Page No.1
RE SOP updated as on 05.10.2017 S C H E D U L E - A-1
WORKS & ESTIMATES
Item
No.
Nature of Power Authority Extent of Powers Delegated to Remarks
PHOD/CHOD/CPD/
SAG in independent
charge of Project
Other
SAG
Jr. Admn.
Grade
Sr.
Scale
Jr. Scale
1. 2. 3. 4. 5 6 7 8 9
A.1.01 To sanction detailed estimates/ revised
estimates for RE works, originally
sanctioned at the time of inclusion in the
budget provided the excess over the
abstract cost is within their power of
sanction.
Item No. 40 (i) of
Bd's L. No. F(X)II-
2007/ PW/4
dt.21.9.07 & 16.3.09
& L.No. F(X)II-
2016/PW/3 Pt.3
dt.14.10.16
(i) Upto 75 Cr.
CEE/CORE only
in CHOD
(ii) Above 75 Cr.
and upto 300
Cr. CAO/CORE
in HAG subject to
limit of variations.
Nil Nil Nil Nil -
Note : i) GMs will have full powers to sanction excess due to price escalation.
(ii) While processing the revision in the cost of estimate, the reasons for delay/time overrun should be clearly recorded.
(iii) Increase in cost due to reason other than escalation should not be more than 20% of original cost.
(iv) The change in scope of work shall be governed by powers of material modifications given in item no A.1.03
(v) Personal approval may be obtained at the level of General Manager with the personal concurrence of FA&CAO in cases of estimates where original cost of the work is above Rs 300 Crore.
(vi) These are the overall variations on the original sanctioned cost as included in the Budget and cannot be exceeded even if more than one revised estimate is sanctioned.
(vii) This delegation will not affect rules in force regarding material modification.
(viii) For variation exceeding the above limit, approval of Board will be required. In such cases, proposal may be sent to Board with the personal concurrence of FA&CAO and personal approval of
General Manager along with a detailed variation statement and a suitable explanatory note.
A.1.02 To sanction part estimates. Item No. 40 (5) of
Bd's L. No. F(X)II-
2016/ PW/3 Pt.3
dt.14.10.2016
5% for works costing
not more than 500 Cr.
by CAO in HAG and
1% by CPDs of the total
value of work as
originally sanctioned in
the budget.
Nil Nil Nil Nil 1. Part estimates may be sanctioned
towards incurring expenses for
preliminary activities like FLS, Geo – technical studies, Design,
Preparation of Plans and drawing
Applications fee for Survey for EHT supply connection, Hiring
of vehicles etc.
2. Vetting of part estimate by associate finance is necessary.
A.1.03 Sanction of material modification of estimate
sanctioned by higher authority.
Para 49 of Bd's L.No.
F(X)II-2007/PW/4
dt.21.9.07
Upto 50 lakh
(CEE/CORE)
NIL NIL NIL NIL -
Note: (1) Total value of material modifications in a work should not exceed 5 Cr. or 5% of the value of work, whichever is less.
(2) The excess or the revised cost of the estimate should not go beyond the CEE's power of sanction.
(3) A material modification estimated to cost more than 50 lakh but below 1.5 Cr. should be certified and sanctioned personally by FA&ACO & GM
(4) Material modifications which are beyond the competence of GM should sent to Board with the personal approval of FA&CAO & GM.
Page No.2
A.1.04 ESTIMATE FOR DEPOSIT WORK :
To sanction estimate for works chargeable to
other Govt. Deptt. Local bodies or private
parties/persons (except work to be executed in
loco carriage workshop).
734 E
735 E Upto 50 Cr. NIL NIL NIL NIL Vetting of estimates by
Associate Finance is necessary.
S C H E D U L E – A - 2
TENDERS, CONTRACTS AND AGREEMENTS
Item
No.
Nature of Power. Authority Extent of Powers Delegated to Remarks PHOD/CHOD/
CPD/SAG in
independent charge of
Project
Other
SAG
Jr. Admn.
Grade
Sr.
Scale
Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
A.2.01 To register/remove the
names of Contractors
in the approved list.
Bd's L/No. 88/ CE-
1/ CT/74 dt.
30.04.1993
& 94/CE-I/CT/4
dt.22.10.01,
17.10.02 & Bd's
L.No.2003/CE-
I/CT/4 Pt.I
dt.16.5.06
Full powers for
Class A (CHOD
only) CPD Upto
Class B & C
only.
Full
powers for
Class B &
C only.
Full powers for Class D
only.
NIL NIL -
Note : (1) A separate list of approved Contractors be maintained for the following 4 slabs of estimated value of the contract according to their capacity to take up such works.
i) Class - A For works more than 50 lakh & upto 1 Cr.
ii) Class – B For works more than 25 lakh & upto 50 lakh.
iii) Class – C For works more than 10 lakh & upto 25 lakh.
iv) Class – D For works upto 10 lakh.
(2) Selection of Contractors should be carried out by the Selection Committee consisting of the following officers:
Class of Contractors (Selection Committee Composition) Accepting Authority.
Class - A One SAG (Executive) & SAG (Finance). PHOD/CHOD of Executive Department.
Class - B & C One JAG (Executive) & JAG (Finance). SAG officer of the Executive Department.
Class - D One Sr.Scale Officer (Executive) & Sr.Scale Officer (Finance). JAG of the Executive Department.
Note : For registration in approved list of the contractors, the contractor will have to furnish a non refundable fee of 5,000/- for Class 'D', 7500/- for Class 'C '.
10,000/- for Class 'B' and 15,000/- for Class 'A'. This fee will cover the entire period of 3 years or part thereof. Contractors desirous of registration should submit
the application in the proforma prescribed by the Railway with the prescribed fee for each category of work in each slab.
Page No.3
Item
No.
Nature of Power. Authority Extent of Powers Delegated to Remarks PHOD/CHOD/CPD/S
AG in independent
charge of Project
Other
SAG
Jr. Admn.
Grade
Sr.
Scale
Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
A.2.02 Powers to dispense
with calling of tenders and acceptance the
same for works contract (calling of
quotations).
Rly. Bd's No.
2007/CE-I/CT/ 18 Pt. dt.5.3.09,
2007/CE-I/ CT/18 Pt.13
dt.6.9.10, 17.5.17 & 11.9.17.
Full powers upto
10 lac in each case subject to annual
ceiling limit of
1.2 Cr.
Same as in
Col.4. Full powers upto 5 lac in
each case subject to annual ceiling limit of
60 lac.
Full powers upto 5 Lac
(where Sr. Scale in independent charge in
branch/Deptt. subject to
ceiling limit of 60 lac in a financial year.
NIL Finance concurrence
is necessary.
Note: I. Normally the powers to dispense with calling of tenders should be exercised sparingly. The circumstances under which quotations have to be called should be spelt out.
II. The work should not be split up for the purpose of bringing it within the ambit of this dispensation. III. The reasonableness of rates should be gone into objectively by the accepting authority. IV. Quotations should not be for items which can be executed through the existing contracts including zonal contracts. V. Quotations should not be for fancy (expensive but of low utility) items.
VI. Quotations should only be for works which are urgent in nature. VII. Quotations should normally be invited from at least 3 well experienced contractors/agencies not necessarily borne on the approved list.
VIII. Accepting Authority must take precautions to see that the quotations are from genuine firms (and not from fictitious firms). IX. A register showing the full particulars of works authorized through quotations will be maintained by the officer having powers to dispense with calling of tenders. The register
may also be sent to Associate Finance while seeking their concurrence.
A.2.03 Single Tender:
Approval
to invite Single
Tender:
Bd's LN/97/CE/
I/CT/ 32
dt.27.08. 97
NIL NIL NIL NIL NIL Prior finance concurrence of FA&CAO's & GM's
approval should be obtained for invitation of single
tender.
Note : Single tenders should be invited in rare and emergent situation only after exhausting the open tender/special limited tender routes. Tight targets and urgency cannot be accepted as a reason for
calling single tenders. The calling of single tender for specialized nature of work should be personally approved by the General Manager with prior concurrence of the FA&CAO (Para-1214-E).
The instructions contained in Bd's letter No.93/W2/PQR/SC/4 dt.27.9.96 and 97/CE-I/CT/32 dt.27.8.97 should be followed strictly. In case of single tenders, the Tender Committee and
Accepting Authority should be one step higher than in case of Open Tender except where General Manager is the accepting authority.
A 2.04
(a)
To invite limited tender
from the list of
approved contractors of
RE.
Rly. Bd's
No. 2007/ CE-I/
CT/18 dt.28.9.07 &
.2013/CE-
I/CT/0/20/PO/Pt.II
(ii) dt.26.11.13
Full powers upto
7.50 Cr. PHOD/
CHOD only. CPD/
SAG in independent
charge of project
1.50 Cr. only.
Full powers
upto 1.50
Cr.
Full powers
upto 37.5 lakh.
NIL NIL
Note : Subject to observance of extant rules and orders issued by Railway Board's on the subject.
Page No.4
Item
No.
Nature of Power. Authority Extent of Powers Delegated to Remarks PHOD/CHOD/
CPD/SAG in
independent charge
of Project
Other
SAG
Jr.
Admn.
Grade
Sr.
Scale
Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
b) To invite Special
Limited tender.
Bd's L/No.
94/CE-I/CT/4 dt.
17.10.02 &
2007/CE-I/CT/18
dt.28.9.07
Full powers
upto Rs. 5 Cr.
PHOD (HAG
only).
NIL NIL NIL NIL i) SLT may be adopted in consultation with FA&CAO in the
following cases:-
(a) Works of urgent nature (to be approved by the GM
personally).
(b) Consultancy works (to be approved by the GM personally).
(c) All other types of work depending upon merit of case to be
approved by PHOD personally.
ii) Special limited tenders may be invited from specialized &
reputed contractors/organizations/ agencies.
iii) Proposal detailing the circumstances and necessity for going
in SLT should be initiated and got concurred by FA&CAO
before personal approval of PHOD/GM is obtained.
iv) Tenderers from whom special limited tenders are to be invited
should preferably be more than six but not less than four.
v) Tenderers need not necessarily be borne on the Approved
List.
Page No.5
Item
No.
Nature of Power Authority Extent of Powers delegated to Remarks
PHOD/CHOD/CPD/
SAG in independent
charge of Project.
Other SAG Jr. Admn.
Grade.
Sr. Scale Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
A.2.05
To invite tenders by public advertisement in the most open
public manner in respect of sanctioned estimates where no future decisions are
required from CORE or Board regarding technical nature of work other than
stores contract.
1213-E & 94/ CE-I/CT/4 dt.17.10.02 & 11.6.03, F(X)II-
2003/ PW/1 dt.9.01.04,
F(X)II-2006/PW/14 dt.26.9.06, 2007/ CE-I/CT/13 dt.3.9.07, 2007/CE-I/CT/ 18 dt.7.3.08,
2008/CE-I/ CT/ Con/7
(PCE/GM) dt.15.12.08, 2007/CE-I/CT/13(I)
dt.26.11.13, 2007/CE-I/CT/0/20/1 dt.8.10.15,
2015/CE-I/ CT/O/20/1 dt.9.9.16 & CORE's L.No.G-
6/1 Pt.VIII dt.13.6.05.
Full Powers upto 300 Cr. to CEE in HAG or CAO/RE
only and 100 Cr. to other HAG only
& 75 Cr. to
CHOD in CORE and
20 Cr. to CPD.
Full powers
up to 20 Cr. to SAG
officers.
Full powers upto
4Cr.
Full powers
over upto
20 lakh.
Nil -
Note: 1. The discretion to invite tenders from abroad will vest with GM. 2. The extant Codal provisions/rules & orders regarding invitation and consideration of tenders shall have to be observed. 3. Tender schedule may be approved by the JAG/SAG officers. Vetting of tender schedule should be necessary only in the rare urgent cases where tenders are called
without sanction of Detailed Estimate. Pre-vetting will not be necessary in case of Zonal Works for which detailed estimate are not to be framed.
4. For two packet system of tendering extant instructions will apply.
For open tender for Works invited through e-tendering. A.2.06
(i) Direct acceptance of tender having value upto and including Rs.50 lakh through
e-tendering.
Bd's L.No. 2017/CE-1/CT9 dt.11.9.17
- - Upto Rs.50 lakh
Same as in Col. 6 holding in
independent charge of project
- Letter of acceptance shall be issued only with the prior vetting of associate finance with respect to items, rates and quantities accepted by the Accepting authority.
Note:
1. The accepting authority while accepting the tender shall record a reasoned note with regard to tender evaluation and acceptance in the form of detailed speaking order. The Accepting authority shall be responsible to ensure that:
a) No splitting has been done while inviting tender to bring it within the ambit of power of direct acceptance of tender.
b) Sanctioned detailed estimate is available.
c) The tender schedule has been prepared as per rates, items and quantities provided within the sanctioned detailed estimate,
2. In case the tender notice period is less than 21 days or accepting authority intend to accept offer other than lowest financial offer, direct acceptance of tender is not allowed in the tender upto and including Rs.50 lakh. Such tenders shall be dealt by Tender Committee, constituted as per para below.
A.2.06 (ii)
For tenders above Rs.50 lakh and upto and including Rs.2 crore. The Tender Committee shall be constituted with two members out of which, one should essentially be from the Finance Department and the other from the concerned Executive Department. Tender Committee & accepting authority for accepting of open tender above Rs.50 lakh and upto Rs.2 crore (open through e-tendering) is as under:-
Page No.6
Tender Committee
Value of tender Concerned Deptt. Sister deptt. Finance Deptt. Accepting Authority
Rs.50 lakh and upto including Rs.2 crore
Sr. Scale - Jr. Scale SG/JAG level
Note : The existing practice of three members Tender Committee shall be applicable for works tender of value more than Rs.2 crore each.
The existing para A.2.06 will be renamed as item No. A.2.06 (iii).
A.2.06
(iii)
To accept open/ limited/Spl. limited
tenders and to enter into contract in
respect of sanctioned works provided the
total cost of each contract does not
exceed 300 Cr.
F(X)II-2003/ PW/ 10 dt.9.10.04, F(X)II-2006/PW/14
dt.26.9.06, 2007/CE-I/CT/13 dt.3.9.07, 15.10.07 , 2007/CE-
I/CT/ 18 dt.7.3.08, CORE's L.No. G-6/1Pt.VIII dt.13.6.05,
2007/CE-I/CT/13(I) dt.26.11.13, 2007/CE-
I/CT/0/20/1 dt.8.10.15 & 2015/CE-I/CT / O/20/1
dt.9.9.16
Full powers upto
300 Cr. to CEE in HAG or CAO/RE
and upto 100 Cr.
to other HAG only
and upto 75 Cr. to
CHOD in CORE and
upto 20 Cr. to
CPD.
Full powers upto
20 Cr.
Full powers
upto 4 Cr.
Full powers
upto
20
lakh.
NIL -
Note: (i) These powers are to be exercised where competent authority's approval under A.2.04 & A.2.05 has been obtained. (ii) The detailed TC constitution for all level are plakhed as Annexure-I & II. (Issued vide this office letter dated 24.11.2015)
Page No.7
Annexure-I of SOP para A.2.06 (iii)
CONSTITUTION OF TENDER COMMITTEE AND AUTHORITY
COMPETENT TO ACCEPT WORKS CONTRACT.
S.N. Value of tenders Tender Committee Accepting Authority
Concerned
Deptt.
Sister Deptt. Finance Deptt.
i) Up to 20 lakh Jr. Scale - Jr. Scale Sr. Scale
ii) Above 20 lakh & up to 4 Cr. Sr. Scale Sr. Scale Jr. Scale SG/JAG
iii) Above 4 Cr. & up to 8 Cr. JAG JAG Sr. Scale SAG/CPD
iv) Above 8 Cr. & up to 20 Cr. JAG JAG JAG SAG/CPD
v) Above 20 Cr. & up to 50 Cr. SAG SAG JAG CHOD in SAG/PHOD in HAG
vi) Above 50 Cr. & up to 75 Cr. SAG SAG SAG CHOD in SAG/PHOD in HAG
vii) Above 75 Cr. & up to 100 Cr. SAG SAG SAG PHOD in HAG/GM
viii) Above 20 Cr. & up to 300 Cr. (for Elect. Deptt. only) SAG SAG SAG CEE in HAG or CAO/RE
ix) Above 100 Cr. (other than Elect. Deptt.) CHOD/PHOD CHOD/PHOD CHOD/PHOD GM
x) Above 300 Cr. (for Elect. Deptt.) CHOD/PHOD CHOD/PHOD CHOD/PHOD GM
NOTE :-
1. In case of single tender, Tender Committee and accepting authority should be one step higher than in case of open tender except where GM is the accepting
authority.
2. Tender committee members can not function as accepting authority also. In such case tender will be accepted at next higher level.
3. Sister Deptt. means associate Technical Deptt. e.g. for Electrical Deptt., S&T Deptt. and Civil Engineering Department are sister department. CPDs can
nominate the TC members of sister department for Project level tenders.
4. Corresponding to the above mentioned delegation the standing Tender Committee nominations for various Department of CORE are given in Annexure-II.
5. The level of Tender Committee shall be decided on the basis of the lowest offer received. In case lower offer is found not acceptable and value of the other
offers to be considered exceed the powers of the Tender Committee constituted for the purpose, all tender papers alongwith the offers, briefing notes and the
accepted recommendations of the tender committee (confined to their passing over the lower offers) should be passed on to the higher tender committee for
their deliberation.
6. In any tender committee case, if the accepting authority of respective grade is not available then the tender committee recommendations may be accepted by
the next higher authority.
7. In any tender committee case, if any TC member of respective grade is not available in a project then CHOD/PHOD can nominate officers either from HQ or
any other project, otherwise next higher grade officer shall act as TC members and then the accepting authority shall be one grade higher than the highest
grade member in the TC.
8. In case the posts in the lower grade are not in operation, the member from that particular department and the accepting authority should be one step higher.
9. In case the officer competent to accept the tender has to be a member of tender committee, the recommendations of the tender committee should be put up for
acceptance to the next higher authority.
10. In project account offices where no JAG Accounts officer is posted, the Sr. Scale Accounts officer will act as finance member in Tenders valuing above 8
Crore & upto 20 Crores.
Page No.8
Annexure-II of SOP para A.2.06 (iii)
FOR THE WORKS CONTRACT FOR CORE.
1. TENDERS OF ELECTRICAL DEPTT.
i) Above 300 Cr. - CEE in HAG or CAO/RE, CE, FA&CAO
ii) Above 50 Cr. & up to 300 Cr. - CEE(P&D), CSTE(P&D) & FA&CAO (SAG) iii) Above 20 Cr. & up to 50 Cr. CEE(P&D), CSTE(P&D) & Dy. FA&CAO-II iv) Above 8 Cr. & up to 20 Cr. - Dy. CEE (Concerned), Dy. CSTE (HQ) & Dy. FA&CAO/I v) Above 4 Cr. & up to 8 Cr.
- Dy. CEE (Concerned), Dy. CSTE (HQ) & Sr. AFA-I
2. TENDERS OF S&T DEPTT.
i) Above 100 Cr. - CSTE, CE & FA&CAO ii) Above 75 Cr. & up to 100 Cr. - CSTE (P&D), CEE (P&D) & FA&CAO (SAG)
iii) Above 50 Cr. & up to 75 Cr. - CSTE (P&D), CEE (P&D), & FA&CAO (SAG) iv) Above 20 Cr. & up to 50 Cr. - CSTE (P&D), CEE (P&D) & Dy. FA&CAO/I
V) Above 8 Cr. & up to 20 Cr. Dy. CSTE (Concerned), Dy. CE & Dy. FA&CAO/I Vi) Above 4 Cr. & up to 8 Cr.
- Dy. CSTE (Concerned), Dy. CE & Sr. AFA-I
3. TENDERS OF CIVIL ENGG. DEPTT.
i) Above 100 Cr. - CE, CEE & FA&CAO ii) Above 75 Cr. & up to 100 Cr. CE, CEE (P&D) & FA&CAO (SAG)
iii) Above 50 Cr. & up to 75 Cr. - CE, CEE (P&D) & FA&CAO (SAG) iv) Above 20 Cr. & up to 50 Cr. - CE, CEE (P&D), & Dy. FA&CAO/I
V) Above 8 Cr. & up to 20 Cr. - Dy. CE, Dy. CEE (HQ) & Dy. FA&CAO/I Vi) Above 4 Cr. & up to 8 Cr. - Dy. CE, Dy. CEE (HQ) & Sr. AFA-I
NOTE :
1. The above standing Tender Committee would not be applicable in cases where Railway Board have specified any other T.C. constitution for tenders of
specific nature. 2. The Tender specified to be called by CORE/Allahabad as per Administrative decision communicated earlier or existing from time to time would
continued to be called and processed by CORE/ALD even if it is less than 12 Cr. in value. 3. For TC cases upto the acceptance level of CHOD/PHOD, the TC member of a department can be changed with the approval of concerned CHOD/PHOD
taking in to account the available officers in the department and their workload. 4. For TC cases up to acceptance level of JAG the TC members may be nominated by concerned CHOD/PHOD on case to case basis.
Page No.9
Item
No.
Nature of Power. Authority Extent of Powers Delegated to Remarks PHOD/CHOD/
CPD/ SAG in independent charge of
Project
Other
SAG
Jr. Admn.
Grade
Sr.
Scale
Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
A.2.07
To execute contract on behalf of the
President of India i.e. to sign agreement in
other than Stores contracts.
1259-E
1217-E
1217 (iv)-E & G-6/1
Pt,VII dt.13.6.05
For contracts accepted by GM.
i) Full powers to CAO/PHOD/
CHOD
ii) Full powers to CPD/SAG in
independent charge of project
for contracts accepted by
CAO/PHOD/CHOD.
Full powers
upto
100 Cr.
Full powers
upto 20 Cr.
