Details of Contracts awarded with respect to RVNL/PIU/Bilaspur as on 28.02.2011.

Tender

Number

Date of

Opening

Description of Item/Work Contract No

& date of

award

Contractor’s

Name

Quantity

(for supply

contract)

Estimated

Cost (for

Engg./Elect.

/ S&T/

Mech.)

Rate (for supply

contract)

Tendered Cost

(for Engg./Elect./

S&T/ Mech.)

Value of

Contract

Scheduled

Completion

date

RVNL/Raipur

/SA -KH-

KHD- ANP/5

Dt. 6/10/07

29.11.07 Construction of Road bed, Major & Minor

Bridges and Track linking (excluding supply of

Rails and Sleepers, Thick Web Switches and

special Sleepers) S&T and OHE & General

Electrical Work in connection with Doubling

between Salka Road- Khongsara (25.8 Km)

and Khodri-Anuppur (61.6 Km) on Bilaspur

Division of South East Central Railway in

Chhattisgarh and MP State, India.

RVNL/Raipur/

SA -KH-KHD-

ANP/ 5

Dt. 15/04/08

M/s DS

Constructions

Ltd, Best &

Crompton

Engineers Ltd.

(JV), C-66,

South

Extension-11,

New Delhi –

110049.

170.12 Cr. 177.498 Cr 177.498 Cr 30.05.2010

Extended up

to

30.06.2011

2008/RVNL/

Bilaspur/DRZ

-RGH

Dt.30.06.08

12.08.08 Conducting Final Location Survey, marking

centre line for Final Alignment on ground,

Design detailed Engineering, preparation of

Drawings and approval from RVNL/Railway for

doubling of Dallirajhara-Rowghat New Rail

link (95.00 Km) on Raipur Division of

S.E.C.Railway.

CPM/RVNL/BS

P/DRZ-

RGH/FLS/01

Dt.23.09.08

M/s Balaji Rail

Road Systems

Ltd, Plot No. 3,

Sitaram Nagar,

Staff Road,

Near Diamond

Point,

Secunderabad

500009

0.9022 Cr. 0.9497Cr 0.9497Cr 15.02.2009

extended up

to 30.04.2011

2009/RVNL/

Bilaspur/DRZ

-ROW/02

Dt.12.03.09

16.06.09 Construction of Road bed, supply of ballast,

major & minor bridges, Residential and

service buildings & general electrical work etc.

, for Dallirajhara-Keoti section( 42 Kms) in

connection with a new rail link between

Dallirajhara and Rowghat in Raipur Division of

S.E.C.Railway in the state of Chhattisgarh

( India).

CPM/RVNL/BSP

/DRZ-

Keoti/SMS/736

Dt.20.10.09

M/s SMS

Infrastructure

Limited- 267

Ganesh

Phadnavis

Bhavan, Near

Triangular

Park,

Dharampeth,

Nagpur

440010

115.629 Cr 97.815 Cr. 97.81Cr. 09.06.2012

(30 months

including

Defect

Liability

Period of 6

Months)

RVNL/Raipur

/SA-KH-KHD-

ANP/ PMC-2

dtd.19.11.07

21.12.07 Project Management Consultancy (PMC) for

Construction of Roadbed, Major and Minor

Bridges, Track Linking (excluding supply of

rails, sleepers, thick web switches & special

sleepers), S&T, and OHE and General

Electrical work in connection with doubling

between Salka Road- Khongsara ( 25.8 Km)

and Khodri- Anuppur (61.6 Km) on Bilaspur

Division of South East Central Railway in

Chhattisgarh & M.P. State ( India).

RVNL/Raipur/

SA-KH-KHD-

ANP/ PMC-2

dtd.29.04.08

M/s S.N.Bhobe

& Associates

Pvt.

Ltd,Banking

Complex No. II

Unit

No.10,Plot No.

9 & 10, Sector-

19A,Vashi,

Navi Mumbai-

400 705

NIL 3.34 Cr. 3.34 Cr. 23.12.2010

(30 months

including

Defect

Liability

Period of 6

Months)

Extended up

to

Dt.30.06.11.

RVNL/Bilasp

ur/DRZ-

ROW/PMC-

2/ dt. 21-09-

09

01.12.09 Project Management Consultancy (PMC)

tender for “construction of roadbed, supply of

ballast, p-way, major & minor bridges,

residential and service buildings, signal and

telecom & electrical work etc., for dallirajhara

– rowghat new rail link project in raipur

division of south east central railway in the

state of chhattisgarh, india”

CPM/RVNL/BSP

/DRZ-

ROW/PMC(Ten

der)/1529

Dt.28.07.10

M/S Lion

Engineering

Consultant &

M/S

Consulting

Engineers

Group Ltd (JV),

Home No.14,

Deepak

Society,

Chhunna

NIL 3.0285 Cr 3.0285 Cr 13.09.2013

(36 months

including

Defect

Liability

Period of 6

Months)

DGM/P-I/RVNL/BSP

Bhatti, Kolar

Road, Bhopal

(MP)

2006/RVNL/

Raipur/Anup

pur-

Bilaspur/3

Dt.22.11.06

04.01.07 Conducting Detailed Designing Engineering (

Civil, P.Way and Electrical Engineering), Yard

Drawings, Preparation of LOP Assistance in

land acquisition and forest clearances,

Detailed Construction Estimate and BOQ for

Doubling between Khodri-Anuppur (61.6Km)

and Salka Road-Khongsara (25.8KM) on

Bilaspur Division of South East Central

Railway.

CPM/RVNL/

Raipur/ Salka

Road-Annupur

Dt.16.01.07

M/S Monarch

Surveyors &

Contractor

Pvt. Ltd. Of 67,

Rujeta Appt.

Panmala,

Pune-30.

Rs.

57,30,000/-

Rs. 52,14,300/- Rs.

52,14,300/-

16.05.2007

Extended up

to 30.09.10

grant of

extension

under

process upto

31.03.11

2006/RVNL/

Mumbai/

Bilaspur

Yard/ Fly

Over/04

Dt.23.11.06

04.01.07 Conducting Confirmatory Final Location

Survey (FLS) of Fly Over at Bilaspur yard and

making the centre line of final alignment on

the ground for BG double line conforming to

the standards of a Group A on FLYOVER and

at its approaches in connection with doubling

of Bilaspur-Anuppur section along with

Detailed Designing of (Civil, P.Way, and

Electrical Engineering) aspects, preparation of

Bill of Quantities including land acquisition on

SEC Railway.

CPM/RVNL/

Raipur/Salka

road-Anuppur

Dt.16.01.07

M/S Monarch

Surveyors &

Contractor

Pvt. Ltd. Of 67,

Rujeta Appt.

Panmala,

Pune-30.

Rs.

19,48,400/-

Rs. 18,12,012/- Rs.

18,12,012/-

30.03.07

Extended up

to 30.09.10

grant of

extension

under

process upto

31.03.11

Sl.No. TENDER NO. Date of Opening

Description of Item/Work Contract No. & date of Award

Contractors Name

Trender Cost

Value of contract

Completion date

1 RVNL/KOL/NOA‐BARA‐DKAS/METRO Dt. 30.11.10

Tech. Bid ‐03.01.2011 Price Bid 27.01.2011

Execution of Design &  construction of PSC viaduct, Embankment and Stations including E&M works in connection with extension of Metro Railway Line Naopara  (excluding) ‐ Baranagar‐ Daksineswar of Kolkata Metro. 

No.RVNL/NOA‐BARA‐DAKS/METRO/TENDER(R)/1   dt.04.02.2011

M/s. CCCL‐SAM India(JV)

223Cr. 199.88Cr. 30 months from the date of issue of LOA

2 RVNL/KOL/JOKA‐BEHALA‐MOMINPUR/VIADUCT/METRO Dt. 27.09.10

Tech. Bid ‐12.11.2010 Price Bid 18.12.10

Package - I : "Construction of viaduct including related works for 4.748 km length excluding station areas from CH (-)1250 to CH 4128.00 between Joka to Behala Chowrasta including depot approach at Joka, in Joka-BBD BAG corridor of Kolkata Metro Railway Line."

RVNL/KOL/METRO/JOKA‐BBD BAG/TENDER/2/BEC File Vol.1/PACKAGE‐I Dt.28.12.2010

M/s. Simplex Infrastructers Ltd.

206.30 Cr. 181.14 Cr. 30 months from the date of issue of LOA

3 RVNL/KOL/JOKA‐BEHALA‐MOMINPUR/VIADUCT/METRO Dt. 27.09.10

Tech. Bid ‐12.11.2010 Price Bid 18.12.10

Package - II : "Construction of viaduct including related works for 4.762 km length excluding station areas from CH 4128.00 to CH 9700.00 between Behala Chowrasta to Mominpur in Joka-BBD BAG corridor of Kolkata Metro Railway Line."

RVNL/KOL/METRO/JOKA‐BBD BAG/TENDER/2/BEC File Vol.1/PACKAGE‐II Dt.28.12.2010

M/s. Simplex Infrastructers Ltd.

206.50 Cr. 184.72 Cr. 30 months from the date of issue of LOA

DETAILS OF CONTRACTS AWARDED UPTO FEB. 2011 BY PIU KOLKATA

S.No Tender No. Date of

Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)

Estimated Cost (for

Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tendered Cost (for

Engg./Elect./S&T/Mech.)

Scheduled Completion

Date

1 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 1 between Bina (Incl) to Ganj Basoda (Incl) chainage

975.16 to 928.500 (Km 46.66).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-1 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.--

Rs 141.88 Cr March, 2012

2 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 2 between GanjBasoda (Excl) to Sanchi (Incl)

chainage 928.500 to 879.750 (Km 48.75).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-2 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.

--

Rs. 150.05 Cr March, 2012

3 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 3 between Sanchi (Excl) to Habibganj (Incl) chainage

879.750 to 830.850 (Km 48.9).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-3 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. NCCL-ECIECCL-ARPL (JV),

C/o M/S Nagarjuna Construction

Company Limited,4th Floor, Uma

Enclave, Road No. 9,

HYDERABAD-500034. --

Rs 135.65 Cr March, 2012

4 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches; Lot

No. 31030801

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

1.25 Cr for 60 kg 1 in 12 Switches

and Rs 16.97 Lakh for 60 kg 1 in 8

1/2 Switches & Rs 4.24 Lakh for

52 kg 1 in 8 1/2 Switches.

Transportation: Rs 26.50 Lac for

60 kg 1 in 12 Switches and Rs

4.50 Lac for 52 kg 1 in 8 1/2

Switches & Rs 1.12 Lakh for 60 kg

1 in 8 1/2 Switches.

Rs 1.77 Cr 30.11.2010

(extended)

5 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing; Lot

No. 31030802

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

2.47 Cr for 60 kg 1 in 12 CMS

Crossing and Rs 0.5 Cr for 60 kg 1

in 8 1/2 CMS Crossing.

Transportation: Rs 3.18 Lac for

60 kg 1 in 12 CMS Crossing and

Rs 0.6 Lac for 60 kg 1 in 8 1/2

CMS Crossing.

Rs 3.02 Cr 30.08.2010

(extended)

6 RVNL/Mumbai/Bina-

BPL/ 2006 dated

30.08.2006

30.08.2006 Conducting Final Location Survey (FLS) marking the

center line of the final alignment on the ground and

Detailed Design Engg (DDE) for BG third line between

Bina-Bhopal (138.423 Km) in WC Rly.

RVNL/Mumb/RPS/FLS(Bi

na- BPL)/ 2006 dated

11.12.2006

M/s Monarch Services &

Contractors, Sinhagad Road,

Pune-411030

--- Rs 1.23 Cr 31.03.2011

(extended)

Details of Contracts Placed upto the month of Feb' 2011 under GM/P-III

7 RVNL/BPL/S&T/HBJ-

BPL-BIN/2

09.06.2009 Supply, installing, modification, testing &commissing of

electronic interlocking system alongwith modification, in

relay based indoor signaling arrangement at PI/RRI/LC

gates, IBH etc. alongwith yard remodeling in connection

with the work of 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central Railway

in the state of Madhya Pradesh (India)

No: RVNL/BPL/S&T/HBJ-

BPL-BIN/2 dated

23.10.2009

M/s Bharat Rail Automations (P)

Ltd. B-107, Mandpeshwar

Industrial Estate, SVP ROAD,

Borivali (W), Mumbai-400092

Signaling & Telecommuction - Rs

23,32,40,706/-

Rs 23.32 Cr 22.10.2011

8 RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901 dated

13.11.2009.

M/s Patil Rail Infrastructure Pvt

Ltd., The Grand, 3rd & 4th Floor

6-3-1090/B-4 Raj Bhawan Road,

Somaji guda, Hyderabad-500082.

Manufacture and Supply: Rs

3.22 Cr. for PSC Turnout Sleeper

Set for 1 in 12, 60 kg and Rs

52.63 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg .

Transportation: Rs 32.86 Lac for

PSC Turnout Sleeper Set for 60 kg

1 in 12 and Rs 6 Lakh for PSC

Turnout Sleeper Set 1 in 8 1/2 for

60 kg.

Rs 4.14 Cr 30.11.2010.

9 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803 dated

17.11.2009

M/s Rayalaseema Concrete

Sleepers Pvt Ltd., The Grand,

3rd & 4th Floor 6-3-1090/B-4 Raj

Bhawan Road, Somaji guda,

Hyderabad-500082.

Manufacture and Supply: Rs

3.34 Cr. for PSC Turnout Sleeper

Set for 1 in 12, and Rs 25.26 Lac

for PSC T/out Sleeper Set 1 in 8

1/2 60 kg & Rs 10.9 lac for PSC

Turnout Sleeper Set for Derailing

Switch 60 Kg, Transportation:

Rs 20.90 Lac for PSC Turnout

Sleeper Set for 60 kg 1 in 12 and

Rs 1.68 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg &

Rs 0.84 lac for PSC Turnout

Sleeper Set for Derailing Switch

60 Kg.

Rs 3.92 Cr 31.12.2010.

