s tatus of the machines over X-mas standby period, services required and plans for rapid start-up OP Group Meeting. KH. c ooling circuits. cooling circuits require 200-300 kW heat load in order not to freeze circuits of the equipment must not be separated from the main cooling circuit - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: s tatus of the machines over X-mas  standby  period,

status of the machines over X-mas standby period, services required and plans for rapid start-up

OP Group Meeting

KH

Page 2: s tatus of the machines over X-mas  standby  period,

• cooling circuits require 200-300 kW heat load in order not to freeze• circuits of the equipment must not be separated from the main cooling circuit • for the temperature surveillance (BE/OP/TI) alarms must be available

cooling circuits

KH

facility cooling circuit load (present or required)

Linacs and LEIR FDED-00049 enough heat load

PSB + TT2 FDED-00065 need to generate load

PSB F$FSEG-00361 need to generate load

PS FDED-00050 centre anneau need to generate load

PS FDED-00032 aimant PS need to generate load

PS F$FSEG-00355 need to generate load

PS FTEB-00046 POPS need to generate load

SPS enough heat load

North Area enough heat load

Page 3: s tatus of the machines over X-mas  standby  period,

Machine Circuits Status Rem :

LEIR - LINAC FDED-00049 Running Source of Linac 3 running

PS Main magnetFDED-00032

Stopped and drained

Difficult to keep it loaded

PS Central buildingFDED-00050

Running Load from EPC

PS POPSFTEB-00046

Stopped and drained

Difficult to keep it loaded

PS + Linac Chilled water PSF$FSEG-00355

Running Linac3 running

PSB Booster + TT2FDED-00065

Running Load from EPC

PSB Chilled water BoosterF$FSEG-00361

Running Loaded with the ventilation

SPS SPS ringFQSTR-00003

Running Cryo machine sector 1-2

North area NAFQSTR-0002

Running Cryo North Area

cooling circuits - IEFC 19/10/12

Page 4: s tatus of the machines over X-mas  standby  period,

• CV will intensify the rounds during the closure especially if the weather is cold.

• On Monday January 7th , CV will restart :• PS : FDED-00032 PS Magnet• POPS: FTEB-00046

• POPS will be fully operational on Tuesday.

S.Deleval – IEFC 19/10/12

cooling circuits - IEFC 19/10/12

Page 5: s tatus of the machines over X-mas  standby  period,

6. February 2012: a good example

• Extremely cold and windy weather • All the primary circuits were running with a reduced load. • Large amount of problems on drinkable and fire hydrant circuits but the

primary circuits had well resisted • POPS start up was delayed because the filling circuit was frozen →

corrective work acheived.

IEFC 19 October 2012 S.Deleval – IEFC 19/10/12

Page 6: s tatus of the machines over X-mas  standby  period,

Linac2 (see EDMS 1235164):• source pulsing, beam on source beam stopper• most converters on• RF off• vacuum maintainedPSB:• some TT2 converters on• all other converters off• RF off• vacuum maintainedPS:• converters off• RF off• vacuum maintainedSPS:• power converters off• RF power amplifiers on (dampers, TWC800, TWC200, IOT prototype in BB3) • vacuum maintained• cooling stays on

proton machines, status

KH

Page 7: s tatus of the machines over X-mas  standby  period,

machine BE/OP BE/ABP TE/EPC BE/RF BE/CO,IT

TE/VSC access RP EN/CV* EN/EL*

Linac2 TI SV X X X X X X X

PSB TI + SV X X X X X X X

PS TI + SV X X X X X X X

SPS SV X X X X X X X

proton machines, services

KH

* EN/CV and EN/EL provide always piquet service

• ‘best effort’ service during working hours, but somebody must be reachable• piquets which are not required (magnets, kickers, LL RF, … do not appear)• magnets: in case of water leaks best effort

OP: TI plus support from beam operators plus supervisor

Page 8: s tatus of the machines over X-mas  standby  period,

Linac3 (see EDMS 1235164):• source pulsing, beam on source beam stopper• most converters on• RF off• vacuum maintained

LEIR:• all converters off• RF off• magnetic cycle prepared in case of re-start• vacuum maintained

ion machines, status

KH

Page 9: s tatus of the machines over X-mas  standby  period,

machine BE/OP BE/ABP TE/EPC BE/CO,IT

TE/VSC access RP EN/CV* EN/EL*

Linac3 TI SV X X X X X X X

LEIR TI + SV X X X X X X

ion machines, services

KH

* EN/CV and EN/EL provide always piquet service

• ‘best effort’ service during working hours, but somebody must be reachable• piquets which are not required (magnets, kickers, LL RF, … do not appear)• magnets: in case of water leaks best effort

Page 10: s tatus of the machines over X-mas  standby  period,

GS: • roads cleared• fire brigade informed• lifts• DSO coverage

references:Linacs: EDMS 1235164

other services

KH

Page 11: s tatus of the machines over X-mas  standby  period,

2013 start-up

KH

06-Jan 07-Jan 08-Jan 09-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan

L2 set up beam 2 PSB PSB set up beam 2 PS PS set up beam 2 SPS SPS set up beam 2 LHC

L3 source re-fill set up beam 2 LEIR LEIR set up beam 2 PS PS set up beam 2 SPS SPS set up beam 2 LHC

beam to be given downstream as soon as readybeam parameters to be confirmed well before X-mas