Details - 2/14.213

, Cathodic Protection Test Point Details - 2/14.199 Standard Rectifier Wiring Diagram - JE02/104 .

(4.7) Associated Standards: AS 3000 1986 Australia Wiring Rules AS 2832.1 1985 Pipes, ,Cables,' Ducts, Guide to Cathodic Protection;

Part One:

(4..8) . Government Regulations: Queensland Electricity Acts and Regulations.

Cathodic Protection System - Karawatha High Level Reservoir - OM Manual

Q-Pulse Id TMS1269 Active 21/07/2015 Page 5 of 19

(5.0) . PERFORMED TESTING

(1) Natural Potential Survey.

(2) Testing of Insulated Flanges, Joints. .

(3) . Soil Resistance Testing. .

(4) Current Drain Survey.

(5). Rectifier Loop Resistance.

(6) Foreign Structure Interference Survey and Mitigation.

(7) 'Final Potential Survey and Commissioning.

NOTE: Details of above testing have not been included in this manual but are available upon request.

(6.0) CONCLUSION

Full Cathodic protection has been achieved on this section of trunk mains. The cathodic protection system will be registered : with the Queensland. Electricity Commission.

7.0) MAINTENANCE

The cathodic protection system is maintained on a monthly basis after commissioning. These checks involve testing rectifier operation and .

recording of pipe to soil potentials..

Cathodic Protection System - Karawatha High Level Reservoir - OM Manual

Q-Pulse Id TMS1269 Active 21/07/2015 Page 6 of 19

12th October 1992 Electrical - Workshop Cathodic Protection

CPS Monthly Maintenance Details. . .

Required:

1/ Notify plant operator and/or sign entry logs where necessary. 2/ Have appropriate keying.

Labour:

One tradesperson, one vehicle. . 20 minutes per site.

Procedure:

1/ Identify installation. 2/ Check system for operation. 3/ Record voltmeter.. .

4/ Record. ammeter. 5/ . Comments. 6/ Log entry.

Cathodic Protection System - Karawatha High Level Reservoir - OM Manual

Q-Pulse Id TMS1269 Active 21/07/2015 Page 7 of 19

13th October 1992 Electrical Workshop Cathodic Protection

CPS 6 Monthly Maintenance Details.

Required:

1/ Notify plant operator and/or sigh entry logs where necessary. 2/ Have appropriate keying. 3/ Set of tools. (Electricians) 4/ Multimeter. 5/ DC clampmeter. .

6/ Copper sulphate reference cell and leads. 7/ Cleaning equipment: '

. 8/ Gatic cover lifters.

Laboúr:

One tradesperson electrical; one laborer, one vehicle. Two hours per site.

Procedure:

1/ Identify system.. : 2/ Check system for operation.

3/ . Record voltmeter. '

4/. Record ammeter. 5/ Record "on" potentials for all test points. 61 Record "instant off" potentials for. all test points. 7/ Récord "off" potentials for all test points: 8/ Perform loop resistance and record. 9/ Check and record anode string currents. 10 /. Comments. 11/ 'Log entry.

Cathodic Protection System - Karawatha High Level Reservoir - OM Manual

Q-Pulse Id TMS1269 Active 21/07/2015 Page 8 of 19

13th October 1992 Electrical Workshop Cathodic Protection

CPS 60 Monthly Maintenance Details.

Required:

1/ Notify plant :operator and/or sign en_ try logs where necessary.' 2/ Have appropriate keying. 3/ . Set of tools. (Electricians) 4/ Multimeter. 51 DC clampmeter. .

6/ Copper sulphate reference cell and leads. 7/ Cleaning equipment. 8/ Gatic cover lifters. 9/ Rectifier load bank. 10/ PCS2000 Detection Equipment,

Labour:

tradesperson electrical, one laborer, one vehicle; Eight hours per Site.

Procedure:

1/ Identify system. 2/ Check system for operation. 3/ Record voltmeter. 4/' Record . ammeter. 5/ Record "on" potentials for all test points. 6/ Record "instant off" potentials for all test points. .