10 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120801

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120801 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

5.70 Lac for 1 in 8 1/2 52Kg

Curved Switches and Rs 5.10 Lac

for 1 in 81/2 Derailing Switches

52Kg. Transportation: Rs 1.31

Lac for 1 in 8 1/2 52Kg Curved

Switches and Rs 1.08 Lac for 1 in

8 1/2 Derailing Switches

Rs 13.19 Lac 10.09.2010

(extended)

11 RVNL/BPL/Elect/HBJ-

BIN/TSS

23.07.2009 Design, Supply, Erection, Testing & commissioning of

132/25 KV Traction Sub-station, Feeding Post, Fixed

Capacitor, bank System & other associated works at

BARETH & SANCHI, TRACTION SUB STATIONS,

Augmentation & replacement of traction transformers AT

BINA TSS, by providing 3rd bay & modification in existing

Feeding Posts at Sukhisewania, Gulabganj in connection

with Electrification of 3rd line on BINA- BHOPAL section

of BHOPAL DIVISION of WCR.

RVNL/BPL/Elect/HBJ-

BIN/TSS

dated18/19.01.2010

M/s S. L. Enterprises 41-A,

Phase-II, Mayapuri Industrial

State, Delhi-110064

Electrical Items-Rs 3.89 Cr for

CORE SOR Items, Rs 11.36 Cr for

Traction Transformer, Rs 0.12 Cr

for Maintenance spares,Rs 0.09

Cr for Maintenance Tools, Rs 0.35

Cr for Site Facilities & Rs 2.65 Cr

for Misc. Items,etc.

Rs 18.47 Cr 18.01.2012

12 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120802

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120802 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

2.33 Cr for 60 Kg CMS Crossing 1

in 12, and Rs 17.75 Lac for 52 Kg

CMS Crossing 1 in 81/2

Transportation: Rs 2.53 Lac for

60 Kg CMS Crossing 1 in 12, and

Rs 0.24 Lac for 52 Kg CMS

Crossing 1 in 81/2.

Rs 2.53 Cr 31.10.2010

(extended)

13 RVNL/New Delhi/B-B-

H/PMC/Pt-II

15.10.2009 Project Management Consultancy forConstruction of

Road Bed, Major and Minor Bridges, Track Linking

(excluding supply of rails, thick web switches & sleepers),

S&T and OHE & General Electrical work in connection

with 3rd line between Habibganj & Bina (144.76 Km) on

Bhopal Division of West Central Railway in the state of

Madhya Pradesh (India)

Notification of Award No

RVNL/New Delhi/B-B-

H/PMC/Pt-II dated

23.03.2010

M/s Aarvee Associates

Architects, Engineers &

Consultants Pvt Ltd, Ravula

Residancy, Srinagar Colony,

Hyderabad-82.

Renumerations for -Rs 6.57 Cr

for staff & Provision &

maintenance of Office for- Rs

2.70 Lacs.

Rs 6.60 Cr 22.10.2012

14 No. RVNL/P-

III/TWS/2009/Pt I

25.02.2010 Manufacture and Supply of Curved Switches with ZU-

1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880

Grade) Stock Rail conforming to Indian Railway

Specifications IRS-T-10-2000 for various rail road

projects in different regions of India.

Notification of Award No

No. RVNL/P-

III/TWS/2009/Pt I

Dated 26.05.2010

M/s VAE VKN RTT (JV),

Century Towers,

5th Floor,

45 Shakespeare Sarani,

Kolkata. - 700 017

Manufacture and Supply: Rs

17.79 Cr for 60 kg 1 in 12 TWS

Transportation: Rs 36.84 Lac for

60 kg 1 in 12 TWS.

Rs 18.16 Cr 25.05.2011

Tender Number Date of

Opening

Description of Item/Work Contract No.

& date of

award

Contractor's Name Quantity (for supply

contract)

Estimated Cost (for

Engg./Elect./

S&T/Mech.)

Rate (for supply

contract)

Tenderered Cost

(for Engg./Elect./

S&T/Mech.)

Value of

Contract

Scheduled

completion

date

2005/RVNL/P/CC/PB

dtd. 22.07.05

29.07.05 Design & Proof checking of Additional

Openings in ROBs at Kosi Kalan and

Bhuteshwar

03.08.05 M/s Unique Engineers 3.6 Lacs 3.33 Lacs 3.33 Lacs 23.08.05

2005/RVNL/CC/P/DEE

/Palwal-Bhuteshwar

dt.12.08.05

29.08.05 Detailed Design Engineering for Palwal -

Bhuteshwar 3rd Line of NCR

12.09.05 M/s Scott Wilson

Kirkpatrick India Pvt. Ltd.

53.01 Lacs 47.00 Lacs 47.00 Lacs 11.03.06

2005/RVNL/CC/P/2005

/Jn.-Tkd dt.16.09.05

29.09.05 Detailed Design Engineering for Jn. Cabin -

Palwal 4th Line (34 Km.) of NR

07.10.05 M/s Dalal Mott Macdonald 16.94 Lacs 19.61 Lacs 19.61 Lacs 06.01.2006

2005/RVNL/CC/P/PCD

E/Palwal-Bhuteshwar

6.03.06 Proof Check of Detailed Design Engineering in

connection with Palwal-Bhuteshwar

28.03.06 M/s Dalal Mott Macdonald - 8.20 lakh. 8.20 Lacs 28.03.2006

2005/RVNL/P/CC/Civil

Works

27.12.05 All Civil Engineering and connected General

Electrical Works for Construction of Road bed

facilities, Buildings, Box-pushing in existing 2

ROBs including Misc. works for Palwal-

Bhuteshwar 3rd Line (81 Kms) on North

Central Railway

8.5.2006 M/s Era Consutrction

India Ltd.

62.05 Cr. 62.05 Cr. 62.05 Cr. 30.06.11

2005/RVNL/P/CC/PMC

(PB) dated 11.09.06

23.06.06 PMC of construction of palwal-Bhuteshwar 3rd

Line Doyubling (81 kms) in the State of

Haryana and Uttar Pradesh (India) including

Road bed facilities, Bridge works, Box

Pushing, Flash Butt Welding, P.Way,

miscellaneous Civil works, Electrical works

including OHE and Signalling and Interlocking

works on North Central Railway

27.09.06 M/s Scott Wilson

kirkpatric India Pvt. Ltd.

4.32 Cr. 4.28 Cr. 4.28 Cr. 13.12.11

RVNL/NDLS/ALJN-

GZB/2005/01 dated

14.10.05.

23.12.2005 Construction of Roadbed, Bridges, Facilities,

Installation of Track (excluding Supply of Rails, Thick

Web Switches & Weldable CMS Crossings) &

Electrical (Railway Electrification & General

Electrification) in connection with Provision of 3rd line

on Aligarh - Ghaziabad Section (106 Kms.) in the State

of Uttar Pradesh (India).

08.06.06 M/s IRCON - GANNON -

Dunkerly - JV

188.00 Crore 223.94 Cr. 223.45 Cr. 31.06.11

Details of Contracts Awarded upto Feb 2011 in connection with Palwal-Bhuteshawar and Aligarh-Ghaziabad 3rd line.

AGMP-II Feb-11.xls Contract Awarded upto March 09

Tender Number Date of

Opening

Description of Item/Work Contract No.

& date of

award

Contractor's Name Quantity (for supply

contract)

Estimated Cost (for

Engg./Elect./

S&T/Mech.)

Rate (for supply

contract)

Tenderered Cost

(for Engg./Elect./

S&T/Mech.)

Value of

Contract

Scheduled

completion

date

RVNL/NDLS/ALJN-

GZB/2005/02 dated

16.11.05.

28.12.05 PMC for the Construction of Roadbed, Bridges,

Facilities, Installation of Track (Excluding Supply of

Rails, Thick Web switches and weldable CMS

crossings( & Electrical (Railway Electrification and

General Electrification) in connection with provision of

3rd Line on Aligarh - Ghaziabad Section (106 Kms) in

the state of Uttar Pradesh)

10.07.06 LASA-Wilbur Smith

Associates-JV4.46 Cr. 4.97 Cr. 4.90 crores 31.12.11

2005/RVNL/P/CC/P.Way(P

B) dated 20.3.2007.24.03.06 Construction of all P.Way Works including supply of

Ballast and P.Way Materials (Excluding Rails and PSC

sleepers), Signalling and OHE for Palwal-Bhuteshwar

3rd Line (81 kms.) on NC Railway.

20.03.07 M/s Kalindee- Cobra JV. 88.59 Cr. 118.7 Cr. 118.7 Cr. 31.12.11

AGM/P1/RVNL/A:KM-

GZB/Weld Tester/2010

dated 08.03.2010.

03.03.2010 Supply of Digital Ultrasonic Equipment for

Welded Rail Joints.

08.03.2010

(AGM/P1/RV

NL/ALJN-

GZB/Weld

Tester/2010

dt. 8.3.10.

M/s Electronics &

Engineering Co. (I) Pvt.

Ltd.

2 No. (Rs. 2,35,000/-

each + [email protected]%,

ST @ 12.5%).

Rs.5,78,052/- Rs.5,78,052/- 08.06.10

AGMP-II Feb-11.xls Contract Awarded upto March 09

Detail of Contract awarded upto February, 2011

Project Planning & Development Department

Sr. No.

Tender No. Date of opening (Tender)

Description of work/study

Contract No. & date (LOA)

Contractor’s Name

Estimated cost of work (Rs.)

Tendered cost (Rs.)

Scheduled completion date

Physical Progress

1 RVNL/PP&D/Bankability/Buramara-Chakulia/10

25/03/10

Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER.

RVNL/PP&D/Bankability/Buramara-Chakulia/10 30/04/2010

M/S Feedback Ventures Pvt. Ltd.

15,0

0,0

00/-

13,1

8,0

85/-

3 months from the date of submission of Bank Guarantee (14/05/2010) 15/08/2010 (extended)

Final Report submitted on 21.01.11 and under examination by RVNL Finance.

2 RVNL/PP&D/Bankability/Nallapadu-Guntakal/RE/10

09/04/10

Bankability study of electrification of Nallapadu-Guntakal section

RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10 11/06/2010

M/s PricewaterhouseCoopers Pvt. Ltd

15,0

0,0

00/-

9,9

1,5

14/-

3 months from the date of submission of Bank Guarantee (25/06/2010) 25/09/2010 (extended)

Final Report submitted on 27.09.10 and under examination by RVNL Finance.

3. PP&D/RFP/BOT/CONSULT/2009/Pt. II

21.08.10

Project Consultancy services for development of PPP model in Railway projects.

PP&D/RFP/BOT/CONSULT/2009/Pt. II dated: 25.03.2010

M/s. RITES Ltd.

30,9

3,2

93/-

15,0

0,0

00/-

26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended)

Final Report submitted 07.02.11 and under modification by RITES.

4. PP&D/RVNL/ HX-SBC/2010

23.08.10

Bankability study for Cuddapah-Bangalore New Line project.

PP&D/RVNL/ HX-SBC/2010 24/09/2010

M/s PricewaterhouseCoopers Pvt. Ltd.

12,8

9,3

40/-

14,5

0,1

00/-

8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010

Final Report submitted on 09.02.11 and under modification by PWC.

5. PP&D/RVNL/ KUR-BOLANGIR/2010

21.09.10

Bankability study for Khurda Road-Bolangir New Line project.

PP&D/RVNL/ KUR-BOLANGIR/2010 04/10/2010

M/S Deloitte Touche Tohmatsu India Pvt. Ltd. 1

5,0

0,0

00/-

9,6

5,1

25/-

10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011)

Final Report sent to Railway Board on 02.02.11 for examination

6. PP&D/RVNL/DHD-INDB/Bank/2010

N.A.

Bankability study for Dahod-Indore New Line project in Western Railway.

PP&D/RVNL/DHD-INDB/Bank/2010 dated 24.12.2010

Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54

----

---

1,9

5,0

00/-

6 weeks from LAO (24.12.10) for Traffic Study. Being only Traffic Study Out sourced.

Study being done in house. Only Traffic Study Out sourced. Traffic Study report submitted on 21.02.11 and under examination.

7. PP&D/FT/HUK/2010

21.01.11

Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway.

PP&D/FT/HUK/2010 dated 08.02.2011

M/S Deloitte Touche Tohmatsu India Pvt. Ltd. 5

,00,0

00/-

8,7

6,8

85/-

16 weeks from the date of acceptance of CV(18/02/2011) 10/06/2011)

Study in progress.

8. PP&D/RVNL/MCLA-NLDA/Bank/2010

N.A.

Bankability study for Macherla-NalgondaNew Line project in South Central Railway.

PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11

Traffic Study to Sh.Sanjeeva SHivesh, CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.-43, Gurgaon.

----

--

1,7

5,0

00/-

4 weeks for from LOA (21.02.11) for Traffic Study. Being only Traffic Study Out sourced.

Study being done in house. Only Traffic Study Out sourced.

9. PP&D/RVNL/ADI-UDZ/Bank/2010

N.A.

Bankability study for Ahmedabad-Udaipur Gauge Conversion project in Western Railway.

N.A. N.A. Study done in house. --

----

--

----

N.A.

Study done in house and Completed, Report sent to Rly. Board on 31.12.2010.

Detail of Contract awarded upto March, 2011

Project Planning & Development Department

S. No

Tender No. Date of opening (Tender)

Description of work/study

Contract No. & date (LOA)

Contractor’s Name

Estimated cost of work (Rs.)

Tendered cost (Rs.)