Full powers
upto
4 Cr.
NIL -
Note: The agreement for the contracts awarded by CORE (LOA issued) shall be executed by officers of appropriate level in HQ/project. In case appropriate level officer is not available in project,
agreement would be executed by next higher authority in project like CPD/SAG (Authority No.G-6/1/Pt.VII dt.13.6.05.
Contract agreement should be framed in terms of para-1217 of Engg. Code.
The terms of contract once entered into should not be materially varied except in consultation with the competent legal and financial authority. (Ref. 1217(iv) of Engg. Code.
For all CORE contract for which work are to be executed in project, finance vetting of the agreement would be done by project finance.
A.2.08
To make minor variations in specifications, conditions of
contract after signing it including minor changes in
drawings, mode of dispatch, inspection/test, and
programme station of delivery, dimensions, workmanship
etc.
- Full powers in respect of
tenders accepted by
themselves.
Same as in Col. 4 Same as
in Col. 4.
Same as in
Col. 4.
NIL -
Note : 1. Standard Conditions, specifications shall not be varied without approval of G.M.
2. Finance concurrence shall be obtained in respect of variation involving financial implications.
3. All variations shall be set out in subsidiary agreement and communicated to the contractor through a letter duly
Signed by the authority which signed the original contract.
A.2.09 To make minor variations in rates arising out of
circumstances not provided for in the contract.
- For increase - NIL Full powers in respect of
lowering of rates for contracts
accepted by them.
Same as in
Col. 4
Same as
in Col. 4
NIL NIL -
Note : 1. Variation in rate for which provision has been made in the contract itself shall not be deemed to constitute a variation provided that they are carried out only to the extent and by order of
the authority specified in the contract.
2. Finance concurrence shall be obtained in respect of variation involving financial implications.
3. All variations shall be set out in subsidiary agreement and communicated to the contractor through a letter duly signed by the authority which signed the original contract.
A.2.10
To vary the quantity of any item or to introduce a new
item in a contract, provided the value of the contract
does not exceed the powers of the authority that
accepted the original contract.
Bd's L/No. 94/CE-
I/CT/37 dt.05.05.95
1265 E & 1268, 94/CE-I/CT/4
dt.22.10.2001, 17.10.02,
2007/CE-I/CT/1 dt.31.8.07, 2007/CE-
I/CT/18 dt.28.9.07 &
2007/CE-I/CT/18 Pt.xii dt.31.12.10
Full powers in respect
of contracts accepted
by them.
Same as in
Col. 4
Same as
in Col. 4
Same as in
Col. 4
NIL -
Page No.10
Note: 1. In works contract, if due to unavoidable and inescapable reasons introduction of new NS item is considered necessary, the same can be done without finance concurrence
subject to a maximum of ceiling of 5 Lakh in a contract (or) 10% of original value of the contract whichever is less. This power shall be exercised by SG/JAG level
officer upto a value of 50,000/- in a contract and by SAG level officer upto a value of 5 lakh in a contract. N.S. items beyond these limits can be introduced with prior
Finance concurrence only.
2. Rates of such NS items accepted without finance concurrence cannot be quoted as Last Accepted Rate (LAR) for justifying similar rates in future tenders. Only rates
obtained through competitive tender process can be adopted as LAR.
3. Individual NS items in contracts shall be operated with variation of plus or minus 25% and payment would be made as per the agreement rate. For this, no finance
concurrence would be required.
4.1 In case an increase in quantity of an individual item by more than 25% of the agreement quantity is considered unavoidable, the same shall be got executed by floating a
fresh tender. If floating a fresh tender for operating that item is considered not practicable, quantity of that item may be operated in excess of 125% of the agreement quantity
subject to the following conditions:
(a) Operation of an item by more than 125% of the agreement quantity needs the approval of an officer of the rank not less than S.A. Grade;
(i) Quantities operated in excess of 125% but upto 140% of the agreement quantity of the concerned item, shall be paid at 98% of the rate awarded for that item in that
particular tender;
(ii) Quantities operated in excess of 140% but upto 150% of the agreement quantity of the concerned item, shall be paid at 96% of the rate awarded for that item in that
particular tender;
(iii) Variation in quantities of individual items beyond 150% will be prohibited and would be permitted only in exceptional unavoidable circumstances with the
concurrence of associate finance and shall be paid at 96% of the rate awarded for that item in that particular tender.
(b) The variation in quantities as per the above formula will apply only to the individual items of the contract and not on the overall contract value.
(c) Execution of quantities beyond 150% of the overall agreemental value should not be permitted and, if found necessary, should be only through fresh tender or by negotiating
with existing contractor, with prior personal concurrence of FA&CAO and approval of General Manager.
4.2 In cases where decrease is involved during execution of contract:
(a) The contract signing authority can decrease the items upto 25% of individual item without finance concurrence.
(b) For decrease beyond 25% for individual items or 25% of contract agreement value, the approval of an officer not less than rank of S.A. Grade may be taken, after obtaining
'No Claim Certificate' from the contractor and with finance concurrence, giving detailed reasons for each such decrease in the quantities.
(c) It should be certified that the work proposed to be reduced will not be required in the same work.
5. The limit for varying quantities for minor value items shall be 100% (as against 25% prescribed for other items). A minor value items for this purpose is defined as an items
whose original agreement value is less than 1% of the total original agreement value."
6. No such quantity variation limit shall apply for foundation items.
7. As far as SOR items are concerned, the limit of 25% would apply to the value of SOR schedule as a whole and not on individual SOR items. However, in case of NS items,
the limit of 25% would apply on the individual items irrespective of the manner of quoting the rate (single percentage rate or individual item rate).
Page No.11
8. For tenders accepted at SAG level at CORE/Hd. Qtrs./Project, variations may be accepted by CPD/SAG independent in-charge of the project subject to the condition that
revised value of the agreement lies within the acceptance power of SAG officer.
9. For tenders accepted by General Manager, variations upto 125% of the original agreement value (even if the revised agreement value is beyond GM's competence to accept
tenders) may be accepted by General Manager.
10. For tenders accepted by Board Members and Railway Ministers, variation upto 110% of the original agreement value may be accepted by General Manager.
11. The aspect of vitiation of tender with respect to variation in quantities should be checked and avoided. In case of vitiation of the tender (both for increase as well as decrease
of value of contract agreement), sanction of the competent authority as per single tender should be obtained.
12. These conditions would be equally applicable to single and limited tender cases, upto power delegated in each contract as per Para A.2.03, A.2.04 & A.2.05 of RE SOP.
Note : Modified changes viz. Para 4.1, 4.2 & 11 shall be applicable with prospective effect in all future works contracts (Ref. Rly. Bd's letter No.2007/CE-I/CT/18 PtXII
dated 31.12.2010
Page No.12
Item
No.
Nature of Power. Authority Extent of Powers Delegated to Remarks PHOD/CHOD/
CPD/SAG in
independent charge of
Project
Other
SAG
Jr. Admn.
Grade
Sr.
Scale
Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9. A.2.11 To extend date of completion
of contracts.
Para 1266-E Full powers in
respect of contracts
signed by them.
Same as in
Col. 4
Same as in
Col. 4
Same as in
Col. 4
NIL 1. Extension should be signed by the authority who had signed the
original contract.
2. For contracts signed by GM, extension should be communicated
by CPDs/CHOD only after obtaining approval of GM and the
extension letter should indicate that the approval of GM has been
obtained.
Note: Finance concurrence for extension would be required in the following cases:
a) Where no loss, no inconvenience cannot be certified.
b) Where the contract was awarded on time preference basis.
c) Where PVC clause is inherent part of the contract and extension proposed is with PVC.
A.2.12
To vary the condition of
any contract
Para 1265-E Full powers in
respect of contracts
accepted by them.
Same as in
Col. 4
Same as in
Col. 4
Same as
in Col. 4.
NIL i) Prior finance concurrence is necessary.
ii) Provided Rly. Board's instructions on any specific conditions
of contract have been issued.
A.2.13 To impose any penalty
provided therein.
1267-E Full powers in
respect of contracts
signed by them.
Same as in
Col. 4
Same as in
Col. 4
Same as
in Col. 4.
NIL i) Provided Rly. Board's instructions on any specific conditions
of contract have been issued.
ii) Waiver of imposition of penalty is not governed by this para.
A.2.13 (a)
Waiver of Liquidated
damages/Token Penalty
recovered from contractors
in terms of contract
condition.
GM/RE 1) Full powers to
PHOD/ CHOD for
tenders accepted by
CPD/SAG
2) Full Powers to
CPD for tenders
accepted by JAG/SG
& below in projects.
Full powers to
SAG for
tenders
accepted by
JAG/SG and
below in HQ.
Nil Nil Nil Prior concurrence of associate finance is necessary
Note : 1. This para deals with LD/Penalty already imposed by competent authority as per provisions of the contract and waiver has been sought for.
2. In case of tender accepted by PHOD/CHOD at the HQ level, the waiver would be done only by GM/CORE with finance concurrence of HQ.
3. Waival of LD should be done in deserving cases on the basis of merit in exceptional circumstances instead of in routine manner.
A.2.14 To cancel/terminate
contracts in accordance
with the conditions of the
contract.
Para 1270E Full powers in
respect of contracts
signed by them.
Same as in
Col. 4
Same as
in Col. 4
Same as in
Col. 4
NIL Note: (i) Cancellation of contract should be conveyed to the contractor under the signature of the officer who signed the contract/agreement.
(ii) For contracts accepted by GM or Rly. Bd. cancellation/termination
of the contract should be conveyed to the contractors under the signature of CPDs/CHOD only after obtaining approval of GM and the
communication should indicate that the approval of GM has been
obtained.
A.2.15 To dispose of stores
rejected in terms of the
contract.
Para 762-S Full powers in
respect of contracts
accepted by them.
Same as in
Col. 4
Same as
in Col. 4
Same as in
Col. 4
NIL -
Page No.13
Item
No.
Nature of Power. Authority Extent of Powers Delegated to Remarks PHOD/CHOD/
CPD/SAG in
independent charge of
Project
Other
SAG
Jr. Admn.
Grade
Sr.
Scale
Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
A.2.16
i)
Refund of cost of tender forms sold to the
tenderers when tender notice is withdrawn.
Bd's L/No. 74-E3/
3000 dt. 14.01.75
Full
Powers.
Full
Powers.
Full
Powers.
Full powers. NIL -
ii) Refund of Earnest Money in cases where
the tender is dropped/ discharged even
before its opening, the cost of tender
document (tender fee) should be refunded.
Bd's L.No.
97/RS(G)779/8
dt.4.8.97
Full
Powers.
Full
Powers.
Full
Powers
Full
Powers.
NIL -
iii) Forfeiture of Earnest Money in connection
with tenders.
Bd's L/No. 74-EB
3000 dt.14.1.75
Full powers upto the
limit of their powers
of calling of tenders.
Same as in
Col.4
Same as
in Col. 4
Same as in
Col. 4
NIL -
iv) Refund of Security Deposit in connection
with tenders.
Bd's L.No.2007/ CE-
I/CT/18 dt.27.8.08
Full
Powers.
Full
Powers.
Full
Powers
NIL NIL -
v) Refund of Earnest Money for unsuccessful
tenderer.
Bd's L.No.2007/ CE-
I/CT/18 (Pt.I)
dt.10.9.08 & Para
1261 of Engg. Code
Full
Powers.
Full
Powers.
Full
Powers
Full
Powers
Nil -
A.2.17 To sanction mobilization advance to
contractor where such advance is provided
for in the contract approved by the
competent authority.
Para 48 of
Bd's L.No. F(X)II-
2006/PW- 17
dt.21.9.07
Full powers. NIL NIL NIL NIL All stipulation given from
time to time by RB on the
subject should be adhered to.
Note All advances mentioned above shall be levy of interest charges @ 12% or as prescribed by Railway Board.
A.2.18 Claims, settled by Arbitration award
against any dispute arising out of a
contract.
Para 36 of Bd's
L.No.F(X)II-
2006/PW-17
dt.21.9.07
Full powers to
PHOD/CHOD only upto
the limit of their powers of acceptance of tenders.
NIL NIL NIL NIL
Note: Full powers, subject to the conditions that the Railway Board should be informed of the details -
(i) Where payment to the contractor as a result of the Arbitrator's award exceeded by more than Rs.50 thousand of the amount considered due by the Railway Administration before the
arbitration proceedings began and;
(ii) Where deficiencies in the General condition of contract or procedures laid down by the Railway Board came to light.
Page No.14
Item
No.
Nature of Power. Authority Extent of Powers Delegated to Remarks PHOD/CHOD/CPD/SAG in
independent charge of Project Other
SAG
Jr. Admn.
Grade
Sr.
Scale
Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
A.2.19
(i)
To sanction payment of
honorarium/remuneration fee payable to
arbitrator in cases in which Rly. Adm. is
a party upto 10,000/-per year in each
case.
Item No.33 of
Board's letter No. F(X)II-2008/PW/6
dt.15.10.09
Full powers Full powers NIL NIL NIL SDGM for CHODs and CPDs.
(ii) To sanction payment of honorarium/
remuneration fee including incidental
expenditure i.e. stamps, Paper, stationary,
Steno etc. demanded by arbitrator.
Full powers to CHOD of
respondent Deptt.
NIL NIL NIL NIL i) SDGM for CHODs &
CPDs in cases when they
are appointed as arbitrator
for the case of their own
Deptt.
ii) This will not apply to
payment of fees to private
persons to act as arbitrator
appointed by Court.
iii) Subject to observance of
extant rules for arranging
payment.
Page No.15
SCHEDULE A-3
LAND AND BUILDINGS
Item
No.
Nature of Power. Authority Extent of Powers Delegated to Remarks
PHOD/CHOD/
CPD/SAG in
independent charge
of Project
Other SAG Jr. Admn. Grade Sr. Scale Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
A.3.01 To accept awards for acquisition of
land against provision made in the
sanctioned estimate and land is
acquired under land acquisition Act.
- Full
Powers.
Full
Powers.
Full Powers for
officers of Civil
Engg.
Deptt. only.
NIL NIL -
A.3.02 To allot licence for plots of Rly. land
to Rly. employees and outsiders in
accordance with rules and executing
agreement thereof.
- Full
Powers.
NIL NIL NIL NIL In consultation with
Open line Rlys.
A.3.03 Renting of Rly. Building:
Rent vacant Rly. Building to persons
outside the Rly. on the highest rent
that can be secured in the
circumstances.
Para
1966-E
Full
Powers.
NIL NIL NIL NIL
A.3.04 To change the classification of Rly. Buildings:
(i) From residential to non-residential
and vice-versa.
- Full
Powers.
Same as in col. 4
for officers of
Civil Engg.
Deptt. Only
NIL NIL NIL -
(ii) From those intended for establishment
on one class to those intended for Estt.
for other class.
- Full
Powers.
Same as in col. 4
for officers of
Civil Engg.
Deptt. Only
NIL NIL NIL -
Note: Subject to the restriction laid down in para 1906-E, and 1907 E, classification made by the Rly. Bd. in their directive.
Page No.16
Item
No.
Nature of Power. Authority Extent of Powers Delegated to Remarks PHOD/CHOD/
CPD/ SAG in
independent
charge of Project
Other
SAG
Jr. Admn.
Grade
Sr.
Scale
Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
A 3.05 Law Charges:
i) To the engagement of a Railway Counsel
borne on panel on scale of fees not higher
than that prescribed by Ministry of Law &
Justice/Rly. Board.
Bd.'s L/No.
F(X)II-2000
/PW/2
dt.13.9.02
Full Powers Full
Powers
Full Powers for all
court cases other
than Supreme
Court.
NIL NIL -
ii) To incur Law charges by engaging counsel
and sanction of fee thereof upto 1050/-
per day in Supreme Court/High Court or
750/- per day in other courts, where
there is no panel of Railway Advocates.
Item No. 31 of
Bd's L.No.
F(X)II-
2007/PW/4
dt.21.9.07
Full
Powers.
Full
Powers
NIL NIL NIL As per clarification of Director Finance
(Exp.)/Rly.Bd.'s letter No.F(X)II-2000/PW/2
dt.13.9.02, this rate is applicable for counsel
not borne on approved panel.
iii) To incur Misc. Expenditure directly
connected with court cases.
- Full Powers. Full
Powers
Full Powers for
all Court Cases
other than
Supreme Court.
NIL NIL Finance concurrence is necessary beyond
Rs.5,000/- in each case.
A 3.06
i)
To allow an employee to store furniture in
a Rly. quarter on payment of normal rent
for a period of 4 months on leave or
transfer temporarily within RE subject to
conditions laid down in Para 1921-E.
- Full Powers. Full
Powers
Full Powers. NIL NIL
ii) To sanction occupation of quarters by non-
gazetted staff free of rent in the
circumstances laid down in para 1918-E.
- Full Powers. Full
Powers
Full Powers. NIL NIL In case staff, who are provided with tented
accommodation/huts built of bamboo
framing, grass mat walling thatched roofs
engaged in relaying surveys and construction.
Page No.17
Item
No.
Nature of Power. Authority Extent of Powers Delegated to Remarks
PHOD/CHOD/
CPD/SAG in
independent charge of
Project
Other
SAG
Jr. Admn.
Grade
Sr.
Scale
Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
iii) To exempt the incumbent of a post
from occupying the quarter allotted to
the post and paying the rent there of
in circumstances laid down in Para
1918-E.
- Full Powers. Full
Powers.
Full
Powers.
NIL NIL
Note : Powers under item A.3.06 are to be exercised by the officers, of Civil Engg. and personnel Deptt. only. However, Head of the projects,
SAGs/CPDs can exercise these powers.
A 3.07
Hiring of Private accommodation
for residential use of Non-
Gazetted staff
2005/LMB/12 Master
circular dt. April, 2006
Full
Powers CE/CORE in
HQ and CPD in
Projects.
NIL NIL NIL NIL The scale of rent paid in each case
will be within the ceiling fixed for
various categories of staff. Any
other instructions on the subject
should also be complied.
A 3.08 Hiring of private accommodation
for use of office/camp office/ORH
accommodation.
Para 7 of Bd's L.No.
F(X)II/2007/PW/4
Dtd.21.9.07
Full
Powers.
NIL NIL NIL NIL Finance concurrence is necessary.
Note: 1. Subject to maximum of 150 Sq. Metre for individual accommodation for camp office/Rest House.
For renting of bigger accommodation administrative approval of GM should be obtained.
2. If more than one such building is proposed to be taken in one OHE Gr. (of not
less than 100 RKM prior administrative approval of CE/CORE shall be obtained).
Page No.18
SCHEDULE – B – Pt.-I
ESTT. MATTERS GAZETTED.
Item
No.
Nature of Power
Authority
Extant of Powers delegated to Remarks PHOD/CHOD/
CPD/SAG in
independent charge
of Project.
Other
SAG
Jr. Admn.
Grade Sr. Scale Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.1.1 Transfer & Posting of officers
within RE Org.
S.N.5 of App.
XXXICR-II
A.C.S No.258
RII. 146 & 147
R-I. ACS
No.226 R.I.
Full Powers
upto SS (cadre
controlling
PHOD/CHOD
only)
Nil Nil Nil Nil CPDs/SAG, in independent charge
of project can transfer the officer
from one post to another at the
same station with information to
cadre controlling PHOD/ CHOD.
Note:- 1. Approval of GM is necessary in case the officer is transferred within one year of joining at a particular station.
2. If transfer allowance is not admissible, it should be specified in the transfer order.
B.1.2 Handing over and taking over
charge in cases in which several
scattered works or stores have to
be inspected before completing
transfer or charge. Treat-ment of
period up to a maximum period of
6 days as on duty.
GOI's decision
under FR
(107) ACS
No.228 App.
Full Powers
up to JAG
Full
Powers
up to Sr.
Scale
Nil Nil Nil -
B.1.3 Grant of advance of Pay on
transfer.
IREM 1113 &
1114 R-1
Full Powers in
respect of officers
working under
them.
Same as
in Col.4
Nil Nil Nil SDGM would exercise these
powers on behalf of GM for
PHOD/CHOD/CPDs & SAG
holding independent charge of
project.
Page No.19
Item No. Nature of Power Authority Extant of Powers delegated to Remarks
PHOD/CHOD/
CPD/SAG in
independent charge of
Project.
Other SAG Jr. Admn. Grade. Sr.
Scale
Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.1.4 Grant of Advance of
TA/DA.
Para 1109 of IREM-
I.
Full Powers
including for
themselves.
Full Powers for
officers working
under their
control.
Full Powers for
officers working
under their
control.
Nil Nil -
B.1.5 Advance for pur-chase
of Motor Cars/Motor
Cycles/ Scooters.
Para 1104 & 1105
of IREM-I
Full Powers in
respect of officers
under them.
Nil Nil Nil Nil SDGM on behalf of GM in respect of
PHOD/CHOD/CPDs/SAG in independent
charge of project subject to availability of
fund.
B.1.06 Advance/Final
withdrawal from
provident fund.
922 R.I. Full Powers for
officers working
under them.
Full powers Nil Nil Nil i) SDGM on behalf of GM in respect
of PHOD/CHOD/CPDs/ SAG in
independent charge of project subject
to availability of fund.
ii) Case to be processed through
Personnel Department only other than
Accounts.
B.1.7 Grant of traveling/
daily allowance
Bd.'s letter No.F(E)-
I/2008/ AL-28/14 dt.
1.12.08.
Full Powers
including their own
TA Journal.
Same as in Col.
4
Full powers
including their
own TA Journal &
in respect of
officers working
under their
control.
NIL Nil -
B.1.8 To authorise a Rly.
servant to proceed on
duty to any part in
India outside his own
Rly. (Project.)
Para 1622 (2) R-II Full Powers in
respect of officers
working under
them.
Same as
in Col.4
Same as
in Col.4
Nil Nil -
Page No.20
Item No. Nature of Power Authority Extant of Powers delegated to Remarks PHOD/CHOD/CPD/ SAG
in independent charge of
Project.
Other SAG Jr.
