documentrw

5
DENSE BITUMENOUS MACADUM THICKNESS AND TEMPERATU OBSERVATIONS CHAINAGE THICKNESS TEMPERATURE ANV1: “Construction of Viaduct including related works for 5.75 KM length E from Ch.- 247.00 to Ch. 6400.00 between Kavi Subhash (New Garia) to VIP Bazar Corridor of Kolkata Metro Railway Line”.

Upload: mani0214

Post on 25-Sep-2015

13 views

Category:

Documents


0 download

DESCRIPTION

asdfasf

TRANSCRIPT

Sheet1 (2)ANV1: Construction of Viaduct including related works for 5.75 KM length Excluding station areas from Ch.- 247.00 to Ch. 6400.00 between Kavi Subhash (New Garia) to VIP Bazar, in New Garia Airport Corridor of Kolkata Metro Railway Line.DENSE BITUMENOUS MACADUM THICKNESS AND TEMPERATURE RECORDOBSERVATIONSCHAINAGETHICKNESSTEMPERATUREREMARKS

34.40.0750.0975300.0780.10218200.0800.1100.0790.099166666700.0820.1020833333

AFCONS REPRESENTATIVERVNL REPRESENTATIVE

Sheet1ChainageWidthAvg WidthLengthArea (Sqm)09.9109.911.110.5101052011.19.810.4510104.5309.88.69.2109234.48.65.57.052.215.51317.0123.77575ChainageAfter DBMBefore DBMThickness of DBMAverageL/sCentreR/sL/sCentreR/s34.42.6472.8742.5772.7940.0700.0800.075302.6992.7942.9292.6142.7202.8540.0850.0740.0750.078202.6292.6842.8492.5392.6242.7590.0900.0600.0900.080102.5742.6142.7142.5012.5342.6290.0730.0800.0850.07902.6292.6092.6142.5492.5242.5340.0800.0850.0800.082

Sheet2

Sheet3