Scheduled completion date

Physical Progress ( upto 31.03.11)

1 RVNL/PP&D/Bankability/Buramara-Chakulia/10

25/03/10

Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER.

RVNL/PP&D/Bankability/Buramara-Chakulia/10 30/04/2010

M/S Feedback Ventures Pvt. Ltd.

15

,00

,00

0/-

13

,18

,08

5/-

3 months from the date of submission of Bank Guarantee (14/05/2010) 15/08/2010 (extended)

Final Report submitted on 21.01.11 and under examination by RVNL Finance.

2 RVNL/PP&D/Bankability/Nallapadu-Guntakal/RE/10

09/04/10

Bankability study of electrification of Nallapadu-Guntakal section

RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10 11/06/2010

M/s PricewaterhouseCoopers Pvt. Ltd

15

,00

,00

0/-

9,9

1,5

14

/-

3 months from the date of

submission of Bank Guarantee

(25/06/2010)

25/09/2010 (extended)

Final Report submitted on 27.09.10 and under submission to RVNL BOD for approval.

3. PP&D/RFP/BOT/CONSULT/2009/Pt. II

21.08.10

Project Consultancy services for development of PPP model in Railway projects.

PP&D/RFP/BOT/CONSULT/2009/Pt. II dated: 25.03.2010

M/s. RITES Ltd.

30

,93

,29

3/-

15

,00

,00

0/-

26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended)

Final Report submitted 07.02.11 and under modification by RITES.

4. PP&D/RVNL/ HX-SBC/2010

23.08.10

Bankability study for Cuddapah-Bangalore New Line project.

PP&D/RVNL/ HX-SBC/2010 24/09/2010

M/s PricewaterhouseCoopers Pvt. Ltd.

12

,89

,34

0/-

14

,50

,10

0/-

8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010

Final Report submittedon 09.02.11 and under modification by PWC.

5. PP&D/RVNL/ KUR-BOLANGIR/2010

21.09.10

Bankability study for Khurda Road-Bolangir New Line project.

PP&D/RVNL/ KUR-BOLANGIR/2010 04/10/2010

M/S Deloitte Touche Tohmatsu India Pvt. Ltd. 1

5,0

0,0

00

/-

9,6

5,1

25

/- 10 weeks from

the date of acceptance of CV(15/10/2010) 25/01/2011

Final Report sent to Railway Board on 02.02.11 for examination & acceptance.

6. PP&D/RVNL/DHD-INDB/Bank/2010

N.A. Study being done in house.

Bankability study for Dahod-Indore New Line project in Western Railway.

PP&D/RVNL/DHD-INDB/Bank/2010 dated 24.12.2010

Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54

----

---

1,9

5,0

00

/- 6 weeks from LAO

(24.12.10) for Traffic Study which is out sourced.

Study being done in house. Only Traffic Study Out sourced.

Traffic Study report submitted on 21.02.11 and under examination.

7. PP&D/FT/HUK/2010 21.01.11

Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway.

PP&D/FT/HUK/2010 dated 08.02.2011

M/S Deloitte Touche Tohmatsu India Pvt. Ltd.

5,0

0,0

00

/-

8,7

6,8

85

/- 16 weeks from

the date of acceptance of CV(18/02/2011) 10/06/2011

Study in progress.

8. PP&D/RVNL/MCLA-NLDA/Bank/2010

N.A. Study being done in-house.

Bankability study for Macherla-NalgondaNew Line project in South Central Railway.

PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11

Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.-43, Gurgaon.

----

--

1,7

5,0

00

/-

4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. 20.03.2011

Study being done in-house. Only Traffic Study Out sourced.

9. PP&D/RVNL/ADI-UDZ/Bank/2010

N.A. Study done in house.

Bankability study for Ahmedabad-Udaipur Gauge Conversion project in Western Railway.

N.A. N.A. Study done in house.

----

--

----

--

N.A.

Study done in house and Completed, Report sent to Rly. Board on 31.12.2010.

10. No. PP&D/RVNL/BJP-

SDB/BANK/2010 20/12/2010

Bankability study of

Bijapur -

Shahabad New line

in South Western

Railway

No.

PP&D/RVNL/BJP-

SDB/BANK/2010

Dated: 08/03/2011

M/s Deloitte

Touche

Tohmatsu India

Pvt. Ltd.

15

,00

,00

0.0

0

12

,28

,17

9.4

7

(3 months from LOA dated 08.03.2011) 06/06/2011

Study in progress.

S.No Tender No. Date of

Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)

Estimated Cost (for

Engg./Elect./S&T/Mech.)

Rate (for supply

contract)

Tendered Cost

(for

Engg./Elect./S&

Scheduled

Completion

Date

1 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges, Track

Linking (excluding supply of rails, thick web switches &

sleepers), S&T and OHE & General Electrical work in

connection with 3rd

line between Habibganj & Bina (144.76

Km) on Bhopal Division of West Central Railway in the state

of Madhya Pradesh (India) - Package No. 1 between Bina

(Incl) to Ganj Basoda (Incl) chainage 975.16 to 928.500 (Km

46.66).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-1 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.--

Rs 141.88 Cr March, 2012

2 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges, Track

Linking (excluding supply of rails, thick web switches &

sleepers), S&T and OHE & General Electrical work in

connection with 3rd

line between Habibganj & Bina (144.76

Km) on Bhopal Division of West Central Railway in the state

of Madhya Pradesh (India) - Package No. 2 between

GanjBasoda (Excl) to Sanchi (Incl) chainage 928.500 to

879.750 (Km 48.75).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-2 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.--

Rs. 150.05 Cr March, 2012

3 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges, Track

Linking (excluding supply of rails, thick web switches &

sleepers), S&T and OHE & General Electrical work in

connection with 3rd

line between Habibganj & Bina (144.76

Km) on Bhopal Division of West Central Railway in the state

of Madhya Pradesh (India) - Package No. 3 between Sanchi

(Excl) to Habibganj (Incl) chainage 879.750 to 830.850 (Km

48.9).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-3 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. NCCL-ECIECCL-ARPL (JV),

C/o M/S Nagarjuna Construction

Company Limited,4th Floor, Uma

Enclave, Road No. 9,

HYDERABAD-500034. --

Rs 135.65 Cr March, 2012

4 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches; Lot No.

31030801

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches dated

30.03.2009

M/s VAE VKN Industries Pvt. Ltd.,

24/5 Sriram Road, Civil Lines,

Delhi-110054.

Manufacture and Supply: Rs 1.25 Cr

for 60 kg 1 in 12 Switches and Rs

16.97 Lakh for 60 kg 1 in 8 1/2

Switches & Rs 4.24 Lakh for 52 kg 1

in 8 1/2 Switches. Transportation:

Rs 26.50 Lac for 60 kg 1 in 12

Switches and Rs 4.50 Lac for 52 kg 1

in 8 1/2 Switches & Rs 1.12 Lakh for

60 kg 1 in 8 1/2 Switches.

Rs 1.77 Cr 30.11.2010

(extended)

5 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing; Lot

No. 31030802

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing dated

30.03.2009

M/s VAE VKN Industries Pvt. Ltd.,

24/5 Sriram Road, Civil Lines,

Delhi-110054.

Manufacture and Supply: Rs 2.47 Cr

for 60 kg 1 in 12 CMS Crossing and

Rs 0.5 Cr for 60 kg 1 in 8 1/2 CMS

Crossing. Transportation: Rs 3.18

Lac for 60 kg 1 in 12 CMS Crossing

and Rs 0.6 Lac for 60 kg 1 in 8 1/2

CMS Crossing.

Rs 3.02 Cr 30.08.2010

(extended)

6 RVNL/Mumbai/Bina-

BPL/ 2006 dated

30.08.2006

30.08.2006 Conducting Final Location Survey (FLS) marking the center

line of the final alignment on the ground and Detailed Design

Engg (DDE) for BG third line between Bina-Bhopal (138.423

Km) in WC Rly.

RVNL/Mumb/RPS/FLS(Bi

na- BPL)/ 2006 dated

11.12.2006

M/s Monarch Services &

Contractors, Sinhagad Road,

Pune-411030

--- Rs 1.23 Cr 31.03.2011

(extended)

Details of Contracts Placed upto the month of March' 2011 under GM/P-III

7 RVNL/BPL/S&T/HBJ-BPL-

BIN/2

09.06.2009 Supply, installing, modification, testing &commissing of

electronic interlocking system alongwith modification, in

relay based indoor signaling arrangement at PI/RRI/LC

gates, IBH etc. alongwith yard remodeling in connection with

the work of 3rd line between Habibganj & Bina (144.76 Km)

on Bhopal Division of West Central Railway in the state of

Madhya Pradesh (India)

No: RVNL/BPL/S&T/HBJ-

BPL-BIN/2 dated

23.10.2009

M/s Bharat Rail Automations (P)

Ltd. B-107, Mandpeshwar

Industrial Estate, SVP ROAD,

Borivali (W), Mumbai-400092

Signaling & Telecommuction - Rs

23,32,40,706/-

Rs 23.32 Cr 22.10.2011

8 RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901 dated

13.11.2009.

M/s Patil Rail Infrastructure Pvt

Ltd., The Grand, 3rd & 4th Floor 6-

3-1090/B-4 Raj Bhawan Road,

Somaji guda, Hyderabad-500082.

Manufacture and Supply: Rs 3.22

Cr. for PSC Turnout Sleeper Set for 1

in 12, 60 kg and Rs 52.63 Lakh for

PSC Turnout Sleeper Set 1 in 8 1/2

for 60 kg . Transportation: Rs 32.86

Lac for PSC Turnout Sleeper Set for

60 kg 1 in 12 and Rs 6 Lakh for PSC

Turnout Sleeper Set 1 in 8 1/2 for 60

kg.

Rs 4.14 Cr 30.11.2010.

9 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803 dated

17.11.2009

M/s Rayalaseema Concrete

Sleepers Pvt Ltd., The Grand, 3rd

& 4th Floor 6-3-1090/B-4 Raj

Bhawan Road, Somaji guda,

Hyderabad-500082.

Manufacture and Supply: Rs 3.34

Cr. for PSC Turnout Sleeper Set for 1

in 12, and Rs 25.26 Lac for PSC T/out

Sleeper Set 1 in 8 1/2 60 kg & Rs

10.9 lac for PSC Turnout Sleeper Set

for Derailing Switch 60 Kg,

Transportation: Rs 20.90 Lac for

PSC Turnout Sleeper Set for 60 kg 1

in 12 and Rs 1.68 Lakh for PSC

Turnout Sleeper Set 1 in 8 1/2 for 60

kg & Rs 0.84 lac for PSC Turnout

Sleeper Set for Derailing Switch 60

Kg.

Rs 3.92 Cr 28.02.2011.

10 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120801

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)for

Salka Road- Anuppur Section under CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120801 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs 5.70

Lac for 1 in 8 1/2 52Kg Curved

Switches and Rs 5.10 Lac for 1 in

81/2 Derailing Switches 52Kg.

Transportation: Rs 1.31 Lac for 1 in

8 1/2 52Kg Curved Switches and Rs

1.08 Lac for 1 in 8 1/2 Derailing

Switches

Rs 13.19 Lac 10.09.2010

(extended)

11 RVNL/BPL/Elect/HBJ-

BIN/TSS

23.07.2009 Design, Supply, Erection, Testing & commissioning of

132/25 KV Traction Sub-station, Feeding Post, Fixed

Capacitor, bank System & other associated works at

BARETH & SANCHI, TRACTION SUB STATIONS,

Augmentation & replacement of traction transformers AT

BINA TSS, by providing 3rd bay & modification in existing

Feeding Posts at Sukhisewania, Gulabganj in connection

with Electrification of 3rd line on BINA- BHOPAL section of

BHOPAL DIVISION of WCR.

RVNL/BPL/Elect/HBJ-

BIN/TSS

dated18/19.01.2010

M/s S. L. Enterprises 41-A, Phase-

II, Mayapuri Industrial State, Delhi-

110064

Electrical Items-Rs 3.89 Cr for

CORE SOR Items, Rs 11.36 Cr for

Traction Transformer, Rs 0.12 Cr for

Maintenance spares,Rs 0.09 Cr for

Maintenance Tools, Rs 0.35 Cr for

Site Facilities & Rs 2.65 Cr for Misc.

Items,etc.

Rs 18.47 Cr 18.01.2012

12 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120802

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)for

Salka Road- Anuppur Section under CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120802 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs 2.33 Cr

for 60 Kg CMS Crossing 1 in 12, and

Rs 17.75 Lac for 52 Kg CMS Crossing

1 in 81/2 Transportation: Rs 2.53

Lac for 60 Kg CMS Crossing 1 in 12,

and Rs 0.24 Lac for 52 Kg CMS

Crossing 1 in 81/2.

Rs 2.53 Cr 31.10.2010

(extended)

13 RVNL/New Delhi/B-B-

H/PMC/Pt-II

15.10.2009 Project Management Consultancy forConstruction of Road

Bed, Major and Minor Bridges, Track Linking (excluding

supply of rails, thick web switches & sleepers), S&T and

OHE & General Electrical work in connection with 3rd line

between Habibganj & Bina (144.76 Km) on Bhopal Division

of West Central Railway in the state of Madhya Pradesh

(India)

Notification of Award No

RVNL/New Delhi/B-B-

H/PMC/Pt-II dated

23.03.2010

M/s Aarvee Associates

Architects, Engineers &

Consultants Pvt Ltd, Ravula

Residancy, Srinagar Colony,

Hyderabad-82.

Renumerations for -Rs 6.57 Cr for

staff & Provision & maintenance of

Office for- Rs 2.70 Lacs.

Rs 6.60 Cr 22.10.2012

14 No. RVNL/P-

III/TWS/2009/Pt I

25.02.2010 Manufacture and Supply of Curved Switches with ZU-

1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880

Grade) Stock Rail conforming to Indian Railway

Specifications IRS-T-10-2000 for various rail road projects in

different regions of India.