Admn.
Grade.
Sr. Scale Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.1.9 To sanction transfer &
packing allowances as
per extant rules.
RB/L.No. PC-III/
78TA/1 dt. 12.5.78.
Full powers for
officers under them.
Same as in Col.
4.
Nil Nil Nil SDGM for GM/PHOD/ CHOD
of CORE & CPDs/ SAG officers
in independent charge of the
project.
B.1.10 Grant of TA/DA for
continuous halt in
accordance with Codal
provisions.
1648 R-II Ed.2005 Full Powers up to 180
days.
Full Powers up
to 120 days.
Nil Nil Nil -
B.1.11
(i)
Permission to Gaz.
Officers to attend
conferences/ congress
or meeting in India
recognised by Rly. Bd.
as duty.
1689-RII
Full Powers Nil Nil Nil Nil 1. Where payment of fee is
involved, concurrence of
Finance is necessary.
2. The sanction for payment of
fee will be taken from the
appropriate authority as laid
down under the extant rules.
(ii) Grant of Spl. CL &
Spl. passes to such
conference/ meeting
recognised by Rly. Bd.
As specified in Rules
335RI to an officer on
his own request spent
in attending
Conference/ Meeting
1689-RII
Full Powers where no
payment for meeting in
India is involved.
Nil Nil Nil Nil -
Page No.21
Item
No.
Nature of Power Authority Extant of Powers delegated to Remarks PHOD/CHOD/CPD/
SAG in independent
charge of Project.
Other SAG Jr.
Admn.
Grade.
Sr. Scale Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.1.12 Grant of leave (LAP, LHAP,
Maternity/ Paternity/Chilled
Care Leave) including C.L.
in accordance with the rules
except special disability
leave, study leave and leave
out of India.
Para 514, 523,
527 R-I
Full powers in
respect of officers
under their control.
However CPDs will
exercise this power
upto 30 days only.
Full powers
upto 21 days in
respect of
officers under
their control.
Same as
in
Col.5.
Full powers in
respect of C.L.
only in respect
of officers
under their
control.
Nil -
B.1.13 Grant of Special disability
leaves.
552-IREC-I Full powers for
officers under their
control.
Nil Nil Nil Nil Subject to Extant codal provisions
of Estt. Code.
B.1.14 Grant of Ex-India leave
subject to certification by
Accounts and permission to
go abroad.
- Full Powers to
PHOD/
CHOD only upto
JAG officers
Nil Nil Nil Nil
B.1.15 Grant of cash payment in lieu
of unutilised leave on
average pay to gazetted
officers on the date of
retirement/ superannuation.
Para 550 of
IREC-I
Full Powers for
officers under their
administra-tive
control.
Same as in
Col.4
Nil Nil Nil Subject to certification of leave
being due, by Accounts. SDGM
on behalf of GM in respect of
PHOD/CHODs/CPDs/SAG in
independent charge of project.
B.1.16 Grant of cash payment of 10
days leave on average pay
(encashment on LAP in
service)
Bd's
L.No.F(E)III/20
08/LE-1/1
dt.29.10.08
Full powers for
officers under their
administrative control
Same as in
Col.4
Nil Nil Nil Subject to fulfillment of latest
instruction issued by Railway
Board in this regard.
Page No.22
Item
No.
Nature of Power Authority Extant of Powers delegated to Remarks
PHOD/CHOD/CPD/
SAG in independent
charge of Project.
Other SAG Jr.
Admn.
Grade.
Sr. Scale Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.1.17 Reimbursement of
Medical expenses in
accordance with extant
orders.
607 RI & 617 RI. Full Powers for
officers under their
administrative control.
Full Powers. Nil Nil Nil Case to be processed by the
concerning branch subject to
recommendation of authorised Rly.
Medical attendant. SDGM on behalf
of GM in respect of
PHOD/CHODs/CPDs/SAG
independent charge of project as per
latest instruction.
B.1.18 To grant leave to
gazetted officers while
abroad and not in
foreign service as per
extant orders.
514 of
IREC-I
Full Powers for
officers under their
administrative control.
Nil Nil Nil Nil Subject to certification by
Accounts that the leave is due.
B.1.19 To sanction passes for
family and kit-wagon
for transportation on
transfer beyond normal
time limit as per extant
rules.
1646 of IREC-II Full
Powers.
Nil Nil Nil Nil SDGM on behalf of GM in
respect of PHOD/CHOD/
CPDs/SAG in independent charge
of project.
B.1.20 Allotment of quarters. Bd's L/ No. E(G)2006-
QRI-1-6
dt.20.4.07.
Full Powers to
SDGM in CORE
and CPDs in
projects
Nil Nil Nil Nil -
Page No.23
Item
No.
Nature of Power Authority Extant of Powers delegated to Remarks PHOD/CHOD/CPD/ SAG in
independent charge of Project. Other
SAG
Jr.
Admn.
Grade.
Sr.
Scale
Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.1.21 Permission for retaining the quarters at
original station to the officer transferred
temporarily as per extant rules.
Bd's L/ No.
E(G)2006-QRI-1-6
dt.20.4.07.
Full Powers upto 4 months to
SDGM in CORE and CPDs
in projects
Nil Nil Nil Nil -
B.1.22 To permit a Rly. servant transferred
permanently from one station to another
station on the Railway Electrification to retain
quarter at the original station subject to
fulfillment of conditions of para 1921-E as per
extant rules
Bd's L/ No. E(G)-
2006-QRI-1-6
dt.20.4.07.
Full powers to SDGM in
CORE and CPDs in projects
Nil Nil Nil Nil -
B.1.23 To allow a Rly. servant to retain his quarter
during leave for a period exceeding two
months as per extant rules
Bd's L/ No.
E(G)2006-QRI-1-6
Dt.20.4.07.
Full Powers to SDGM in
CORE and CPDs in projects
Nil Nil Nil Nil
B.1.24 To allow a Rly. servant to retain his quarter
during deputation in India on Foreign service
terms as per extant rules.
Bd's L/ No.
E(G)2006-QRI-1-6
dt.20.4.07.
Full
Powers to SDGM in CORE
and CPDs in projects
Nil Nil Nil Nil
B.1.25 To allow the heirs of deceased Rly. servant to
retain his quarters as per extant rules.
Bd's L/ No. E(G)98-
QRI-11
dt.22.1.1999.
Full Powers to SDGM in
CORE and CPDs in projects
upto 24 months on payment
of normal rent from the date
of the death of the employee.
Nil Nil Nil Nil
Page No.24
Item
No.
Nature of Power Authority Extant of Powers delegated to Remarks PHOD/CHOD/CPD/ SAG in
independent charge of Project. Other
SAG
Jr.
Admn.
Grade.
Sr.
Scal
e
Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.1.26 To exempt the incumbent of a post from
accepting the quarter allotted to the post and
from paying rent up to a period of 4 months in
the following circumstances as per extant rules
Para 1719 of IREM-
II
(i) When an employee temporarily transferred to
a post.
Full Powers to SDGM in
CORE and CPDs in projects.
Nil Nil Nil Nil -
(ii) When the quarter is subject to extensive
repairs such as renewal of roofing or such
other special work necessitating the vacating
of the whole quarter.
Full Powers to SDGM in
CORE and CPDs in projects
Nil Nil Nil Nil -
(iii) When an employee is required to vacate the
quarter under Medical advice on account of
infectious disease or epidemic.
Full Powers to SDGM in
CORE and CPDs in projects
Nil Nil Nil Nil -
B.1.27 Permission to allow retention of quarter on
retirement as per extant rules
Bd's L/ No.
E(G)2006-QR I-6
(Master circular
No.49) dt.20.4.07
-
(i) Up to 4 Months. Full powers to SDGM in
CORE and CPDs in projects
on payment of Normal rent.
Nil Nil Nil Nil -
(ii) Beyond 4 months at rates and under conditions
prescribed in Rly. Bd's Letter dt.01.6.01.
-do- Full Powers to SDGM in
CORE and CPDs in projects.
Nil Nil Nil Nil -
Page No.25
Item No. Nature of Power Authority Extant of Powers delegated to Remarks
PHOD/CHOD/CPD/SAG in
independent charge of
Project.
Other
SAG
Jr. Admn.
Grade.
Sr.
Scal
e
Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.1.28 Permission to allow retention of quarter on
resignation, dismissal/ removal from the
service as per extant rules.
Bd's L/ No.
E(G)2006-QR I-6
(Master circular
No.49) dt.20.4.07
Full powers to SDGM in
CORE and CPDs in
projects upto one month
only on payment of
normal rent.
Nil Nil Nil Nil -
B.1.29 Permission for making an application for
passport, issue of no objection certificate for
going abroad.
Bd's L. No.
95/V(C)00/1
dt.22.11.95
Full Powers to
CPO/CORE only for
Gaz. Officers excluding
PHOD/
CHOD/CPD/SAG
officers incharge of
project .
Nil Nil Nil Nil Subject to no D&AR & Vig.
cases pending.
B.1.30 Reporting and sanction of transactions of
immovable/ movable property under conduct
rules 16 & 18.
Para 16 & 18 of
CCS.
Full powers to SDGM
only for officers up to JA
grade.
Nil Nil Nil Nil -
B.1.31 To sanction release of funds against HBA
within the budget allotment.
Para 1132 of IREM-
I
Full powers to SDGM
only for all officers.
Nil Nil Nil Nil SDGM to exercise these
powers on behalf of GM
B.1.32 To permit acceptance of honorarium for
conducting disciplinary enquiries against Rly.
officers arising out of Vigilance/CBI cases
where the limit shall be Rs.6,750/- in a year.
Item No.5(e) of Bd's
L.No. F(X)II-2007/
PW/4 dt.21.9.07 &
15.10.09
Full Powers for officers
working under their
control.
Nil Nil Nil Nil Subject to nomination as
enquiry officer by
competent authority &
finance concurrence. SDGM
on behalf of GM in respect
of PHOD/ CHOD/CPDs/
SAG in independent charge
of project.
Page No.26
Item No. Nature of Power Authority Extant of Powers delegated to Remarks PHOD/CHOD/
CPD/ SAG in
independent charge
of Project.
Other
SAG
Jr. Admn.
Grade.
Sr. Scale Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.1.33 To permit journey by road on duty between
two stations connected by Rail.
Para 1630 of
IREC-II
Full Powers. Full
Powers.
Full Powers in
respect of
officers
working under
them.
Nil Nil SDGM on behalf of GM in
respect of PHOD/
CHOD/CPDs/SAG in
independent charge of
project.
B.1.34 To permit Rly. Officers to work and/or
receive fee (recurring and non recurring)
from Private sources upto 5000/- in each
individual case.
Item No.5(b) of Bd's
L.No. F(X)II-2007/
PW/4 dt.21.9.07&
15.10.09
Full Powers up to
2000/- in
individual cases.
Same as
in Col. 4.
Nil Nil Nil -
B.1.35 To sanction reimbursement of membership
(to the extant of 90% of the annual
subscription) in cases of professional
institutions approved by Rly. Board for
officers.
Bd's L/ No.
E(G)2004 FEI-5 dt.
16.9.04.
Full
Powers.
Nil Nil Nil Nil SDGM on behalf of GM for
PHOD/CHOD of CORE and
CPDs & SAG in
independent charge of the
project.
B.1.36 To issue KIT Wagon pass on
transfer/retirement by Mail/ Exp./Passenger
Train.
- Full powers for
officers under
them.
Same as
in Col. 4.
Nil Nil Nil CPO for GM/PHOD/ CHOD
and CPDs & SAG in
independent charge of the
project..
B.1.37 To sanction dual charge allowance as per
extant rules where such arrangements have
the approval of GM/RE.
Para 1337 of
IREC-II
Full Powers for
officer under their
control.
Nil Nil Nil Nil Prior finance concurrence is
necessary.
B.1.38 To sign Vakalatnama on behalf of GM in
respect of official law suits.
- Full Powers
CORE(HQ) only.
Full
Powers
CORE(H
Q) only.
Full Powers
CORE(HQ)
only.
Full
Powers
CORE(H
Q) only.
Nil i) Vakalatnama of SC –
DGM, HC/CAT – JAG,
Lower Court – JAG/SS
officer.
ii) Full powers to be
exercised by CORE/HQ
only.
Page No.27
Item No. Nature of Power Authority Extant of Powers delegated to Remarks
PHOD/CHOD/
CPD/ SAG in
independent charge
of Project.
Other
SAG
Jr. Admn.
Grade.
Sr. Scale Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.1.39
To sanction reward for meritorious work of
outstanding nature for Gaz. Officers up to Sr.
Scale.
Para 5(d) of Bd's
L.No. F(X)II-2007/
PW/4 dt.21.9.07 &
Bd's L. No.F(X)II-
2008/PW/6
dt.15.10.09
Full powers for
1250/- each
(PHOD/ CHOD
only) subject to
annual ceiling
limit of 5,000/-
Nil Nil Nil Nil Subject to availability of
fund and fulfillment of latest
instruction issued by
Railway Board in this
regard.
B.1.40 Advance for purchase of computer Bd's L.No.
F(E)Spel./95ADV/
4/1 dt.26.9.96
Full powers in
respect of officers
under them
Nil Nil Nil Nil Subject to availability of
fund and fulfillment of latest
instruction issued by
Railway Board in this
regard.
Page No.28
SCHEDULE "B" PT. II
ESTABLISHMENT MATTERS (NON GAZETTED)
Item
No.
Nature of Power
Authority
Extant of Powers delegated to
Remarks PHOD/CHOD/CPD/
SAG in independent
charge of Project.
Other
SAG
Jr. Admn.
Grade.
Sr. Scale Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.2.1 Creation, abolition and
extension of work charged
posts.
Bd's L.No.
E(G)98/EC2-3
dt.3.8.98
Full
Powers.
Full
Powers.
Full Powers for
posts upto Gr.
9300-34800/-
+
GP 4200
Nil Nil Concurrence of Finance is necessary even if the posts are specifically provided in the
sanctioned estimates. For any variation,
from that provided in the sanctioned estimate i.e. in number, duration, category
or scale of pay, fresh concurrence of
Finance shall be obtained.
B.2.2 To sanction dual charge allowance
to a non-gazetted Rly. servant for
holding charge of more than one
post.
Para 1337 of
IREC-II
Full
Powers.
Full
Powers.
Full
Powers.
Nil Nil -
Note :
i) Prior Finance concurrence is necessary.
ii) Such arrangements shall, not be made for periods shorter than 46 days and longer than 180 days.
iii) Dual arrangement can be made in respect of the following categories of non-gazetted posts :-
a) Similar posts of the same status but not in the same office.
b) Different posts of equal status but carrying different duties in the same office.
c) Different posts of unequal status carrying different duties whether in the same office or otherwise, provided the Incumbents of the higher posts do not hold the charge of a Rly. servant
subordinate to him.
d) A formal office order must be issued.
B.2.3 Grant of extra ordinary leave for
counting towards increments.
S.No.8 of App. xxxii
IREC-II
Full Powers in
respect of staff for
whom they are
appointing authority.
Same as
in Col.4.
Same as
in Col.4.
Same as in
Col.4.
Nil This would be subject to provision of
Rules 1320 R-II.
B.2.4 To sanction Investigation of Arrear
Claims of Pay & Allowances to
Non-Gazetted Rly. Servants up to 3
years old claims irrespective of
amount involved.
Para 1004 of
IREM-I
Full
Powers.
Full
Powers.
Full Powers. Full Powers. Nil 1) PHOD/CHODs/CPDs/SAG in
independent charge of project
may sanction investigation of
claims over 3 years old without
any monetary limit.
2) Prior finance concurrence is
required for ordering
investigation in such cases.
Page No.29
Item
No.
Nature of Power Authority Extant of Powers delegated to Remarks
PHOD/CHOD/CPD/ SAG
in independent charge of
Project.
Other
SAG
Jr. Admn.
Grade.
Sr. Scale Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.2.5 Grant of mileage allowance to be
calculated by a route other than
shortest or cheapest route for
journeys within his jurisdiction,
subject to limitation laid down in
the Indian Rly. Estt. Code Vol.II.
1607 IREC-II Full
Powers.
Same as in
Col.4
Nil Nil Nil
B.2.6 Provisional Payment of
wages/salaries.
Chapter XI of
Indian Railway &
Finance Admn.
Full Powers upto 3 months in
respect of Gr. C & D staff holding posts which are within
their powers of sanction.
Same as in
Col.4.
Nil Nil Nil Finance concurrence is necessary.
B.2.7 Transfer of Gr.'C' & 'D' staff :-
a) Within the same project (including
Temporary transfer for period not
exceeding 180 days).
Rule 226 & 231 of IREC Vol.I(2003)
Full
Powers.
Full
Powers.
Full Powers for Gr. D &
Artisan staff
under them within their
jurisdiction.
Full Powers as in Col. 6 for
officers in
independent charge.
Nil
b) Within CORE (between HQ and
Projects/and between two projects). - Full Powers to PHOD/
CHODs only.
Nil Nil Nil Nil
c) Repatriation to lien holding
division/Railway.
Rule 226 & 229 of
IREC Vol.I(2003) Full Powers to
PHOD/CHODs (for Gr.
'C'&'D") CPD/ SAG
independent incharge
(for Gr; 'D') only.
Nil Nil Nil Nil CPDs full powers for (Gr. 'C' & Gr.
'D') staff left with one year or less
time for retirement.
d) Induction to RE - Full Powers Nil Nil Nil Nil
B.2.8 Treating as duty the period of
handing over and taking over of
charge in cases in which several
scattered work or stores have to be
inspected before completing the
transfer of charge.
FR(107) Adv. CS
No.228 RII
Compendium of
Rulings App.
XXXR.II
Full
Powers.
Full
Powers.
Full
Powers.
Nil Nil
Page No.30
Item
No.
Nature of Power Authority Extant of Powers delegated to Remarks PHOD/CHOD/CPD/ SAG
in independent charge of
Project.
Other
SAG
Jr. Admn.
Grade.
Sr. Scale Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
GRANT OF LEAVE :
B.2.9
(a)
Grant of CL. Rule 236-R-1 2003 & Bd's
letter No.96/ LE1-4 of
31.12.96 Rule 515, 525,
526 & 527 of IREC Vol.I
(2003)
Full
Powers.
Full
Powers.
Full
Powers.
Full
Powers
Full
Powers
All Sr. Supervisors incharge in scale of
pay Rs.9300-34800/- + 4200 GP or
above also authorized to sanction
ordinary casual leave upto 08/10 days
in a year to Gr. C & D staff working
under them.
B.2.9 (b) Grant of LAP, LHAP,
maternity/paternity
leave/Child care leave in
accordance with the rules.
Rule 236-R-1 2003 &
Bd's letter No.96/ LE1-4
of 31.12.96 Rule 515,
525, 526 & 527 of IREC
Vol.I (2003)
Full
Powers.
Full
Powers.
Full
Powers
Full
Powers
upto 60
days.
Nil
(c) Study leave as per extant
rules.
556 IREC-I & App. V.
IREC-I
Full Powers. Nil Nil Nil Nil Finance concurrence is necessary.
(d) To grant Ex. India Leave
and permission to go
abroad.
- Full Powers. Nil Nil Nil Nil Subject to vigilance & D&AR (Major
Penalty) clearance & instruction issued
by GM/ CORE/ALD
(e) Grant of extra ordinary
leave to Rly. servant.
530 IREC-I Full Powers. Nil Nil Nil Nil Condition as per Para 530 R-I
should be fulfilled.
(f) Grant of Hospital Leave as per
extant Rules. 554 IREC-I Full Powers upto 24
months.
Nil Nil Nil Nil
(g) Special disability leave in
accordance with the rules.
Rule 552, 553 of IREC
Vol.I (2003)
Full
Powers on
recommendation of
CMD
Nil Nil Nil Nil The period of the leave shall be such as
certified by the Medical Officer. It should
not be extended except on the certificate of
that authority & in no case be beyond 24
months.
B.2.10 Grant of Special Casual Leave
for Athletic meets/
Scouting/Cultural activities.
1104 IREM & Rly. Bd.'s L/ No. E(W) 74 SPL-4 of 24.1.75
& (W)75 WE 6-13 dt.2.5.80
Page No.31
Item
No.
Nature of Power Authority Extant of Powers delegated to Remarks PHOD/CHOD/CPD/
SAG in independent
charge of Project.
Other SAG Jr. Admn.
Grade.
Sr. Scale Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
a) Sports. Full Powers up to 90
days for National &
Inter-National events
& 30 days in a
Calendar year in all
other cases.
Same as in
Col.4.
Full Powers
up to 30
days.
Same as
in Col.6
Nil -
b) Scouting/Cultural activities. - Full Powers up to 30
days in a Calendar
year.
Same as in
Col.4.
Same as in
Col.4.
Same as
in Col.4.
Nil -
B.2.11 To grant leave to Rly. Servant
who is unlikely to be fit to
return to duty.
522 IREC-I Full Powers. Full Powers. Nil Nil Nil Subject to the ceiling limits as provided
in the rules.
B.2.12 Grant of special Casual Leave up to
a total period of 15 days in a
Calendar year to Rly. staff who are
members of managing committee
for attending meeting including
those of the Bd. of Directors and
the Sub committees of Co-
operative, Credit Societies and
banks including consumer co-
operative societies.
1104
IREM
Full Powers. Full Powers. Full Powers. Full Powers
where he is
incharge.
Nil The Facility of special CL and special
passes is not admissible to members for
attending meeting Genl./ Annual Meeting
ordinary or extra ordinary meeting of the
share holders.
B.2.13 Sanction of daily allowance for
continuous halt not exceeding 180
days.
1618 IREC-II Full
Powers.
Same as in
Col.4.
Same as in
Col.4.
Full
powers if
he is
incharge
Nil
B.2.14 To authorise a Rly. servant to
proceed on duty to any part in
India.
1622, 1623,
1624, 1625,
1626, 1627 RII.
Full Powers in respect
of staff working under
them.