7/ Record "Off" potentials for all test points. 8/ Perform loop resistance: and record. 9/ Check and record anode string currents. 10/ Load test rectifier for 10 minutes. 11/ Check' all switchboard and testpoint terminals for tightness. 12/ .Check all switchboard and testpoints are labelled and I.D:..tags attached. 13/ Check plans are correctly drawn and modify if ,necessary: 14/ Remove and inspect anodes. 15/ Recheck all interference (CPS) bleeds. .

16/ Pipecamp structure if applicable. 17/ Apply for "continue to operate" permit if . applicable.

Q .

Cathodic Protection System - Karawatha High Level Reservoir - OM Manual

Q-Pulse Id TMS1269 Active 21/07/2015 Page 9 of 19

BRISBANECITY COUNCIL

MEMORANDUM

File No.-

From Date

óc _ /6s:/.3

Subject KARAvv, :6")-i A

R" i-S-Tw1T`-t : -. . a Tc.R . . .- .a.x :3. i 4(6 x i

St7',. :-TïQ.R - t).x 3-¡L.!6 x k t.o -:3 t 4, )6 J.Zìw;

fa-N) Pt t_ r E!-3 tF,i,S

_ .. . . R ç.i.r T Zr., RE; Ri- + rcq: C,ATN RE: .C.0 T a 4 -3Z8 .mV.

7_r.+ REF - ) oS r-V

ç-PTK c (7.1; T N RGT' C.5 o. ;.,r CPA r tN c-: C.S. . . TO. . .Z:rv: . REF - (` .

C-:A.t,`t.-... Rai' ..:.G5 To CaJJ Gt.).SO T?' Ztvi. : RGr.. :RS-1

4.- -T75:-TI./ - 334. rrV

CG-t . .çATx Rgr . c7.t ar 6

CTI Rt? C`i . ..T.ö Z.b., . REF R-7- l -t--t rt S mu

CS -cp c. ATN R c t . . GS 3- ! ..,...

GA T N 1?G . .. .4's 'cb Zr-.) REF R8- cs i t.4 r'rnV:

GFA.T. .TÇO.. cATÑ

eATH Iac Cq TQ Z/.3 . Rai= R7-1.-1 T-1 SS.m( c.T u. c c . o .GA;Tt-t. REt' 6:(5\-)

cra x. RT. cgQ To 7-tv RC-r R9t -:

Cathodic Protection System - Karawatha High Level Reservoir - OM Manual

Q-Pulse Id TMS1269 Active 21/07/2015 Page 10 of 19

BRISBANE CITY COUNCIL

MEMORANDUM

To =ile No.

From Date

"as/og3 Subject KA QA\.vATl-iA RESE RVp¡R.

tv j-1.t:4? F, L:_ . . . i'STEt--I -t(_`+1-S

.

C.A i tJ ct6 o.:..c.ÁT1H.:RET....c.6 .R.ET . .Ç.6 TO REF R5- i . T

CA l i-A .. . Rai'. . G6 To :a.ö. - . : . . . : . .G.L) L ò:14 To . Zr,a .RZr og 5: -m.

G.í'y 5.1-k C. ïfl CF, c N Rl G c. ST?.. Cta: .1... Rei. . Ct.A. TO 7.3J Rr - CATI-4 Rc'.. Gu To -:.317 ...:mN.

2.14 REF Rt4 -. -1 i 8"1 rnV

CC 32L (G 9,91)

g

Cathodic Protection System - Karawatha High Level Reservoir - OM Manual

Q-Pulse Id TMS1269 Active 21/07/2015 Page 11 of 19

BRISBANE CITY COUNCIL

MEMORANDUM

To File.No.

From Date '.

.50S/9 3

Subject EIRFA i i-:A RESERv R

!U PtsTENTt NoN - (o1-AR7-c0 ) P.E:çyT 5E7 MR

iNi_CT:.Vi;l_VE Pr T: - s. (:.AT i-i RE-T. TO Rì.t-.

cfa N RG Gi4 . . . : .r. . . .C;z eSJÿ.

