s e c t i o n 9 0 5 -- p r o p o s a l...

9
S E C T I O N 9 0 5 -- P R O P O S A L (CONTINUED) I (We) hereby certify by digital signature and electronic submission via Bid Express of the Section 905 proposal below, that all certifications, disclosures and affidavits incorporated herein are deemed to be duly executed in the aggregate, fully enforceable and binding upon delivery of the bid proposal. I (We) further acknowledge that this certification shall not extend to the bid bond or alternate security which must be separately executed for the benefit of the Commission. This signature does not cure deficiencies in any required certifications, disclosures and/or affidavits. I (We) also acknowledge the right of the Commission to require full and final execution on any certification, disclosure or affidavit contained in the proposal at the Commission’s election upon award. Failure to so execute at the Commission’s request within the time allowed in the Standard Specifications for execution of all contract documents will result in forfeiture of the bid bond or alternate security. Bidder acknowledges receipt of and has added to and made a part of the proposal and contract documents the following addendum (addenda): ADDENDUM NO. 1 DATED 9/17/2019 ADDENDUM NO. DATED ADDENDUM NO DATED ADDENDUM NO. DATED ADDENDUM NO DATED ADDENDUM NO. DATED Number Description TOTAL ADDENDA: 1 (Must agree with total addenda issued prior to opening of bids) Respectfully Submitted, DATE Contractor BY Signature TITLE ADDRESS CITY, STATE, ZIP PHONE FAX E-MAIL 1 Revised Bid Items; Revised or Added Plan Sheet Nos. 8001- 8003, 8011; Amendment EBS Download Required. (To be filled in if a corporation) Our corporation is chartered under the Laws of the State of and the names, titles and business addresses of the executives are as follows: President Address Secretary Address Treasurer Address The following is my (our) itemized proposal. BR-0060-03(020)/ 105333301000 Marshall County(ies) Revised 01/26/2016

Upload: others

Post on 09-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: S E C T I O N 9 0 5 -- P R O P O S A L CONTINUED)mdot.ms.gov/bidsystem_data/20190924/ADDENDUMS/105333301...2019/09/24  · 0150 209-A005 7,763 Square Yard Geotextile Stabilization,

S E C T I O N 9 0 5 -- P R O P O S A L (CONTINUED)

I (We) hereby certify by digital signature and electronic submission via Bid Express of the Section 905 proposal below, that all certifications, disclosures and affidavits incorporated herein are deemed to be duly executed in the aggregate, fully enforceable and binding upon delivery of the bid proposal. I (We) further acknowledge that this certification shall not extend to the bid bond or alternate security which must be separately executed for the benefit of the Commission. This signature does not cure deficiencies in any required certifications, disclosures and/or affidavits. I (We) also acknowledge the right of the Commission to require full and final execution on any certification, disclosure or affidavit contained in the proposal at the Commission’s election upon award. Failure to so execute at the Commission’s request within the time allowed in the Standard Specifications for execution of all contract documents will result in forfeiture of the bid bond or alternate security. Bidder acknowledges receipt of and has added to and made a part of the proposal and contract documents the following addendum (addenda):

ADDENDUM NO. 1 DATED 9/17/2019 ADDENDUM NO. DATED ADDENDUM NO DATED ADDENDUM NO. DATED ADDENDUM NO DATED ADDENDUM NO. DATED

Number Description TOTAL ADDENDA: 1 (Must agree with total addenda issued prior to opening of bids) Respectfully Submitted,

DATE

Contractor

BY Signature

TITLE

ADDRESS

CITY, STATE, ZIP

PHONE

FAX

E-MAIL

1 Revised Bid Items; Revised or Added Plan Sheet Nos. 8001-8003, 8011; Amendment EBS Download Required.

(To be filled in if a corporation) Our corporation is chartered under the Laws of the State of and the names, titles and business addresses of the executives are as follows:

President Address

Secretary Address

Treasurer Address The following is my (our) itemized proposal.

BR-0060-03(020)/ 105333301000 Marshall County(ies)

Revised 01/26/2016

Page 2: S E C T I O N 9 0 5 -- P R O P O S A L CONTINUED)mdot.ms.gov/bidsystem_data/20190924/ADDENDUMS/105333301...2019/09/24  · 0150 209-A005 7,763 Square Yard Geotextile Stabilization,

Line No. Item Code Adj Code Quantity Units Description [Fixed Unit Price]

Section 905

MARSHALL

BR-0060-03(020)/105333301

Bridge Replacement on SR 4 over the BNSF Railway & MS Central Railroad Company, Bridge No. 75.3, known as Federal Aid Project No. BR-0060-03(020) / 105333301 in Marshall County.

Proposal (Sheet 2 - 1)

Roadway Items

Lump Sum0010 201-A001 1 Clearing and Grubbing

Acre0020 201-B001 1 Clearing and Grubbing

Lump Sum0030 202-A001 1 Removal of Obstructions

Square Yard0040 202-B005 6,024 Removal of Asphalt Paved Ditch, All Depths

Linear Feet0050 202-B050 802 Removal of Concrete Combination Curb & Gutter

Square Yard0060 202-B052 421 Removal of Concrete Driveways, All Depths

Square Yard0070 202-B080 461 Removal of Concrete Sidewalk

Each0080 202-B165 6 Removal of Inlets, All Sizes

Linear Feet0090 202-B191 767 Removal of Pipe, 8" And Above

Each0100 202-B215 16 Removal of Sign Including Post & Footing

Cubic Yard0110 (E)203-A001 12,417 Unclassified Excavation, FM, AH

Cubic Yard0120 (E)203-EX020 7,944 Borrow Excavation, AH, FME, Class B9

Cubic Yard0130 (E)203-G001 500 Excess Excavation, FM, AH

Cubic Yard0140 (S)206-A001 848 Structure Excavation

Square Yard0150 209-A005 7,763 Geotextile Stabilization, Type V, Non-Woven

Cubic Yard0160 (E)211-B001 3,543 Topsoil for Slope Treatment, Contractor Furnished

Ton0170 213-C001 4 Superphosphate

Square Yard0180 216-A001 1,018 Solid Sodding

Square Yard0190 217-A001 10 Ditch Liner

Thousand Gallon0200 219-A001 453 Watering [$20.00]

Acre0210 220-A001 4 Insect Pest Control [$30.00]

Cubic Yard0220 (S)221-A001 30 Concrete Paved Ditch

Acre0230 223-A001 7 Mowing [$50.00]

Square Yard0240 224-A001 1,200 Soil Reinforcing Mat

Acre0250 225-A001 7 Grassing

Ton0260 225-B001 4 Agricultural Limestone

Ton0270 225-C001 15 Mulch, Vegetative Mulch

Acre0280 226-A001 7 Temporary Grassing

Linear Feet0290 234-A001 2,500 Temporary Silt Fence

Linear Feet0300 237-A002 2,728 Wattles, 20"

Linear Feet0310 239-A001 800 Temporary Slope Drains

Linear Feet0320 246-A001 1,300 Sandbags

(Date Printed 09/17/19) (Addendum No. 1)

Page 3: S E C T I O N 9 0 5 -- P R O P O S A L CONTINUED)mdot.ms.gov/bidsystem_data/20190924/ADDENDUMS/105333301...2019/09/24  · 0150 209-A005 7,763 Square Yard Geotextile Stabilization,

Line No. Item Code Adj Code Quantity Units Description [Fixed Unit Price]

Section 905

MARSHALL

BR-0060-03(020)/105333301

Proposal (Sheet 2 - 2)

Ton0330 249-A001 100 Riprap for Erosion Control

Ton0340 (GT)304-B002 3,610 Granular Material, Class 3, Group D

Ton0350 (BA1)403-A003 1,047 12.5-mm, ST, Asphalt Pavement

Ton0360 (BA1)403-A006 1,178 19-mm, ST, Asphalt Pavement

Ton0370 (BA1)403-A015 768 9.5-mm, ST, Asphalt Pavement

Gallon0380 (A2)407-A001 854 Asphalt for Tack Coat

Linear Feet0390 413-E001 70 Sawing and Sealing Transverse Joints in Asphalt Pavement

