s 206th and s 208th st cross section...2018/04/25  · september 2017 2016 2017 2018 2019 2020 2021...

8
September 2017 South 206th and South 208th Streets Cross Secon 30’ roadway curb 1 36’ roadway 5’ sidewalk 5’ sidewalk curb curb 2 20’ roadway 3 99 1 2 3 Exisng Condions Proposed South 206th and South 208th Streets - Looking East sidewalk sidewalk roadway bio-retenon 28ʹ *Conngent on soil tesng. SR 509 Compleon Project Puget Sound Gateway Program

Upload: others

Post on 06-Feb-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • September 2017

    South 206th and South 208th Streets Cross Section

    30’ roadwaycurb

    1

    36’ roadway5’ sidewalk 5’ sidewalkcurb curb

    2

    20’ roadway

    3

    99

    1 2 3

    Existing Conditions

    Proposed South 206th and South 208th Streets - Looking East

    sidewalk sidewalkroadway bio-retention6ʹ 6ʹ28ʹ 8ʹ

    *Contingent on soil testing.

    SR 509 Completion ProjectPuget Sound Gateway Program

  • September 2017

    South 204th Street and 34th Avenue South Cross Section

    28’ roadway

    224’ roadway

    curb

    1991 2 Existing Conditions

    Proposed South 204th Street - Looking East Proposed 34th Avenue South - Looking South

    sidewalkroadwaybio-retention*6ʹ28ʹ8ʹ

    *Contingent on soil testing.

    SR 509 Completion ProjectPuget Sound Gateway Program

  • September 2017

    Visualization

    South 272nd Street Before South 272nd Street After

    SR 509 Completion ProjectPuget Sound Gateway Program

  • September 2017

    SR 509 Before SR 509 After

    Visualization

    SR 509 Completion ProjectPuget Sound Gateway Program

  • September 2017

    SR 516 Interchange Before SR 516 Interchange After

    Visualization

    SR 509 Completion ProjectPuget Sound Gateway Program

  • September 2017

    SR 509 and Sound Transit Coordination

    Preliminary draftSubject to revision

    Federal Way Link ExtensionSouth 206th Street South 208th Street 34th Avenue South South 204th Street SR 509

    99

    99

    South 206th Street

    South 204th Street

    34th

    Ave

    nue

    Sout

    h

    South 208th Street

    Federal Way Link Extension

    509

    509

    SR 509 Completion ProjectPuget Sound Gateway Program

  • September 2017

    2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031

    SR 509Early work

    Sound Transit Federal Way Link Extension

    Stage 1I-5 to 28th/24th

    Stage 228th/24th to 188th

    DESIGN/RIGHT-OF-WAY

    DESIGN/RIGHT OF WAY

    CONSTRUCTION

    CONSTRUCTION

    CONSTRUCTION

    OPEN

    SR 509 Project Timeline

    • South 204th Street• South 208th Street• 34th Ave South• South 206th Street

    SR 509 Completion ProjectPuget Sound Gateway Program

  • September 2017

    Connecting WA

    Local Funding

    Toll Funding

    2015-2017 2021-20232017-2019 2025-20272023-20252019-2021 2027-2029 2029-2031

    $2.5M$2.5M $93.5M $395M $283M

    $30M

    $305M $206M

    $60M

    $260M

    $40M

    $20M

    $180M$93.5M

    $305M

    $395M

    $266M

    $313M$300M

    $200M

    Gateway Program Funding Timeline for SR 509 and SR 167

    Puget Sound Gateway Program