GA.T. N: . .RC .t. . .Ci..¡. Te 7..v REF

çA .t. . .Rc. T . .CS . . .lt) RïF R5 -1

Rer . :G.S Tn. C4, S0 e u ̀ ' L,4. . . -ro R tF R5- t

CF.iTt^A . .'RE t G^ i O Z- RcF R~l-

CATI-i. _ Rai" 7...:v REF - f

GF±TN:.R= G9 To..2.1:.;REF R-t

Ia.T.N....RET Ggr3:.Tc> ..:7..) .. REF :...R9-1t3

UT..fs`t 114Vï .. i.T:::: - RET. To -21.v REF.:'.R6-I

G1an4 . . R . c.6. : . : 71"a

Tò . . .'zN. . . REF P.6- I

G .1Tt-k R.-Er REr :GATH 'R1=T. C..,r; To CQ Z.ö;,,} . i .O REF

CC:32L (G 9'97)

Cathodic Protection System - Karawatha High Level Reservoir - OM Manual

Q-Pulse Id TMS1269 Active 21/07/2015 Page 12 of 19

BRISBANE CITY COUNCIL

MEMORANDUM

File No.

From

Subject KFR!`-.w ATi-j

Date

a. /off / 'R3

RE--; .1 F t CR 5...=' i A î Sc. V

ïP . RESISANC'; = ïS w ao.v aav a./.4v aS\/ a6V

AN -^.-c.)-4 Çt.>f;FN-i

IV P -r.,z1At- zimaramRl iNtx f P

.RC. .. c4 . . . 1-4. . 2,.U. .R.-F . . Ri.4. -.a Rci ...c4..Td.:.C.4

Zrv R4-a,

t-sC:1 tr`V' Cr- T V Ó`S. OLt7'.M 1

,

9a-i. - mN/...

G..i.. H . . R.ET. .. . G5 . . T o. .Z . REF R S - CsTt4 . R C.5 .To

.REF R5 - 1

sa .m\l. .crw. . . . . :-t. .305 rnV4, - 997 mV -. .61.57 .crX.4. . tOSS rr.V crf, - 106.a

c.PTh ::RET Cri íZ7 .Zi.) . REF .R.l-l. r 4E1 mcr

c.A11-k . . PET' cc2 22-3 . .REF . Rc3-1

: r53a rrsL/44

50 t rr,Vof.J :/* 54a. r.nl. 4,1?.

Re-r . .ccî RcF . . R51-1 . 5-\3 ;isti/ 5i40.. rrV.4.

cATH REÇ'C.Fsß..Tco..Z, REF -.l:g 335..rn\I 36.5(TV

CC 1324 (G 9977

co

0 ,

Q.

m

Cathodic Protection System - Karawatha High Level Reservoir - OM Manual

Q-Pulse Id TMS1269 Active 21/07/2015 Page 13 of 19

BRISBANE CITY COUNCIL

MEMORANDUM :

File No.

From . Date

Subject ..

vFLv. . . h?1T: - .7171-k. Zrv . REF Rb- t

Rc. C..17ö.G.`-? :.? .L, . RE -F Rb-1 -- 1 (=LA. r-i-,t!

G'..* . . . o. 7 Rar- Q,¿y.=t

.RET

. '.., REF.. t

3b3: m\l ot. -r53.a.. .crv.. : _ C5"."S. m4 -4-1.5 . rs,V.

-1 oa.1 cn\io,r... . : . - töto . mV.

CC 1321 (G 9,91)

;

Cathodic Protection System - Karawatha High Level Reservoir - OM Manual

Q-Pulse Id TMS1269 Active 21/07/2015 Page 14 of 19

BRISBANE CITY COUNCIL

MEMORANDUM

To File No.

From- Dàte

á-/Og /3 Subject KSRI; -ATNP SERV0;Q,

Roat

FE SE.R\no(Z.

AtvCJt"E". cA0ti. Prt

CC 1 â2L ¡'G 9,91)

Cathodic Protection System - Karawatha High Level Reservoir - OM Manual

Q-Pulse Id TMS1269 Active 21/07/2015 Page 15 of 19

DEPARTMENT OF WATER SUPPLY AND SEWERAGE

MECHANICAL AND ELECTRICAL BRANCH

METROPOLITAN DIVISION

EAGLEFARM PUMPING STATION..