Square Yard0400 (C)502-A001 149 Reinforced Cement Concrete Bridge End Pavement

Linear Feet0410 503-C010 60 Saw Cut, Full Depth

Cubic Yard0420 (S)601-B001 44 Class "B" Structural Concrete, Minor Structures

Cubic Yard0430 (S)601-B002 2 Class "C" Structural Concrete, Minor Structures

Pounds0440 (S)602-A001 3,198 Reinforcing Steel

Linear Feet0450 (S)603-ALT003 528 18" Type A Alternate Pipe

Linear Feet0460 (S)603-CA011 936 18" Reinforced Concrete Pipe, Class III

Linear Feet0470 (S)603-CA026 792 24" Reinforced Concrete Pipe, Class III

Each0480 (S)603-CB003 4 18" Reinforced Concrete End Section

Each0490 (S)603-CB004 2 24" Reinforced Concrete End Section

Linear Feet0500 (S)603-CE002 40 22" x 13" Concrete Arch Pipe, Class A III

Linear Feet0510 (S)603-CE008 64 29" x 18" Concrete Arch Pipe, Class A III

Linear Feet0520 (S)603-CE028 32 58" x 36" Concrete Arch Pipe, Class A III

Each0530 (S)603-CF002 2 22" x 13" Concrete Arch Pipe End Section

Each0540 (S)603-CF003 2 29" x 18" Concrete Arch Pipe End Section

Each0550 (S)603-CF007 2 58" x 36" Concrete Arch Pipe End Section

Pounds0560 604-A001 1,027 Castings

Square Yard0570 (S)605-AA003 36 Geotextile for Subsurface Drainage, Type V, Non-Woven

Linear Feet0580 (S)605-O003 64 4" Perforated Sewer Pipe for Underdrains, SDR 35

Linear Feet0590 (S)605-P003 52 4" Non-perforated Sewer Pipe for Underdrains, SDR 35

Cubic Yard0600 (GY)605-W001 2 Filter Material for Combination Storm Drain and/or Underdrains,Type A,FM

Linear Feet0610 606-B001 175 Guard Rail, Class A, Type 1

Each0620 606-D022 4 Guard Rail, Bridge End Section, Type I

Each0630 606-E007 4 Guard Rail, Terminal End Section, Non-Flared

Square Yard0640 (S)608-B001 1,010 Concrete Sidewalk, With Reinforcement

Linear Feet0650 (S)609-D001 78 Combination Concrete Curb and Gutter Type 1

(Date Printed 09/17/19) (Addendum No. 1)

Page 4: S E C T I O N 9 0 5 -- P R O P O S A L CONTINUED)mdot.ms.gov/bidsystem_data/20190924/ADDENDUMS/105333301...2019/09/24  · 0150 209-A005 7,763 Square Yard Geotextile Stabilization,

Line No. Item Code Adj Code Quantity Units Description [Fixed Unit Price]

Section 905

MARSHALL

BR-0060-03(020)/105333301

Proposal (Sheet 2 - 3)

Linear Feet0660 (S)609-D012 1,314 Combination Concrete Curb and Gutter Type 3A Modified

Cubic Yard0670 612-B001 24 Flowable Fill, Non-Excavatable

Each0680 613-D005 7 Adjustment of Manhole

Square Yard0690 (S)614-A001 600 Concrete Driveway, Without Reinforcement

Square Yard0700 (S)614-B001 253 Concrete Driveway, With Reinforcement

Linear Feet0710 (S)615-A002 40 Concrete Bridge End Barrier, 33.5"

Each0720 617-A001 48 Right-of-Way Marker

Lump Sum0730 618-A001 1 Maintenance of Traffic

Linear Feet0740 619-A1003 5,291 Temporary Traffic Stripe, Continuous White, Paint

Linear Feet0750 619-A2003 5,822 Temporary Traffic Stripe, Continuous Yellow, Paint

Linear Feet0760 619-A5002 349 Temporary Traffic Stripe, Detail, Paint

Linear Feet0770 619-A6004 311 Temporary Traffic Stripe, Legend, Paint

Square Feet0780 619-D1001 221 Standard Roadside Construction Signs, Less than 10 Square Feet

Square Feet0790 619-D2001 224 Standard Roadside Construction Signs, 10 Square Feet or More

Linear Feet0800 619-G4001 12 Barricades, Type III, Double Faced

Linear Feet0810 619-G4005 72 Barricades, Type III, Single Faced

Each0820 619-G5001 60 Free Standing Plastic Drums

Each0830 619-G7001 3 Warning Lights, Type "B"

Lump Sum0840 620-A001 1 Mobilization

Linear Feet0850 626-C001 5,291 6" Thermoplastic Double Drop Edge Stripe, Continuous White

Linear Feet0860 626-E002 5,822 6" Thermoplastic Double Drop Traffic Stripe, Continuous Yellow

Linear Feet0870 626-G004 349 Thermoplastic Double Drop Detail Stripe, White

Linear Feet0880 626-H002 311 Thermoplastic Double Drop Legend, White

Each0890 627-L001 63 Two-Way Yellow Reflective High Performance Raised Markers

Square Feet0900 630-A001 25 Standard Roadside Signs, Sheet Aluminum, 0.080" Thickness

Square Feet0910 630-A003 27 Standard Roadside Signs, Sheet Aluminum, 0.125" Thickness

Linear Feet0920 630-C003 97 Steel U-Section Posts, 3.0 lb/ft

Each0930 630-F006 22 Delineators, Guard Rail, White

Each0940 630-F007 22 Delineators, Guard Rail, Yellow

Each0950 630-G005 4 Type 3 Object Markers, OM-3R or OM-3L, Post Mounted

Lump Sum0960 699-A001 1 Roadway Construction Stakes

Ton0970 (S)815-A007 25 Loose Riprap, Size 300

Square Yard0980 (S)815-E001 67 Geotextile under Riprap

Ton0990 (S)815-F002 12 Sediment Control Stone

(Date Printed 09/17/19) (Addendum No. 1)

Page 5: S E C T I O N 9 0 5 -- P R O P O S A L CONTINUED)mdot.ms.gov/bidsystem_data/20190924/ADDENDUMS/105333301...2019/09/24  · 0150 209-A005 7,763 Square Yard Geotextile Stabilization,

Line No. Item Code Adj Code Quantity Units Description [Fixed Unit Price]

Section 905

MARSHALL

BR-0060-03(020)/105333301

Proposal (Sheet 2 - 4)

Each1000 907-619-E3001 4 Changeable Message Sign

Lump Sum1010 907-899-A001 1 Railway-Highway Provisions

Ton1020 (GT)304-F001 7,513 3/4" and Down Crushed Stone Base

ALTERNATE GROUP AA NUMBER 1

Ton1030 (GT)304-F002 7,513 Size 610 Crushed Stone Base

ALTERNATE GROUP AA NUMBER 2

Ton1040 (GT)304-F003 7,513 Size 825B Crushed Stone Base

ALTERNATE GROUP AA NUMBER 3

Cubic Yard1050 (GY)605-W002 16 Filter Material for Combination Storm Drain and/or Underdrains,Type B, FM

ALTERNATE GROUP BB NUMBER 1

Cubic Yard1060 (GY)605-W003 16 Filter Material for Combination Storm Drain and/or Underdrains,Type C, FM

ALTERNATE GROUP BB NUMBER 2

Bridge Items

Square Yard1070 501-K001 853 Transverse Grooving

Linear Feet1080 (S)803-D007 2,625 HP 14 x 89 Steel Piling

Linear Feet1090 (S)803-P003 845 30" Steel Pipe Piling, Wall Thickness 0.500"

Linear Feet1100 (S)804-C026 764 110' Prestressed Concrete Beam, Type IV

Linear Feet1110 (S)804-C095 902 65' Prestressed Concrete Beam, Type IV

Pounds1120 (S)805-A001 97,542 Reinforcement

Linear Feet1130 (S)813-A002 484 Concrete Railing, 32"

Linear Feet1140 (S)813-B001 480 Concrete-Steel Railing

Cubic Yard1150 (S)815-D001 95 Concrete Slope Paving

Each1160 (S)907-803-B001 1 Conventional Static Pile Load Test [$5,000.00]

Each1170 (S)907-803-I003 1 PDA Test Pile, HP Steel Pile

Each1180 (S)907-803-I004 1 PDA Test Pile, Steel Pipe Pile

Each1190 (S)907-803-J001 2 Pile Restrike

Cubic Yard1200 (S)907-804-A002 226 Bridge Concrete, Class AA

Cubic Yard1210 (S)907-804-A004 336 Bridge Concrete, Class BD

(Date Printed 09/17/19) (Addendum No. 1)

Page 6: S E C T I O N 9 0 5 -- P R O P O S A L CONTINUED)mdot.ms.gov/bidsystem_data/20190924/ADDENDUMS/105333301...2019/09/24  · 0150 209-A005 7,763 Square Yard Geotextile Stabilization,

NU

MB

ER

SH

EE

T

DA

TE

SH

EE

T N

O.