Notification of Award No

No. RVNL/P-

III/TWS/2009/Pt I

Dated 26.05.2010

M/s VAE VKN RTT (JV),

Century Towers,

5th Floor,

45 Shakespeare Sarani,

Kolkata. - 700 017

Manufacture and Supply: Rs 17.79

Cr for 60 kg 1 in 12 TWS

Transportation: Rs 36.84 Lac for 60

kg 1 in 12 TWS.

Rs 18.16 Cr 25.05.2011

S.No Tender No. Date of

Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)

Estimated Cost (for

Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tendered Cost (for

Engg./Elect./S&T/Mech.)

Scheduled Completion

Date

1 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 1 between Bina (Incl) to Ganj Basoda (Incl) chainage

975.16 to 928.500 (Km 46.66).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-1 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.--

Rs 141.88 Cr March, 2012

2 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 2 between GanjBasoda (Excl) to Sanchi (Incl)

chainage 928.500 to 879.750 (Km 48.75).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-2 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.

--

Rs. 150.05 Cr March, 2012

3 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 3 between Sanchi (Excl) to Habibganj (Incl) chainage

879.750 to 830.850 (Km 48.9).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-3 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. NCCL-ECIECCL-ARPL (JV),

C/o M/S Nagarjuna Construction

Company Limited,4th Floor, Uma

Enclave, Road No. 9,

HYDERABAD-500034. --

Rs 135.65 Cr March, 2012

4 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches; Lot

No. 31030801

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

1.25 Cr for 60 kg 1 in 12 Switches

and Rs 16.97 Lakh for 60 kg 1 in 8

1/2 Switches & Rs 4.24 Lakh for

52 kg 1 in 8 1/2 Switches.

Transportation: Rs 26.50 Lac for

60 kg 1 in 12 Switches and Rs

4.50 Lac for 52 kg 1 in 8 1/2

Switches & Rs 1.12 Lakh for 60 kg

1 in 8 1/2 Switches.

Rs 1.77 Cr 30.11.2010

(extended)

5 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing; Lot

No. 31030802

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

2.47 Cr for 60 kg 1 in 12 CMS

Crossing and Rs 0.5 Cr for 60 kg 1

in 8 1/2 CMS Crossing.

Transportation: Rs 3.18 Lac for

60 kg 1 in 12 CMS Crossing and

Rs 0.6 Lac for 60 kg 1 in 8 1/2

CMS Crossing.

Rs 3.02 Cr 30.08.2010

(extended)

6 RVNL/Mumbai/Bina-

BPL/ 2006 dated

30.08.2006

30.08.2006 Conducting Final Location Survey (FLS) marking the

center line of the final alignment on the ground and

Detailed Design Engg (DDE) for BG third line between

Bina-Bhopal (138.423 Km) in WC Rly.

RVNL/Mumb/RPS/FLS(Bi

na- BPL)/ 2006 dated

11.12.2006

M/s Monarch Services &

Contractors, Sinhagad Road,

Pune-411030

--- Rs 1.23 Cr 31.03.2011

(extended)

Details of Contracts Placed upto the month of April' 2011 under GM/P-III

7 RVNL/BPL/S&T/HBJ-

BPL-BIN/2

09.06.2009 Supply, installing, modification, testing &commissing of

electronic interlocking system alongwith modification, in

relay based indoor signaling arrangement at PI/RRI/LC

gates, IBH etc. alongwith yard remodeling in connection

with the work of 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central Railway

in the state of Madhya Pradesh (India)

No: RVNL/BPL/S&T/HBJ-

BPL-BIN/2 dated

23.10.2009

M/s Bharat Rail Automations (P)

Ltd. B-107, Mandpeshwar

Industrial Estate, SVP ROAD,

Borivali (W), Mumbai-400092

Signaling & Telecommuction - Rs

23,32,40,706/-

Rs 23.32 Cr 22.10.2011

8 RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901 dated

13.11.2009.

M/s Patil Rail Infrastructure Pvt

Ltd., The Grand, 3rd & 4th Floor

6-3-1090/B-4 Raj Bhawan Road,

Somaji guda, Hyderabad-500082.

Manufacture and Supply: Rs

3.22 Cr. for PSC Turnout Sleeper

Set for 1 in 12, 60 kg and Rs

52.63 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg .

Transportation: Rs 32.86 Lac for

PSC Turnout Sleeper Set for 60 kg

1 in 12 and Rs 6 Lakh for PSC

Turnout Sleeper Set 1 in 8 1/2 for

60 kg.

Rs 4.14 Cr 30.11.2010.

9 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803 dated

17.11.2009

M/s Rayalaseema Concrete

Sleepers Pvt Ltd., The Grand,

3rd & 4th Floor 6-3-1090/B-4 Raj

Bhawan Road, Somaji guda,

Hyderabad-500082.

Manufacture and Supply: Rs

3.34 Cr. for PSC Turnout Sleeper

Set for 1 in 12, and Rs 25.26 Lac

for PSC T/out Sleeper Set 1 in 8

1/2 60 kg & Rs 10.9 lac for PSC

Turnout Sleeper Set for Derailing

Switch 60 Kg, Transportation:

Rs 20.90 Lac for PSC Turnout

Sleeper Set for 60 kg 1 in 12 and

Rs 1.68 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg &

Rs 0.84 lac for PSC Turnout

Sleeper Set for Derailing Switch

60 Kg.

Rs 3.92 Cr 28.02.2011.

10 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120801

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120801 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

5.70 Lac for 1 in 8 1/2 52Kg

Curved Switches and Rs 5.10 Lac

for 1 in 81/2 Derailing Switches

52Kg. Transportation: Rs 1.31

Lac for 1 in 8 1/2 52Kg Curved

Switches and Rs 1.08 Lac for 1 in

8 1/2 Derailing Switches

Rs 13.19 Lac 10.09.2010

(extended)

11 RVNL/BPL/Elect/HBJ-

BIN/TSS

23.07.2009 Design, Supply, Erection, Testing & commissioning of

132/25 KV Traction Sub-station, Feeding Post, Fixed

Capacitor, bank System & other associated works at

BARETH & SANCHI, TRACTION SUB STATIONS,

Augmentation & replacement of traction transformers AT

BINA TSS, by providing 3rd bay & modification in existing

Feeding Posts at Sukhisewania, Gulabganj in connection

with Electrification of 3rd line on BINA- BHOPAL section

of BHOPAL DIVISION of WCR.

RVNL/BPL/Elect/HBJ-

BIN/TSS

dated18/19.01.2010

M/s S. L. Enterprises 41-A,

Phase-II, Mayapuri Industrial

State, Delhi-110064

Electrical Items-Rs 3.89 Cr for

CORE SOR Items, Rs 11.36 Cr for

Traction Transformer, Rs 0.12 Cr

for Maintenance spares,Rs 0.09

Cr for Maintenance Tools, Rs 0.35

Cr for Site Facilities & Rs 2.65 Cr

for Misc. Items,etc.

Rs 18.47 Cr 18.01.2012

12 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120802

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120802 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

2.33 Cr for 60 Kg CMS Crossing 1

in 12, and Rs 17.75 Lac for 52 Kg

CMS Crossing 1 in 81/2

Transportation: Rs 2.53 Lac for

60 Kg CMS Crossing 1 in 12, and

Rs 0.24 Lac for 52 Kg CMS

Crossing 1 in 81/2.

Rs 2.53 Cr 31.10.2010

(extended)

13 RVNL/New Delhi/B-B-

H/PMC/Pt-II

15.10.2009 Project Management Consultancy forConstruction of

Road Bed, Major and Minor Bridges, Track Linking

(excluding supply of rails, thick web switches & sleepers),

S&T and OHE & General Electrical work in connection

with 3rd line between Habibganj & Bina (144.76 Km) on

Bhopal Division of West Central Railway in the state of

Madhya Pradesh (India)

Notification of Award No

RVNL/New Delhi/B-B-

H/PMC/Pt-II dated

23.03.2010

M/s Aarvee Associates

Architects, Engineers &

Consultants Pvt Ltd, Ravula

Residancy, Srinagar Colony,

Hyderabad-82.

Renumerations for -Rs 6.57 Cr

for staff & Provision &

maintenance of Office for- Rs

2.70 Lacs.

Rs 6.60 Cr 22.10.2012

14 No. RVNL/P-

III/TWS/2009/Pt I

25.02.2010 Manufacture and Supply of Curved Switches with ZU-

1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880

Grade) Stock Rail conforming to Indian Railway

Specifications IRS-T-10-2000 for various rail road

projects in different regions of India.

Notification of Award No

No. RVNL/P-

III/TWS/2009/Pt I

Dated 26.05.2010

M/s VAE VKN RTT (JV),

Century Towers,

5th Floor,

45 Shakespeare Sarani,

Kolkata. - 700 017

Manufacture and Supply: Rs

17.79 Cr for 60 kg 1 in 12 TWS

Transportation: Rs 36.84 Lac for

60 kg 1 in 12 TWS.

Rs 18.16 Cr 25.05.2011

Detail of Contract awarded upto April, 2011

Project Planning & Development Department

Sr. No.

Tender No. Date of opening (Tender)

Description of work/study

Contract No. & date (LOA)

Contractor’s Name

Estimated cost of

work (Rs.)

Tendered cost (Rs.)

Scheduled completion date

Physical Progress

( upto 30.04.11)

1 RVNL/PP&D/Bankability/Buramara-Chakulia/10

25/03/10 Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER.

RVNL/PP&D/Bankability/Buramara-Chakulia/10 30/04/2010

M/S Feedback Ventures Pvt. Ltd.

15,0

0,0

00/-

1

3,1

8,0

85/-

3 months from the date of submission of Bank Guarantee (14/05/2010) 15/08/2010 (extended)

Final Report submitted on 21.01.11 and under examination by RVNL Finance.

2 RVNL/PP&D/Bankability/Nallapadu-Guntakal/RE/10

09/04/10 Bankability study of electrification of Nallapadu-Guntakal section

RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10 11/06/2010

M/s PricewaterhouseCoopers Pvt. Ltd

15,0

0,0

00/-

9,9

1,5

14/-

3 months from the date of submission of Bank Guarantee (25/06/2010) 25/09/2010 (extended)

Final Report submitted on 27.09.10 and under submission to RVNL BOD for approval.

3. PP&D/RFP/BOT/CONSULT/2009/Pt. II

21.08.10 Project Consultancy services for development of PPP model in Railway projects.

PP&D/RFP/BOT/CONSULT/2009/Pt. II dated: 25.03.2010

M/s. RITES Ltd.

30,9

3,2

93/-

15,0

0,0

00/-

26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended)

Draft Final Report submitted 07.02.11 and under modification by RITES.

4. PP&D/RVNL/ HX-SBC/2010

23.08.10 Bankability study for Cuddapah-Bangalore New Line project.

PP&D/RVNL/ HX-SBC/2010 24/09/2010

M/s PricewaterhouseCoopers Pvt. Ltd.

12,8

9,3

40/-

1

4,5

0,1

00/-

8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010

Draft Final Report submitted on 09.02.11 and under modification by PWC.

5. PP&D/RVNL/ KUR-BOLANGIR/2010

21.09.10 Bankability study for Khurda Road-Bolangir New Line project.

PP&D/RVNL/ KUR-BOLANGIR/2010 04/10/2010

M/S Deloitte Touche Tohmatsu India Pvt. Ltd.

15,0

0,0

00/-

9,6

5,1

25/-

10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011)

Final Report sent to Railway Board on 02.02.11 for examination & acceptance.

6. PP&D/RVNL/DHD-INDB/Bank/2010

N.A. Study being done in house.

Bankability study for Dahod-Indore New Line project in Western Railway.

PP&D/RVNL/DHD-INDB/Bank/2010 dated 24.12.2010

Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54 --

----

-

1,9

5,0

00/-

6 weeks from LAO (24.12.10) for Traffic Study which is out sourced.

Study being done in house. Only Traffic Study Out sourced. Traffic Study draft report submitted on 21.02.11 and under examination. Final traffic report under preparation.

7. PP&D/FT/HUK/2010

21.01.11 Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway.

PP&D/FT/HUK/2010 dated 08.02.2011

M/S Deloitte Touche Tohmatsu India Pvt. Ltd.

5,0

0,0

00/-

8,7

6,8

85/-

16 weeks from the date of acceptance of CV(18/02/2011) 10/06/2011)

Study in progress.

8. PP&D/RVNL/MCLA-NLDA/Bank/2010

N.A. Study being done in house.

Bankability study for Macherla-NalgondaNew Line project in South Central Railway.

PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11

Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.-43, Gurgaon.

----

--

1,7

5,0

00/-

4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. 20.03.2011

Study being done in house. Only Traffic Study Out sourced. Modified draft traffic report submitted on 03.05.11 and under examination.

9. PP&D/RVNL/ADI-UDZ/Bank/2010

N.A. Study done in house.

Bankability study for Ahmedabad-Udaipur Gauge Conversion project in Western Railway.

N.A. N.A. Study done in house.

----

--

--

----

N.A. Study done in house and Completed, Report sent to Rly. Board on 31.12.2010.

10. No. PP&D/RVNL/BJP-SDB/BANK/2010

20/12/2010 Bankability study of Bijapur - Shahabad New line

in South Western Railway

No. PP&D/RVNL/BJP-SDB/BANK/2010

Dated: 08/03/2011

M/s Deloitte Touche

Tohmatsu India

Pvt. Ltd.

15,0

0,0

00.0

0

12,2

8,1

79.4

7

(3 months from LOA dated 08.03.2011) 06/06/2011

Study in progress.