ELECTRICIAL WORKSHOP

INSULATED JOINT TESTING DETAILS:

DATE ;21-470% -97.1 '

DESCRIPTION

MAINS DETAILS:- LOCATIONS:- KY>RAwRttAQ Rc`ScfZvOR. itvc"T SIZE:- .C1CA0,nM .

MATERIAL:- SaTEL= COATING:= pvc NUMBER:-.

IN GROUND TESTING

BOLT TO FLANGE RESISTANCE: - `>à.c.An NUMBER OF BOLT:- 1611(.14..7,:a.) pER rLANC; b

FLANGE TO FLANGE RESISTANCE:- 30n, WS INSULATION CHECKER MODEL 702: - 0.K.

POTENTIAL DIFFERENCE TO REFERENCE. CELL

PROTECTED SIDE: - RCSc42Vcn1R UNPROTECTED SID:E:

- -mLu40t wipm4

ABOVE TESTING

BOLT TO FLANGE RESISTANCE:-

NUMBER OF BOLTS:=. FLANGE TO FLANGE RESISTANCE:--

COP1MEIdTS.

IC) SZ.. ACRáSS. 1-1-11.4 GE

EU R PL.PGEt1 ß`i wIzITc.R ' S:.1PPL4

TESTED BY

M iJ GOÇtAtC.K -

Cathodic Protection System - Karawatha High Level Reservoir - OM Manual

Q-Pulse Id TMS1269 Active 21/07/2015 Page 16 of 19

DEPARTMENT. OF WATER SUPPLY AND SEWERAGE

MECHANICAL AND ELECTRICAL BRANCH

METROPOLITAN DIVISION

.EAGLE FARM PUMPING STATION

ELECTRICIAL WORKSHOP

INSULATED JOINT TESTING DETAILS:. .

DATE Z.L1, -05 - DESCRIPTION

MAINS DETAILS:= LOCATIONS:- KARAwATHta'R._ScR.lotQ SIZE:- 492:C rn Nn MATERIAL:.- SSeEt` COATING: - F`,G NUMBER: - .

IN GROUND TESTING

BOLT TO FLANGE RESISTANCE: - NUMBER OF BOLT:- pEF FLAtVGa FLANGE TO FLANGE RESISTANCE:-. gs,z2,.T,

INSULATION CHECKER MODEL 702:- POT.ENTIAL DIFFERENCE TO REFERENCE .CELL

PROTECTED SIDE;- REScR.JotR. _--t UNPROTECTED SIDE:--TRvr.,K MAIN . -1;33 mV.

ABOVE TESTING

BOLT TO FLANGE. RESISTANCE: NUMBER OF BOLTS: - .

FLANGE TO FLANGE RESISTANCE:

COMMENTS

I ti 9c-3;._AM7p ßct_ïs n.FRRA v,içtETZ ScPPLt

TESTED BY

M . ' tJiG`,.CRMiG14:

i+K MAttJ

;cRvC; R VALVE.

i._ --r. 7.7 Ei

Cathodic Protection System - Karawatha High Level Reservoir - OM Manual

Q-Pulse Id TMS1269 Active 21/07/2015 Page 17 of 19

ELM

NOTES L Wsl 11 fYf. /iidTt1UDME Föt

NgTffIDt / TAtOY1ID1 NM OM OTABVI.

ADDITIONAL Us COUPON CATHODIC CONNECTIONS

C 0.00 AS fO6TluCTEO

MOITiDYL Mr WAN tAT10tE rneFrtms

DAM i00 MPibl'L 6101®

011.

OLP. 33.91 rr

1111 ANO MOM / IE 10 / lA1E FM DQTIIL

fATE

i DESl91

ODE.

MC= OF

0161Trt:TI01

OUT,

ODf3TOR OF

N i E 58111IES

TATE,

OIIfLTOt OF Wt. f.t

DUE

fES1A JS. 2í13 f3 »I

autr 9.L1. mum ElSAMSON

muffs

DUB

O® I.S. 1112.!1

% Ib. 611CO29C

WISE CITY COUCIL

SORT SIM !

mime cav ®ltrDiL t =TOM MVO

KARAiIATNA RESERVOIR

i1T1E.