BY

BR

IDG

E D

IVIS

ION

RE

VIS

ION

S

GE

NE

RA

LIZ

ED

SO

IL P

RO

FIL

E

1 O

F 1

4

2 O

F 1

4

3 O

F 1

4

4 O

F 1

4

6 O

F 1

4

7 O

F 1

4

8 O

F 1

4

9 O

F 1

4

10 O

F 1

4

11 O

F 1

4

12 O

F 1

4

13 O

F 1

4

14 O

F 1

4

80

04

80

05

80

06

80

07

80

08

80

09

80

10

80

11

80

12

80

13

EN

D B

EN

T D

ET

AIL

S

DI-

BR

-1

SQ

-B

R-1

80

01

80

02

DE

TA

ILE

D I

ND

EX

(B

RID

GE

)

SU

MM

AR

Y O

F Q

UA

NT

ITIE

S (

BR

IDG

E)

NU

MB

ER

WO

RK

ING

D

ES

CR

IPT

ION

OF

SH

EE

TS

80

14

80

15

80

16

301000

105333

BR

-0060-0

3(0

20)

BR

-00

60

-03

(02

0)

MA

RS

HA

LL

SP

AN

DE

TA

ILS

LIG

HT

ING

BR

AC

KE

T D

ET

AIL

S

65

FT

. B

EA

M D

ET

AIL

S B

EA

M N

O.

65

-1

& 6

5-2

110 F

T. B

EA

M D

ET

AIL

S B

EA

M N

O. 110-1

BE

AR

ING

PA

D,

SO

LE

PL

AT

E,

AN

D B

EA

M B

EV

EL

DE

TA

ILS

MIS

CE

LL

AN

EO

US

SP

AN

DE

TA

ILS

80

03

2018-0

2-0

5

SP

AN

S N

O. 1, 2, &

3 D

ET

AIL

S

5 O

F 1

4

80

17

EC

BR

-1

80

18

RD

-32

EN

D B

EN

TS

1 &

4 D

ET

AIL

S

IN

T. B

EN

TS

2 &

3 D

ET

AIL

S

ST

AT

EP

RO

JE

CT

NO

.

MIS

S.

DATEREVISIONBY

WO

RK

ING

NU

MB

ER

SH

EE

T N

UM

BE

R

MIS

SIS

SIP

PI

DE

PA

RT

ME

NT

OF

TR

AN

SP

OR

TA

TIO

N

MISSISSIPPI DEPARTMENT OF TRANSPORTATION

PLAN

00:00DGNFILENAME AMPM

8001

CO

UN

TY

:

PR

OJE

CT

NU

MB

ER

:

BRIDGE DIVISION

FM

S:

DE

SIG

NE

R

DE

TA

ILE

R

DIR

EC

TO

R O

F S

TR

UC

TU

RE

S,

ST

AT

E B

RID

GE

EN

GIN

EE

R -

JU

ST

IN W

AL

KE

R,

P.E

.

CH

EC

KE

R

ISS

UE

DA

TE

DE

P. D

IR. O

F S

TR

UC

TU

RE

S, A

SS

T. S

TA

TE

BR

IDG

E E

NG

INE

ER

- S

CO

TT

WE

ST

ER

FIE

LD

, P

.E.

OV

ER

PA

SS

AT

ST

A. 116+

31.4

5

DE

TA

ILE

D I

ND

EX

DI-B

R-1

(BR

IDG

E)

Jo

sh

Wil

tsh

ire

RA

ILIN

G D

ET

AIL

S

OV

ER

PA

SS

AT

ST

A. 116+

31.4

5S

R4

AC

RO

SS

BN

SF

RA

ILW

AY

AN

D M

S C

EN

TR

AL

RA

ILR

OA

D C

O.

LA

YO

UT

, E

ST

IMA

TE

D Q

UA

NT

ITIE

S,

& G

EN

ER

AL

NO

TE

S,

EX

HIB

IT "

B-1

"

FO

UN

DA

TIO

N &

GE

NE

RA

L N

OT

ES

, E

XH

IBIT

"B

-1"

PE

DE

ST

RIA

N R

AIL

DE

TA

IL

S,

EX

HIB

IT

"B

-1

"

BR

IDG

E E

RO

SIO

N C

ON

TR

OL

PL

AN

, E

XH

IBIT

"B

-1"

Jo

sh

Wil

tsh

ire

Spencer

Yate

s

9/11/19

8002, 8003, &

8011

BJ,

SE

Y,

& J

LW

tballard
New Stamp
Page 7: S E C T I O N 9 0 5 -- P R O P O S A L CONTINUED)mdot.ms.gov/bidsystem_data/20190924/ADDENDUMS/105333301...2019/09/24  · 0150 209-A005 7,763 Square Yard Geotextile Stabilization,

STATE

PRO

JECT N

O.

MIS

S.

BR-0

060-0

3(0

20)

SUM

MA

RY

OF

QU

AN

TITI

ES

PA

Y IT

EM N

O.

PA

Y IT

EMU

NIT

QU

AN

TITI

ES

Bri

dge

Su

mm

ary

PR

ELIM

INA

RY

FIN

AL

50

1-K

00

1Tr

ansv

erse

Gro

ovi

ng

SY8

53

90

7-8

03

-B0

01

Co

nve

nti

on

al S

tati

c P

ile L

oad

Tes

tEA

1

80

3-D

00

7H

P 1

4 x

89

Ste

el P

ilin

gLF

2,6

25

90

7-8

03

-I0

03

PD

A T

est

Pile

, HP

Ste

el P

ileEA

1

90

7-8

03

-I0

04

PD

A T

est

Pile

, Ste

el P

ipe

Pile

EA1

90

7-8

03

-J0

01

Pile

Res

trik

eEA

2

80

3-P

00

33

0"

Stee

l Pip

e P

ilin

g, W

all T

hic

knes

s 0

.50

0"

LF8

45

90

7-8

04

-A0

02

Bri

dge

Co

ncr

ete,

Cla

ss A

AC

Y2

26

90

7-8

04

-A0

04

Bri

dge

Co

ncr

ete,

Cla

ss B

DC

Y3

36

80

4-C

02

61

10

' Pre

stre

ssed

Co

ncr

ete

Bea

m, T

ype

IVLF

76

4

80

4-C

09

56

5' P

rest

ress

ed C

on

cret

e B

eam

, Typ

e IV

LF9

02

80

5-A

00

1R

ein

forc

emen

tLB

S9

7,5

42

81

3-A

00

2C

on

cret

e R

ailin

g, 3

2"

LF4

84

81

3-B

00

1C

on

cret

e-St

eel R

ailin

gLF

48

0

81

5-D

00

1C

on

cret

e Sl

op

e P

avin

gC

Y9

5

SHEE

T N

UM

BER

WO

RK

ING

NU

MB

ER

MIS

SISS

IPP

I DEP

AR

TMEN

T O

F TR

AN

SPO

RTA

TIO

N

SUM

MA

RY

OF

QU

AN

TITI

ES

(BR

IDG

E IT

EMS)

PR

OJE

CT

SQ-B

R-1

DES

IGN

ERTr

ent

Wix

on

, PE

CH

ECK

ERB

arb

ara

Jon

es, P

E

DET

AIL

ERIS

SUE

DA

TE0

9/2

9/2

01

7

DIR

ECTO

R O

F ST

RU

CTU

RES

, STA

TE B

RID

GE

ENG

INEE

R -

JU

STIN

WA

LKER

. P.E

.

DEP

. DIR

OF

STR

UC

TUR

ES, A

SST.