11. No. PP&D/RVNL/DW

R-BGM/BANK/ 2010

27/12/2010 Bankability study of Dharwad –

Belgaum New line in South Western Railway

No. PP&D/RVNL/DWR

-BGM/BANK/Tender/2010 Dated: 04/04/2011

M/s ARKITECHNO

Consultants (India) Pvt. Ltd

14,8

9,0

00.0

0

9,7

1,1

68.0

0

(3 months from LOA)

03/07/2011

Study in progress.

12. No. PP&D/RVNL/

RDG-TK / BANK/2010

04/1/2011 Bankability study of

Rayadurg-Tumkur New line in South Western Railway

No. PP&D/RVNL/

RDG-TK /BANK/2010 Dated: 19/04/2011

M/s Deloitte

Touche Tohmatsu India Pvt. Ltd.

14,8

9,0

00.0

0

12,2

8,1

79.4

7

(3 months from LOA) 18.07.2011

Study in progress.

S.No Tender No. Date of

Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)

Estimated Cost (for

Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tendered Cost (for

Engg./Elect./S&T/Mech.)

Scheduled Completion

Date

1 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 1 between Bina (Incl) to Ganj Basoda (Incl) chainage

975.16 to 928.500 (Km 46.66).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-1 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.--

Rs 141.88 Cr March, 2012

2 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 2 between GanjBasoda (Excl) to Sanchi (Incl)

chainage 928.500 to 879.750 (Km 48.75).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-2 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.

--

Rs. 150.05 Cr March, 2012

3 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 3 between Sanchi (Excl) to Habibganj (Incl) chainage

879.750 to 830.850 (Km 48.9).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-3 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. NCCL-ECIECCL-ARPL (JV),

C/o M/S Nagarjuna Construction

Company Limited,4th Floor, Uma

Enclave, Road No. 9,

HYDERABAD-500034. --

Rs 135.65 Cr March, 2012

4 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches; Lot

No. 31030801

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs 1.25

Cr for 60 kg 1 in 12 Switches and

Rs 16.97 Lakh for 60 kg 1 in 8 1/2

Switches & Rs 4.24 Lakh for 52 kg 1

in 8 1/2 Switches. Transportation:

Rs 26.50 Lac for 60 kg 1 in 12

Switches and Rs 4.50 Lac for 52 kg

1 in 8 1/2 Switches & Rs 1.12 Lakh

for 60 kg 1 in 8 1/2 Switches.

Rs 1.77 Cr 30.11.2010

(extended)

5 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing; Lot

No. 31030802

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs 2.47

Cr for 60 kg 1 in 12 CMS Crossing

and Rs 0.5 Cr for 60 kg 1 in 8 1/2

CMS Crossing. Transportation:

Rs 3.18 Lac for 60 kg 1 in 12 CMS

Crossing and Rs 0.6 Lac for 60 kg 1

in 8 1/2 CMS Crossing.

Rs 3.02 Cr 30.08.2010

(extended)

6 RVNL/Mumbai/Bina-

BPL/ 2006 dated

30.08.2006

30.08.2006 Conducting Final Location Survey (FLS) marking the

center line of the final alignment on the ground and

Detailed Design Engg (DDE) for BG third line between

Bina-Bhopal (138.423 Km) in WC Rly.

RVNL/Mumb/RPS/FLS(Bi

na- BPL)/ 2006 dated

11.12.2006

M/s Monarch Services &

Contractors, Sinhagad Road,

Pune-411030

--- Rs 1.23 Cr 31.03.2011

(extended)

Details of Contracts Placed upto the month of May' 2011 under GM/P-III

7 RVNL/BPL/S&T/HBJ-

BPL-BIN/2

09.06.2009 Supply, installing, modification, testing &commissing of

electronic interlocking system alongwith modification, in

relay based indoor signaling arrangement at PI/RRI/LC

gates, IBH etc. alongwith yard remodeling in connection

with the work of 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central Railway

in the state of Madhya Pradesh (India)

No: RVNL/BPL/S&T/HBJ-

BPL-BIN/2 dated

23.10.2009

M/s Bharat Rail Automations (P)

Ltd. B-107, Mandpeshwar

Industrial Estate, SVP ROAD,

Borivali (W), Mumbai-400092

Signaling & Telecommuction - Rs

23,32,40,706/-

Rs 23.32 Cr 22.10.2011

8 RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901 dated

13.11.2009.

M/s Patil Rail Infrastructure Pvt

Ltd., The Grand, 3rd & 4th Floor

6-3-1090/B-4 Raj Bhawan Road,

Somaji guda, Hyderabad-500082.

Manufacture and Supply: Rs 3.22

Cr. for PSC Turnout Sleeper Set for

1 in 12, 60 kg and Rs 52.63 Lakh

for PSC Turnout Sleeper Set 1 in 8

1/2 for 60 kg . Transportation: Rs

32.86 Lac for PSC Turnout Sleeper

Set for 60 kg 1 in 12 and Rs 6 Lakh

for PSC Turnout Sleeper Set 1 in 8

1/2 for 60 kg.

Rs 4.14 Cr 30.11.2010.

9 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803 dated

17.11.2009

M/s Rayalaseema Concrete

Sleepers Pvt Ltd., The Grand,

3rd & 4th Floor 6-3-1090/B-4 Raj

Bhawan Road, Somaji guda,

Hyderabad-500082.

Manufacture and Supply: Rs 3.34

Cr. for PSC Turnout Sleeper Set for

1 in 12, and Rs 25.26 Lac for PSC

T/out Sleeper Set 1 in 8 1/2 60 kg

& Rs 10.9 lac for PSC Turnout

Sleeper Set for Derailing Switch 60

Kg, Transportation: Rs 20.90 Lac

for PSC Turnout Sleeper Set for 60

kg 1 in 12 and Rs 1.68 Lakh for

PSC Turnout Sleeper Set 1 in 8 1/2

for 60 kg & Rs 0.84 lac for PSC

Turnout Sleeper Set for Derailing

Switch 60 Kg.

Rs 3.92 Cr 28.02.2011.

10 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120801

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120801 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs 5.70

Lac for 1 in 8 1/2 52Kg Curved

Switches and Rs 5.10 Lac for 1 in

81/2 Derailing Switches 52Kg.

Transportation: Rs 1.31 Lac for 1

in 8 1/2 52Kg Curved Switches and

Rs 1.08 Lac for 1 in 8 1/2 Derailing

Switches

Rs 13.19 Lac 10.09.2010

(extended)

11 RVNL/BPL/Elect/HBJ-

BIN/TSS

23.07.2009 Design, Supply, Erection, Testing & commissioning of

132/25 KV Traction Sub-station, Feeding Post, Fixed

Capacitor, bank System & other associated works at

BARETH & SANCHI, TRACTION SUB STATIONS,

Augmentation & replacement of traction transformers AT

BINA TSS, by providing 3rd bay & modification in existing

Feeding Posts at Sukhisewania, Gulabganj in connection

with Electrification of 3rd line on BINA- BHOPAL section

of BHOPAL DIVISION of WCR.

RVNL/BPL/Elect/HBJ-

BIN/TSS

dated18/19.01.2010

M/s S. L. Enterprises 41-A,

Phase-II, Mayapuri Industrial

State, Delhi-110064

Electrical Items-Rs 3.89 Cr for

CORE SOR Items, Rs 11.36 Cr for

Traction Transformer, Rs 0.12 Cr for

Maintenance spares,Rs 0.09 Cr for

Maintenance Tools, Rs 0.35 Cr for

Site Facilities & Rs 2.65 Cr for Misc.

Items,etc.

Rs 18.47 Cr 18.01.2012

12 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120802

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120802 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs 2.33

Cr for 60 Kg CMS Crossing 1 in 12,

and Rs 17.75 Lac for 52 Kg CMS

Crossing 1 in 81/2

Transportation: Rs 2.53 Lac for 60

Kg CMS Crossing 1 in 12, and Rs

0.24 Lac for 52 Kg CMS Crossing 1

in 81/2.

Rs 2.53 Cr 31.10.2010

(extended)

13 RVNL/New Delhi/B-B-

H/PMC/Pt-II

15.10.2009 Project Management Consultancy forConstruction of

Road Bed, Major and Minor Bridges, Track Linking

(excluding supply of rails, thick web switches & sleepers),

S&T and OHE & General Electrical work in connection

with 3rd line between Habibganj & Bina (144.76 Km) on

Bhopal Division of West Central Railway in the state of

Madhya Pradesh (India)

Notification of Award No

RVNL/New Delhi/B-B-

H/PMC/Pt-II dated

23.03.2010

M/s Aarvee Associates

Architects, Engineers &

Consultants Pvt Ltd, Ravula

Residancy, Srinagar Colony,

Hyderabad-82.

Renumerations for -Rs 6.57 Cr for

staff & Provision & maintenance of

Office for- Rs 2.70 Lacs.

Rs 6.60 Cr 22.10.2012

14 No. RVNL/P-

III/TWS/2009/Pt I

25.02.2010 Manufacture and Supply of Curved Switches with ZU-

1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880

Grade) Stock Rail conforming to Indian Railway

Specifications IRS-T-10-2000 for various rail road

projects in different regions of India.

Notification of Award No

No. RVNL/P-

III/TWS/2009/Pt I

Dated 26.05.2010

M/s VAE VKN RTT (JV),

Century Towers,

5th Floor,

45 Shakespeare Sarani,

Kolkata. - 700 017

Manufacture and Supply: Rs 17.79

Cr for 60 kg 1 in 12 TWS

Transportation: Rs 36.84 Lac for

60 kg 1 in 12 TWS.

Rs 18.16 Cr 25.05.2011

(Extended upto

15.09.2011)

Detail of Contract awarded upto May, 2011

Project Planning & Development Department

Sr. No.

Tender No. Date of opening (Tender)

Description of work/study

Contract No. & date (LOA)

Contractor’s Name

Estimated cost of

work (Rs.)

Tendered cost (Rs.)

Scheduled completion date

Physical Progress (upto 31.05.11)

1 RVNL/PP&D/Bankability/Buramara-Chakulia/10

25/03/10

Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER.

RVNL/PP&D/Bankability/Buramara-Chakulia/10 30/04/2010

M/S Feedback Ventures Pvt. Ltd.

15,0

0,0

00/-

13,1

8,0

85/-

3 months from the date of submission of Bank Guarantee (14/05/2010) 15/08/2010 (extended)

Final Report submitted on 21.01.11 and under examination by RVNL Finance.

2

RVNL/PP&D/Bankability/Nallapadu-Guntakal/RE/10

09/04/10

Bankability study of electrification of Nallapadu-Guntakal section

RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10 11/06/2010

M/s PricewaterhouseCoopers Pvt. Ltd

15,0

0,0

00/-

9

,91,5

14/-

3 months from the date of submission of Bank Guarantee (25/06/2010) 25/09/2010 (extended)

Final Report submitted on 27.09.10 and has been sent on 18.05.11 for putting op to RVNL BOD for approval.

3. PP&D/RFP/BOT/CONSULT/2009/Pt. II

21.08.10

Project Consultancy services for development of PPP model in Railway projects.

PP&D/RFP/BOT/CONSULT/2009/Pt. II dated: 25.03.2010

M/s. RITES Ltd.

30,9

3,2

93/-

15,0

0,0

00/-

26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended)

Final Report submitted on 18.05.10 and has been sent on 24.05.11 for putting op to RVNL BOD for approval.

4. PP&D/RVNL/ HX-SBC/2010

23.08.10

Bankability study for Cuddapah-Bangalore New Line project.

PP&D/RVNL/ HX-SBC/2010 24/09/2010

M/s PricewaterhouseCoopers Pvt. Ltd.

12,8

9,3

40/-

14,5

0,1

00/-

8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010

Revised Draft Final Report submitted on 30.05.11 and under examination by RVNL

5.

PP&D/RVNL/ KUR-BOLANGIR/2010

21.09.10

Bankability study for Khurda Road-Bolangir New Line project.

PP&D/RVNL/ KUR-BOLANGIR/2010 04/10/2010

M/S Deloitte Touche Tohmatsu India Pvt. Ltd.

15,0

0,0

00/-

9,6

5,1

25/-

10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011)

Final Report sent to Railway Board on 02.02.11 for examination & acceptance.

6.

PP&D/RVNL/DHD-INDB/Bank/2010

N.A. Study being done in house.

Bankability study for Dahod-Indore New Line project in Western Railway.

PP&D/RVNL/DHD-INDB/Bank/2010 dated 24.12.2010

Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54 ----

---

1,9

5,0

00/-

6 weeks from LAO (24.12.10) for Traffic Study which is out sourced.

Study being done in house. Only Traffic Study Out sourced. Traffic Study draft report submitted on 21.02.11 and under examination. Final traffic report under preparation.

7. PP&D/FT/HUK/2010

21.01.11

Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway.

PP&D/FT/HUK/2010 dated 08.02.2011

M/S Deloitte Touche Tohmatsu India Pvt. Ltd.

5,0

0,0

00/-

8,7

6,8

85/-

16 weeks from the date of acceptance of CV(18/02/2011) 10/06/2011)

Study in progress.

8.

PP&D/RVNL/MCLA-NLDA/Bank/2010

N.A. Study being done in house.

Bankability study for Macherla-NalgondaNew Line project in South Central Railway.

PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11

Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.-43, Gurgaon. --

----

1,7

5,0

00/-

4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. 20.03.2011

Study being done in house. Only Traffic Study Out sourced. Revised draft traffic report submitted on 30.05.11 and under examination.

9. PP&D/RVNL/ADI-UDZ/Bank/2010

N.A. Study done in house.

Bankability study for Ahmedabad-Udaipur Gauge Conversion project in Western Railway.

N.A. N.A. Study done in house.

----

--

----

--

N.A.

Study done in house and Completed, Report sent to Rly. Board on 31.12.2010.

10.