Same as in
Col.4.
Same as in
Col.4.
Nil Nil
Page No.32
Item
No.
Nature of Power
Authority
Extant of Powers delegated to
Remarks PHOD/CHOD/CPD/
SAG in independent
charge of Project.
Other
SAG
Jr. Admn.
Grade.
Sr. Scale Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.2.15 Grant of consolidated Conveyance
Allowance :-
a) Car & Scooter. 1641 of
IREC-I
Full
Powers.
Full
Powers.
Nil Nil Nil Note: Finance concurrence will
be necessary.
b) Cycle. Full
Powers.
Full
Powers.
Full
Powers.
Nil Nil -do-
B.2.16 Fixing Head quarters of Non-Gaz. Staff. 1621 of IREC-
II Sub Rules
(3) Sec.I of
App.XXXI
R.II
Full
Powers.
Full
Powers.
Full Powers in
respect of Gr.
D & Artisan
Staff
Nil Nil - do -
B.2.17 To issue no objection certificate for
issuing a pass port.
- Full Powers. Nil Nil Nil Nil Subject to vigilance & D&AR
(Major Penalty) clearance &
instruction issued by GM/
CORE/ALD
B.2.18 To grant Certificate that a Rly. servant would
have continued to officiate in the post but for
his proceeding on leave.
- Full Powers in respect
of staff for whom they
are appointing
authorities.
Same as in
Col.4.
Same as in
Col.4.
Same as
in Col.4.
Same as in
Col.4. -
B.2. 19
(a)
Grant of Cash payment in lieu of unutilised
leave on average pay (encashment of
unutilised LAP) on retirement.
550 IREC-I Full Powers. Full Powers. Full Powers. Full Powers
where he is
incharge
Nil -
(b) Grant of cash payment of 10 days leave on
average pay (encashment on LAP in
services)
Rly.Bd's
L/No. F(E)-
III/2008/
LE-I/1
dt.29.10.08 &
11.6.09
Full
Powers.
Full
Powers.
Full Powers Full Powers
where he is
incharge
Nil Subject to fulfillment of latest
instructions issued by Railway
Board in this regard
Page No.33
Item
No.
Nature of Power Authority Extant of Powers delegated to Remarks PHOD/CHOD/
CPD/ SAG in
independent charge
of Project.
Other
SAG
Jr. Admn.
Grade.
Sr. Scale Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.2.20 To sanction under taking of work
for which a fee is offered and
acceptance of a fee from private
sources.
Para 5 (b) of Bd's L.No.F (X)II/2007/
PW/4 dt. 21.9.07,
F(X)/II-2008/PW/6
15.10.09 & 1334 R-II.
Full powers up to
5000/- in each
individual case & if
recurring up to
5000/- to an
individual during a
financial year.
Same as in
Co.4.
Nil Nil Nil Conditions laid down in para 1334 R-II are
to be satisfied.
B.2.21 To sanction the undertaking of
Work for which an honorarium is
offered and the grant of acceptance
of an honorarium (recurring & non-
recurring).
Para 10 (a) of
Bd's L.No.
F(X)II/2007/PW/
4 dt. 21.9.07 &
15.10.09
Full Powers up
to 10,000/-
individual cases in a
financial year.
Same as
in Col.4.
Powers up to a
max. of
5,000/-
individual cases
in a financial
year.
Nil Nil i) Finance concurrence beyond
Rs. 6,000/- is required.
ii) The grant of honorarium is subject to the
conditions laid down in the para 1334 R-II.
iii) In cases when the Addl. work to be
done on honorarium basis arisen as a result
of directives/orders from Rly. Bd. or HQ
Office and it affects more than one Project
the rate of honorarium should be got
approved from Hd. Qrts. i.e. CHODs
concerned and FA&CAO
B.2.22
To sanction rewards for meritorious
work of out-standing nature
including RPF Staff.
Bd's L/No.F(X)
II/2007/ PW-4
dt.21.9.07 & Bd's
L.No. F(X)/II-
2008/PW/6/6
dt.16.1.09
Full powers up
to 1000/- in each case subject to ceiling
limit of
40,000/- (for CEE,
CSTE/CORE and for all others
25,000/- per year
for both item No.
B.2.22 & B.2.23
Full Powers
up to
750/- in
each case
subject to
ceiling limit of
10,000/- per
year
Full Powers up to
500/- in each
case subject to
ceiling limit of
4,000/- per
year.
Nil Nil Subject to availability of fund and
fulfillment of latest instructions issued by
Railway Board in this regard
Page No.34
Item No. Nature of Power Authority Extant of Powers delegated to Remarks PHOD/CHOD/CPD/ SAG
in independent charge of
Project.
Other SAG Jr. Admn.
Grade.
Sr. Scale Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.2.23 To grant group award to staff
employed under their control
for service of an exceptional
merit rendered to Rly. on any
occasion subject to individual
award not exceeding the
prescribed limit.
GM/RE Full powers up to
5000/- for CORE
PHOD/CHODs &
2500/- for CPD /SAG
in independent charge of
Project.
Nil Nil Nil Nil Subject to availability of fund and
fulfillment of latest instructions issued by
Railway Board in this regard
B.2.24 Rewards for apprehension of
offenders in criminal cases.
- Full powers up to
100/- in each case
without any annual
ceiling limit.
Same as
in Col.4.
Same as
in Col.4.
Nil Nil -
B.2.25 Grant of advance of pay in
case of transfer/leave.
1102 of IREM Full powers in respect of
staff under their control.
Same as
in Col.4.
Same as
in Col.4.
Nil Nil No advance is admissible when leave
taken is for less than 30 days.
B.2.26 Grant of advance of pay under
special circumstances.
1517 GI Bd's
L/No. F(E)
56PW-7/2
dt.11.7.60
& 7.4.61
Full powers for whom
they are controlling
officers upto 3 months
pay or
5000/- whichever is
less.
Same as in
Col.4.
Nil Nil Nil The powers under this item can be
exercised only when the GM or the
Central Govt. as the case may have
declared a particular calamity as one
necessiating the grant of the concession
and have prescribed the quantum of the
advance.
B.2.27 Grant of Advance of
TA/DA.
1102 of IREM Full
Powers.
Full Powers. Full powers in
respect of staff
under their control.
Full powers
where he is
incharge
Nil -
B.2.28 To sanction advance for
purchase of conveyance
other than Motor Car.
1106 & 1107 of
IREM. Bd's
L/No. F
(E)Spl.81 Adv.
2/3 dt.8.11.81.
Full
Powers.
Full Powers. Full Powers in
respect of cycle.
Full powers
where he is
incharge
Nil
Page No.35
Item
No.
Nature of Power Authority Extant of Powers delegated to Remarks PHOD/CHOD/CPD/ SAG
in independent charge of
Project.
Other
SAG
Jr. Admn.
Grade.
Sr. Scale Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.2.29 To sanction advance for
festival to a non-gazetted
Rly. servant drawing
Grade pay upto Rs.4800/-
Bd's L.No.
E(LL)2008/FA/1
dt.5.11.08 & Para 1102
of IREM-I.
Full
Powers. Full
Powers.
Full
Powers.
Full Powers. Full
Powers.
1) Only one advance may be
sanctioned to an employee in a
calendar year.
2) Condition prescribed in Para
1625 IREM should be observed.
B.2.30
Sanction temporary/ final
withdrawal from PF/VPF.
- Full powers in respect of
staff under their control.
Same as
in Col.4.
Same as in
Col.4.
Same as in
Col.4.
Full Powers
for Gr.C staff
in scale
below
9300-
34800+GP
4200/- and
also Gr.D
staff..
1) These powers are to be exercised
by Personnel officers or by
officer discharging functions of
Personnel Officer.
2) Provision of Para 922 RI to 925
RI should be observed.
B.2.31 To sanction release of
funds against HBA subject
to availability of funds
thereof.
F(E)Spl.74 Adv. 3/10
dt.8.2.77
Full Powers. Nil Nil Nil Nil Subject to observance of conditions
laid down in Bd.'s letters No.
F(E)Spl.74/Adv/ 3/40 dt.8.2.77 & No.
F(E)/ Spl.80 Adv/3 dt.21.6.80 or latest
B.2.32 To sanction educational
assistance or
reimbursement of tuition
fees to staff in accordance
with extant orders of Rly.
Bd.
Para 2204 of IREM-II &
Bd's L/No. E(W)2008
ED-2/4 dt.4.5.09
Full Powers. Full
Powers.
Full
Powers.
Full
Powers.
Full
Powers.
-
B.2.33 To sanction payment of
compensation under
workmen's compensation
Act.
XXXIII IREM Full Powers. Full
Powers.
Full
Powers.
Full Powers
where he is
incharge
Nil Sanction to the payment of
compensation under W.C. Act is
subject to prior certification by the
Accounts Deptt. All cases involving
payment of compensation should be
reported to the Head of Deptt.
Page No.36
Item
No.
Nature of Power Authority Extant of Powers delegated to Remarks PHOD/CHOD/CPD/ SAG
in independent charge of
Project.
Other
SAG
Jr. Admn.
Grade.
Sr. Scale Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.2.34 Reimbursement of medical expenses in
accordance with extant orders and
Rules.
607-IREC-I
616-IREC-I Full Powers. Full
Powers.
Nil Nil Nil Subject to processing by concerned
Deptt.
B.2.35 To order postponement of payment of
Govt. Contribution to SRPF when it
has become due for payment upto a
period of two months.
944- IREC-I Full Powers. Full
Powers.
Full Powers. Full
Powers.
Nil -
B.2.36 To condone break in service in case of
non-gazetted Rly. servant. 918-R-I Full Powers
up to
12 months.
Same as
in Co.4.
Nil Nil Nil -
B.2.37 To order recoveries of over payments
in respect of non-gazetted Rly.
servants.
1013 IREM Full
Powers.
Full
Powers.
Full Powers. Full
Powers.
Nil -
B.2.38 To waive recoveries of amounts
overdrawn by non-gazetted Rly.
servants which have been detected after
one year of payment.
1017 of IREM Full
Powers.
Full
Powers.
Full Powers
up to
500/- in
each case.
Nil Nil 1. Conditions prescribed in para 1013 to
1019 of IREM –I will have to be
followed.
2. Prior Finance concurrence is
necessary.
B.2.39 To waive irrecoverable amounts
overdrawn by non-gazetted Rly.
servants which have been detected
within one year.
1017 of IREM Full
Powers.
Same as
in Col.4.
Nil Nil Nil 1. Condition prescribed in Para 1013 to
1019 of IREM-I to be followed.
2. Prior finance concurrence is necessary.
B.2.40 To sanction write off of irrecoverable
personal advances or amounts
otherwise due from Non-gazetted Rly.
servants i.e. rent etc.
1017 of IREM Full
Powers.
Full
Powers.
Nil Nil Nil - do -
B.2.41 To waive off the cost of training of a
Rly. employee who has received
training at Rlys's cost and who is
required to serve the Rlys. for a
minimum prescribed period upto the
cost proportionate to the service
rendered.
Item No.24 of
Bd.'s L.No.F
(X)II/2007/PW
4 dt.21.9.07
Full Powers in
respect of non-gaz.
staff subject to
verification
by Accounts.
Same as
in Col.4
Nil Nil Nil -
Page No.37
Item
No.
Nature of Power Authority Extant of Powers delegated to Remarks PHOD/CHOD/
CPD/ SAG in
independent charge of
Project.
Other SAG Jr. Admn.
Grade.
Sr.
Scale
Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
Allotment of quarters.
B.2.42 To permit a Rly. servant transferred
temporarily to another station to retain
quarter at the original station.
Bd's L/ No.
E(G)2006-QR I-6
(Master circular
No.49) dt.20.4.07
Full Powers to
SDGM in CORE
and CPD's in
projects upto
4 months.
Nil Nil Nil Nil
B.2.43 To permit a Rly. servant transferred
permanently from one station to
another station on the Railway
Electrification to retain quarter at the
original station subject to fulfillment of
conditions of para 1921-E as per extant
rules
-do-
(1) Upto 2 months. Full Powers to
SDGM in CORE
and CPD's in
projects up to 2
months on normal
rent.
Nil Nil Nil Nil
2) Beyond 2 months at rates and under
conditions prescribed in Rly. Bd's letter
dt.17.12.83 & 27.8.84.
Full Powers to
SDGM in CORE
and CPD's in
projects.
Nil Nil Nil Nil
B.2.44 To allow a Railway servant to retain his
quarter during leave for a period exceeding
2 months.
1728(I)IREM & Bd's
L.No E(G)2006-QR I-6
(Master circular No.49)
dt.20.4.07
Full Powers to
SDGM in CORE and
CPD's in projects.
Nil Nil Nil Nil
Page No.38
Item
No.
Nature of Power Authority Extant of Powers delegated to Remarks PHOD/CHOD/CPD/ SAG in
independent charge of
Project.
Other
SAG
Jr. Admn.
Grade.
Sr.
Scale
Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.2.45 To allow a railway servant to retain
his quarter during deputation in
India on foreign service for a period
of 2 months.
1728(iv)IREM Bd's
L.No.E(G)2006-QR I-6
(Master circular No.49)
dt.20.4.07
Full Powers to SDGM in
CORE and CPD's in
projects.
Nil Nil Nil Nil
B.2.46 To allow the heirs of deceased
railway servant to retain his quarter.
Bd's L.No E(G)2006-QR I-6
(Master circular No.49)
dt.20.4.07
Full Powers to SDGM in
CORE and CPD's in
projects up to 24 months
on payment of normal rent
from the date of death of
the employee.
Nil Nil Nil Nil
B.2.47 In case of subletting Rly.
accommodation or a portion there of
unauthorisedly by Rly. servant.
(i) To cancel allotment of Rly.
accommodation and to charge
enhanced rent for the period of
subletting @ 6 times/5 times/4 times
the assessed rent or 10% of
emoluments whichever is higher.
- Full Powers to SDGM in
CORE and CPD's in
projects .
Nil Nil Nil Nil
(ii) To debar the employee from sharing
Rly. accommodation for any length
of time.
- Full Powers to SDGM in
CORE and CPD's in
projects.
Nil Nil Nil Nil
(iii) To debar a Rly. employee eligible
for allotment of Rly. accommodation
for a period not exceeding 3 years.
- Full Powers to SDGM in
CORE and CPD's in
projects.
Nil Nil Nil Nil
Page No.39
Item No. Nature of Power Authority Extant of Powers delegated to Remarks
PHOD/CHOD/CPD/ SAG in
independent charge of
Project.
Other
SAG
Jr. Admn.
Grade.
Sr.
Scale
Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.2.48 To exempt the incumbent of a post from
accepting the quarter allotted to the post and
from paying rent therefore upto a maximum
period of 4 months in the following
circumstances.
Para 1719 of
IREM-II
i) When an employee is temporarily transferred
to a post.
Full Powers to SDGM in
CORE and CPD's in
projects.
Nil Nil Nil Nil
ii) When the quarter is subject to extensive
repairs such as renewal of roofing or such
other spl. work necessiating the vacation of
the whole quarter.
-do- -do- -do- -do- -do-
iii) When an employee is required to vacate the
quarters under Medical advice on account of
infectious disease or epidemic.
-do- -do- -do- -do- -do-
B.2.49 Permission to allow retention of quarter after
retirement :-
Bd's L.No
E(G)2006-QR I-
6 (Master
circular No.49)
dt.20.4.07
Full powers to SDGM in
CORE and CPD's in
projects upto 4 months on
payment of normal rent.
Full Powers to SDGM in
CORE and CPD's in
projects.
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
i) Up to 4 months.
ii)
Beyond 4 months as per extant order of
Railway Board.
B.2.50 Permission to allow retention of quarter of
staff on resignation/ dismissal /removal from
the service.
-do- Full Powers to SDGM in CORE and CPD's in projects
upto one month only on
payment of normal rent.
Nil Nil Nil Nil
B.2.51 Permission to allow the non residential
accommodation not required for official
purposes, for temp. residential
accommodation.
1962-E Full Powers to SDGM in
CORE and CPD's in
projects on payment of
charges worked out in
consul-tation with finance.
Nil Nil Nil Nil
Page No.40
Item
No.
Nature of Power Authority Extant of Powers delegated to Remarks PHOD/CHOD/CPD/
SAG in independent
charge of Project.
Other SAG Jr. Admn.
Grade.
Sr. Scale Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.2.52 To issue service certificate to Rly. servants
who have put in 12 months service or more.
1620(I) IREC-
I.
Full powers in
respect of staff
working under them.
Same as in Col.4. Same as in
Col.4.
Same as in
Col.4.
Same as
in
Col.4.
-
B.2.53 To grant temporary exemptions from the
limitation of hours of work and periodic rest
as prescribed Under Sec.71(C) 1, 2, 3, 7 (1)
& 2 of IR (Amend) Act, 1956.
3504 Sec. B
(6)IREM Sec
71-C & sec.-
71(1) of
HOER, 1961
Full
Powers.
Same as in Col.4. Same as in
Col.4.
Same as in
Col.4.
Same as
in
Col.4.
-
B.2.54 To permit non-gazetted Rly. ser-vants to
collect subscriptions from non-gazetted Rly.
servants for religious and cultural activities.
Rules 24 of RS
Conduct Rules.
Full
Powers.
Full Powers. Nil Nil Nil -
B.2.55 Reporting and sanction for transactions in
movable/imm-ovable and valuable
properties under conduct rules 16 & 18.
Rules 24 of
R.S. (Conduct)
Rules.
Full Powers for staff
under their control.
Nil Nil Nil Nil -
B.2.56
Forwarding of applications to posts outside
the Rly. subject to the approval of the parent
Railway.
1402 of IREM Full Powers to
CHOD only.
NIL NIL NIL NIL -
B.2.57 Payment of Deposit of decretal amount in
satisfaction of the decree passed by Civil
Court/Authority under payment of Wages
Act.
- Full Powers. Full
Powers.
Full
Powers.
Nil Nil -
B.2.58 To sanction passes for family & kit of Non-
Gaz. Staff for transportation on transfer
beyond normal time limit in special cases.
- Full Powers. Nil Nil Nil Nil -
Page No.41
Item
No.
Nature of Power Authority Extant of Powers delegated to Remarks PHOD/CHOD/
CPD/ SAG in
independent charge of
Project.
Other SAG Jr. Admn.
Grade.
Sr. Scale Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.2.59 To issue Kit wagon passes on transfer by
passenger train.
- Full Powers. Full Powers for staff
under their
Administrative
Control.
Nil Nil Nil -
B.2.60 To allow drawal of house rent allowance. - Full Powers. Full
Powers.
Full
Powers.
Nil Nil -
B.2.61 To sanction increment in the sanctioned
scale for Gr. C & D staff in accordance
with Rules.
- Full Powers. Full
Powers.
Full
Powers.
Full
Powers.
Nil -
B.2.62 To sanction overtime in accordance with
the factory Act hours of employment
regulation.
- Full Powers. Full
Powers.
Full
Powers.
Full
Powers.
Nil -
B.2.63 To recast Service Record of Gr. C & D
staff in case it is damaged/lost in
consultation with parent Rly.
- Full
Powers.
Nil Nil Nil Nil In terms of extant orders by
Rly. Bd.
B.2.64 To authorise senior subordinates for
signing of passes/PTOs.
- Full
Powers.
Nil Nil Nil Nil Subject to provision of Pass
Rules.
B.2.65 To permit journey by road between two
stations connected by Rail for Official
purposes.
- Full
Powers.
Full Powers. Nil Nil Nil -
B.2.66
To grant extra-ordinary leave without leave
salary to a Rly. servant without lien on a
permanent post while officiating in a post or
holding temporary post on a monthly rate of
pay in the event of prolonged sickness.
Para
530
IREC-I
Full subject to
maximum of
one year.
Nil Nil Nil Nil -
Page No.42
Item
No.
Nature of Power Authority Extant of Powers delegated to Remarks PHOD/CHOD/
CPD/SAG in
independent charge of
Project.
Other
SAG
Jr. Admn.
Grade.
Sr. Scale Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
B.2.67 Sanction for payment of gratuity under
gratuity Act to Casual Labour/Temporary
status Casual Labour in the event of
disablement/retrenchment/death/superannuat
ion or resignation.
Rly.Bd's L/No. E/
LL/85/AT/GRA/ I-I
dt.26.2.86.
Full
Powers.
Full
Powers.
Full Powers Full
Powers
(SPO
only).
Nil Finance Concurrence is nece- ssary.
Case should be processed by 'P' branch.
B.2.68
Re-employment of retired Railway
Employee upto age of 62 years.
Rly. Bd's letter
No.E(NG)II/2007/RC
-4/CORE/1 dated
11.5.07 & 14.5.08
and RBE No.24/98 of
E(NG)-II/97/RC-4/8
dated 3.2.98 &
20.3.08.
Full Powers upto 25
employees.
Nil Nil
Nil Nil 1. As per extant orders of Railway
Board
2. Subject to availability of vacancy
against sanctioned post.
3. Limit of 25 employee at each
project to be kept, above which
project should seek for CORE/
ALD's prior approval.
B.2.69 To sanction advance for purchase of
computer.
Bd's L.No.
F(E)Spel./95/
ADV/4/1
dt.26.9.96
Full powers Nil Nil Nil Nil Subject to availability of fund and
fulfillment of latest instructions issued
by Railway Board in this regard
B.2.70 To sanction reimbursement of membership
(to the extant of 90% of the annual
subscription) in cases of professional
institutions approved by Rly. Board for Sr.
Supervisors in Gr. 9300-34800/- upto
Grade Pay
4600 & 4800/-
Bd's L/ No.
E(G)2004 FEI-5
dt. 16.9.04.
Full
Powers.
Nil Nil Nil Nil SDGM on behalf of GM will exercise
this power in CORE and CPDs for
projects.
B.2.71
Sanction of expenditure for deputation of
Rly. Employee for training courses,
seminars, symposia in non-Rly. Institutions
upto 8 lakh in a year.