STA

TE B

RID

GE

ENG

INEE

R -

SC

OTT

WES

TER

FIEL

D, P

.E.

80

02

BR

-006

0-03

(020

)10

5333

-301

000

MA

RS

HA

LL

CO

UN

TIE

S

tballard
New Stamp
Page 8: S E C T I O N 9 0 5 -- P R O P O S A L CONTINUED)mdot.ms.gov/bidsystem_data/20190924/ADDENDUMS/105333301...2019/09/24  · 0150 209-A005 7,763 Square Yard Geotextile Stabilization,

EL

. 6

27

.35

-5.3

2000\%

EL.

611.9

24

EL.

615.7

52

+4.0

0000\%

Sta

. 2+

08.8

60 A

H

Sta 1

18

+9

3.6

99

BK

=

Eq

uati

on

:

VPC Sta.

114+90.0

00

VP

I S

ta. 1

17

+8

0.0

00

VPT Sta.

3+85.1

61

301000

105333

BR

-0060-0

3(0

20)

BR

-00

60

-03

(02

0)

MA

RS

HA

LL

DE

SIG

N D

AT

A:

NO

TE

:T

he g

ird

er d

efle

cti

on

dia

gram

s s

ho

wn

in

th

ese p

lan

s w

ere p

rep

ared

an

d i

nte

nd

ed

for d

esig

n a

nd e

sti

mati

on p

urposes o

nly

. A

ctu

al

brid

ge g

irder d

efle

cti

ons m

ay d

iffer

fro

m t

he d

efle

cti

on

dia

gram

s s

ho

wn

in

th

ese p

lan

s.

It i

s t

he C

ontractor's

responsibility t

o c

onstruct t

he b

ridge t

o m

eet t

he

requir

em

ents

of t

he p

lans a

nd s

pecif

icati

ons i

nclu

din

g, but

not

lim

ited t

o, th

e

requir

em

ents

for b

rid

ge d

eck s

mooth

ness.

B

rid

ge E

ngin

eer f

or r

evie

w, th

rough t

he P

roje

ct

Engin

eer. T

his

subm

itta

l shall

inclu

de

all

calc

ula

tions, assum

pti

ons a

nd p

aram

ete

rs u

sed b

y t

he C

ontr

acto

r t

o d

ete

rm

ine

brid

ge g

irder d

efle

cti

ons a

nd f

orm

grade e

levati

ons. T

his

subm

itta

l

sh

all

als

o i

nclu

de a

n e

recti

on

an

d c

on

str

ucti

on

pro

ced

ure t

hat

ad

dresses

th

e c

on

str

ucti

on

mean

s a

nd

meth

od

olo

gie

s u

sed

by

th

e C

on

tracto

r a

nd

sh

all

co

nsid

er

effects

in

clu

din

g,

bu

t n

ot

lim

ited

to

, co

nstr

ucti

on

ph

asin

g,

po

urin

g s

ch

ed

ule

s,

appli

ed p

erm

anent

and c

onstr

ucti

on l

oadin

g, and s

hall

inclu

de c

alc

ula

tions a

nd

deta

ils o

f t

em

porary g

irder b

racin

g s

yste

ms u

sed t

o e

nsure g

irder s

tabil

ity a

nd

to c

ounter t

he e

ffects o

f g

irder t

ilt.

Afte

r g

irder e

recti

on a

nd p

rio

r t

o d

eck c

onstr

ucti

on, th

e C

ontr

acto

r s

hall

subm

it

deck t

hic

kness v

erif

icati

on c

alc

ula

tions f

or e

ach g

irder. T

hese c

alc

ula

tions s

hall

in

clu

de a

co

mp

aris

on

of t

he e

recte

d g

ird

er t

op

fla

ng

e p

ro

fil

es v

ersu

s

th

e p

lan d

eck g

rade e

levati

ons o

ver e

ach g

irder p

lus t

he a

nti

cip

ate

d g

irder d

efle

cti

on

d

ue t

o a

pp

lied

perm

an

en

t d

ead

lo

ad

an

d c

reep

.

Th

ree (

3) c

op

ies o

f t

he d

eck

th

ick

ness v

erif

icati

on

calc

ula

tio

ns a

nd

an

y p

ro

po

sed

rem

edia

tion m

easures t

o c

orrect

for t

hin

deck a

reas s

hall

be s

ubm

itte

d t

o t

he D

irecto

r

o

f S

tru

ctu

res,

Sta

te B

rid

ge E

ng

ineer f

or r

ev

iew

, th

ro

ug

h t

he P

ro

ject

En

gin

eer.

The B

RID

GE

SU

PE

RS

TR

UC

TU

RE

CO

NS

TR

UC

TIO

N P

LA

N a

nd

th

e d

eck

th

ick

ness

v

erif

icati

on

calc

ula

tio

ns s

hall

be p

rep

ared

an

d s

tam

ped

by

a M

issis

sip

pi

R

egis

tered P

rofessio

nal

Engin

eer.

Prio

r t

o f

orm

wo

rk

co

nstr

ucti

on

, th

e C

on

tracto

r s

hall

su

bm

it t

hree (

3) c

op

ies o

f a

pro

po

sed

B

RID

GE

SU

PE

RS

TR

UC

TU

RE

CO

NS

TR

UC

TIO

N P

LA

N t

o t

he D

irecto

r o

f S

tructu

res, S

tate

SE

ISM

IC D

ES

IGN

DA

TA

:S

eism

ic P

erfo

rm

an

ce Z

on

e.

. .

. .

. .

. .

Zo

ne 2

Site C

lass D

efinition. . . . . . . . . . . S

ite C

lass "

C"

Im

portance C

ategory. . . . . . . . . . . O

ther

Est.

Len

gth

1 2

0.6

5

0.6

5

Stren

gth

I

Stren

gth

I

Ben

t N

o.

Co

ntr

oll

ing

Lim

itS

tate

LR

FD

Resis

tance

Facto

r

Req

uir

ed

Ult

imate

Bearin

g(T

ons)

Pil

e T

ype

& S

ize

(ft.)

CA

PA

CIT

Y A

ND

TIP

EL

EV

AT

ION

SC

HE

DU

LE

RE

QU

IRE

D U

LT

IMA

TE

PIL

E B

EA

RIN

G

Ben

t N

o.

(ft.)

Min

. L

ength

Tip

Ele

v.

1 2

52

7.4

PD

A T

ES

T P

IL

E S

CH

ED

UL

E

F.G

. E

lev. 620.5

930

Item

Lo

cati

on

Spans

End b

ents

Int.

ben

ts

To

tals

ES

TIM

AT

ED

QU

AN

TIT

IES

Gro

ovin

g

Trans.

Lo

ad

Test

Sta

tic P

ile

Co

nv

en

tio

nal

Restr

ike

Pil

e

Pip

e P

ilin

g

Steel

30" D

iam

.

men

t

Rein

fo

rce-

Rail

ing, 32"

Co

ncrete

Each

L.F

.L

.F.

Each

Each

C.Y

.L

.F.

L.F

.L

.F.

S.Y

.C

.Y.

L.F

.

Pav

ing

Slo

pe

Co

ncrete

C.Y

.

GE

NE

RA

L N

OT

ES

:

853.3

3

853.3

3

1 1

84

5.0

84

5.0

902.4

2

902.4

2

764.1

7

764.1

7

480.0

0

484.3

3

480.0

0

94

.50

94

.50

4.3

3

480.0

0

Ste

el

Pil

ing

HP

14

X8

9

40

.65

Stren

gth

I

NO

TE

:

3

HP

14

x8

9

HP

14

x8

9

14

6

14

6

35

4

35

4S

tren

gth

I0

.65

52

8.4

336.3

6

86

.62

139.6

0

226.2

2336.3

6

2018-0

2-0

5

Loading. . . . . . .

. H

L-93

Ro

ad

way

wid

th

. .

. .

36

'-0

" G

utter t

o g

utter

Co

ncrete.

. .

. .

. .

Class "

AA

" (

4,0

00

p.s

.i.)

PA

IN

T N

OT

E:

NO

TE

:N

OT

E:F

or a

dditio

n n

otes a

nd

details, see s

heet n

o. 8

00

4.

