rvnl of rates of standard bill... · 2. 3. 4. the rates for site specific and non-scheduled items...

3
RVNL

Upload: others

Post on 14-Mar-2020

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RVNL of rates of Standard Bill... · 2. 3. 4. The rates for site specific and non-scheduled items are to be analyzed for each project separately. On such items SBOQ rates and above

RVNL

Page 2: RVNL of rates of Standard Bill... · 2. 3. 4. The rates for site specific and non-scheduled items are to be analyzed for each project separately. On such items SBOQ rates and above

RVNL

Page 3: RVNL of rates of Standard Bill... · 2. 3. 4. The rates for site specific and non-scheduled items are to be analyzed for each project separately. On such items SBOQ rates and above

RVNL