F(X)II-2006/
PW/18 dt.20.8.08
Full powers upto
50,000 in a year
only CPD/SAG in
independent charge
of Projects.
Nil Nil Nil Nil i) In CORE SDGM of behalf of GM will
exercise these powers subject to
ceiling limit of 3 lakh.
ii) All such cases will be put up to SDGM
for sanction through P. Branch in
CORE.
Note: 1. The overall registration fee should be subject to a maximum of 25,000/- and prorata registration fee of 4,000/- per day. For arriving at this monetary limit the cost of TA/DA should not
be taken into account.
2. These powers will be applicable for non-gazetted as well as gazetted officials.
3. At present, ten independent projects are under the control of CORE. Thus the ceiling fixed for one project is 50,000/- per year.
Page No.43
SCHEDULE – D.I.
WRITE-OFF AND WAIVER
Item
No.
Nature of Power
Authority
Extent of Powers delegated to
Remarks PHOD/CHOD/
CPD/SAG in
independent charge of
Project.
Other
SAG
Jr. Admn.
Grade.
Sr. Scale Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
D.1.01 To write-off amount due to the
Rly. otherwise than when they
are irrecover-able (this also
applies to advertisement
charges).
Item No.27 Annex. II
Chap. Vof FI Rly. Bd's
No. F(X)II/2007/PW/4
dt.21.9.07
Full Powers up to
10,000/- in each
case.
Same as
in Col.4.
Full Powers
upto
5,000/- in
each case.
Nil Nil Note:- Write-off of amount
exceeding 5,000/- would
require finance concurrence.
Note : This does not apply to wharfage, demurrage, storage and lost property charges which may be written off or referred to Rly. Board without sanction of higher authority.
D.1.02 To write-off irrecoverable
losses of cash, stores, tools &
plants.
Rly.Bd's No. F(X)II-
2016/PW/3 dt.14.9.16
a) When a Rly. Employee is in
any way responsible.
- Full Powers up to
2.5 Lakh in each
case.
Same
as in
Col.4.
Full Powers up
to 50,000/- in
each case.
Full Powers up to
10,000/- in each
case.
Nil -
b) When a Rly. Employee is not in
any way responsible.
- Full Powers up to
1 Cr. in each case.
Same
as in
Col.4.
Full Powers up
to 25 lakh in
each case.
Full Powers up
to 2.5 lakh in
each case.
Nil -
Note 1) Finance concurrence should be taken in all cases relating to loss of cash.
2) Cases of loss involving more than Rs.50,000/- or presenting unusual features or revealing serious defects in procedure should be reported to Board.
Page No.44
SCHEDULE - D-2
CONTINGENT CHARGES.
Item
No.
Nature of Power Authority Extent of Powers delegated to Remarks
PHOD/CHOD/CPD/SAG
in independent charge of
Project.
Other SAG Jr. Admn.
Grade.
Sr. Scale Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
D.2.0 Contingencies :
D.2.01 To exercise the powers of Head of
offices contained in para-graphs 1011,
1013, 1015, 1043, 1044 & 1045.
Chapter X
F-I
Full Powers. Full Powers. Full Powers. Full
Powers.
Nil -
Imprest :
D.2.02 To sanction cash imprest in
accordance with prescribed rules.
Para 1050,
1051 &
1052F-I, CS
No.7
dt.1.11.02
Full Powers. Full Powers up
to
10000/-.
Full Powers for
officers under
their control up
to 5000/-.
Nil Nil Prior Finance
concurrence is necessary.
D.2.03 To sanction repairs to machines and
rectification of stores supplied to Rly.
by a firm subject to recovery of actual
charges incurred on
repairs/rectification from the supplier.
- Full Powers up to
25,000/- in each case.
Full Powers up
to
10,000/-in
each case.
Full Powers up
to
10,000/-in
each case.
Nil Nil -
Page No.45
Item
No.
Nature of Power Authority Extent of Powers delegated to Remarks PHOD/CHOD/
CPD/SAG in
independent charge
of Project.
Other SAG Jr. Admn.
Grade.
Sr. Scale Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
D.2.04
i)
To sanction repairs of motor vehicles,
trolleys, D.G. Sets, tools and plants,
survey instruments etc. including
purchase of materials required in
connection therewith.
507-FI Para
713 to 715 of
Genl. Code
Vol.I CS
No.18
dt.29.7.02
Full Powers up to
50,000/- in each
case.
Full Powers
up to
30,000/- in
each case.
Full Powers
upto
20000/-in
each case.
Full Powers
up to
10000/- in
each case.
Full Powers
up to
5000/- in
each case.
i) Prior Finance concurrence is necessary in each
case above 10,000/-.
ii) Subject to annual ceiling limit of 50,000/-
per L.V., 75,000/- per H.V. i.e. truck &
L.C.V. etc. & 25,000/- per D.G. Sets.
iii) Sanction beyond 50,000/- or beyond annual
ceiling limit would be given by SDGM on
behalf of GM
ii) Servicing of vehicle i.e.
LCV/HV/Passenger Road Vehicle by
local firms of repute (Lubrication Oil
changes etc.
- Full powers Full powers Full
powers
Nil Nil Annual ceiling limit of 10,000/- per
vehicle.
iii)
Sanction for purchase, maintenance,
hiring and repairs to office machines
and other T&P etc.
1001, 1022
& 1026 F-I
Full
Powers.
Full
Powers.
Full powers
upto
10,000/- in
each case.
Nil Nil Finance concurrence is necessary beyond
10,000/-. Annual ceiling limit of .50,000/-
for each deptt. of CORE and for Project.
iv)
Washing and re-conditioning of bed
cushions, pillow covers i.e. washing
of covers of pillows and getting the
cotton of bed cushions and pillows
ginned and pillows re-stuffed Dying
or dry cleaning of carpets belonging
to Rest Houses, Rest Rooms etc.
- Full
Powers.
Full
Powers.
Full
Powers.
Full
Powers.
Nil -
v)
Sanction to purchase of cycle. Para 1023 of
IRFC Vol.I
Full powers in HQ
office and in
projects 3500/-
per cycle subject to
maximum of 5
cycles per annum
Nil Nil Nil Nil
Page No.46
Item
No.
Nature of Power Authority Extent of Powers delegated to Remarks PHOD/CHOD/CPD/ SAG
in independent charge of
Project.
Other
SAG
Jr. Admn.
Grade.
Sr. Scale Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
vi)
Repairs to furniture
including canning. GM/RE Full Powers Full
Powers
Full powers. Full
powers
Nil Finance concurrence is necessary beyond 5000/-
(vii)
Repairs to cycle - Full powers Full
powers
Full powers upto
500/- per annum per
cycle.
Full powers upto
200/- per annum per
cycle.
Nil
D.2.04
(viii)
To sanction repairs of
crane related tools &
plants.
Deleted
D.2.04
(ix)
To sanction repairs/
maintenance/ overhauling
of tower wagons or any of
its assemblies
Deleted
x(a)
Sanction of expenditure
and entering into contract
for annual service
maintenance contract for
office machinery
equipments M&P
appliances.
F(X)II
87/PW/ 12
dt. 20.9.89
& F(X)II
99/PW/3
dt. 20.10.99
& 1001 F-1
Full Powers upto 5
lakh in each case
CHODs only. Full
Power upto
2 lakh in each case of
CPDs/ SAGs in
independent charge of
Project.
Full Powers
upto
50000/-
in each
case.
Full Powers
upto
25000/- in
each case.
Nil Nil Finance concurrence is necessary.
(b)
To enter into contract for
AMC on single tender
basis from authorised
dealer for equipments.
F(X)II/99/
PW/3 dt.
20.10.99 &
F(X)II-
2004/PW/8
dt. 30.11.05
Full Powers upto 10
lakh per item per annum
to CHODs & CPDs
only.
Nil Nil Nil Nil Finance concurrence is necessary.
Page No.47
Item
No.
Nature of Power Authority Extent of Powers delegated to Remarks PHOD/CHOD/ CPD/SAG
in independent charge of
Project.
Other SAG Jr. Admn.
Grade. Sr. Scale Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
(c) Sanction for payment of interest free
advance for AMC for office
equipments.
F(X)II/99/
PW/3 dt.
20.10.99
& dt.
27.4.2000
Full Powers upto 2
lakh per item per annum
to CHODs only and up
to 1 lakh to CPDs/
SAGs in independent
charge of Project.
Nil Nil Nil Nil Finance concurrence is necessary.
Note :- 1. Indents for purchase of office machines whether on account of additional or replakhement should be plakhed on DGS&D through COS/Dy. COS/Stores Officers of Projects.
2. Concurrence of FA&CAO is necessary to the purchase of accounting machine for departmental offices.
3. Prior finance concurrence is necessary for entering into service contract. (Service agreement shall be vetted by finance).
4. Bank Guarantee need not be insisted upon in case of payment of advance in AMC contract for equipments up to 20,000/- per annum in case of OEM/authorised agent only. Advance
exceeding 20,000/- per annum shall however be invariably covered by Bank Guarantee for equivalent amount.
5. Indemnity bond invariably be taken particularly where equipment is taken out from Railway premises for repair/maintenance.
6. Since AMCs are in the nature of service contracts and OEM/authorised dealers are often reluctant to submit earnest money or Security Deposits, this need not be insisted upon in such cases
are may however be taken to enter into such contracts only with reputed dealers so as to ensure satisfactory performance of the firm and minimum downtime of the equipment.
D.2.04
(xi)
To sanction expenditure towards
diagnostic charges for repairs & repair
of machine like rail cranes, tower
wagons, UTV, MEMV etc. including
purchase of spares incidental to
repairs.
Bd's letter
No.2011/F
(X)/II/5/11
dt.15.6.16
Full
Powers
Nil Full Powers
upto 1 Lakh
in each case.
Nil Nil 1) Prior finance concurrence is necessary
beyond 10,000/-
2) In case where these activities are proposed
to be done through OEM/authorized dealer
on single tender basis only PHOD/
CHOD/CPD in SAG can exercise these
powers.
3) In case of single tender the Tender
Committee and Accepting Authority should
be one step higher than in case of open
tender except where General Manager is the
Accepting Authority.
4) In case where these activities are proposed
to be done through OEM/authorized dealer
on single tender basis the certificate that the
nature of repair is such that it cannot be got
done satisfactorily/economically other than
OEM/authorized dealer should be given by
officer not below JAG
Page No.48
SCHEDULE – D - 3.
GENERAL SANCTIONS
Item
No.
Nature of Power Authority Extent of Powers delegated to Remarks PHOD/CHOD/CPD/
SAG in independent
charge of Project.
Other
SAG
Jr. Admn.
Grade.
Sr.
Scale
Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
D.3.0 GENERAL SANCTIONS :-
D.3.01 To grant diet charges to persons requiring assistance from
the Rly. in emergent cases which involve living under
difficulties as regards necessities of life.
Item 50(c) of
Annex.II
Chap.VF-I
Full
Powers.
Full
Powers.
Full
Powers up to
500/- per case.
Same as
in Col.6.
Nil -
D.3.02 To authorize expenditure for accident and emergencies to
restore or safe guard communications without allotment
of funds (subject to immediate report being submitted to
the Hd. Qrs. Office) and its prompt regularization by
obtaining sanction of competent authority to estimates and
allotment.
Para
1103E
Full
Powers.
Full
Powers. Full Powers. Nil Nil -
D.3.03 To sanction expenditure upto Rs.2000/- in any single case for
supplying food to labourers temporarily employed on breaches
and other accidents.
- Full
Powers.
Full
Powers.
Full Powers
up to
1000/-.
Nil Nil -
D.3.04 To sanction payment of rents, rates, taxes of buildings, occupied
as offices and installations and residence of officers and
subordinates under their control.
- Full
Powers.
Full
Powers.
Nil Nil Nil To be exercised by
Civil Engg. Officers
and CPDs.
Page No.49
Item
No.
Nature of Power Authority Extent of Powers delegated to Remarks PHOD/CHOD/
CPD/SAG in
independent charge
of Project.
Other
SAG
Jr. Admn.
Grade.
Sr. Scale Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
D.3.05 To issue plant from Engg. Plant Reserve
to works and to transfer plant released
from work direct from one work to
another in R.E. except Road vehicle.
Para 1905 &
1921-S.
Full Powers
including issue of
plant from Engg.
Plant Reserve on
loan to other
Rly./Govt. Deptt. or
private firm.
Full Powers
for issue of
plant from
the Engg.
Plant
reserve.
Full Powers for
issue of plant from
the Engg. Plant
reserve.
Nil Nil -
D.3.06 Payment on behalf of the Rlys. for
Registration fees and fees for licences or
renewals of licences as prescribed under
the Factory Act/ Contract Labour Act.
- Full
Powers.
Full
Powers.
Full
Powers.
Full Powers. Full Powers to
Asstt. Officers
holding in-
dependent
charge.
-
D.3.07 Payment of service charges/taxes to local
bodies like Octroi, Toll Tax etc.
- Full powers Same as in
Col.4
Same as
in Col.4
Same as
in Col.4
Nil
Local Purchase :
D.3.08
(i) Purchase of non- stock items upto
10,000/- per item but not exceeding
1,00,000/- in the aggregate per month for
Deptts. of CORE and project.
Bd's L. No.
2008/RS
(G)/779/97
dt6.2.09 &
Adv. Correction
Slip No. 32 of
para 711-A of
Stores Code.
Full
Powers.
Full Powers. Full Powers up to
5000/- per item
but not exceeding
50000/- in
aggregate p.m.
Full Powers
up to
2000/- per
item but not
exceeding
20000/- in
aggregate p.m.
Asstt. Officers
holding
independent
charge. Full
Powers up to
1000/- per item
but not exceeding
4,000/- in
aggregate p.m.
Definition of Non-
stock item
CPDs of the project
can decide in Adv.
Regarding stock and
non-stock item.
Note : 1. For items costing more than 500/-, quotations from more than one firm shall be obtained.
2. No non-stock article for which a standard pattern exists should be purchased, if it could be manufactured by the Railway.
3. Local purchases should invariably be done through Super Bazar to the extent stocks are available there. In such cases a single quotation upto 2,000/- per item can be
accepted.
4. In case of the proprietary items the above powers can be exercised on single offer with the finance concurrence in each case.
Page No.50
Item
No.
Nature of Power Authority Extent of Powers delegated to Remarks PHOD/CHOD/CPD/
SAG in independent
charge of Project.
Other
SAG
Jr. Admn.
Grade.
Sr. Scale Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
(ii)
In case of emergency purchase of
stock items (if not available from
stores stock) upto 5,000/- per item
but not exceeding 50,000/- in
aggregate per month for Deptts. of
CORE and projects.
- Full
Powers.
Full
Powers.
Full Powers. Full Powers up
to
3000/- per
item but not
exceeding
30,000/- in
aggregate p.m.
Asstt. Officers
holding indepe-ndent
charge. Full Powers
up to 1000/- per
item but not
exceeding
4,000/- in
aggregate p.m.
Prior Finance
concurrence is
necessary.
(iii)
To sanction purchase of
Periodicals/technical/non technical
books in connection with official
works (both Govt. and Non Govt.
publications).
GM/RE &
Para 1001- FI.
Full powers upto
10,000/- in a financial
year.
Full powers
upto
7,000/- in
a financial
year.
Full powers upto
5,000/- in a
financial year.
Nil Nil
Note: 1) The requirement of periodicals related to computers and Engg. Design is reviewed in a year by HOD personally.
2) The list of books to be purchased is scrutinized by HOD personally in reference to the utility and relevance to Rly. working.
3) Powers is not to be re-delegated to subordinate officers.
4) In addition to the above, any officer who look after the works of CPO/CORE will exercise the powers up to 10,000/- in a financial year for purchase of Law Books/Journals.
(iv) Purchase of stationery stores
including rubber stamps and office
seals etc. urgently required.
Para I 1109-S Full powers upto
500/- per item subject
to a maxi-mum of
5,000/- per year.
Same as in
Col.4.
Full powers upto
250/- per item
subject to a
maxi-mum of
5,000/- per year.
Full powers upto
Rs.20/- per item
subject to a
maxi-mum of
100/- per year.
Nil -
Note:- The exercise of above powers will be subject to the following conditions :-
a) Local purchases should be so regulated that the overall procurement of stationery stores including those received through the Govt. of India Stationery/Regional Stationery Depot does
not exceed the total requirement of the indenter calculated on the basis of Quantity/Scale prescribed by the Chief Controller of Printing & Stationery for the consumption of different
items of Stationery by various categories of staff.
b) These delegation do not extend to the purchase of paper for printing purpose except with the prior concurrence of Chief Controller of Printing & Stationery.
c) A register showing details of such purchases should be maintained and copies of all sanctions should be sent to the concerned Accounts Officers to enable him to keep a watch over the
ceiling limit.
Page No.51
Item
No.
Nature of Power Authority Extent of Powers delegated to Remarks PHOD/CHOD/CPD/
SAG in independent charge
of Project.
Other
SAG
Jr. Admn.
Grade.
Sr.
Scale
Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
D.3.09 To sanction printing and
binding work from outside
press/agencies:
Para 1030 FI
a) Items generally supplied
by Rly. Printing Press e.g.
registers, forms etc.
Full powers up to
10,000/- in each case.
Same as
in Col.4.
Full powers up to
5000/- in each
case.
Nil Nil Prior finance concurrence is
necessary.
b) Tender papers, reports,
brochures, safety bulletin
etc. not printed in Rly.
Printing Press.
- Full powers up to
50,000/- in each case.
Same as
in Col.4.
Full powers up to
25000/- in
each case.
Nil Nil Prior finance concurrence is
necessary for cases beyond
10,000/- in each case. Sanction for
individual cases above 50,000/-
would be given by SDGM only.
D.3.10 Maintenance of Records:
To approve destruction of
time expired records.
- Full Powers Same as in
Col.4.
Same as in Col.4. Same as
in Col.4.
Nil
Note :- 1. A list showing the periods after which the records may be destroyed shall be drawn and got approved by G.M.
2. The conditions prescribed in appendix-IXth of Finance Code Vol.I will be observed.
Ceremonial Occasions :
D.3.11 To sanction expenditure on
ceremonial occasions.
Bd's letter No.F(X)II-
2004-Exp/6 dt.9.5.05 &
F(X)II-2013/PW/2 dt.
23.1.13 and 21.6.13. Item
29(a) of Appendix-II of
Chapter F-I
Full Powers upto
2,000/- for CPD/SAG in
independent charge of
project only on each
occasion subject to annual
ceiling limit of
10,000/- and
25,000/- on each
occasion SDGM only in
CORE.
Nil Nil Nil Nil -
Page No.52
Item
No.
Nature of Power Authority Extent of Powers delegated to Remarks
PHOD/CHOD/CPD
Other SAG SG/JAG. Sr. Scale Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
D.3.12
Special Contingencies :
Serving of light refreshment
on official occasion and to
sanction working lunches.
Rly. Bd.'s L/No.F(x)II-
95/exp./1 dt.9.9.97,&
F(x)II 004/Exp/4
dt.18.1.06, 4/6/07,
13.9.12 & 11.9.15
Full Powers up to
1,500/- on any one
occasion subject to
overall limit of
15,000/- per year for
light refreshment and
35,000/- for working
lunch totaling to
50,000/- per year.
Full Powers up to
1,200/- on any
one occasion
subject to overall
limit of
12,000/- per year
for light
refreshment only.
Full Powers up to
900/- on any
one occasion
subject to overall
limit of 9,000/-
per year for light
refreshment only.
Full Powers up to
300/- on any
one occasion
subject to overall
limit of 3,000/-
per year for light
refreshment only.
Full Powers up to
200/- on any
one occasion
subject to overall
limit of 2,000/-
per year for light
refreshment only.
-
Note: 1) For light refreshment and working lunch sanction for 36,000/- per year would be given by Sr. Scale officer of RE/TKJ subject to limit of 5,000/- on each occasion for
working lunch.
2) The ceiling limit per meeting shall be 30/- per head, for light refreshment and 175/- per head for working lunch as per Railway Board's letter No. F(X)II-2004/EXP/4 dated
22.6.2016.
3) Actual incurrence of expenditure may be consistent with austerity standards and the numbers of such meetings should also be kept to the bare minimum as instructed vide Railway
Board's letter Nol. F(X)II-2004/EXP/4 dated 18.1.2006.
4) A register of Expenditure on refreshment and working lunch should be maintained, showing the amount spent and available, to watch the ceiling limit fixed. The register has to be
necessary sent to bill passing authority alongwith the bill at the time of internal check of bill for payment by each Deptt. in HQ Projects & RE/TKJ on each occasions.
5) For expenditure beyond above limit sanction of SDGM on behalf of General Manager with prior finance concurrence will be required.
i) To sanction expenditure up to
40,000/- per year in connection with
entertainment of distinguished official or
non official personages, representative of
foreign technical associates/ experts,
representatives of Trade & Industry
including overseas companies.
Bd's L/ No.
F(X)II/94/ PW/3
dt.31.5.96,
27.6.2000 &
2007/PW/4
dt.21.9.07
Full Power SDGM
only.
Nil Nil Nil Nil For Luncheon parties & Dinner
personal approval of GM is
required.
ii) To sanction hiring of lighting equipment,
furniture and camp equipments etc. to
meet emergent need and payment of hire
charges.
- Full
Powers.
Full
Powers.
Full Powers. Nil Nil -
Page No.53
Item
No.
Nature of Power Authority Extent of Powers delegated to Remarks PHOD/CHOD/CPD/
SAG in independent
charge of Project.
Other
SAG
Jr. Admn.
Grade.
Sr. Scale Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
D.3.13 To sanction charges for analysis and/or testing
of samples in Govt. laboratories. Para 759-S Full
Powers.
Full
Powers.
Full Powers. Full Powers. Nil
D.3.14 Electrical & Telegraph Crossing etc.
a) To enter into contracts and to execute and
review them for the crossing of Rly. land and
track in connection with doubling restoration and new lines etc.