Concrete. . . . . . . C

lass "

BD

" (

4,0

00 p

.s.i

.)

Specif

icati

ons. . . . . A

.A.S

.H.T

.O, L

RF

D 2

014 &

2016 i

nte

rem

s

Stay

-in

-p

lace m

etal d

eck

fo

rm

s .

. .

. .

18

lb

s/sq

ft (

betw

een

flan

ges)

PIL

E N

OT

ES

:

ST

EE

L P

IP

E P

IL

E N

OT

ES

:

be i

nclu

ded

in

th

e p

rices a

nd

pay

men

ts f

or b

id

item

s.

n

ot

be p

aid

for d

irectl

y a

nd c

om

pensati

on t

herefor w

ill

Wo

rk

fo

r w

hic

h n

o p

ay

ite

m i

s p

ro

vid

ed

in

th

e p

ro

po

sal

wil

l

o

therw

ise n

oted.

Rein

forcin

g s

teel

shall

be A

ST

M A

615, G

rade 6

0, unle

ss

f

inis

h i

n a

ccordance w

ith t

he s

pecif

icati

ons.

Co

ncrete s

urfaces s

hall r

eceiv

e a

Class 2

ru

bb

ed

or s

pray

E

ng

in

eer.

a

fter n

otification f

rom

the D

irector o

f S

tructures, S

tate B

ridge

t

he p

rovided c

am

ber d

ata. T

herefore, deck g

rades s

hould b

e s

et o

nly

s

ho

uld

be a

ware t

hat

the d

efle

cti

on

dia

gram

may

be m

od

ifie

d b

ased

on

The C

ontr

acto

r s

hall

provid

e c

am

ber d

ata

afte

r e

recti

on. T

he C

ontr

acto

r

p

rio

r t

o s

hip

pin

g.

Th

e F

ab

ric

ato

r s

hall

pro

vid

e c

am

ber d

ata

at

rele

ase a

nd

im

med

iate

ly

S

tate

Brid

ge E

ngin

eer f

or a

pp

ro

val

prio

r t

o t

he m

an

ufactu

re o

f b

eam

s.

p

lan, shall b

e s

ubm

itted i

n d

uplicate t

o t

he D

irector o

f S

tructures,

Sh

op

draw

ing

s o

f p

restr

essed

beam

s,

inclu

din

g a

n e

recti

on

a

re n

ot a

cceptable.

M

issis

sip

pi

Sta

nd

ard

Sp

ecif

icati

on

s.

Parti

al

su

bm

itta

ls

b

e f

urn

ish

ed

in

acco

rd

an

ce w

ith

Sectio

n 8

05

of t

he

Rein

fo

rcem

en

t o

rd

er l

ists

an

d r

eq

uir

ed

pla

cin

g p

lan

s s

hall

S

tructures" (

AC

I 3

15R

-94).

S

tan

dard

Practi

ce f

or D

eta

ilin

g R

ein

fo

rced

Co

ncrete

Bar b

endin

g d

eta

ils s

hall

be i

n a

ccordance w

ith "

Manual

of

c

onstruction o

f e

nd b

ents.

No

pay

men

t w

ill

be a

llo

wed

fo

r e

xcav

ati

on

in

cid

en

tal

to t

he

o

therw

ise n

oted.

Rail

ing e

xpansio

n j

oin

t m

ate

ria

l shall

be b

itum

inous f

iber t

ype u

nle

ss

Brid

ge c

oncrete

shall

be c

lass "

AA

" o

r "

BD

" a

s i

ndic

ate

d i

n t

he p

lans.

S

pan

Deta

ils f

or l

imit

s o

f t

ransverse g

roovin

g o

n b

rid

ge d

eck.

S

ections 5

01 a

nd 8

04 o

f t

he s

pecifications. S

ee M

isc.

m

echanic

all

y t

ransverse g

rooved i

n a

ccordance w

ith

Th

e f

inal

su

rface t

ex

ture o

f t

he b

rid

ge d

eck

sh

all

be

p

rice a

dju

stm

en

t.

E

ng

ineer p

ro

vid

ed

su

ch

ch

an

ges w

ill

no

t b

e c

au

se f

or c

on

tract

m

ay

be a

uth

orized

by

th

e D

irecto

r o

f S

tru

ctu

res,

State B

rid

ge

M

ino

r c

han

ges i

n d

eta

il o

f d

esig

n o

r c

on

str

ucti

on

pro

ced

ure

a

pproval o

f t

he D

irector o

f S

tructures, S

tate B

ridge E

ngineer.

No c

hange o

f p

lans w

ill

be p

erm

itte

d e

xcept

by w

rit

ten

R

oad a

nd B

rid

ge C

onstr

ucti

on, 2017.

Mis

sis

sip

pi

Sta

ndard S

pecif

icati

ons f

or

p

erfo

rm

ed

by

a c

ertified

weld

er.

Weld

ing s

hall

com

ply

wit

h A

NS

I/A

WS

D1.5

Brid

ge W

eld

ing C

ode a

nd b

e

Ste

el

Pip

e P

iles a

re i

nte

nded t

o b

e o

pend e

nded.

All

Ste

el

Pip

e P

iles s

hall

be A

ST

M A

25

2,

Grad

e 3

(F

y =

45

,00

0 p

si.

).

b

y t

he D

irecto

r's

of S

tru

ctu

res,

State B

rid

ge E

ng

in

eer.

a

ltern

ati

ve h

am

mer i

s a

pp

ro

ved

C

ontr

acto

r's

driv

abil

ity a

naly

sis

uti

lizin

g t

he C

ontr

acto

r's

sele

cte

d

t

han 7

0,0

00 f

t-lbs t

o t

he t

ip e

levations s

pecified u

nless t

he

Ste

el

pip

e p

iles s

hall

be d

riv

en w

ith a

maxim

um

rate

d e

nergy n

o l

ess

o

f t

he p

ile i

n o

rd

er t

o p

ro

perly

place a

nd

pro

tect P

DA

gag

es.

b

e l

arge e

nough t

o p

rovid

e a

min

imum

of 3

" c

learance o

n e

ach s

ide

Pil

e h

am

mer l

eads u

sed f

or a

ll P

DA

test

pil

es a

nd P

DA

restr

ikes s

hall

i

nclu

des t

he L

RF

D r

esistan

ce f

acto

r f

or P

DA

of 0

.65

.

U

LT

IM

AT

E P

IL

E B

EA

RIN

G C

AP

AC

IT

Y A

ND

TIP

EL

EV

AT

IO

N S

CH

ED

UL

E

The r

equir

ed u

ltim

ate

pil

e b

earin

g s

how

n i

n t

he R

EQ

UIR

ED

r

esults o

f t

he P

DA

test p

iles.

Pil

e l

ength

s a

nd d

riv

ing c

rit

eria

shall

be p

rovid

ed b

ased o

n t

he

o

therw

ise d

irected b

y t

he E

ngineer.

PD

A t

est p

iles s

hall r

eq

uire a

1 d

ay

an

d 7

day

restrik

e u

nless

b

e o

ne a

nd o

ne h

alf

(1•) t

imes t

he m

inim

um

pil

e b

earin

g c

apacit

y.

When l

oadin

g t

ests

are r

equir

ed, th

e m

axim

um

test

load s

hall

sh

all b

e c

ertified

an

d e

lectro

des s

hall b

e a

pp

ro

ved

.

Weld

ing

sh

all

be d

on

e b

y t

he E

LE

CT

RIC

AR

C p

ro

cess.

Weld

ers

S

tate B

ridge E

ngineer.

s

pliced

, o

nly

, as a

pp

ro

ved

by

th

e D

irecto

r o

f S

tru

ctu

res,

Wh

en

feasib

le,

bearin

g p

iles s

hall

be d

riv

en

fu

ll l

en

gth

an

d b

e

t

est p

iles d

riv

en

ou

tsid

e t

he s

tru

ctu

ral l

im

its.