No. PP&D/RVNL/BJ

P-SDB/BANK/2010

20/12/2010

Bankability study of Bijapur -

Shahabad New line in South Western Railway

No. PP&D/RVNL/BJP-

SDB/BANK/2010 Dated: 08/03/2011

M/s Deloitte Touche Tohmatsu India Pvt. Ltd.

15,0

0,0

00.0

0

12,2

8,1

79.4

7

(3 months from LOA dated 08.03.2011) 06/06/2011

Study in progress.

11.

No.

PP&D/RVNL/DWR-BGM/BANK/ 2010

27/12/2010

Bankability study

of Dharwad – Belgaum New line in South Western Railway

No. PP&D/RVNL/DWR

-BGM/BANK/Tender/2010 Dated: 04/04/2011

M/s ARKITECHNO Consultants (India) Pvt. Ltd

14,8

9,0

00.0

0

9,7

1,1

68.0

0

(3 months from LOA) 03/07/2011

Study in progress.

12.

No. PP&D/RVNL/ RDG-TK / BANK/2010

04/1/2011

Bankability study of Rayadurg-Tumkur New line in South Western Railway

No. PP&D/RVNL/ RDG-TK /BANK/2010 Dated: 19/04/2011

M/s Deloitte Touche Tohmatsu India Pvt. Ltd.

14,8

9,0

00.0

0

12,2

8,1

79.4

7

(3 months from LOA) 18.07.2011

Study in progress.

S.No Tender No. Date of

Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)

Estimated Cost (for

Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tendered Cost (for

Engg./Elect./S&T/Mech.)

Scheduled Completion

Date

1 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 1 between Bina (Incl) to Ganj Basoda (Incl) chainage

975.16 to 928.500 (Km 46.66).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-1 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.--

Rs 141.88 Cr March, 2012

2 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 2 between GanjBasoda (Excl) to Sanchi (Incl)

chainage 928.500 to 879.750 (Km 48.75).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-2 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.

--

Rs. 150.05 Cr March, 2012

3 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 3 between Sanchi (Excl) to Habibganj (Incl) chainage

879.750 to 830.850 (Km 48.9).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-3 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. NCCL-ECIECCL-ARPL (JV),

C/o M/S Nagarjuna Construction

Company Limited,4th Floor, Uma

Enclave, Road No. 9,

HYDERABAD-500034. --

Rs 135.65 Cr March, 2012

4 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches; Lot

No. 31030801

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

1.25 Cr for 60 kg 1 in 12 Switches

and Rs 16.97 Lakh for 60 kg 1 in 8

1/2 Switches & Rs 4.24 Lakh for

52 kg 1 in 8 1/2 Switches.

Transportation: Rs 26.50 Lac for

60 kg 1 in 12 Switches and Rs

4.50 Lac for 52 kg 1 in 8 1/2

Switches & Rs 1.12 Lakh for 60 kg

1 in 8 1/2 Switches.

Rs 1.77 Cr 30.11.2010

(extended)

5 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing; Lot

No. 31030802

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

2.47 Cr for 60 kg 1 in 12 CMS

Crossing and Rs 0.5 Cr for 60 kg 1

in 8 1/2 CMS Crossing.

Transportation: Rs 3.18 Lac for

60 kg 1 in 12 CMS Crossing and

Rs 0.6 Lac for 60 kg 1 in 8 1/2

CMS Crossing.

Rs 3.02 Cr 30.08.2010

(extended)

6 RVNL/Mumbai/Bina-

BPL/ 2006 dated

30.08.2006

30.08.2006 Conducting Final Location Survey (FLS) marking the

center line of the final alignment on the ground and

Detailed Design Engg (DDE) for BG third line between

Bina-Bhopal (138.423 Km) in WC Rly.

RVNL/Mumb/RPS/FLS(Bi

na- BPL)/ 2006 dated

11.12.2006

M/s Monarch Services &

Contractors, Sinhagad Road,

Pune-411030

--- Rs 1.23 Cr 31.03.2011

(extended)

Details of Contracts Placed upto the month of June' 2011 under GM/P-III

7 RVNL/BPL/S&T/HBJ-

BPL-BIN/2

09.06.2009 Supply, installing, modification, testing &commissing of

electronic interlocking system alongwith modification, in

relay based indoor signaling arrangement at PI/RRI/LC

gates, IBH etc. alongwith yard remodeling in connection

with the work of 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central Railway

in the state of Madhya Pradesh (India)

No: RVNL/BPL/S&T/HBJ-

BPL-BIN/2 dated

23.10.2009

M/s Bharat Rail Automations (P)

Ltd. B-107, Mandpeshwar

Industrial Estate, SVP ROAD,

Borivali (W), Mumbai-400092

Signaling & Telecommuction - Rs

23,32,40,706/-

Rs 23.32 Cr 22.10.2011

8 RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901 dated

13.11.2009.

M/s Patil Rail Infrastructure Pvt

Ltd., The Grand, 3rd & 4th Floor

6-3-1090/B-4 Raj Bhawan Road,

Somaji guda, Hyderabad-500082.

Manufacture and Supply: Rs

3.22 Cr. for PSC Turnout Sleeper

Set for 1 in 12, 60 kg and Rs

52.63 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg .

Transportation: Rs 32.86 Lac for

PSC Turnout Sleeper Set for 60 kg

1 in 12 and Rs 6 Lakh for PSC

Turnout Sleeper Set 1 in 8 1/2 for

60 kg.

Rs 4.14 Cr 30.11.2010.

9 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803 dated

17.11.2009

M/s Rayalaseema Concrete

Sleepers Pvt Ltd., The Grand,

3rd & 4th Floor 6-3-1090/B-4 Raj

Bhawan Road, Somaji guda,

Hyderabad-500082.

Manufacture and Supply: Rs

3.34 Cr. for PSC Turnout Sleeper

Set for 1 in 12, and Rs 25.26 Lac

for PSC T/out Sleeper Set 1 in 8

1/2 60 kg & Rs 10.9 lac for PSC

Turnout Sleeper Set for Derailing

Switch 60 Kg, Transportation:

Rs 20.90 Lac for PSC Turnout

Sleeper Set for 60 kg 1 in 12 and

Rs 1.68 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg &

Rs 0.84 lac for PSC Turnout

Sleeper Set for Derailing Switch

60 Kg.

Rs 3.92 Cr 28.02.2011.

10 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120801

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120801 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

5.70 Lac for 1 in 8 1/2 52Kg

Curved Switches and Rs 5.10 Lac

for 1 in 81/2 Derailing Switches

52Kg. Transportation: Rs 1.31

Lac for 1 in 8 1/2 52Kg Curved

Switches and Rs 1.08 Lac for 1 in

8 1/2 Derailing Switches

Rs 13.19 Lac 10.09.2010

(extended)

11 RVNL/BPL/Elect/HBJ-

BIN/TSS

23.07.2009 Design, Supply, Erection, Testing & commissioning of

132/25 KV Traction Sub-station, Feeding Post, Fixed

Capacitor, bank System & other associated works at

BARETH & SANCHI, TRACTION SUB STATIONS,

Augmentation & replacement of traction transformers AT

BINA TSS, by providing 3rd bay & modification in existing

Feeding Posts at Sukhisewania, Gulabganj in connection

with Electrification of 3rd line on BINA- BHOPAL section

of BHOPAL DIVISION of WCR.

RVNL/BPL/Elect/HBJ-

BIN/TSS

dated18/19.01.2010

M/s S. L. Enterprises 41-A,

Phase-II, Mayapuri Industrial

State, Delhi-110064

Electrical Items-Rs 3.89 Cr for

CORE SOR Items, Rs 11.36 Cr for

Traction Transformer, Rs 0.12 Cr

for Maintenance spares,Rs 0.09

Cr for Maintenance Tools, Rs 0.35

Cr for Site Facilities & Rs 2.65 Cr

for Misc. Items,etc.

Rs 18.47 Cr 18.01.2012

12 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120802

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120802 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

2.33 Cr for 60 Kg CMS Crossing 1

in 12, and Rs 17.75 Lac for 52 Kg

CMS Crossing 1 in 81/2

Transportation: Rs 2.53 Lac for

60 Kg CMS Crossing 1 in 12, and

Rs 0.24 Lac for 52 Kg CMS

Crossing 1 in 81/2.

Rs 2.53 Cr 31.10.2010

(extended)

13 RVNL/New Delhi/B-B-

H/PMC/Pt-II

15.10.2009 Project Management Consultancy forConstruction of

Road Bed, Major and Minor Bridges, Track Linking

(excluding supply of rails, thick web switches & sleepers),

S&T and OHE & General Electrical work in connection

with 3rd line between Habibganj & Bina (144.76 Km) on

Bhopal Division of West Central Railway in the state of

Madhya Pradesh (India)

Notification of Award No

RVNL/New Delhi/B-B-

H/PMC/Pt-II dated

23.03.2010

M/s Aarvee Associates

Architects, Engineers &

Consultants Pvt Ltd, Ravula

Residancy, Srinagar Colony,

Hyderabad-82.

Renumerations for -Rs 6.57 Cr

for staff & Provision &

maintenance of Office for- Rs

2.70 Lacs.

Rs 6.60 Cr 22.10.2012

14 No. RVNL/P-

III/TWS/2009/Pt I

25.02.2010 Manufacture and Supply of Curved Switches with ZU-

1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880

Grade) Stock Rail conforming to Indian Railway

Specifications IRS-T-10-2000 for various rail road

projects in different regions of India.

Notification of Award No

No. RVNL/P-

III/TWS/2009/Pt I

Dated 26.05.2010

M/s VAE VKN RTT (JV),

Century Towers,

5th Floor,

45 Shakespeare Sarani,

Kolkata. - 700 017

Manufacture and Supply: Rs

17.79 Cr for 60 kg 1 in 12 TWS

Transportation: Rs 36.84 Lac for

60 kg 1 in 12 TWS.

Rs 18.16 Cr 25.05.2011

(Extended upto

15.09.2011)

DETAILS OF CONTRACT PLACED DURING THE MONTH OF JULY, 2011.

Tender No. Date of opening.

Description of Item/work

Contract No.

and date.

Contractor’s Name.

Quantity (for supply contract) Estimated Cost)for Engg.,

S&T/Mech.

Rate (for supply contract) Tendered Cost. (for

Engg./Elect/ S&T/

Mech)

Value of contract. Schedule completion.

IFB No. 2010/ RVNL/ Bilaspur/ DRZ-ROW/04 dated

01.11.2010

28.01.2011 “Construction of Roadbed, Supply of Ballast, Major & Minor

Bridges, Residential and Service Buildings & General Electrical Work

etc. for Keoti - Rowghat Section (53 Km) in Connection with a New

Rail Link between Dallirajhara and Rowghat in Raipur Division of

South East Central Railway in the State of Chhattisgarh, India.”

LOA No. CPM/RVNL/ BSP/Keoti-ROW/JMC/ 357 dated 18.07.2011.

M/s. JMC Projects (India) Ltd.,

Engineers & Contractors, Ahmedabad.

Estimated cost: Rs.131.80 crore

Tender cost: Rs.131.76 Cr.

Rs.1317656338.20/- 30 months + 6 months defect liability period.

DGM/P-II/RVNL/BSP.

S.No Tender No. Date of

Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)

Estimated Cost (for

Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tendered Cost (for

Engg./Elect./S&T/Mech.)

Scheduled Completion

Date

1 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General

Electrical work in connection with 3rd

line between

Habibganj & Bina (144.76 Km) on Bhopal Division of

West Central Railway in the state of Madhya Pradesh

(India) - Package No. 1 between Bina (Incl) to Ganj

Basoda (Incl) chainage 975.16 to 928.500 (Km 46.66).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-1 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No.

979,Mount Poonamalle

Road,Manakakkam, Chennai-

600089. --

Rs 141.88 Cr March, 2012

2 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General

Electrical work in connection with 3rd

line between

Habibganj & Bina (144.76 Km) on Bhopal Division of

West Central Railway in the state of Madhya Pradesh

(India) - Package No. 2 between GanjBasoda (Excl) to

Sanchi (Incl) chainage 928.500 to 879.750 (Km 48.75).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-2 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No.

979,Mount Poonamalle

Road,Manakakkam, Chennai-

600089. --

Rs. 150.05 Cr March, 2012

3 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General

Electrical work in connection with 3rd

line between

Habibganj & Bina (144.76 Km) on Bhopal Division of

West Central Railway in the state of Madhya Pradesh

(India) - Package No. 3 between Sanchi (Excl) to

Habibganj (Incl) chainage 879.750 to 830.850 (Km

48.9).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-3 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. NCCL-ECIECCL-ARPL

(JV), C/o M/S Nagarjuna

Construction Company

Limited,4th Floor, Uma Enclave,

Road No. 9, HYDERABAD-

500034.--

Rs 135.65 Cr March, 2012

4 RVNL/P-III/P.way

items/Guntakul-

Raichur/1 of

2009/Switches; Lot No.

31030801

27.06.2008 Manufacture and supply of P.way items for BG

(1673mm) for patch doubling of Guntakul-Raichur

Section under CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

1.25 Cr for 60 kg 1 in 12 Switches

and Rs 16.97 Lakh for 60 kg 1 in

8 1/2 Switches & Rs 4.24 Lakh

for 52 kg 1 in 8 1/2 Switches.

Transportation: Rs 26.50 Lac

for 60 kg 1 in 12 Switches and Rs

4.50 Lac for 52 kg 1 in 8 1/2

Switches & Rs 1.12 Lakh for 60

kg 1 in 8 1/2 Switches.

Rs 1.77 Cr 30.11.2010

(extended)

5 RVNL/P-III/P.way

items/Guntakul-

Raichur/1 of 2009/CMS

Xing; Lot No. 31030802

27.06.2008 Manufacture and supply of P.way items for BG

(1673mm) for patch doubling of Guntakul-Raichur

Section under CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

2.47 Cr for 60 kg 1 in 12 CMS

Crossing and Rs 0.5 Cr for 60 kg

1 in 8 1/2 CMS Crossing.