- Full
Powers.
Full
Powers.
Full Powers. Nil Nil
b) To accept estimates and arrange advances of
payments in connection with the shifting of line crossings, Rly. land and tracks in
connection with execution of Railway work.
- Full Powers to accept
estimates & advances
within his power of
sanction upto
25,000/- without finance
concurrence.
Beyond 25,000/- with
finance concurrence.
Same as in
Col.4.
Same as in
Col.4.
Nil Nil -
D.3.15 Hiring of Machine and Equipment like road
cranes, heavy duty trailers, Road Rollers etc. for field works.
- Full
Powers.
Nil Nil Nil Nil Prior finance concurrence is
necessary beyond
10000/-.
D.3.16 Purchase of Motor Vehicles for which
provision has been made in the estimate
sanctioned by the higher authority.
Item 17
Annex-II.
Chap. V FI.
Nil Nil Nil Nil Nil All purchases should have
personal prior approval of GM
(including purchases for handing
over to open line against newly
created assets by RE).
D.3.17 To sanction exp. on ambulance/transport of
injured employees/ passengers involved in
accidents.
- Full
Powers.
Full
Powers.
Full Powers up to
1000/- in
individual case.
Full Powers up
to
500/- in
individual
case.
Full
Powers
upto
200/- on
each
occasion.
Page No.54
Item No. Nature of Power Authority Extent of Powers delegated to Remarks PHOD/CHOD/
CPD/SAG in
independent charge
of Project.
Other SAG Jr.
Admn.
Grade.
Sr.
Scal
e
Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
D.3.18 To sanction payment of TA to a person not in
Govt. service when called upon to attend
Commission of Enquiry, Conferences, meetings
of committees Departmental enquiry or perform
any other public duty in honorary capacity
including tendering evidence for the Rly. in
Court of Law.
- Full
Powers.
Full Powers. Nil Nil Nil According to rates prescribed by
Rly. Board.
D.3.19 To sanction payment of TA to Public witnesses
attending departmental enquiries in vigilance
cases.
- Full Powers up to
100/- per day
according to status
of person.
Same as in Col.4. Nil Nil Nil Subject to observance of extant
instructions of Rly. Board.
D.3.20 To approve hiring out of Plant to non-Rly.
parties in the interest of Public Service.
1923-S Full
Powers.
Full
Powers.
Full
Powers.
Nil Nil Rate of hire charges will be fixed in
advance in consultation with finance
and agreements in approved form shall
be executed with the parties.
D.3.21
(a)
To surrender/sanction installation of DOT land
lines telephones at offices/residences of JAG
and above officers, Traction substations and
Remote control centre (SCADA) and payment
of all charges connected with its installation.
Bd's L.No. 87/W-
3/Tele/TN/23
dt.6.8.99
Full Powers.
(CSTE/ CORE in
HQ & CPD in
Project.
Nil Nil Nil Nil i) For other officers and offices, DOT
land line telephone may be provided
with the concurrence of FA&CAO/
CORE and sanction of GM/RE.
ii) For SCADA/TSS/JAG and above
officer, an information to be given to
HQ (CSTE) after sanction and
installation within a month.
(b) Provision of Casual/Temporary P&T telephones
for the use of V.I.Ps., high officials or till
regular telephones connections are provided in
project offices.
Para
1040 F-I
Full Powers.
(CSTE/ CORE
only)
Nil Nil Nil Nil Prior finance concurrence is necessary.
(c) To sanction payment to DOT for protective works :-
(i) For local protective works (Executed by
territorial divisions of DOT).
GM/RE Full Powers Full Powers up to
50 lakh to CSTE
posted in Project.
Nil Nil Nil Prior finance concurrence is necessary.
Note: To be exercised subject to verification of the estimate by the officer incharge of Telecom works in the project with reference to existing agreement between Rly./RE & DOT for such
works.
(ii) Long distance trunk circuits (Works executed
by RE Project circle of DOT).
GM/RE Full Powers Nil Nil Nil Nil Prior finance concurrence is necessary.
Note: Subject to verification of the estimate by project S&T Officer in charge of Telecom Works with reference to existing agreement between Rly./RE & DOT for such works.
(iii)
New para
Advance payment for survey charges for
assessment of protective works required (Joint
Survey by officials of Railway and DOT)
- Full Powers Nil Nil Nil Nil Prior finance concurrence is
necessary.
Page No.55
Item No. Nature of Power Authority Extent of Powers delegated to Remarks PHOD/CHOD/
CPD/SAG in
independent charge
of Project.
Other SAG Jr. Admn.
Grade.
Sr.
Scale
Jr.
Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
D.3.22 Payment of Service connection charges
for availing supply from State Electricity
Board's and other power supply authority
(All related activities)
- Full
Powers.
Full Powers for
officers of Elect.
Deptt. only.
Nil Nil Nil i) For Traction sub Station, office
building and residential
accommodation in projects, CORE etc.
ii) Concurrence of associate Finance is
required for each case for Traction Sub-
Station
Note : In case where the proposed payment is in excess of provision in sanctioned estimate, steps may be taken immediately to regularize the excess under advise to CORE/HQRs.
CAO/CORE may issue suitable guidelines to Project authorities for efficacy and scrutiny of the proposal.
Proposal may be strictly scrutinized as per the provisions made in the sanctioned detailed estimate and introduction/ modification of sub work attracting the provisions of MM may be dealt
accordingly.
D.3.22 (a) -DELETED-
D.3.23 Funeral expenses of indigent employees
who die in Rly. hospital.
Bd's L/No.
E(W)2004/W
E-6/9
dt.4.12.09
Full powers up to
8000/- in each
case.
Full powers upto
5,000/- in each
case.
Full powers
upto
2000/- in
each case.
Nil Nil Subject to amount being recovered
from the settlement dues of the
deceased.
D.3.24
i)
To sanction condemnation of Machines,
Tools & Plants on age cum condition
basis, other than office equipment
1147-I of
Stores Code
Full Powers. Nil Nil Nil Nil
ii) For office equipment -do- Full Powers Nil Nil Nil Nil
D.3.25 To approve participation in exhibition and
sanction of expenditure in connection with
the same.
RB L/No.
90/FF/8/
Policy
dt.29.1.90
Full Powers
SDGM only up to
1 lakh in each
case.
Nil Full powers up
to
50,000/- in
each case
(DGM only)
Nil Nil i) Prior finance concurrence would
be necessary in each case.
ii) The overall expenditure would
be kept within the ceiling of 5
lakh p.a.
Page No.56
tem No. Nature of Power Authority Extent of Powers delegated to Remarks PHOD/CHOD/ CPD/SAG
in independent charge of
Project.
Other
SAG
Jr.
Admn.
Grade.
Sr.
Scale
Jr. Scale
1. 2. 3. 4. 5. 6. 7. 8. 9.
D.3.26 Hiring of passenger
road vehicle for
specific occasions.
RB's No.F
(X)II/86/PW-6
dt.5.5.87, F(X)II-
2006/PW/11
dt.15.5.07 &
28.5.08,
E(G)/2000/AL4/ 13
dt.01.5.06 &
E(G)/2007/AL4/6
dt.8.8.07
Full Powers to
PHOD/CHOD for
CORE and
CPD/SAG in
independent charge
for projects.
Nil Nil Nil Nil 1. CPD/SAG in independent charge in project can hire
vehicles only for officers of SAG and above grade of
Rly. Board, CORE, RE projects and for organizing
CRS inspection.
2. For project officials up to JAG/SG, sanction for hiring
of road vehicles would be given by CPD for 15 days
in a month and after that by respective PHOD/CHOD.
(Note : However officers already having vehicle cannot
be provided additional vehicle on temporary
basis)
3. The type of vehicle should be as per guidelines issued
from Railway Board from time to time.
4. The vehicle should be hired only if it is not possible to
manage from the existing hired/Govt. vehicle at that
location/ station and it is not economical to bring RE
vehicle based at other near by stations.
5. Monthly statement on the vehicle hired during the
period should be sent to 'General Branch'
D.3.26(i)
New Para
Hiring of passenger road
vehicle for filed
Supervisor in each
groups
GM/CORE For Powers to hire one
road vehicle in each
group.
Nil Nil Nil Nil Prior Associate Finance concurrence is necessary.
Note : 1) Ìããֶ㠽ã쌾㠹ããäÀ¾ããñ•ã¶ãã ãä¶ãªñÍã‡ãŠãò ‡ãñŠ ãä¶ã¾ãâ¨ã¥ã ½ãò ÀÖñØããè ý
2) ÊããùØã ºãì‡ãŠ properly maintain ãä‡ãŠ¾ãã •ãã¾ã ý
3) Running in KM ‡ãŠãè ½ãããäÔã‡ãŠ Ceiling 3000 KM ÀÖ¶ããè Öõý Up side variation Unified Term & Condition for operation of hired vehicle ‡ãñŠ Íã¦ããô ‡ãñŠ ‚ã¶ãìÔããÀ ÀÖ¶ãã Öõ ý
D.3.27 To the incurrence of
expenditure for Printing
of Visiting Cards
(inclusive of Card) to
the officers.
GM/RE Full Powers. Upto
300/- p.a. for each JAG
officer & above at HQ
(CORE).
Upto 300/- p.a. for
each branch officer (not
below Sr. Scale in
project.)
Nil Nil Nil Nil -
Note :- i) (Facility to Sr. Scale can only be extended in the project where in a particular branch JAG Officers is not available).
ii) After obtaining sanction of the appropriate authority, the cards may be printed by the officer from non-Railway printing press and the amount reimbursed upto the monetary limits
prescribed after submission of vouchers. It should be treated as contingent exp. for which necessary budget provision should be made/should exist.
Page No.57
SCHEDULE – D.4.
SALES & DISPOSAL
Item
No.
Nature of Power Authority PHOD/CHOD/CPD/
SAG in independent
charge of Project.
Other SAG Jr. Admn Grade Sr.
Scale
Jr.
Scale
Remarks
1. 2. 3. 4. 5. 6. 7. 8. 9.
Sales of Railway Assets :
D.4.01 i) To sale of any Rly. Assets
except portion of Railway
lines costing up to Rs.3
lakh.
Revised Para 94B-
E & Item No.41(c)
of Annex.II
Chap. V F-I.
Full powers up to
50,000/-.
Full powers up
to
35,000/-.
Full powers up to
25,000/-.
Nil Nil These powers are to be
exercised by the
officers of Civil Engg.
Deptt. only. However,
Head of the Projects –
SAGs/ CPDs can
exercised these powers.
ii) To sanction sale of
Cinder. Sarkanda grass,
Ordinary grass and Trees
to outsiders.
Full Powers. Full Powers. Full Powers. Nil Nil -do-
Page No.58
SCHEDULE – D.5.
Public Relations
Item
No.
Nature of Power Authority Extent of Powers delegated to Remarks
Head Quarters office Project office
CPRO Sr. PRO PRO CPD/SAG in
independent
charge of project.
JAG
officers
looking
after PR
works
1. 2. 3. 4. 5. 6. 7. 8. 9.
D.5.01 a) Plakhing of Advertisement in
newspapers and periodicals in
accordance with DAVP rates
(i) For release of classified
advertisement without finance
concurrence.
(ii) For release of display
advertisement with finance
concurrence.
2006/PR/5/63
dt.30.5.07
Full powers
Full powers upto
50,000/- per
item.
Full powers
upto
20,000/- per
item.
Nil
Nil
Nil
Full powers
Full powers upto
50,000/- per
item
Nil
Nil
Finance concurrence needed
if expenditure in a case
exceeds 5 lakh.
-
D.5.02 Purchase/Printing of Brochure,
Pamphlets poster, folders, handouts,
visiting cards etc.
Purchase and Printing of blank
invitation cards, envelopes, plastic
folders etc.
4.15 of manual Full powers upto
10,000/- per
occasion.
Nil Nil Full powers upto
5000/-
Nil Finance concurrence is
necessary beyond
10,000/-
D.5.03 (a) On entertaining perspective clients
for sales promotion and
commercial publicity, public
relations.
Bd's letter
No.2003/PR/4/11
dt.18.8.03 &
2007/PR/4/5
dt.13.7.07
For hospitality –
250/- per meal
per head or
500/- per head per
day.
Nil Nil Nil Nil -
(b) Press tours & reception Bd's letter
No.2003/PR/4/11
dt.18.8.03 &
2007/PR/4/5
dt.13.7.07
500/- meal per
head per day.
Nil Nil Nil Nil
Page No.59
Item No. Nature of Power Authority Extent of Powers delegated to Remarks
Head Quarters office Project office
CPRO Sr. PRO PRO CPD/SAG in
independent charge
of project.
JAG officers
looking after
PR works
1. 2. 3. 4. 5. 6. 7. 8. 9.
Note: 1. The expenditure can be incurred by the CPRO with administrative approval of GM.
2. If the expenditure on one occasion does not exceed 25000/- it can be incurred by the CPRO with administrative approval of GM.
3. The expenditure beyond 25,000/- on any occasion would require finance concurrence.
4. The instructions contained in Board's letter No.89/PR/4/9 dt.24.4.89 should be followed.
5. Annual ceiling limit for hospitality for press & other persons will be 50,000/-. Also CPRO is authorized to maintain a cash imprest of 4000/- for the purpose.
D.5.04 Direct purchase of photo goods, Audio &
Video cassettes and accessories of video
equipments, periodicals, CDs/VCD/DVD
including small accessories like albums
corners frames, etc.
- Full powers upto
10000/-
Full powers
upto
2000/-
Full
powers
upto
1500/-
Full powers upto
5000/-
Nil Finance concurrence necessary
if expenditure exceeds 5000/-
in a case, subject to ceiling limit of
20000/- per annum.
D.5.05 Repairs of still photographic
equipments/video equipments.
- Full Powers upto
3,000/-
Nil Nil Full powers upto
3000/-
Nil Without finance concurrence
D.5.06 Still photography coverage/VHS Video
coverage for official purpose through a
private agency.
GM/RE Full Powers upto
10000/- per
occasion without
Finance
concurrence
subject to annual
ceiling limit 1
Lakh.
Nil Nil Full powers upto
5000/- on each
occasion without
finance concurrence.
Subject to annual
ceiling limit of
50000/- each project.
Nil (i) Finance concurrence is necessary beyond
5000/- per occasion for project.
(ii) Video coverage requirements of extra
project offices located within the project will
also be dealt under this item.
D.5.07 Purchase of Momentos. - Full powers upto
15,000/- in
each case
Nil Nil Nil Nil Without finance concurrence. Annual ceiling
limit is 50,000/-
D.5.08 Preparation of suitable Art design matters/blocks/ case art pulls, etc. for release to
news papers and periodicals and for use in
(i) Poster leaflets folder handout etc. (ii) Hoarding
(iii) Neon signs
(iv) Cinema Slides (v) Time Table, advertisements date cards
Manual for
PR Deptt.
2007 issued
from PR
Directorate
Sept.'07
Full Powers. Nil Nil Full powers Nil Subject to finance concurrence if exp. Per
case exceed 20000/- Annual ceiling limit
is 50,000/-
Page No.60
SCHEDULE – D-6
IT RELATED MATTERS
Item
No.
Nature of Power Authority Extent of Powers Delegated to Remarks
PHOD/CHOD/CPD/ SAG
in independent charge of
Project
SAG Jr. Admn.
Grade
Sr.
Scale
Jr.
Scale
1. 2. 3. 4. 5 6 7 8 9 D.6.01 (a) Sanction for procurement of
PCs on additional account
Bd’s LNo. 2006/C&IS/
Oth/delegation of
powers/36 dt. 10.12.08
& 11.9.12
10 Nos. per financial year for
PHODs/CHODs/
CPDs/SAG in independent
charge of project.
Nil Nil Nil Nil Finance concurrence is necessary.
(b) Sanction for procurement of
PC’s on replakhement account
after completing their codal
life.
Bd’s letter No.
2006/C&IS/Oth/
delegation of powers/36
dtd. 10.12.2008
Full powers Nil Nil Nil Nil For codal life refer Bd’s letter no. 2002/ AC-
II/1/10 dated 24.05.2006 (ACS F-I no.62) as
amended from time to time should be on the
recommendation of condemnation committee
consisting of one finance member.
Note: 1. All procurements to be done preferably on DGS&D rate contract and by local stores officer OR officer nominated to look after stores function.
2. PCs to be procured subject to the ceiling limit of 40,000/- ( Forty thousand only) for CPU and TFT monitor etc. Use of thin clients may be encouraged as they are cheaper and also easy
to maintain. It was suggested to use "Open Office" etc. a free software for official use vide Bd's letter No. 2006/C&IS/OTH/Laptop/14 dt.26.5.08. 3. The technical officer nominated shall ensure that necessary technical standards/guidelines as and when issued by C&IS Dte are always adhered to and that the plant holders maintain full
record of the systems and their components within their jurisdiction.
4. While procuring equipment it should be ensured that as far as possible IT equipment is purchased with minimum three years warranty so as to take life cycle cost into account.
5. As per Rly. Bd's Letter No.2006/C&IS/OTH/LAPTOP dated 20/09/06, LAPTOP in lieu of desktop has been permitted to officers in JAG & above. LAPTOP specs. shall be technically
certified centrally by DGM/IT/CORE/ALD only.
6. Practice of providing every PC with a separate printer may be discouraged and Duplex Laser Printers may preferably be provided on the network which may be shared by
a number of users, especially amongst the non-gazetted users or where confidentially is not an issue.
7. Procurement to be done as per norms for standard non stock items circulated by Railway Board (Stores dte) from time to time.
8. Technical clearance to be taken from DGM/IT in HQ and Dy. CSTE/nominated technical officer in project. 9. Peripherals (UPS, Printers, Scanners, LaserJet printers, card readers, Bluetooth dongles etc.) to be procured as per norms for standard non stock items circulated by Railway Board (Stores
dte) from time to time,
Page No.61
Item
No.
Nature of Power Authority Extent of Powers Delegated to Remarks
PHOD/CHOD/CPD/SAG in
independent charge of Project SAG Jr. Admn.
Grade
Sr.
Scale
Jr.
Scale
1. 2. 3. 4. 5 6 7 8 9
D.6.02 Sanction for procurement of
proprietary software's
Bd's letter No.2006/
C&IS/Oth/Laptop/14
dt.26.5.08 Bd’s letter No.
2006/C&IS/Oth/
delegation of powers/ 36
dtd. 10.12.08
Full powers. Nil Nil Nil Nil
Note : 1. The procurement shall be processed by DGM/IT in HQ and by Dy. CSTE/nominated technical officer in projects.
2. Separate copies of licensed software should only be procured for each PC alongwith licenses for Antivirus and firewalls as a standard non-stock requisition through Stores Deptt.
3. It was suggested to use "Open Office" etc. a free software for official use vide Bd's letter No. 2006/C&IS/OTH/Laptop/14 dt.26.5.08.
4. In case procurement of priced software is unavoidable then the same may be justified on the basis of functional requirements.
5. As has been reiterated vide Railway Board's letter No. 2006/C&IS/PRS/Audit/4/Pt.1 dt.16.4.08, no pirated software may be used.
6. Associate Finance concurrence to be obtained for proposals costing more than 10,000/-.
7. During procurement Stores Deptt. should follow the instructions related to purchase of Proprietary items issued vide Bd's letter No.2001/F(S)1/PW/7/2 dated 12.7.06 and
2007/RS(G)/779/1 dated 04.04.08 as modified from time to time.
D.6.03 Sanction for procurement of non-
stock consumables (viz. Storage
media (including Pen drives)/
Cartridges/toners/ Batteries etc.)
Bd's letter No.
2006/C&IS/Oth/
delegation of powers/36
dt. 10.12.08
Full powers Full powers
upto
7500/-
p.m.
Full powers
upto
5000/-
p.m.
Nil Nil -
Note: 1(a)
1(b)
As per Rule 145 of General Financial Rules 2005, purchase of goods upto the value of 15,000/- (Rupees Fifteen Thousand) only on each occasion may be made without inviting
quotations or bids on the basis of a certificate to be recorded by the competent authority in the following format. "I________________________, am personally satisfied that these
goods purchased are of the requisite quality and specification and have been purchased from a reliable supplier at a reasonable price."
Competent authority for above purpose shall be minimum JAG officer.
2. Beyond 15,000/- procurement shall be done as standard non-stock requisition through Stores Deptt.
D.6.04 Procurement of Local Area
Network Infra-structure.
Bd’s letter No. 2001/
C&IS/ Comp./ Policy
dt.7.12.2001 & Bd's letter
No. 2006/C&IS/Oth/
delegation of powers/36
dated 10/12/2008
Full powers PHODs/ CHODs
only, cost per case not to
exceed 10 lakh.
CPDs/SAG officers heading
independent establishment
cost per case not to exceed
5 lakh.
Nil Nil Nil Nil -
Note: 1. Prior concurrence of Associate Finance to be obtained in the usual manner.
2. Where Railnet connectivity is provided, efforts should be made to use the Railnet network.
3. It may be ensured that all PCs are connected to the Railnet unless for security reasons or otherwise they have to be kept away from
Railnet, for which specific approval of the GM/CPD may be taken.
4. Technical concurrence of DGM/IT to be obtained in HQ
Page No.62
Item
No.
Nature of Power Authority Extent of Powers Delegated to Remarks
PHOD/CHOD/
CPD /SAG in
independent charge
of Project
SAG Jr. Admn.
Grade
Sr.
Scale
Jr.
Scale
1. 2. 3. 4. 5 6 7 8 9
D.6.05 Annual Maintenance
Contracts (AMC) for
Hardware and Software
(Including CORE
Website)
Bd's letter No.
2006/C&IS/Oth
/delegation of powers/36
dt. 10/12/2008
Full powers
SDGM only in
HQ & CPDs in
projects
Nil Nil Nil Nil -
Note :- 1. AMC shall be processed by DGM/IT in CORE(HQ) & by Dy. CSTE/ nominated technical officer in projects.