Th

e D

irecto

r o

f S

tru

ctu

res,

Sta

te B

rid

ge E

ng

ineer m

ay

au

tho

riz

e

E

LE

VA

TIO

N S

CH

ED

UL

E.

s

how

n i

n t

he R

EQ

UIR

ED

UL

TIM

AT

E P

IL

E B

EA

RIN

G C

AP

AC

IT

Y A

ND

TIP

Perm

anent

pil

es s

hall

be d

riv

en t

o a

n e

levati

on n

o h

igher t

han t

he e

levati

on

d

irected

by

th

e D

irecto

r o

f S

tru

ctu

res,

State B

rid

ge E

ng

in

eer.

e

levati

on s

how

n i

n t

he P

DA

TE

ST

PIL

E S

CH

ED

UL

E, unle

ss o

therw

ise

Rem

ain

ing t

est

pil

es a

ll b

e d

riv

en a

s a

conti

nuos o

perati

on, to

the t

ip

o

f t

he P

DA

In

dicato

r T

est P

ile i

s c

om

plete.

c

han

ge.

Th

erefo

re,

reco

mm

en

d o

rd

erin

g P

DA

Test

Pil

es a

fte

r a

naly

sis

I

ndicator T

est P

iles, the p

lan l

engths o

f t

he P

DA

Test P

iles m

ay

d

riving a

ny P

DA

Test P

iles. B

ased o

n t

he r

esults o

f t

he P

DA

d

riv

en

wit

h m

an

dato

ry

restr

ikes a

nd

PD

A r

esu

lts a

naly

zed

prio

r t

o

The P

DA

monit

ored I

ndic

ato

r T

est

Pil

es w

ill

be o

ut-

of-posit

ion p

iles

o

f t

he i

nd

icato

r P

DA

test

pil

e s

hall

be m

on

ito

red

usin

g P

DA

.

d

riv

en

co

nti

nu

ou

sly

usin

g a

n a

pp

ro

ved

im

pact

ham

mer.

Th

e f

ull

len

gth

s

how

n o

n t

he F

oundati

on P

lan. T

he i

ndic

ato

r P

DA

test

pil

e s

hall

be

The f

irst

PD

A t

est

pil

e d

riv

en s

hall

be a

n i

ndic

ato

r P

DA

test

pil

e a

s

P

DA

TE

ST

PIL

E S

CH

ED

UL

E a

nd

wil

l b

e p

aid

fo

r a

s t

est

pil

es o

nly

.

i

ndicator t

est p

ile o

r p

roduction p

ile a

t t

he l

ocation s

how

n i

n t

he

PD

A t

est

pil

es s

hall

be d

riv

en w

ith a

n a

pproved i

mpact

ham

mer a

s a

n

S

tate B

ridge E

ngineer.

a

lternative h

am

mer i

s a

pproved b

y t

he D

irector's

of S

tructures,

C

ontr

acto

r's

driv

abil

ity a

naly

sis

uti

lizin

g t

he C

ontr

acto

r's

sele

cte

d

t

han 5

5,0

00 f

t-lbs t

o t

he t

ip e

levations s

pecified u

nless t

he

Ste

el

HP

pil

es s

hall

be d

riv

en

wit

h a

max

imu

m r

ate

d e

nerg

y n

o l

ess

p

rotect P

DA

gages.

o

n e

ach s

ide o

f t

he p

ile i

n o

rder t

o p

roperly p

lace a

nd

s

hall

be l

arge e

nough t

o p

rovid

e a

min

imum

of 3

" o

f c

learance

Pil

e h

am

mer l

ead

s u

sed

fo

r a

ll P

DA

test

pil

es a

nd

PD

A r

estr

ikes

t

he L

RF

D r

esistance f

actor f

or P

DA

of 0

.65.

U

LT

IM

AT

E P

IL

E B

EA

RIN

G A

ND

TIP

EL

EV

AT

IO

N S

CH

ED

UL

E i

nclu

des

The r

equir

ed u

ltim

ate

pil

e b

earin

g s

how

n i

n t

he R

EQ

UIR

ED

r

esults o

f t

he P

DA

test p

iles.

Pil

e l

en

gth

s a

nd

driv

ing

crit

eria

sh

all

be p

ro

vid

ed

based

on t

he

o

therw

ise d

irected b

y t

he E

ngineer.

PD

A t

est p

iles s

hall r

eq

uire a

1 d

ay

an

d 7

day

restrik

e u

nless

capacity.

b

e o

ne a

nd

on

e h

alf

(1

•) t

imes t

he m

inim

um

pil

e b

earin

g

When l

oadin

g t

ests

are r

equir

ed, th

e m

axim

um

test

load s

hall

s

hall b

e c

ertified

an

d e

lectro

des s

hall b

e a

pp

ro

ved

.

Weld

ing

sh

all

be d

on

e b

y t

he E

LE

CT

RIC

AR

C p

ro

cess.

Weld

ers

S

tate B

rid

ge E

ng

in

eer.

s

pliced

, o

nly

, as a

pp

ro

ved

by

th

e D

irecto

r o

f S

tru

ctu

res,

Wh

en

feasib

le,

bearin

g p

iles s

hall

be d

riv

en

fu

ll l

en

gth

an

d b

e

d

eterm

in

ed

by

th

e s

co

ur l

in

e.

The t

ip e

levati

on o

f p

ilin

g, for h

ydrauli

c s

tructu

res, m

ay b

e

C

AP

AC

IT

Y A

ND

TIP

EL

EV

AT

IO

N S

CH

ED

UL

E.

t

he e

levati

on s

how

n i

n t

he R

EQ

UIR

ED

UL

TIM

AT

E P

IL

E B

EA

RIN

G

Perm

an

en

t p

iles s

hall

be d

riv

en

to

an

ele

vati

on

no

hig

her t

han

S

tru

ctu

res,

State B

rid

ge E

ng

in

eer.

P

IL

E S

CH

ED

UL

E, unle

ss o

therw

ise d

irecte

d b

y t

he D

irecto

r o

f

b

earin

g c

ap

acit

y a

nd

th

e t

ip e

lev

ati

on

s s

ho

wn

in

th

e P

DA

TE

ST

Test

pil

es s

hall

be d

riv

en a

s a

conti

nuous o

perati

on, to

the

t

est p

iles d

riv

en

ou

tsid

e t

he s

tru

ctu

ral l

im

its.

Th

e D

irecto

r o

f S

tru

ctu

res,

Sta

te B

rid

ge E

ng

ineer m

ay

au

tho

riz

e

as test p

iles o

nly

.

s

how

n i

n t

he P

DA

TE

ST

PIL

E S

CH

ED

UL

E a

nd w

ill

be p

aid

for

Test

pil

es s

hall

be d

riv

en

as p

erm

an

en

t p

iles a

t th

e l

ocati

on

85

75

65

65

75

VE

RT

IC

AL

CU

RV

E =

580 F

T.

to t

he R

eq

uir

ed

Ult

imate

Bearin

g.

Th

e L

RF

D L

oad

Resis

tan

ce F

acto

r o

f 0

.65

has b

een

ap

pli

ed

85

30" S

teel P

ipe P

ile •

"

30" S

teel P

ipe P

ile •

"

Each

1 1

HP

Ste

el

Pil

e

Pil

e,

PD

A T

est

Ste

el

Pip

e P

ile

Pil

e,

PD

A T

est

Cla

ss A

A

Concrete

,

Bri

dg

e

Cla

ss B

D

Concrete

,

Bri

dg

e

Ty

pe-IV

Beam

Prest.

Conc.

65 F

t.

Ty

pe-IV

Beam

Prest.

Conc.

11

0 F

t.

Lb

s.

Ste

el

Rail

ing

Co

ncrete

-

2550.0

2550.0

1 21

75,4

69

13,1

90

8,8

83

97,5

42

1 1

813-B

001, C

oncrete

-S

teel

Rail

ing.)

(N

ot

a s

ep

erate

pay

ite

m.

Pain

t an

d c

oati

ng

sh

all

be a

bso

rb

ed

un

der p

ay

ite

m

Specif

icati

ons. F

inal

top c

oat

shall

be g

loss b

lack.

sh

all

be c

lean

ed

an

d t

hen

pain

ted

wit

h o

ne s

ho

p c

oat

of i

no

rg

an

ic z

inc p

er t

he

to

p c

oat o

f a

rcy

lic l

ay

tex

per S

ectio

n 8

14

of t

he S

pecificatio

ns.