Transportation: Rs 3.18 Lac for

60 kg 1 in 12 CMS Crossing and

Rs 0.6 Lac for 60 kg 1 in 8 1/2

CMS Crossing.

Rs 3.02 Cr 30.08.2010

(extended)

6 RVNL/Mumbai/Bina-

BPL/ 2006 dated

30.08.2006

30.08.2006 Conducting Final Location Survey (FLS) marking the

center line of the final alignment on the ground and

Detailed Design Engg (DDE) for BG third line between

Bina-Bhopal (138.423 Km) in WC Rly.

RVNL/Mumb/RPS/FLS(Bi

na- BPL)/ 2006 dated

11.12.2006

M/s Monarch Services &

Contractors, Sinhagad Road,

Pune-411030

--- Rs 1.23 Cr 31.03.2011

(extended)

Details of Contracts Placed upto the month of July' 2011 under GM/P-III

7 RVNL/BPL/S&T/HBJ-

BPL-BIN/2

09.06.2009 Supply, installing, modification, testing &commissing of

electronic interlocking system alongwith modification, in

relay based indoor signaling arrangement at PI/RRI/LC

gates, IBH etc. alongwith yard remodeling in connection

with the work of 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India)

No: RVNL/BPL/S&T/HBJ-

BPL-BIN/2 dated

23.10.2009

M/s Bharat Rail Automations (P)

Ltd. B-107, Mandpeshwar

Industrial Estate, SVP ROAD,

Borivali (W), Mumbai-400092

Signaling & Telecommuction - Rs

23,32,40,706/-

Rs 23.32 Cr 22.10.2011

8 RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901

04.09.2009

.

Manufacture and supply of P.way items for BG

(1673mm) for for patch doubling of Guntakul-Raichur

Section under CPM/RVNL/SC

RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901 dated

13.11.2009.

M/s Patil Rail Infrastructure Pvt

Ltd., The Grand, 3rd & 4th Floor

6-3-1090/B-4 Raj Bhawan Road,

Somaji guda, Hyderabad-

500082.

Manufacture and Supply: Rs

3.22 Cr. for PSC Turnout Sleeper

Set for 1 in 12, 60 kg and Rs

52.63 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg .

Transportation: Rs 32.86 Lac

for PSC Turnout Sleeper Set for

60 kg 1 in 12 and Rs 6 Lakh for

PSC Turnout Sleeper Set 1 in 8

1/2 for 60 kg.

Rs 4.14 Cr 30.11.2010.

9 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803

04.09.2009

.

Manufacture and supply of P.way items for BG

(1673mm) for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803 dated

17.11.2009

M/s Rayalaseema Concrete

Sleepers Pvt Ltd., The Grand,

3rd & 4th Floor 6-3-1090/B-4

Raj Bhawan Road, Somaji guda,

Hyderabad-500082.

Manufacture and Supply: Rs

3.34 Cr. for PSC Turnout Sleeper

Set for 1 in 12, and Rs 25.26 Lac

for PSC T/out Sleeper Set 1 in 8

1/2 60 kg & Rs 10.9 lac for PSC

Turnout Sleeper Set for Derailing

Switch 60 Kg, Transportation:

Rs 20.90 Lac for PSC Turnout

Sleeper Set for 60 kg 1 in 12 and

Rs 1.68 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg &

Rs 0.84 lac for PSC Turnout

Sleeper Set for Derailing Switch

60 Kg.

Rs 3.92 Cr 28.02.2011.

10 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120801

04.09.2009

.

Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120801 dated

18.11.2009

M/s Hindustan Engg. &

Industries Ltd., Mody Building,

27, Sir RN Mukherji Marg,

Kolkata-700001.

Manufacture and Supply: Rs

5.70 Lac for 1 in 8 1/2 52Kg

Curved Switches and Rs 5.10 Lac

for 1 in 81/2 Derailing Switches

52Kg. Transportation: Rs 1.31

Lac for 1 in 8 1/2 52Kg Curved

Switches and Rs 1.08 Lac for 1 in

8 1/2 Derailing Switches

Rs 13.19 Lac 10.09.2010

(extended)

11 RVNL/BPL/Elect/HBJ-

BIN/TSS

23.07.2009 Design, Supply, Erection, Testing & commissioning of

132/25 KV Traction Sub-station, Feeding Post, Fixed

Capacitor, bank System & other associated works at

BARETH & SANCHI, TRACTION SUB STATIONS,

Augmentation & replacement of traction transformers

AT BINA TSS, by providing 3rd bay & modification in

existing Feeding Posts at Sukhisewania, Gulabganj in

connection with Electrification of 3rd line on BINA-

BHOPAL section of BHOPAL DIVISION of WCR.

RVNL/BPL/Elect/HBJ-

BIN/TSS

dated18/19.01.2010

M/s S. L. Enterprises 41-A,

Phase-II, Mayapuri Industrial

State, Delhi-110064

Electrical Items-Rs 3.89 Cr for

CORE SOR Items, Rs 11.36 Cr

for Traction Transformer, Rs 0.12

Cr for Maintenance spares,Rs

0.09 Cr for Maintenance Tools,

Rs 0.35 Cr for Site Facilities & Rs

2.65 Cr for Misc. Items,etc.

Rs 18.47 Cr 18.01.2012

12 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120802

04.09.2009

.

Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120802 dated

18.11.2009

M/s Hindustan Engg. &

Industries Ltd., Mody Building,

27, Sir RN Mukherji Marg,

Kolkata-700001.

Manufacture and Supply: Rs

2.33 Cr for 60 Kg CMS Crossing

1 in 12, and Rs 17.75 Lac for 52

Kg CMS Crossing 1 in 81/2

Transportation: Rs 2.53 Lac for

60 Kg CMS Crossing 1 in 12, and

Rs 0.24 Lac for 52 Kg CMS

Crossing 1 in 81/2.

Rs 2.53 Cr 31.10.2010

(extended)

13 RVNL/New Delhi/B-B-

H/PMC/Pt-II

15.10.2009 Project Management Consultancy forConstruction of

Road Bed, Major and Minor Bridges, Track Linking

(excluding supply of rails, thick web switches &

sleepers), S&T and OHE & General Electrical work in

connection with 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India)

Notification of Award No

RVNL/New Delhi/B-B-

H/PMC/Pt-II dated

23.03.2010

M/s Aarvee Associates

Architects, Engineers &

Consultants Pvt Ltd, Ravula

Residancy, Srinagar Colony,

Hyderabad-82.

Renumerations for -Rs 6.57 Cr

for staff & Provision &

maintenance of Office for- Rs

2.70 Lacs.

Rs 6.60 Cr 22.10.2012

14 No. RVNL/P-

III/TWS/2009/Pt I

25.02.2010 Manufacture and Supply of Curved Switches with ZU-

1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880

Grade) Stock Rail conforming to Indian Railway

Specifications IRS-T-10-2000 for various rail road

projects in different regions of India.

Notification of Award No

No. RVNL/P-

III/TWS/2009/Pt I

Dated 26.05.2010

M/s VAE VKN RTT (JV),

Century Towers,

5th Floor,

45 Shakespeare Sarani,

Kolkata. - 700 017

Manufacture and Supply: Rs

17.79 Cr for 60 kg 1 in 12 TWS

Transportation: Rs 36.84 Lac

for 60 kg 1 in 12 TWS.

Rs 18.16 Cr 25.05.2011

(Extended upto

15.09.2011)

Detail of Contract awarded upto July, 2011

Project Planning & Development Department

Sr. No.

Tender No. Date of opening (Tender)

Description of work/study

Contract No. & date (LOA)

Contractor’s Name

Estimated cost of

work (Rs.)

Tendered cost (Rs.)

Scheduled completion date

Physical Progress

( upto 31.07.11)

1 RVNL/PP&D/Bankability/Buramara -Chakulia/10

25/03/10 Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER.

RVNL/PP&D/Bankability/Buramara-Chakulia/10 30/04/2010

M/S Feedback Ventures Pvt. Ltd.

15,0

0,0

00/-

1

3,1

8,0

85/-

3 months from the date of submission of Bank Guarantee (14/05/2010) 15/08/2010 (extended)

Final Report is being placed before RVNL BOD for approval.

2 RVNL/PP&D/Bankability/Nallapadu -Guntakal/RE/10

09/04/10 Bankability study of electrification of Nallapadu-Guntakal section

RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10 11/06/2010

M/s PricewaterhouseCoopers Pvt. Ltd

15,0

0,0

00/-

9,9

1,5

14/-

3 months from the date of submission of Bank Guarantee (25/06/2010) 25/09/2010 (extended)

Final Report approved by RVNL BOD and is under submission to Railway Board for acceptance.

3. PP&D/RFP/BOT/CONSULT/2009/Pt. II

21.08.10 Project Consultancy services for development of PPP model in Railway projects.

PP&D/RFP/BOT/CONSULT/2009/Pt. II dated: 25.03.2010

M/s. RITES Ltd.

30,9

3,2

93/-

15,0

0,0

00/-

26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended)

Final Report has been approved by RVNL BOD for onward transmission to Railway board for acceptance.

4. PP&D/RVNL/ HX-SBC/2010

23.08.10 Bankability study for Cuddapah-Bangalore New Line project.

PP&D/RVNL/ HX-SBC/2010 24/09/2010

M/s PricewaterhouseCoopers Pvt. Ltd.

12,8

9,3

40/-

1

4,5

0,1

00/-

8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010

Final Report submitted on 26.07.11 and under examination by RVNL.

5. PP&D/RVNL/ KUR-BOLANGIR/2010

21.09.10 Bankability study for Khurda Road-Bolangir New Line project.

PP&D/RVNL/ KUR-BOLANGIR/2010 04/10/2010

M/S Deloitte Touche Tohmatsu India Pvt. Ltd.

15,0

0,0

00/-

9,6

5,1

25/-

10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011)

Final Report sent to Railway Board on 02.02.11 for acceptance.

6. PP&D/RVNL/DHD-INDB/Bank/2010

N.A. Study done in house.

Bankability study for Dahod-Indore New Line project in Western Railway.

PP&D/RVNL/DHD-INDB/Bank/2010 dated 24.12.2010

Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54

----

---

1,9

5,0

00/-

6 weeks from LAO (24.12.10) for Traffic Study which is out sourced.

Study done in house. Only Traffic Study Out sourced. Final report submitted on 20.06.2011 and under examination.

7. PP&D/FT/HUK/2010 21.01.11 Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway.

PP&D/FT/HUK/2010 dated 08.02.2011

M/S Deloitte Touche Tohmatsu India Pvt. Ltd.

5,0

0,0

00/-

8,7

6,8

85/-

16 weeks from the date of acceptance of CV(18/02/2011) 10/06/2011)

Draft Final report submitted on 15.07.2011 and under examination.

8. PP&D/RVNL/MCLA- NLDA/Bank/2010

N.A. Study done in house.

Bankability study for Macherla-NalgondaNew Line project in South Central Railway.

PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11

Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.-43, Gurgaon.

----

--

1,7

5,0

00/-

4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. 20.03.2011

Study done in house. Only Traffic Study Out sourced. Final report submitted on 02.06.2011 and under examination.

9. PP&D/RVNL/ADI -UDZ/Bank/2010

N.A. Study done in house.

Bankability study for Ahmedabad -Udaipur Gauge Conversion project in Western Railway.

N.A. N.A. Study done in house.

----

--

--

----

N.A. Study done in house and Completed, Report sent to Rly. Board on 31.12.2010.

10. No. PP&D/RVNL/BJP -SDB/BANK/2010

20/12/10 Bankability study of Bijapur - Shahabad New line in South Western

Railway

No. PP&D/RVNL/BJP-SDB/BANK/2010 Dated: 08/03/2011

M/s Deloitte Touche

Tohmatsu India Pvt. Ltd.

15,0

0,0

00.0

0

12,2

8,1

79.4

7

(3 months from LOA dated 08.03.2011) 06/06/2011

Draft final report submitted on 10.06.2011 and under examination by RVNL.

11. No. PP&D/RVNL/DWR -BGM/BANK/ 2010

27/12/10 Bankability study of Dharwad – Belgaum New line

in South Western Railway

No. PP&D/RVNL/DWR-

BGM/BANK/Tender/2010 Dated: 04/04/2011

M/s ARKITECHNO Consultants (India)

Pvt. Ltd

14,8

9,0

00.0

0

9,7

1,1

68.0

0

(3 months from LOA)

03/07/2011

Study in progress. Interim report submitted on 23.06.2011

12. No. PP&D/RVNL/ RDG-TK / BANK/2010

04/01/11 Bankability study of Rayadurg-Tumkur

New line in South Western Railway

No. PP&D/RVNL/ RDG-TK

/BANK/2010 Dated: 19/04/2011

M/s Deloitte Touche Tohmatsu

India Pvt. Ltd.

14,8

9,0

00.0

0

12,2

8,1

79.4

7

(3 months from LOA) 18.07.2011

Study in progress. Interim report submitted on 20.06.2011

13. No. 2006/Website/

rvnl.org//Pt.II

N.A. Extension of Web

Space hosting with 100 E-Mail boxes and Maintenance of web Portal of RVNL on nomination basis.

No. 2006/Website/

rvnl.org//Pt.II Dated: 12/05/2011

National Co-

operative Consumers’ Federation of India Ltd. …

…..

2,5

3,0

00.0

0

11/04/2011 to 10/04/2012

N.A.

Detail of Contract awarded upto August, 2011

Project Planning & Development Department

Sr. No.

Tender No. Date of opening (Tender)

Description of work/study

Contract No. & date (LOA)

Contractor’s Name

Estimated cost of

work (Rs.)

