s-101 update to stakeholders

19
S-101 Update to Stakeholders March 2010

Upload: joy

Post on 22-Feb-2016

44 views

Category:

Documents


0 download

DESCRIPTION

S-101 Update to Stakeholders. March 2010. Purpose. S-101 represents a major step forward in product specifications for Electronic Navigational Charts. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: S-101 Update to Stakeholders

S-101 Update to Stakeholders

March 2010

Page 2: S-101 Update to Stakeholders

Purpose• S-101 represents a major step forward in product

specifications for Electronic Navigational Charts.• This consists mainly of new feature types to

overcome existing issues (e.g. overuse of caution areas) and improved functionality leading to more efficient data handling.

• As a result, TSMAD is proposing a phased approach for the development , testing, and release of S-101*

*Approved TSMAD 19

Page 3: S-101 Update to Stakeholders

S-101Software Development Lifecycle

• Planning– Phased Approach

• Analysis– Stakeholders Input

• Design– Test Beds

• Implementation• Maintenance

Page 4: S-101 Update to Stakeholders

Benefits of a Phased Approach• Iterative Development

– Each iteration is usable and testable

• Controlled change– Enables a test of the change control process to both S-101 and S-100

• Enables smooth migration– Manageable change

• Will mitigate type approval concerns– Ensure that S-101 catalogues are not software or hardware updates

• Does not try and solve everything at once• Enables stakeholders to phase their development

implementation of S-100 based product specifications

Page 5: S-101 Update to Stakeholders

Phases

Phase 1 S-57 ENC Content Equivalent

Phase 2 Enhanced Packaging and Data Loading

Phase 3 Extending the S-101 model

Phase 4 Scalability

Page 6: S-101 Update to Stakeholders

Phase 1: S-57 ENC Content Equivalent

• S-101 draft 0.1 contains:– Feature Catalogue

• includes only those features and attributes that are currently in S-57 3.1.2

• XML– Portrayal

• Constrained by S-52 PL 3.4– General Feature Model– Includes the S-100 geometry

– Compound curves– Will contain updates - .001, .002 – Use of the new 8211 encoding

• Deliverable: S-101 .000 file and updates (no catalogue file)

Page 7: S-101 Update to Stakeholders

Phase 1: Activities

• Feature Catalogue– Create XML Feature Catalogue– Create XSLT Style Sheet

• Information types will be utilized for the new 8211

• Begin developing Version 1 Data Capture and Classification Guide

• Develop draft 0.1 test dataset

Page 8: S-101 Update to Stakeholders

Phase 1: Benefits

• Proof of Concept and validation of S-100– Feature Catalogue is exchanged as data

• Utilization of the new 8211 encoding• Creation of an S-100 compliant product

specification– Template for other S-100 product specifications

• Prove that an S-57 based product can be built using S-100

Page 9: S-101 Update to Stakeholders

Phase 2: Enhanced Packaging and Data Loading Mechanisms

• S-101 draft 0.2 contains:– New support file formats and management– New file naming conventions– Populating exchange sets

• Metadata• Improved Display Scales for ECDIS loading

– Updating Scenarios– Includes text file updating

– Portrayal Catalogue is introduced• Deliverable: Complete Exchange Set including

updates

Page 10: S-101 Update to Stakeholders

Phase 2: Activities

• Define new file formats (XHTML, JPEG etc.)• Define new naming convention• Create multiple test data sets utilizing the

enhanced display scales• Create enhanced updating scenarios• Enhance metadata and data discovery

Page 11: S-101 Update to Stakeholders

Phase 2: Benefits• Demonstrate improved functionality of S-100• Prove that this process is supportable• Improved data delivery

– Improved data discovery– Easily Accessible Metadata– Support File Improvements (xhtml, jpeg)

• Continuous dialogue between IHO and stakeholders

• Opportunity to test potential efficiencies• Platform to demonstrate new capabilities

Page 12: S-101 Update to Stakeholders

Phase 3: Extending the Model• S-101 draft 0.3 contains:

• Utilization of extended model capabilities– Introduce Complex attributes – Introduce Information Types– Multiple language support

• Explore the use of cartographic attributes for enhanced display

• Continue to update the Data Capture and Classification Guide to support enriched content

• Issue a new version of the Feature Catalogue and Portrayal Catalogue with content changes

• Deliverable: Phase 2 deliverables with extended content and updated Feature Catalogue and Portrayal Catalogue

Page 13: S-101 Update to Stakeholders

Phase 3: Activities• Feature Catalogue

– Create XML Feature Catalogue– Include Complex attribute– Include Information type (enhanced language support)– Include Cartographic Attributes

• Portrayal Catalogue– Create XML Portrayal Catalogue

– Include updated portrayal to reflect extended feature catalogue– Utilize Add, Modify and Delete in the Portrayal Catalogue

• Deliverable: Complete Exchange Set, updated Feature and Portrayal Catalogues, Data Capture and Classification Guide

Page 14: S-101 Update to Stakeholders

Phase 3: Benefits

• Prove maintainability– Feature Catalogue updating– Portrayal Catalogue updating

• Enhanced language support• Improved Update process• Prove that the catalogues are machine usable data• Data Quality and Usability improvements

– Complex attributes will clean underlying data

Page 15: S-101 Update to Stakeholders

Phase 4: Scalability• S-101 draft 0.4 contains:

– Introduce the concept of Scale Independent and Scale Dependent Datasets

• Create an information object dataset that contains all the information objects for every dataset associated with it.

– Finalize Version 1 of the feature catalogue and portrayal catalogue

• Additional complex attributes• Additional information types

• Deliverable: Version 1.0 of S-101 Test Dataset and test datasets containing scale independent and scale dependent data

Page 16: S-101 Update to Stakeholders

Phase 4: Activities

• Finalize Version 1 Feature Catalogue• Finalize Version 1 Portrayal Catalogue• Finalize Version 1 Data Capture and

Classification Guide• Creation of S-101 Version 1.0 Test dataset• Create Test Data containing scale independent

and scale dependent data.

Page 17: S-101 Update to Stakeholders

Phase 4: Benefits

• Test the continued maintenance of the standard

• Improves the ability of data producers to reflect the real world– Caution Area Reduction

Page 18: S-101 Update to Stakeholders

Implementation MatrixPhase 1 Phase 2 Phase 3 Phase 4

Data Capture and Classification Guide X X X X

Feature Catalogue (S-57 content) X X

Portrayal Catalogue (S-52 content) X

Feature Catalogue – extended content X X

Portrayal Catalogue – extended content X X

New 8211 encoding X X X X

Updated Support Files and management X X X

New File Naming Conventions X X X

Updated Display Scales X X X

New Geometry X X

Multiple Language Support X X

Cartographic Attributes X X

Scalability X X

Page 19: S-101 Update to Stakeholders

S-101 Timeline