Bo

lt h

oles

of i

norganic

zin

c, one f

ield

inte

rm

edia

te c

oat

of a

rcyli

c l

ayte

x a

nd o

ne f

ield

Str

uctu

ral

ste

el

su

rfaces s

hall

be c

lean

ed

an

d t

hen

pain

ted

wit

h o

ne s

ho

p c

oat

*V

ER

TIC

AL

CL

EA

RA

NC

E N

OT

E:

ele

vati

on

wit

hin

th

e r

ail

ro

ad

rig

ht

of w

ay

.

of r

ail e

levation t

o t

he l

ow

est g

irder

cle

aran

ce a

s m

easu

red

fro

m t

he h

igh

est

top

Verti

cal

cle

arance s

how

n i

s t

he m

inim

um

N

OT

E:

NO

TE

:

CO

NS

TR

UC

TIO

N N

OT

E:

BR

IDG

E R

EM

OV

AL

NO

TE

:

(A

llo

w f

or a

min

imu

m o

f 3

0 d

ay

s f

or r

ev

iew

).

to t

he R

ail

roads a

nd m

ust

have t

he p

lans a

pproved p

rio

r t

o r

em

oval

Th

e c

on

tracto

r m

ust

su

bm

it e

xis

tin

g b

rid

ge d

eck

an

d r

ail

dem

oli

tio

n p

lan

s

that

all

min

imu

m c

learan

ce r

eq

uir

em

en

ts w

ill

be p

ro

vid

ed

.

of ?

SR

4 a

nd

? R

ail

ro

ad

s p

rio

r t

o b

eg

inn

ing

wo

rk

to

en

su

re

Th

e c

on

tracto

r s

hall

verif

y t

he s

tati

on

alo

ng

SR

4 a

t th

e i

nte

rsecti

on

beg

inn

ing

co

nstr

ucti

on

.

of r

ail s

hall b

e v

erified p

rior t

o

The e

levati

on o

f t

he e

xis

ting t

op

NO

TE

:N

OT

E: M

P 5

28.3

5

DO

T N

o.

66

72

4P

exis

ting E

ast

rail

road t

rack b

elo

w:

on

th

e N

orth

an

d S

ou

th

sid

e o

f t

he s

tru

ctu

re n

ear t

he c

en

ter l

in

e o

f t

he

bla

ck

lett

erin

g a

nd

nu

mb

erin

g o

n a

wh

ite b

ack

gro

un

d i

n a

co

nsp

icu

ou

s l

ocati

on

Th

e C

on

tracto

r t

o a

pp

ly t

he f

oll

ow

ing

in

fo

rm

ati

on

, u

sin

g s

ev

en

(7

) i

nch

hig

h

NO

TE

:N

OT

E: 2

1'-

6" V

ertical f

ro

m t

he t

op

of r

ail t

rack

15

'-0

" H

oriz

on

tal

fro

m t

he c

en

terli

ne o

f t

rack

str

uctu

res s

hall

be a

s f

oll

ow

s b

elo

w:

Min

imu

m c

on

str

ucti

on

cle

aran

ces f

or f

als

ew

ork

an

d a

ny

oth

er t

em

po

rary

EL

EV

AT

ION

WIT

H P

RO

FIL

E A

LO

NG

? A

PP

RO

AC

H R

OA

DW

AY

EL

EV

AT

ION

WIT

H P

RO

FIL

E A

LO

NG

? A

PP

RO

AC

H R

OA

DW

AY

Scale: 1

"=

20'-

0"

1'-

1•"

12

34

F.G. 620.5912

Sta. 116+97.58

Sta. 116+31.45

Begin Bridge

F.G. 619.8004

F.G. 619.2692

EL

. 5

89

.26

Vert. Cl.

Excavate

Excavate

EL

. 6

02

.0

pav

ing

Conc. slo

pe

3:1

(ty

p.)

fo

oti

ng

s

Exist.

gro

und

Natu

ral

lin

es

? r

ail

way

end b

ent

Exist.

pav

ing

Co

nc.

slo

pe

Vert. Cl.

*25.29'

25.59'

F.G. 620.3499

Sta. 118+07.58

Sta. 118+73.70

End Bridge

1 @

24

0'-

0" (

65

'-0

",

11

0'-

0",

65

'-0

") p

restressed

co

ncrete b

eam

sp

an

1'-

1•"

Lig

hti

ng

brack

et

Lig

hti

ng

brack

et

Sta. 116+87.58

Sta. 118+17.58

sh

eet n

um

bers 8

00

8-8

01

6.

(C

onti

nuous f

or l

ive l

oad o

nly

) P

er d

eta

ils o

n

of w

ay

Rail

road r

ight

of w

ay

Rail

road r

ight

18

- H

P 1

4x

89

piles

sheets n

o. 8005 &

8006.

1 &

4 p

er d

etails o

n

Ste

el

pil

e e

nd

ben

ts n

o.

EL

. 6

30

EL

. 6

20

EL

. 6

10

EL

. 6

00

EL

. 5

90

EL

. 6

30

EL

. 6

20

EL

. 6

10

EL

. 6

00

EL

. 5

90

20'-

0"

37.1

2'<

15

.0

0'

47.2

0'<

drain

age f

low

on t

he r

ail

road r

ight

of w

ay.

brid

ge w

ill

no

t ch

an

ge t

he c

haracte

ris

tics o

f t

he

NO

TE

: O

mit

drain

ho

les t

his

sp

an

. T

he p

ro

po

sed

10

'-0

" f

en

cin

g p

er d

etails o

n s

heet n

o.

80

04

7 ~

30" d

iam

. steel p

ipe p

iles

per d

etails o

n s

heet n

o. 8

007

Steel p

ip

e p

ile b

en

ts N

o.

2 &

3

Tota

l le

ngth

of b

rid

ge =

242'-

3" ? f

utu

re t

rack

64'-

0•"

110'-

0"

64'-

0•"

EL

. 5

87

.35

23'-

0"

27'-

0"

? a

ccess

ro

ad

Jo

sh

Wil

tsh

ire

Spencer

Yate

s

1

1

1

ST

AT

EP

RO

JE

CT

NO

.

MIS

S.

DATEREVISIONBY

WO

RK

ING

NU

MB

ER

SH

EE

T N

UM

BE

R

MIS

SIS

SIP

PI

DE

PA

RT

ME

NT

OF

TR

AN

SP

OR

TA

TIO

N

MISSISSIPPI DEPARTMENT OF TRANSPORTATION

PLAN

00:00DGNFILENAME AMPM

9/11/19SEY Removed Test Pile

8003

CO

UN

TY

:

PR

OJE

CT

NU

MB

ER

:

BRIDGE DIVISION

FM

S:

DE

SIG

NE

R

DE

TA

ILE

R

DIR

EC

TO

R O

F S

TR

UC

TU

RE

S,

ST

AT

E B

RID

GE

EN

GIN

EE

R -

JU

ST

IN W

AL

KE

R,

P.E

.

CH

EC

KE

R

ISS

UE

DA

TE

DE

P. D

IR. O

F S

TR

UC

TU

RE

S, A

SS

T. S

TA

TE

BR

IDG

E E

NG

INE

ER

- S

CO

TT

WE

ST

ER

FIE

LD

, P

.E.

BIR

MIN

GH

AM

SU

BD

IVIS

ION

RR

MP

52

8.3

5

OV

ER

PA

SS

AT

ST

A.

11

6+

31

.45

SR

4 A

CR

OS

S B

NS

F R

AIL

WA

Y &

1 O

F 1

4

MS

CE

NT

RA

L R

AIL

RO

AD

CO

.

LA

YO

UT

- E

XH

IB

IT

"B

-1

"

Jo

sh

Wil

tsh

ire

1

tballard
New Stamp
Page 9: S E C T I O N 9 0 5 -- P R O P O S A L CONTINUED)mdot.ms.gov/bidsystem_data/20190924/ADDENDUMS/105333301...2019/09/24  · 0150 209-A005 7,763 Square Yard Geotextile Stabilization,

Op

en

jo

int

at

en

d b

en

ts

7"

5"

4"

4"

6"

1'-

1"

1'-

3"

1'-

2"

1'-

0"

Saw

cu

t r

ail j

oin

t

(ty

p.)