CATHODIC PROTECTION seotu LAYOUT

WILE, 1 100 . CF

fiMt0ó

486/N/8-TBICOO29E

Cathodic Protection System - Karawatha High Level Reservoir - OM Manual

Q-Pulse Id TMS1269 Active 21/07/2015 Page 18 of 19

.760111.1ti

C

N

71

11015161113 WITCOJ

N

T107 111511911

1213711.142111a

90E 61 PUT 1171 ORET DQE 11.7 aa9 / OMAN

-

f7 Eil>FSi / 161mIRID1 (

MOM 1

wax = A ItN6.

EEf KIE 17

MOM ROE

I

.t

75191191R

._i.'T:

: '.Ir'ìA1:7T', 1 --

os>9 .r71'51

1:3Zi21TSn8 a

111 OATA 1C®1

a 16 UM

LP. 07S DI g115>ffiIOCATLtO

um= sail a aQ

AtOt!1 REED -EE .tmtC111 BED -®

C Cata 2 111í5I 9aTE

o VC tDE6E - tim / 19101

uM9E Ef. E71111 IDE I1..1

Ca= E7. E11m IDE Iki

CUICIE ET. El= IDE 191

CAnCE 51. E191 PPE IY.7

W7/>E 16. ES»IDE NM

a4- tar 1eAT

ao.la-N1IEIBM

C- 9111 i$50t DíIZED TO ROtf LEM PCP AT Fill WWI I

C. Q- IVA IMO 1>2]iD 10 0alE Llama IF 7A' MSS D IT 701 91170T 111.5013

,: .

Ii0GG.`L.L1701G7O©OUOOO

r(i i i 1 ii i {

1

11 BATA 10®

70 MO E9101170

ß- .7-

TA~

0- 7D-

71-

72-

711-

U --

711-

n-

77-

70-

H-

N - U-

' NI-

It-

SI-

12-

111-

t4-

a-

91-

17-

.F-

NI-

110-

)D1-

102-

tY4-

101-.

215-

XS-

"IF

7011-

1.11-

uo-.

111-

112-

uf-

114-

us-

ur-

u7-

u- u11

no-

rm-

91-

ur III-

ß5-

7211-

11.7 - u- 121-

07 ö

12

NOTES Ur

440111:11E 10 E E0 -warm 7C E tua

/st C was Tt I 011 Q am ID E rI t01 Q09 RE LSO @ 13 EIED9 ID E 1Jr= 12111311 WNW 7t E 1.011

ML' imam wet mt®T A twE if WU MUM= mans emu emu= A MO.

N179 1 ITLtE7Dt 10 MOM tIQIAEL ETIIDIm iR LIMI

7ort:, °L016Úis

RIM í E7Bai1E1

11101eT)E 11E1 1110.1011.

LOLL M1 íEIEC7mMi W u70 MAILS. ...

C W At 09191171110 JAS.

11.E area lot mN Wiox

941 2í9®W1.1115111.

OAP.

0J-P . y

w . 6

i DOE 9BOEIT / rat T11 / TOE )i1.

WE, WIC= W 02611447191 íi i EJat MOTOR IF Et.

9411AT396 / LS. il4tflmml

EOM

WAN

lIOaD

aQa,

74. LILIA OMB, D1 MIPS

11.11111

IS

MO Ill I. eBCA30C

NSW art' COWL

@OMMIlf IF WM IiRLI i MYSIMIE

MEhAr CI IECHIMECAt I a111nsA1. ssnns 1191!41

KARAifATNA RESERVOIR

TiltE' WM= MECUM VIM MEW

111111FIR / 11211111

IMO N

ta1, WITS

t1ltm9 M.

486/6/6-TB1C0030E C

I 32

Cathodic Protection System - Karawatha High Level Reservoir - OM Manual

Q-Pulse Id TMS1269 Active 21/07/2015 Page 19 of 19