2. Prior finance concurrence to be obtained.
3. Bank Guarantee need not be insisted upon in case of payment of advance in AMC contract for equipments up to 20,000/- per annum in case of OEM/authorised agent only.
Advance exceeding 20,000/- per annum shall however be invariably covered by Bank Guarantee for equivalent amount.
4. Indemnity bond invariably be taken particularly where equipment is taken out from Railway premises for repair/maintenance.
5. Since AMCs are in the nature of service contracts and OEM/authorised dealers are often reluctant to submit earnest money or Security Deposits, this need not be insisted upon in such
cases are may however be taken to enter into such contracts only with reputed dealers so as to ensure satisfactory performance of the firm and minimum downtime of the equipment.
D.6.06 Repair/servicing of PC,
Peripherals & other IT
equipments in absence of
AMC
1001 F1 Full powers to
PHOD/ CHOD
only in HQ and
CPDs in project.
Nil Nil Nil Nil (i)
(ii)
Prior finance concurrence to be obtained beyond
10000/- in each case.
Certificate regarding absence of AMC to be
given by DGM/IT in HQ and Dy. CSTE/
nominated technical officer in projects.
D.6.07 Buying of space on
commercial services for
hosting CORE Website.
- Full powers to
SDGM only.
Nil Nil Nil Nil -
D.6.08 Modification/Development
of Software applications
Chapter-X, F-1 Upto
50,000/- per
year.
Nil Nil Nil Nil (i)
(ii)
Prior finance concurrence to be obtained beyond
10000/- in each case.
Any other instructions issued from Rly. Board on
the subject to be complied.
D.6.09 Sanction for Broad-band
Internet connection for non
commercial usage in offices
where Railnet facility is not
available.
Bd’s letter No. 2001/
C&IS/Comp/Policy
dt.7.12. 01 and
2000/Tele/TW/ 1/
Railnet works
dt.24.1.06 &
2004/Tele/ TN/3
dt.13.10.06, 13.10.11
& 05.1.12
Full powers.
CPDs upto 6
(six connection)
only.
Nil Nil Nil Nil Note :
Lowest unlimited download plan of MTNL or BSNL for
broadband, available in the area may be subscribed to.
Registration/Activation charges, security deposit, CPE
(Modem) monthly charges, installation/ testing charges
etc. as applicable for commissioning the connectivity
from MTNL/ BSNL is also allowed.
Page No.63
Item
No.
Nature of Power Authority Extent of Powers Delegated to Remarks
PHOD/CHOD/CPD/ SAG
in independent charge of
Project
SAG Jr.
Admn.
Grade
Sr.
Scale
Jr.
Scale
1. 2. 3. 4. 5 6 7 8 9
D.6.10 Sanction for Broadband
internet connection at the
residence of JAG & above
officers if the facility of
internet through broadband
on Railway phone/ LAN is
not already available.
Bd’s letter No.
2004/Tele/TN/3
dt.13.10.06, 12.2.07 &
29.4.09 Bd's letter No.
2000/Tele/TW/1 Railnet
Works dt.04.12.08.
Full powers to
PHOD/CHOD and
CPDs in project.
Nil Nil Nil Nil
Note: 1. No additional DOT telephone shall be provided on this account.
2. Lowest unlimited download plan of MTNL or BSNL for broadband, available in the area may be subscribed to.
3. Officers may also opt for services of other service providers but the ceiling will be as per the lowest unlimited download plan of MTNL or BSNL available in that area. Nodal Deptt. for
provision of this facility – S&T Deptt.
4. Installation charges shall be as per note (ii) of SOP para D.6.09.
5. Any other officer who is not eligible as per the above may also opt for Broadband connection on his/her official phone subject to payment of all charges on this account by the officer
himself/herself.
6. Instead of taking broad band internet connection on land line phone, JAG & above officers provided with Laptop may take wireless broadband internet connection on their own. In such a case
the re-imbursement of the amount payable to the officer will be actual amount as billed by the service provider or the limit prescribed in Bd's letter No.2004/Tele/TN/3 dated 29.4.09 whichever
is less sanction for which shall be given by PHOD/CHOD & CPDs in project.
Note : Para D.6.01 to D.6.08 : For technical clearance, DGM/IT is nominated as the technical officer at CORE. In projects Dy. CSTE is nominated as
technical officer. If Dy. CSTE is not available in the project CPD may nominate any other JAG officer in his plakhe.
Page No.64
POWERS OF GENERAL MANAGERS OF INDIAN RAILWAYS.
In supersession of existing orders on the subject, the President is pleased to make the following rules specifying the areas in which the General Managers may not sanction
expenditure or deal with other matters without previous sanction of the higher authority. These rules will be applicable to General Managers of Zonal Railways and Production
Units as well as Director General, Research Design and Standards Organisation and General Managers (Construction) in so far as they relate to them.
Subject to the observance of these rules, the General Managers shall have powers to sanction expenditure and to delegate their powers to authorities subordinate to them
alongwith powers to re-delegate them to lower authorities.
Any delegation or re-delegation of powers by the General Managers to authorities subordinate to them should be made only in consultation with the Financial Adviser and
Chief Accounts Officers of the Railways and will be subject to the existing codal provision as well as other regulations/instructions issued by Railway Board from time to time. In
the event of a difference of opinion between the General Manager and Financial Adviser and Chief Accounts Officer, the matter should be referred to Railway Board for orders.
The exercise of the powers delegated shall be subject to existing Codal Provisions, Rules and Regulations as well as restrictions imposed from time to time by Railway
Board in the context of economy in expenditure or otherwise.
RULES
The previous sanction of the higher authority is necessary.
A - Gazetted Staff
1. To the creation and the abolition of a permanent post and to the alteration of the scale of pay of a service or a post.
2. To the keeping of a post sanctioned by the Railway Board unfilled for more than twelve months up to JA Grade provided that if the post has remained unfilled for more
than six months, its justification is established afresh with the concurrence of Financial Adviser and Chief Accounts Officer before operating the post.
3. To the creation of a temporary post except that posts may be created without higher sanction in Senior Scale/Class-II Services for a period not exceeding six months/twelve
months respectively in emergent situation with concurrence of Financial Adviser and Chief Accounts Officer and provided that the post will not be operated beyond six
months/twelve months.
4. (a) To the creation of work-charged posts above JA Grade against Construction/Survey/Scrap Sale/M&P estimates.
Note
: Temporary/Work-charged post/posts in JA Grade, Senior Scale, Junior Scale, Or Class II specifically provided for in a
Construction/Survey/M&P/Scrap sale Estimate or in any Urgency Certificate sanctioned by the General Manager or by the Railway Board may be
created/extended by the General Manager with prior concurrence of Financial Adviser and Chief Accounts Officer.
Authority : Board's letter No. F(X)II-2009/PW/9 dated 25.8.2010
(b) To the grant of provisional payment beyond 3 months to incumbents of such posts which are proposed to be extended beyond available sanction.
5. (a) To grant to a Railway Officer emoluments (whether as pay, honorarium or allowances of any sort) higher than that admissible under the Railway Rules or any
orders of the Government of India.
(b) To permit a Railway Officer to undertake work and/or receive fee (non-recurring or recurring) from private sources exceeding 5,000/- in each individual case.
Page No.65
(c) To permit Medical Officers including Chief Medical Officer to receive fees for professional attendance if they hold posts in which private practice is debarred
under orders of a higher authority.
(d) To grant to an officer above JA Grade a reward in excess of 5,000/- in each individual case.
.
Note: i)
ii)
iii)
The limit of group cash award will be 1,00,000/- in each individual case
While granting group cash award, the limit of individual reward should not be exceeded.
It group cash award is being awarded both for gazetted officers and non-gazetted staff simultaneously, total limit for both the categories clubbed
together will be 1,00,000/- only.
(Authority – Board's letter No. F(X)II-2016/PW/3 Pt.2 dt.16.12.2016)
(e) To the acceptance of honorarium by a Gazetted Railway servant in excess of 10,000/- in a year for undertaking work as arbitrator in a dispute in which the
Railway Administration is a party and in excess of 5,000/- in a year in all other types of cases, except cases of acceptance of honorarium for conducting Disciplinary
Enquiries against Railway Officers arising out of Vigilance/CBI cases where the limit shall be as per the rate fixed by Board by time to time.
(Authority Board's letter No.F(X)II-2008/PW/6 dt.25.4.2013)
Note i)
ii)
iii)
General Manager may grant to an Officer upto and including SA Grade in addition to his pay, special pay limited to 10% of the presumptive pay
of the additional post when he holds charge of another post in addition to his own, provided the additional charge is held for a period exceeding
45 days but not exceeding six months in the case of Officers up to and including JA Grade, and 3 months in case of Officers working in SA
Grade.
The aggregate of pay and additional pay shall not exceed 80,000/- per month.
The dual charge arrangement shall not be carried beyond six months in the case of JA Grade and three months in the case of SA Grade Officers
under any circumstances.
(Authority Board's letter No.F(X)II-94/PW/9 dt.29.12.1994, F(E)Spl.-98/FR/1/1/ dt.28.1.2000 &` F(E)Spl.2009/FR/1/3 dt.21.6.10)
6. To the write-off of –
(a) Advances.
(b) Amounts overdrawn by Officers, or otherwise due from them, which were discovered in audit within a year.
7. To the construction or purchase of a building for use as residence by and Officer or to hire a building for use as residence by an Officer or to hire a building for use as
residence by an Officer under conditions which fall outside the framework of the extant instructions in regard to the ceiling of rental, minimum period for the lease and
other conditions.
8. To the acceptance of resignation of an Administrative Grade Officer.
Note : The General Manager, while accepting resignations of the Officers upto Senior Scale level, will have the power to waive the prescribed notice
period in respect of Probationary Officers selected for IAS/IFS/IPS.
Page No.66
B - Non-Gazetted Staff.
9. To the grant of special pay or other additions to pay or to the grant of personal pay otherwise than in accordance with Rule 2003(23)(a)-RII and allowances other than
those admissible under Railway Fundamental or Supplementary Rules or any other orders of the Government of India.
10. (a) To the grant of honorarium in excess of 15,000/- in each individual case.
(b) To the grant of honorarium to the cashiers and other cash and pay office staff, in excess of 25% of their annual basic pay plus grade pay in a financial year.
Note i) Where the honorarium is recurring, the limit applies to the total amount paid in a financial year.
ii) These powers will be exercised with the concurrence of FA&CAO.
(Authority – Board's letter No. F(X)II-2013/PW/4 dt.25.7.2013)
(c) To grant of reward in excess of 5,000/- in each individual case
.
Note: i)
ii)
iii)
The limit of group cash award will be 1,00,000/- in each individual case.
While granting group cash award, the limit of individual reward should not be exceeded.
If group cash award is being awarded both for gazetted officers and non-gazetted staff simultaneously, total limit for both the categories clubbed
together will be 1,00,000/- only.
(Authority – Board's letter No. F(X)II-2016/PW/3 Pt.2 dt.16.12.2016)
(d) To the grant of reward in excess of 30,000/- in each individual case to Railway Employees who have done exemplary work to avert accident.
Note : The powers indicated in 10(d) above may be re-delegated to DRM's upto 7500/- in each case.
(Authority – Board's letter No.F(X)II/2014/PW/4 dt.05.2.2015)
C - General : Gazetted and Non-Gazetted Staff.
11. To the grant of advances otherwise than as authorised under general rules and orders.
12. To the grant of leave otherwise than as admissible under the rules.
13. To the deputation of a Railway servant out of India.
Note : DG/RDSO, however, will be guided by Board's extant orders on the subject.
14. To the ex-gratia payment of bonuses or rewards in excess of 50,000/- per case for inventions.
Note : GM may exercise these powers only in those cases where the employee secure the patent for such innovation and transfers the rights to Indian
Railways unconditionally and such innovation is considered useful for Indian Railways.
(Authority : Board's letter No. 2016/F(X)II/PW/3 Pt.3 dt.10.02.2017)
15. To the grant of rewards for detection and/or apprehension of offenders in a criminal case in excess of 5,000/- in each case.
Page No.67
16. To the reimbursement of legal expenses of a Railway servant.
(a) Who institutes a suit in a Court of Law without the prior approval of the Railway Administration; or
(b) If the suit emanates as a result of actions taken by the Railway servant other than the discharge of official duty.
(Authority : Board's letter No.F(X)II/2016/PW/3 dt.14.9.2016)
17. To the purchase of a motor-car, motor cycle, motor boat or any other vehicle.
Note : 1. The General Manager may hire vehicles within the Policy instructions issued by Board from time to time. These powers can be further
delegated to PHODs.
2. Before hiring of a vehicle is sanctioned, it should be certified that the demand cannot be met by transfer from one of the works on hand or
completed..
(Authority : Board's letter No.F(X)II/2016/PW/3 dt.14.9.16 & 04.5.2017)
18. To the payment of compensation in case of Railway accidents other than those awarded by Railway Claims Tribunal to the dependants of Railway employee killed or to
Railway employees injured in accidents caused by the working of trains or Railway engines provided that the death or injury was met with in the discharge of their duties
otherwise than due to their own negligence or willful action, in excess of a maximum of 24 months' emoluments of the Railway employee.
Note : 1. In the case of persons to whom the Workmen's Compensation Act applies, compensation shall be paid under this rule only if "the authority
competent to sanction compensation considers that more liberal treatment than that given by the Act is necessary. The compensation so paid
shall not, inclusive of the compensation payable under the Act, exceed the amount admissible under this rule.
2. The term 'emoluments' means monthly average of emoluments as defined in paragraph 2544-R/II (CSR 486) and in the case of running staff the
emoluments will include the pay element in running allowance viz. 30% of the average basic pay drawn during the last twelve months or
during the entire service if it is less than twelve months.
3. The above ceiling of 24 months emoluments would not be applicable wherever the compensation is paid strictly as per the statutory provisions
of the worksmen's Compensation Act.
(Authority : Board's letter No.F(X)II/2003/PW/II dt.18.11.04)
19. To the grant of compensation to a Railway employee for loss of private property except compensation in excess of 5,000/- in any individual case for loss suffered by an
employee in the course of a strike or Railway accident in the execution of Railway duty and from circumstances arising directly out of that duty.
20. To the sanction of ex-gratia payment in excess of 3,000/- to the dependant of a Railway employee in the event of his/her death arising out of injuries sustained in the
execution of his/her duty.
21. To the payment of medical charges otherwise than as authorised under general rules or orders.
22. To permit a railway servant below the rank of Junior Administrative Grade to travel by Air on duty.
Page No.68
Note A. Grant of permission by the General Manager to Junior Administrative Grade Officers to travel by Air on duty would be subject to the following
conditions:
1. These powers may be exercised only by General Managers and not by CAOs and are not to be re-delegated further. However the Chief
Administrative Officer, COFMOW/New Delhi, DCW/Patiala and MTP/Chennai may also exercised these powers with the personal
concurrence of FA&CAO
(Authority : Board's letter No. F(X)II/2003/PW/6 dt.04.4.2003)
2. These powers are to be exercised personally by the General Manager with the personal concurrence of FA&CAO.
3. Air travel will be permitted only in cases where the duration of the journey one-way is more than 12 hrs. by rail.
4. Each proposal regarding Air Travel would require to be justified on merits.
23. To the remission of recovery of rent from the incumbent of a post for which a quarter has been allotted.
Note : The General Manager may exempt the incumbent of a post from occupying the quarter allotted to the post and/or from paying rent thereof upto a
maximum period of four months in the following circumstances :
i) when an employee is temporarily transferred to a post in another station;
ii) when the quarter is subjected to extensive repairs, such as renewals of roofing, replakhement of flooring, or such other special works
necessitating the vacation of the whole quarter;
iii) when an employee is required to vacate the quarter under medical advice on account of an infectious disease or an epidemic.
24. To the waiver of the cost of training of a Railway employee who has received training at Railway's cost and who is required to serve the Railway for a minimum prescribed
period, in excess of the cost proportionate to the service rendered.
25. To the sanction of expenditure on deputation of Railway employees for training courses, seminars, symposia in non-railway Institutions in excess of 20 lakh in a year for
Zonal Railways and 8 lakh in a year for Production Units.
Note : (i) The overall registration fee, however, should be subject to a maximum of 25,000/- and pro-rata registration fee of 4000/- per day. For
arriving at this monetary limit the cost of TA & DA should not be taken into account.
(ii) The ceiling limits of above powers will be exclusive of service tax or any other taxes/charges.
(iii) DRMs may be delegated powers for nomination of non-Gazetted Railway employees for training in recognized institution of repute for
registration fee of 2,000/- per day ad overall registration fee upto 10,000/- per training course per employee subject to the budget grant
allotted by Zonal Railway to Division for this purpose.
(Authority : Board's letter No. 2017/F(X)II/PW/1/I dt.18.5.2017)
D - Payments to persons other than Railway employee.
26. To the refund of fare and freight, otherwise than in accordance with relevant Tariff Rules, in excess of 20,000/- in each case.
27. To the write-off of amounts due to the Railways, otherwise than when they are irrecoverable, in excess of 2 Lakh in each case.
Page No.69
Note : Items (26) and (27) do not apply to wharfage, demurrage, storage and lost property charges which may be written off or refunded by Railway
Administration without the sanction of higher authority.
(Authority : Board's letter No.F(X)II-2016/PW/3 dt.14.9.2016)
28. (a) To the grant of rewards in excess of 25000/- in each case.
(b) To the grant of rewards in excess of 50000/- in each case to the persons who have done exemplary work to avert accidents and saved passenger life.
Note : The powers indicated in item No.28 (b) above may be re-delegated to DRM's upto 10000/- in each case.
(Authority : Board's letter No.F(X)II-2016/PW/3 dt.14.9.2016)
29. (a) To the incurrence of expenditure on each ceremonial occasion in excess of lakh.
(b) To the incurrence of expenditure on important functions which are attended by:
i) Minister of Railways/Minister of State for Railways : in excess of 10 lakh in each case,
ii) President/Prime Minister: in excess of 15 lakh in each case.
Note : (i) The powers under item 29 will be exercised by the General Managers subject to an annual ceiling of 25 lakhs for Production Units and
50 lakhs for Zonal Railways.
(ii) The powers under item 29(a) will cover the expenditure on Railway week celebration also, the limit for which will be 2 lakh for a Zonal
Railway/Production Unit as a whole.
(Authority : Board's letters No.F(X)II-2016/PW/3 dated 14.9.2016)
30.(a) To the incurrence of expenditure in engaging/obtaining consultancy services from outside bodies in excess of 2 Crore. for PPP projects (other than property
development schemes) and 1 Cr. for other works in each case or in excess of 6 crore in a year.
(b) To the incurrence of expenditure in engaging/obtaining consultancy services connected with property development schemes, i.e. for commercial exploitation only, from
outside bodies in excess of 2.5 crore in each case or in excess of 12.5 Cr. in a year for Zonal Railways, Production Units and RDSO.
Note : i) It may be ensured that no contracts are awarded by the Railways for activities which can be carried out in-house.
ii) Details of consultancy Contracts awarded by each Zonal Railways for commercial exploitation should be endorsed to all other General
Managers for information to avoid duplication.
iii) The General Managers will evolve, in consultation with FA&CAO, a suitable mechanism to ensure that the limits laid down herein are not
exceeded under any circumstances.
iv) For consultancy contracts, the minimum level of tender committee shall be SAG.
v) All cases decided by the Zonal Railways should be reported to Board through the PCDOs to CRB and FC, to enable assessment of the
exercise of these powers.
vi) The agency/consultant is renowned/Government approved and has sufficient experience in the relevant field.
Page No.70
vii) The powers delegated to the officers below the GM are as under:-
(a) CAO:- 50 lakh in each case with annual ceiling of 3 crore with concurrence of FA&CAO/FA&CAO(C). These powers of CAOs will
be in addition to and separate from the powers delegated to General Managers. Also, the level of Tender Committee shall be SAG.
(b) PHOD:- Upto 10 lakh in each case with annual ceiling of 20 lakh with concurrence of FA&CAO/FA&CAO(C)
(c) DRM:- Upto 5 lakh in each case with annual ceiling of 10 lakh. These powers will exercised by DRMs in consultation with associate
finance. In the tender committee JAG/SG level officers may be nominated. In cases where JAG/SG level officer are not available from
Finance side in the Division, DFM may be nominated as Finance member of the tender committee.
However, with reference to delegation as per (a), (b) & (c) above, if the consultancy contract is to be fixed only on a single tender basis
due to special circumstances, GM's personal approval would be required irrespective of the value of the contract.
(Authority : Board's letter No.F(X)II/2016/PW/3 dt.14.9.2016).
31. (a) To the filing or defending of an appeal in the Supreme Court.
(b) to the engagement of a Railway Counsel on scale of fees higher than that prescribed by Ministry of Law and Justice;
(c) to the engagement of counsel at more than 1,050/- per day in Supreme Court or in any of the High Courts or at more than 750/- per day elsewhere;
(d) To payment of fees in excess of scales of fees fixed by the High Courts concerned.
32. To the grant of allowances or fees to private persons or donations to private bodies including Railway Institutes, Hospitals and Schools, an excess of the scales or
maximum limits laid down by the Railway Board.
33. (a) To the payment of arbitration fees to private persons in excess of 25,000/- in each case.
Note : i) The circumstances under which such appointment of private persons has been made, should, however, be brought to the notice of the Board.
ii) This will not apply to payment of fees to arbitrators appointed by Court, for which full powers will be exercised by GMs.
(Authority : Board's letter No.F(X)II/2000/PW/2 dt.29.5.2000).
(b) To the payment of arbitration fees to retired Railway Officers in excess of 75,000/- per case.
(Authority : Board's letter No.F(X)II/2008/PW/6 dt.15.10.2009).
(c) To the payment of contribution/subscription to a medical institutions, if medical aid is rendered by such institution to Railway employees, in excess of 1,000/-
per annum.