5'-

6" m

ax

1.5

H

1 V

1'-

2"

1'-

0"

1'-6"

Varies

ƒ" T

hic

k1•"

6"

3" 3"3"

1•"

3"

Po

st

(T

yp.)

‚"

ƒ" $

Anchor B

olt

s

? B

olt

Ho

les

? P

ost &

Base P

late

BA

SE

PL

AT

E D

ET

AIL

S

‡"x 1

•" S

lot F

or

9"

DE

TA

IL

"A

"

Post

„" T

hic

k N

eo

pren

e P

ad

2-ƒ"$ A

nchor B

olt

s

9"x6"xƒ" B

ase P

late

6" Embedment

(Min.)

2•"$ x

Š" P

ost

GE

NE

RA

L N

OT

ES

:

All

Ste

el

Pla

tes S

hall

Conform

To A

AS

HT

O S

pecif

icati

ons A

709 G

rade 5

0 U

nle

ss O

therw

ise N

ote

d.

The F

abric

ato

r S

hall

Ensure T

hat

The S

teel

Rail

Has N

o S

harp E

dges O

r P

rotr

usio

ns.

A

NS

I/A

AS

HT

O/A

WS

D1.5

BR

ID

GE

WE

LD

IN

G C

OD

E.

All

Weld

ing S

hall

Be D

one B

y T

he E

lectr

ic A

rc P

rocess A

nd S

hall

Conform

To T

he

Cham

fer A

ll C

oncrete

Edges ƒ

" U

nle

ss O

therw

ise N

ote

d.

All

Dim

ensio

ns A

re M

easured A

long ?

Rail

.

All

Ste

el

Tu

bin

g S

hall

Co

nfo

rm

to

A.S

.T.M

. S

pecif

icati

on

s A

50

0 G

rad

e B

.

Nuts

Shall

Be T

apped O

versiz

e T

he M

inim

um

Am

ount

Requir

ed F

or P

roper A

ssem

bly

.

A

nch

orag

e H

ard

ware S

hall

Be I

n A

cco

rd

an

ce W

ith

A.S

.T.M

. D

esig

nati

on

A1

53

.

S

hall

Be I

n A

ccordance W

ith A

.S.T

.M. D

esig

nati

on F

436. G

alv

aniz

ing F

or

A

nch

or B

olt

s S

hall

Be I

n A

cco

rd

an

ce W

ith

A.S

.T.M

. D

esig

nati

on

A5

63

. W

ash

ers

An

ch

or B

olt

s S

hall

Be F

ab

ric

ate

d F

ro

m A

.S.T

.M.

Desig

nati

on

A3

6 S

teel.

Nu

ts F

or

B

y T

he D

irecto

r O

f S

tructu

res,

Sta

te B

rid

ge E

ngin

eer.

B

rid

ge E

ngin

eer. N

o F

abric

ati

on S

hall

Begin

Unti

l A

ll S

ubm

itta

ls H

ave B

een A

uth

oriz

ed

W

ires A

nd

Flu

x W

hic

h H

av

e B

een

Ap

pro

ved

By

Th

e D

irecto

r O

f S

tru

ctu

res,

Sta

te

P

rocedures A

nd A

Procedure F

or S

torage A

nd H

andli

ng O

f W

eld

ing E

lectr

odes,

Prio

r T

o A

ny

Fab

ric

ati

on

, T

he F

ab

ric

ato

r S

hall

Hav

e S

ho

p D

raw

ing

s,

Weld

ing

D

irecto

r O

f S

tru

ctu

res,

Sta

te B

rid

ge E

ng

ineer T

hro

ug

h T

he S

ho

p I

nsp

ecto

r.

Certi

fic

ati

on F

or A

ll W

eld

ers T

o B

e U

sed O

n T

his

Proje

ct

Shall

Be S

ubm

itte

d T

o T

he

W

ate

r S

hall

Be P

rovid

ed W

ith A

…"$ D

rain

Hole

.

All

Areas O

f T

he P

edestr

ian B

arrie

r R

ail

Fabric

ati

on W

hic

h C

an R

eta

in

1'-6"3"

4"3"

2•" $

po

st

•"x

•" p

ick

ets (

ty

p.)

•"x•" l

ow

er r

ail

•"x•" u

pper r

ail

s

Spears

10'-0" (over 110' span, typ.)

2'-6" typ.

1'-

3"

1'-

1"

1'-

2"

11"

1'-

0"

9"

ato

p h

ead w

all

Ty

p.

co

ncret

po

st

alo

ng s

pan

Typ c

oncrete

post

Varies

2•"

Saw

cu

t r

ail j

oin

t

3"

4"

wid

e c

ircles

(ty

p.)

4"O

.D.

x 3

"I.D

. x

•"

9"

11"

9"

301000

105333

BR

-0060-0

3(0

20)

BR

-00

60

-03

(02

0)

MA

RS

HA

LL

NO

TE

:

see s

heet n

o.

80

16

.

For r

ein

forcem

ent

and o

ther d

eta

ils

2018-0

2-0

5

mechanic

al

anchorin

g s

yste

m

usin

g a

n a

pp

ro

ved

ad

hesiv

e o

r

Dril

l and i

nsta

ll a

nchor b

olt

s

PA

IN

T N

OT

E:

All

Concrete

Used I

n T

he P

edestr

ian R

ail

Shall

Be C

lass "

BD

".

813-B

001, C

oncrete

-S

teel

Rail

ing.)

(N

ot

a s

ep

erate

pay

ite

m.

Pain

t an

d c

oati

ng

sh

all

be a

bso

rb

ed

un

der p

ay

ite

m

Specif

icati

ons. F

inal

top c

oat

shall

be g

loss b

lack.

sh

all

be c

lean

ed

an

d t

hen

pain

ted

wit

h o

ne s

ho

p c

oat

of i

no

rg

an

ic z

inc p

er t

he

to

p c

oat o

f a

rcy

lic l

ay

tex

per S

ectio

n 8

14

of t

he S

pecificatio

ns.

Bo

lt h

oles

of i

norganic

zin

c, one f

ield

inte

rm

edia

te c

oat

of a

rcyli

c l

ayte

x a

nd o

ne f

ield

Str

uctu

ral

ste

el

su

rfaces s

hall

be c

lean

ed

an

d t

hen

pain

ted

wit

h o

ne s

ho

p c

oat

Jo

sh

Wil

tsh

ire

Spencer

Yate

s

SH

OP

DR

AW

ING

NO

TE

:

1

1

the D

irecto

r o

f S

tructu

res, S

tate

Brid

ge E

ngin

eer, for r

evie

w a

nd a

pproval.

Prio

r t

o f

abric

ati

on, pedestr

ian r

ail

shop d

raw

ings s

hall

be s

ubm

itte

d t

o

ST

AT

EP

RO

JE

CT

NO

.

MIS

S.

DATEREVISIONBY

WO

RK

ING

NU

MB

ER

SH

EE

T N

UM

BE

R

MIS

SIS

SIP

PI

DE

PA

RT

ME

NT

OF

TR

AN

SP

OR

TA

TIO

N

MISSISSIPPI DEPARTMENT OF TRANSPORTATION

PLAN

00:00DGNFILENAME AMPM

9/11/19JLW Added Note

8011

CO

UN

TY

:

PR

OJE

CT

NU

MB

ER

:

BRIDGE DIVISION

FM

S:

DE

SIG

NE

R

DE

TA

ILE

R

DIR

EC

TO

R O

F S

TR

UC

TU

RE

S,

ST

AT

E B

RID

GE

EN

GIN

EE

R -

JU

ST

IN W

AL

KE

R,

P.E

.

CH

EC

KE

R

ISS

UE

DA

TE

DE

P. D

IR. O

F S

TR

UC

TU

RE

S, A

SS

T. S

TA

TE

BR

IDG

E E

NG

INE

ER

- S

CO

TT

WE

ST

ER

FIE

LD

, P

.E.

OV

ER

PA

SS

AT

ST

A. 116+

31.4

5

EX

HIB

IT

- "

B-1"

BIR

MIN

GH

AM

SU

BD

IV.

RR

MP

52

8.3

5

PE

DE

ST

RIA

N R

AIL

DE

TA

ILS 9 O

F 1

4

Jo

sh

Wil

tsh

ire

tballard
New Stamp