(d) To the payment of contribution or subscription to a professional institution in excess of 10,000/- per annum in each case. These powers may be delegated to
DRMs also.
(Authority : Board's letter No. 2017/F(X)II/PW/1/I dt.18.5.2017).
Note : 1) The General Manager will have full powers for payment of fees to surveyors engaged for the assessment of the value of damaged
consignments.
2) In respect of any item for which no scale has been laid down in any of the extant orders, the Railway Administration shall have no powers.
Page No.71
34. To the payment of compensation in cases of Railway accidents, otherwise than as specified below :-
(A) Ordinary Passengers (including Government servants, other
than those specified in Category B below and their
dependents).
- Upto 4 lakh in any single case.
(Authority – Board's letter No.F(X)-2000/PW/2 dated 23.1.2001)
(B) Military men, being or travelling on military duty. - No powers. All cases to be submitted to the higher authority.
(C) Compensation to public (other than Railway passengers) for
injury to person or damage to property caused by accidents
as a result of negligence or carelessness on the part of
Railway.
- Upto 10,000/-.
(D) Claims decreed by a Court of Law. - Full powers to pay any Sum so decreed.
(E) Claims settled out of Court with advice of Law Officer of
Government.
- Upto 25,000/- in any single case.
35. To the payment of claims, otherwise than as specified below or claims for compensation other than those relating to goods lost or damaged and those arising out of
Railway accidents :-
(i) Claims settled out of court. - Upto 10,000/- in each case.
(ii) Claims decreed by a court of Law. - Full powers subject to the condition that particulars of cases involving expenditure of more than
25,000/- in each case should be reported to Railway Board for information.
Note : The powers under item 35(i) above should not be re-delegated to subordinate authorities.
36. Claims settled by arbitration award against
any dispute arising out of a contract.
- Full powers, subject to the conditions that the Railway Board should be informed of the details :-
(i) Where payment to a contractor as result of the arbitrator's award exceeded by more than 10 lakh of the
amount considered due by the Railway Administration before the arbitration proceedings began:
(ii) Where deficiencies in the General conditions of contract or flaw in procedures/practices noticed by
Railways/Pus during the course of arbitral proceedings/awards, regardless of value of award.
Note : The powers under item 36 above should not be re-delegated to authorities below the level of HODs.
(Authority : Board's letter No.F(X)II/2016/PW/3 dt.02.2.2017).
Page No.72
E - Expenditure on works not wholly chargeable to Ordinary Working Expenses.
37. To the inclusion in the Preliminary Works Programme of :-
(a) New Works under the Plan Heads New Lines, Gauge conversion, Railway Electrification, Metropolitan Transport Projects, Computerisation and setting up of
New Production Units; and
(b) Other New Works in excess of 5 Cr. each.
Sanction of Works :-
38. To the incurrence of expenditure on New Lines, Gauge Conversion, Railway Electrification works, Metropolitan Railway Projects, Computerization, setting up of new
Production Units, or Rolling Stock or Surveys not provided in the sanctioned budget for the year or carried forward from the sanctioned budget of the previous year.
39. To the incurrence of expenditure of other works not provided in the sanctioned budget or carried forward from the sanctioned budget of any previous year, except –
(a) Works/M&P under lumpsum provision:
All works costing less than 2.5 crore each with the following restrictions:
(i) Total lumpsum provision made in the Budget for such works is not exceeded.
(ii) Works in respect of existing Railway Schools. Hospitals, Dispensaries, Institutes, Officers Club, Rest Houses and Holiday Homes – not more than Rs.20 lakh in
each case.
(iii) Machinery and Plant – costing not more than 50 lakh each for GM/Open Line and Pus (including CAO in independent charge). General Managers may decide
to delegate these powers upto a maximum of 10 lakh to CWMS/DRMs subject to annual ceiling fixed by the Railway for the Workshop/Division.
(iv) Works under Computerization Planhead: Note: (a) Despite the provisions of Items No. 37 and 38 above, General Managers can sanction works upto 1crore per case in Planhead 17 under List of
Approved Works for replakhement of the overaged IT equipments for IT related works. While replakhing these assets, Railways will ensure that the
equipments procured conforms to the latest specifications issued by Railway Board. However, these powers shall be exercised with the personal
concurrence of FA&CAO and personal approval of General Manager.
(b) It is reiterated that powers for Software Development have not been delegated to Railways and proposals regarding them shall continue to be sent to
Railway Board for further processing and approval.
(c) Extension/Upgradation/Strengthening of LAN: GMs can sanction extension/upgradation/strengthening of LAN upto 20 lakh in each case.
Page No.73
(b) Out of Turn Works:
Works costing less than Rs.2.5 crore each subject to the following restrictions:
(i) The funds required for such works as provided in the sanctioned budget for works in these categories are not exceeded.
(ii) Budgetary ceiling will be 12 Cr. (other than lumpsum) in a financial year, of which not more than 5 Cr. could be on other than safety
related items with the proviso that all safety works should be completed within a maximum period of 8 months from the date of sanction.
(iii) While sanctioning out of turn works, the urgency of work and the throw forward of works under the planhead/source should be kept in view.
(iv) Restrictions given in para 39 (a) should be followed.
(v) Powers to sanction M&P items and works under computerization planhead can be exercised only as per provisions contained in para 39 (a).
(vi) For passenger Amenities Works, Emphasis should be on creation of amenities of durable and lasting nature and funds should not be frittered
away on provision of superficial items like furnishings and furniture, etc.
Note : DRMs may sanction works under the planhead 'Passengers and Other Users' Amenities upto 1 crore in each case under item 39.
(Authority : Board's letter No. 2016/F(X)II/PW/5 dt.07.12.2016).
40. (1) Sanction of Detailed Estimates/Revised Estimate:-
(a) To the sanction of detailed estimate/revised estimate for works over original sanctioned cost (abstract cost) due to reasons other than price escalations above 20% of
the original cost estimate.
Note : (i) GMs will have full powers to sanction excess due to price escalation.
(ii) While processing the revision in the cost of estimate, the reasons for delay/time overrun should be clearly recorded.
(iii) The change in scope of work shall be governed by powers for material modification given in item No.49.
(iv) CAO/Con in HAG may sanction Detailed/Revised Estimates in the cases where original cost of the work is not moiré than Rs.500 crore
subject to limits of variations, indicated in item No. 40(1)
(v) Personal approval may be obtained at the level of General Manager with the personal concurrence of FA&CAO/FA&CAO(C) in cases of
estimates where original cost of the work is above 500 Cr..
(vi) These are the overall variations on the original sanctioned cost as included in the Budget and can not be exceeded even if more than one
revised estimate is sanctioned.
(vii) This delegation will not effect rules in force regarding material modification.
(viii) For variations exceeding the above limits, approval of Board will be required. In such cases, proposals may be sent to Board with personal
concurrence of FA&CAO/ FA&CAO(C) and personal approval of General Manager along with a detailed variation statement and suitable
explanatory note.
(b) To the sanction of track renewal estimates where the excess is not within the General Manager's competence as prescribed in sub-item 40(1)(a).
(Authority : Board's letter No. 2016/F(X)II/10/17 dated 5.10.16 & F(X)II/2016/PW/3 Pt.3 dt.14.10.2016).
Page No.74
40. (2) To an excess over the estimated cost of Machinery & Plant included in M&P Programme as follows;
(a) Increase in cost due to price escalation – More than 100% of Original Estimate or 2 Cr., whichever is less..
(b) Increase in cost due to reasons other than Price escalation – More than 20% of original estimate or 50 lakh, whichever is less.
Note : i) Powers indicated in item No. 40(2) (b) above covers material modification also.
ii) Personal approval may be obtained at the level of General Manager with the personal concurrence of FA&CAO in cases of material
modifications costing above 10 Lakh each
iii) These are the overall variations with respect to original sanctioned cost as included in the Budget at the time of sanction and cannot be
exceeded even if more than one revised estimate is sanctioned.
(Authority : Board's letter No. 2011/F(X)II/5/11 dt.24.8.2016)
40. (3) SURVEYS :
To an excess over 20% on an original estimate sanctioned by higher authorities.
Note : i) General Manager can sanction survey estimates provided the surveys are included in the sanctioned budget and approved yardsticks are
followed while remaining within the amount indicated in the budget.
ii) This delegation does not apply to works which do not have necessary procedural approval.
(Authority : Board's letter No.F(X)II/2000/PW/2 dt.27.6.2000)
40. (4) Lumpsum Works.
(i) To incur expenditure on lumpsum works provided in the sanctioned budget for the year or carried forward from the sanctioned budget of any previous year in
excess of the total lumpsum provision for such works in the sanctioned budget.
(ii) To sanction excess over estimates of works sanctioned under item No.39 in cases where percentage variation is beyond the competence of the General Manager in
terms of Rule 40(1)(a).
Note The works thrown forward from previous years may be taken up only if the funds required for them can be found by re-appropriation within the
sanctioned allotment.
(Authority : Board's letter No. F(X)II/2014/PW/1 Pt.II dt.29.5.2015)
40. (5) Part estimates: To sanction part estimates costing above 5% of the total value of the work, as originally sanctioned in the Budget
Note i) Part estimate may be sanctioned towards incurring expenses for preliminary activities like FLS, Geo-technical studies, Design, Preparation of
plans and drawings etc. which will help in preparation of detailed estimate.
ii) The detailed estimate should be allowed to be prepared and got sanctioned only after these preliminary activities are completed.
iii) These preliminary activities may be executed on works contract basis.
iv) CAO/Con in HAG may exercise above power to sanction part estimate where original cost of the work is not more than 500 crore.
(Authority : Board's letter No. F(X)II-2016/PW/3 Pt.3 dt.14.10.2016)
Page No.75
F. Miscellaneous.
41. To the sale of -
(a) any portion of a Railway line.
(b) any item of authorised rolling stock or
Note : The sale of following may be excluded from above delegation:-
i) Railway component can be sold for the purpose of vendor/product development at book rate/latest purchase rate whichever is higher with
usual charges as permitted in Stores code.
ii) Movable asset (other than rolling stock) can be sold on book rate or reserve price whichever is higher, provided it is not to be replakhed.
(Authority : Board's letter No. F(X)II-2016/PW/3 dt.22.3.2017)
42. To the dismantling or otherwise permanently closing to public traffic of any existing open line section.
43. To the alteration of or departure from the terms of contracts with Branch or Worked Lines.
44. To the write off of irrecoverable losses of cash, stores, tools and plant -
(i) exceeding 5 lakh in value when a Railway employee is in any responsible for the loss.
(ii) exceeding 5 crore in value when a Railway employee is not in any way responsible for the loss.
Note : 1) Every important case of loss should be brought to the notice of the Railway Board, as soon as possible, after its discovery. When the loss
involved does not exceed 50,000/- the case need not be reported unless it represents unusual features or reveals serious defects in
procedure.
2) In efficient balances under Suspense Heads not exceeding 1 lakh can also be written off by the General Manager.
(Authority : Board's letter No. F(X)II-2016/PW/3 dt.14.9.2016)
45. To the incurrence of expenditure in excess of 5 lakh per year in connection with the entertainment of distinguished visitors, i.e. distinguished official or non-official
personages, representatives of foreign technical associates, foreign technical experts, representatives of Trade and Industry including overseas companies.
(Authority : Board's letter No. F(X)II-2016/PW/3 dt.14.9.2016)
46. Except in accordance with the rules contained in the Indian Railway Codes or any general or special orders issued by the Railway Board –
(i) to the construction of an assisted siding.
(ii) to the acquisition, lease or disposal of land.
47. To enter into contracts beyond the powers delegated by Railway Board.
(Authority : Board's letter No. F(X)II/2014/PW/1 dt.01.01.2015)
48. To the grant of advances to contractors -
(i) Mobilisation advance in excess of 10% of the contract value.
Page No.76
(ii) Advances against new machinery and plant – in excess of 10% of contract value or 75% of the value of the new machinery and plant brought to the site of work
(whichever is less).
(iii) Advances for accelerating the progress of work in special circumstances in excess of 5% of contract value or 1 crore (whichever is less).
Note : All advances mentioned above shall be subject to levy of interest charges at the rate of 4.5% per annum above the base rate of State Bank of India
or as prescribed by the Railway Board.
(Authority : Board's letter No.F(X)II-97/PW/4 dt.5.5.1998 and 2007/CE-1/CT/18 Pt.2 dated 04.10.2012 & 2007/CE-1/CT/18 Pt.33 dated 23.5.2012)
49. To any material modification estimated to cost over 2.5 Crore or more in each case.
Note i) Total value of Material modification in the work should not exceed 20 Crore. In case of Computerization Planhead, total value of material
Modification in a work should not exceed Rs.5 Crore or 5% of the original cost of the work, whichever is less.
ii) The excess or the revised cost of the estimate does not go beyond the General Manager's power of sanction.
iii) A Material modification estimated to cost more than 50 lakh but below 2.5 Cr. each should be certified and sanctioned personally by FA&CAO and
General Managers.
iv) Material modification which are beyond the competence of General Manager should be sent to Board with the personal approval of FA&CAO and
General Manager,
(Authority : Board's letter No. F(X)II-2014/PW/1 Pt.II dt.30.10.2015)
50. To the grant of diet charges in any other case except -
(a) To a Railway employee undergoing treatment as indoor patient in Railway or non-Railway Government hospital for any diseases other than tuberculosis or
leprosy or mental disease when the employee's basic pay is not more than 7,820/- per month.
(b) (i) To a Railway employee or members of his family when receiving treatment for tuberculosis or leprosy or mental disease in a Railway
hospital or an approved Institution, when the employee's basic pay is not more than 11,540/- per month.
(ii) To the dependent relatives of a railway employee receiving treatment for tuberculosis or leprosy in a Railway hospital or an approved Institution, when the
employee's basic pay is not more than 11,540/- per month.
Note : In the case of temporary staff the pay last drawn while on active duty may be treated as substantive pay for the purpose of this sub-rule.
(c) To persons, whether Railway employees or not, requiring such assistance from the Railway in emergent cases which involve living under difficulties as regards
necessaries of life.
Note i) Indigent passengers injured or taken ill and removed to Railway hospitals and trespassers, who require immediate medical assistance may be given diet at
the expense of the Railway Administrations, the expenditure being treated as part of ordinary working expenses of the Railway hospital.
ii) The General Managers have powers to sanction free diet or reimbursement of the cost of such diet according as the indoor treatment is given in a Railway
hospital or in a non-Railway hospital, to Railway servants injured in the course of duty for such period as they remain indoor patients, not extending
beyond one year after they are declared permanently unfit and discharged from service.
51. Deleted.
(Authority : Board's letter No. F(X)II-2016/PW/3 Pt.3 dt.03.03.2017)
Page No.77
52. To the supply of electricity to outsiders except under the following conditions:-
(i) The provisions of the Electricity Act are not infringed;
(ii) Such supply does not cause any extra outlay either immediate or contingent;
(iii) The supply can be made without any inconvenience to the Railway and after its full needs have been met;
(iv) The rates charged allow for profit after taking into account all costs of production, direct and indirect and are above the rates supplied to Railway employees; and
(v) The Railway should have power to discontinue the supply without notice and without compensation.
53. To any alteration in the existing cash and pay arrangements.
54. To the introduction of new designs for goods and coaching stock sanctioned for construction during each financial year irrespective of whether the stock is to be built to
existing, sanctioned or new designs.
55. To changes, alterations or modifications in the designs, layout or equipment of the existing rolling stock and marine vessels involving :-
(a) infringements of the schedule of maximum and minimum running dimensions unless previously sanctioned;
(b) Decrease in the revenue earning capacities of coaching and goods vehicles and marine vessels, such as alterations in the class or seating capacity of coaching
vehicles and marine vessels and a permanent decrease in the relationship between gross load and tare in the case of goods vehicles;
(c) Conversion of public service vehicles into Railway service vehicles and vice versa and material modifications (such as alterations in the wheel arrangements etc.
in existing Railway service vehicles.);
(d) The introduction of new facilities, fittings and equipments for the traveling public where such have not previously had the approval of the Board, e.g. cooling
arrangements in carriages, electric fans in second class compartments, variations in types of lavatory and other equipments which involve matter of policy.
56. To alteration in the authorized stock of all descriptions.
57. To any expenditure on an object which has not previously been recognized as a fit object for Railway expenditure.
-0-0-0-0-0-
Page No.78
¹ãÆ£ãã¶ã ‡ãŠã¾ããÃÊã¾ã
‡ãñŠ¶³ãè¾ã ÀñÊã ãäÌã²ãì¦ããè‡ãŠÀ¥ã ÔãâØ㟶ã
ƒÊããÖãºã㪠- 211001
Headquarters office
Central Organisation
Railway Electrification
Allahabad-211001
N. G-6/13 (T&P) Date: 18.9.2013
CEE, CSTE, CE, SDGM/CPO, CVO, COS & FA&CAO/CORE/ALD
CEE(P&D), CSTE(P&D), CMM/CORE/ALD
CPDs (RE), UMB, MS, LKO, Kota, SC, GKP, HJP, NJP & BBS
Dy. CPO, Dy. GM & Dy. FA&CAO/CORE/ALD.
Sub : Scale of T&P office equipment – System of
Procurement Accountal and Disposal.
Ref : This office letter No. G-6/13 Pt.XII dated 25.7.2002 and 09.7.2009.
- - - - - -
In suppression to this office letters under reference, the scale of T&P and Office equipments for officers headquartered at CORE/ALD and various projects
has further been revised in consultation with CORE Finance and approval of GM. The same is enclosed as Annexure-I & II. The system of procurement, accountal
and disposal of these items in headquarters as well as in project offices is detailed below:-
(a) Procurement; Procurement as per approved scale should be done with the approval of the head of the project in field units and CHODs in headquarters as
per approved procurement procedure of the project/ headquarters and extant guidelines/rules/codal provisions.
(b) Accountal; Proper accountal should be maintained by every office in the T&P and office equipment Ledger as per stores accountal procedure.
(c) Disposal; On expiry of the codal life or after the equipment become unserviceable the survey and subsequent condemnation should be processed by
individual department for the T&P and office equipment held on the ledger.
DA : As above.
(Rajesh Chaturvedi)
Dy. General Manager
for General Manager (G)
Page No.79
Page No.80
Page No.81
Appendix-C
¹ãÆ£ãã¶ã ‡ãŠã¾ããÃÊã¾ã
‡ãñŠ¶³ãè¾ã ÀñÊã ãäÌã²ãì¦ããè‡ãŠÀ¥ã ÔãâØ㟶ã
ƒÊããÖãºã㪠- 211001
Headquarters office
Central Organisation
Railway Electrification
Allahabad-211001
No. G-6/13 (Banned Items) Dated: 09.7.2009
CEE, CSTE, CE, SDGM/CPO, CVO, COS & FA&CAO/CORE/ALD
CPDs (RE), UMB, MS, LKO, Kota, SC, GKP, HJP, NJP & BBS
Sub : Items which are banned/restricted to be procured as Economy measure.
Ref : This office letter No. G-6/1 Pt.VI dated 4.6.01
- - - - -
The list of banned/restriction on procurement of various items used by Railway Electrification offices were circulated vide this letter under reference. Some items which were restricted
for procurement have been relaxed in the changed circumstances.
In supersession of all previous instructions on the subject matter the items which have still been specified as banned/restricted are listed below for information.
Item No. Description of items Authority for
ban/restriction
Ref. No. Remarks
1. 4 Passenger Road Vehicle/hiring
of road vehicle. Rly. Bd. &
GM/RE
F(X)II/2006/PW/11 dt.21.11.06, 7.5.07 & GM/RE letter No. G-
6/7 Pt.XIV dt.29.8.08
1400 Km. for HQ, 1800 Km. for project and 2400 Km. for project field officers.
2. Other road vehicles (other than
passenger road vehicles) GM/RE GM/RE ON/90 dt.16.1.90 Prior approval of GM is required for procurement.
3. Furniture/Almirah GM/RE G-6/13 (Banned item)
Dated 8.7.09
(1) CPDs/CHODs can sanction procurement of furniture after associate finance
concurrence in following cases:-
(a) For officer as per latest scale of T&P issued from CORE.
(b) For staff, ORH/Camp office/ Meeting Room etc. upto a limit of Rs.3 Lakhs per annum
including replacement account.
(2) CPDs can sanction procurement of furniture with project finance concurrence for
handing over to open line as per provision available in sanctioned estimate.
4. 4
.
i) Photocopier machine GM/RE G-6/13 (Banned item)
Dated 8.7.09
(1) On replacements account : Full powers to PHOD/CHOD in HQ and CPDs in Projects.
(2) On additional accounts : One no. each on (i) & (ii) in CPDs project and one No. each on (i) & (ii) for field group officers manned by on officer of rank not less than JAG.
(3) However the quantity of items (iii & iv) shall be limited as under:
ii) fax machine or MFD having fax
function
iii) Auto CAD
iv) Multimedia Projector
Page No.82
- 2 -
SN. Items Qty. limit for each
project
Qty. limit for deptt. in CORE/HQ
(i) Auto CAD Nil 1 No. for Elect. Deptt.
(ii) Multimedia
Projector,
1 No. Only EDP centre shall have maximum 2 projectors.
4. Note : Above limit shall not apply for GM's Secretariat.
Check Note : Replakhement purely on age cum condition basis after observing the
condemnation procedure.
5. Air conditioner GM/RE - Sanction can be given by CEE/CORE and CPDs in the projects. For project, CPDs can
sanction for procurement of Air Conditioner upto maximum Rs.2 lakh in a year.
6. Calendar/Dairies Rly. Board. Bd's L.No. F(X)II-
86/Exp./2 dt.4.12.91
-
The above relaxation is subject to normal finance vetting of indents as required as per extant rules.
This issues with the concurrence of CORE finance & approval of GM/RE.
(Veena Sinha)
for General Manager (G)