Tendered cost (Rs.)

Scheduled completion date

Physical Progress

( upto 31.08.11)

1 RVNL/PP&D/Bankability/Buramara -Chakulia/10

25/03/10 Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER.

RVNL/PP&D/Bankability/Buramara-Chakulia/10 30/04/2010

M/S Feedback Ventures Pvt. Ltd.

15,0

0,0

00/-

1

3,1

8,0

85/-

3 months from the date of submission of Bank Guarantee (14/05/2010) 15/08/2010 (extended)

Final Report sent to Railway Board on 16.08.11 for acceptance.

2 RVNL/PP&D/Bankability/Nallapadu -Guntakal/RE/10

09/04/10 Bankability study of electrification of Nallapadu-Guntakal section

RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10 11/06/2010

M/s PricewaterhouseCoopers Pvt. Ltd

15,0

0,0

00/-

9,9

1,5

14/-

3 months from the date of submission of Bank Guarantee (25/06/2010) 25/09/2010 (extended)

Final Report sent to Railway Board on 04.08.11 for acceptance.

3. PP&D/RFP/BOT/CONSULT/2009/Pt. II

21.08.10 Project Consultancy services for development of PPP model in Railway projects.

PP&D/RFP/BOT/CONSULT/2009/Pt. II dated: 25.03.2010

M/s. RITES Ltd.

30,9

3,2

93/-

15,0

0,0

00/-

26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended)

Final Report has been approved by RVNL BOD for onward transmission to Railway board for acceptance.

4. PP&D/RVNL/ HX-SBC/2010

23.08.10 Bankability study for Cuddapah-Bangalore New Line project.

PP&D/RVNL/ HX-SBC/2010 24/09/2010

M/s PricewaterhouseCoopers Pvt. Ltd.

12,8

9,3

40/-

1

4,5

0,1

00/-

8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010

Final Report submitted on 26.07.11 and under examination by RVNL.

5. PP&D/RVNL/ KUR-BOLANGIR/2010

21.09.10 Bankability study for Khurda Road-Bolangir New Line project.

PP&D/RVNL/ KUR-BOLANGIR/2010 04/10/2010

M/S Deloitte Touche Tohmatsu India Pvt. Ltd.

15,0

0,0

00/-

9,6

5,1

25/-

10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011)

Final Report sent to Railway Board on 02.02.11 for acceptance.

6. PP&D/RVNL/DHD-INDB/Bank/2010

N.A. Study done in house.

Bankability study for Dahod-Indore New Line project in Western Railway.

PP&D/RVNL/DHD-INDB/Bank/2010 dated 24.12.2010

Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54

----

---

1,9

5,0

00/-

6 weeks from LAO (24.12.10) for Traffic Study which is out sourced.

Study done in house. Only Traffic Study Out sourced. Final report submitted on 20.06.2011 and under examination.

7. PP&D/FT/HUK/2010 21.01.11 Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway.

PP&D/FT/HUK/2010 dated 08.02.2011

M/S Deloitte Touche Tohmatsu India Pvt. Ltd.

5,0

0,0

00/-

8,7

6,8

85/-

16 weeks from the date of acceptance of CV(18/02/2011) 10/06/2011)

Draft Final report submitted on 15.07.2011 and under examination.

8. PP&D/RVNL/MCLA- NLDA/Bank/2010

N.A. Study done in house.

Bankability study for Macherla-NalgondaNew Line project in South Central Railway.

PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11

Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.-43, Gurgaon.

----

--

1,7

5,0

00/-

4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. 20.03.2011

Study done in house. Only Traffic Study Out sourced. Revised Final report submitted on 09.08.2011 and under examination.

9. PP&D/RVNL/ADI -UDZ/Bank/2010

N.A. Study done in house.

Bankability study for Ahmedabad -Udaipur Gauge Conversion project in Western Railway.

N.A. N.A. Study done in house.

----

--

--

----

N.A. Study done in house and Completed, Report sent to Rly. Board on 31.12.2010.

10. No. PP&D/RVNL/BJP -SDB/BANK/2010

20/12/10 Bankability study of Bijapur - Shahabad New line in South Western

Railway

No. PP&D/RVNL/BJP-SDB/BANK/2010 Dated: 08/03/2011

M/s Deloitte Touche

Tohmatsu India Pvt. Ltd.

15,0

0,0

00.0

0

12,2

8,1

79.4

7

(3 months from LOA dated 08.03.2011) 06/06/2011

Draft Final report submitted on 11.08.2011 and under examination by RVNL.

11. No. PP&D/RVNL/DWR -BGM/BANK/ 2010

27/12/10 Bankability study of Dharwad – Belgaum New line

in South Western Railway

No. PP&D/RVNL/DWR-

BGM/BANK/Tender/2010 Dated: 04/04/2011

M/s ARKITECHNO Consultants (India)

Pvt. Ltd

14,8

9,0

00.0

0

9,7

1,1

68.0

0

(3 months from LOA dated

04.04.2011)

03/07/2011

Draft Final report submitted on 29.08.2011 and under examination by RVNL.

12. No. PP&D/RVNL/ RDG-TK / BANK/2010

04/01/11 Bankability study of Rayadurg-Tumkur

New line in South Western Railway

No. PP&D/RVNL/ RDG-TK

/BANK/2010 Dated: 19/04/2011

M/s Deloitte Touche Tohmatsu

India Pvt. Ltd.

14,8

9,0

00.0

0

12,2

8,1

79.4

7

(3 months from LOA dated 19.04.2011) 18.07.2011

Draft Final report submitted on 11.08.2011 and under examination by RVNL.

S.No Tender No. Date of

Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)

Estimated Cost (for

Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tendered Cost (for

Engg./Elect./S&T/Mech.)

Scheduled Completion

Date

1 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General

Electrical work in connection with 3rd

line between

Habibganj & Bina (144.76 Km) on Bhopal Division of

West Central Railway in the state of Madhya Pradesh

(India) - Package No. 1 between Bina (Incl) to Ganj

Basoda (Incl) chainage 975.16 to 928.500 (Km 46.66).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-1 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No.

979,Mount Poonamalle

Road,Manakakkam, Chennai-

600089. --

Rs 141.88 Cr March, 2012

2 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General

Electrical work in connection with 3rd

line between

Habibganj & Bina (144.76 Km) on Bhopal Division of

West Central Railway in the state of Madhya Pradesh

(India) - Package No. 2 between GanjBasoda (Excl) to

Sanchi (Incl) chainage 928.500 to 879.750 (Km 48.75).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-2 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No.

979,Mount Poonamalle

Road,Manakakkam, Chennai-

600089. --

Rs. 150.05 Cr March, 2012

3 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General

Electrical work in connection with 3rd

line between

Habibganj & Bina (144.76 Km) on Bhopal Division of

West Central Railway in the state of Madhya Pradesh

(India) - Package No. 3 between Sanchi (Excl) to

Habibganj (Incl) chainage 879.750 to 830.850 (Km

48.9).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-3 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. NCCL-ECIECCL-ARPL

(JV), C/o M/S Nagarjuna

Construction Company

Limited,4th Floor, Uma Enclave,

Road No. 9, HYDERABAD-

500034.--

Rs 135.65 Cr March, 2012

4 RVNL/P-III/P.way

items/Guntakul-

Raichur/1 of

2009/Switches; Lot No.

31030801

27.06.2008 Manufacture and supply of P.way items for BG

(1673mm) for patch doubling of Guntakul-Raichur

Section under CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

1.25 Cr for 60 kg 1 in 12 Switches

and Rs 16.97 Lakh for 60 kg 1 in

8 1/2 Switches & Rs 4.24 Lakh

for 52 kg 1 in 8 1/2 Switches.

Transportation: Rs 26.50 Lac

for 60 kg 1 in 12 Switches and Rs

4.50 Lac for 52 kg 1 in 8 1/2

Switches & Rs 1.12 Lakh for 60

kg 1 in 8 1/2 Switches.

Rs 1.77 Cr 30.11.2010

(extended)

5 RVNL/P-III/P.way

items/Guntakul-

Raichur/1 of 2009/CMS

Xing; Lot No. 31030802

27.06.2008 Manufacture and supply of P.way items for BG

(1673mm) for patch doubling of Guntakul-Raichur

Section under CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

2.47 Cr for 60 kg 1 in 12 CMS

Crossing and Rs 0.5 Cr for 60 kg

1 in 8 1/2 CMS Crossing.

Transportation: Rs 3.18 Lac for

60 kg 1 in 12 CMS Crossing and

Rs 0.6 Lac for 60 kg 1 in 8 1/2

CMS Crossing.

Rs 3.02 Cr 30.08.2010

(extended)

6 RVNL/Mumbai/Bina-

BPL/ 2006 dated

30.08.2006

30.08.2006 Conducting Final Location Survey (FLS) marking the

center line of the final alignment on the ground and

Detailed Design Engg (DDE) for BG third line between

Bina-Bhopal (138.423 Km) in WC Rly.

RVNL/Mumb/RPS/FLS(Bi

na- BPL)/ 2006 dated

11.12.2006

M/s Monarch Services &

Contractors, Sinhagad Road,

Pune-411030

--- Rs 1.23 Cr 31.03.2011

(extended)

Details of Contracts Placed upto the month of Sept' 2011 under GM/P-III

7 RVNL/BPL/S&T/HBJ-

BPL-BIN/2

09.06.2009 Supply, installing, modification, testing &commissing of

electronic interlocking system alongwith modification, in

relay based indoor signaling arrangement at PI/RRI/LC

gates, IBH etc. alongwith yard remodeling in connection

with the work of 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India)

No: RVNL/BPL/S&T/HBJ-

BPL-BIN/2 dated

23.10.2009

M/s Bharat Rail Automations (P)

Ltd. B-107, Mandpeshwar

Industrial Estate, SVP ROAD,

Borivali (W), Mumbai-400092

Signaling & Telecommuction - Rs

23,32,40,706/-

Rs 23.32 Cr 22.10.2011

8 RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901

04.09.2009

.

Manufacture and supply of P.way items for BG

(1673mm) for for patch doubling of Guntakul-Raichur

Section under CPM/RVNL/SC

RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901 dated

13.11.2009.

M/s Patil Rail Infrastructure Pvt

Ltd., The Grand, 3rd & 4th Floor

6-3-1090/B-4 Raj Bhawan Road,

Somaji guda, Hyderabad-

500082.

Manufacture and Supply: Rs

3.22 Cr. for PSC Turnout Sleeper

Set for 1 in 12, 60 kg and Rs

52.63 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg .

Transportation: Rs 32.86 Lac

for PSC Turnout Sleeper Set for

60 kg 1 in 12 and Rs 6 Lakh for

PSC Turnout Sleeper Set 1 in 8

1/2 for 60 kg.

Rs 4.14 Cr 30.11.2010.

9 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803

04.09.2009

.

Manufacture and supply of P.way items for BG

(1673mm) for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803 dated

17.11.2009

M/s Rayalaseema Concrete

Sleepers Pvt Ltd., The Grand,

3rd & 4th Floor 6-3-1090/B-4

Raj Bhawan Road, Somaji guda,

Hyderabad-500082.

Manufacture and Supply: Rs

3.34 Cr. for PSC Turnout Sleeper

Set for 1 in 12, and Rs 25.26 Lac

for PSC T/out Sleeper Set 1 in 8

1/2 60 kg & Rs 10.9 lac for PSC

Turnout Sleeper Set for Derailing

Switch 60 Kg, Transportation:

Rs 20.90 Lac for PSC Turnout

Sleeper Set for 60 kg 1 in 12 and

Rs 1.68 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg &

Rs 0.84 lac for PSC Turnout

Sleeper Set for Derailing Switch

60 Kg.

Rs 3.92 Cr 28.02.2011.

10 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120801

04.09.2009

.

Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120801 dated

18.11.2009

M/s Hindustan Engg. &

Industries Ltd., Mody Building,

27, Sir RN Mukherji Marg,

Kolkata-700001.

Manufacture and Supply: Rs

5.70 Lac for 1 in 8 1/2 52Kg

Curved Switches and Rs 5.10 Lac

for 1 in 81/2 Derailing Switches

52Kg. Transportation: Rs 1.31

Lac for 1 in 8 1/2 52Kg Curved

Switches and Rs 1.08 Lac for 1 in

8 1/2 Derailing Switches

Rs 13.19 Lac 10.09.2010

(extended)

11 RVNL/BPL/Elect/HBJ-

BIN/TSS

23.07.2009 Design, Supply, Erection, Testing & commissioning of

132/25 KV Traction Sub-station, Feeding Post, Fixed

Capacitor, bank System & other associated works at

BARETH & SANCHI, TRACTION SUB STATIONS,

Augmentation & replacement of traction transformers

AT BINA TSS, by providing 3rd bay & modification in

existing Feeding Posts at Sukhisewania, Gulabganj in

connection with Electrification of 3rd line on BINA-

BHOPAL section of BHOPAL DIVISION of WCR.

RVNL/BPL/Elect/HBJ-

BIN/TSS

dated18/19.01.2010

M/s S. L. Enterprises 41-A,

Phase-II, Mayapuri Industrial

State, Delhi-110064

Electrical Items-Rs 3.89 Cr for

CORE SOR Items, Rs 11.36 Cr

for Traction Transformer, Rs 0.12

Cr for Maintenance spares,Rs

0.09 Cr for Maintenance Tools,

Rs 0.35 Cr for Site Facilities & Rs

2.65 Cr for Misc. Items,etc.

Rs 18.47 Cr 18.01.2012

12 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120802

04.09.2009

.

Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120802 dated

18.11.2009

M/s Hindustan Engg. &

Industries Ltd., Mody Building,

27, Sir RN Mukherji Marg,

Kolkata-700001.

Manufacture and Supply: Rs

2.33 Cr for 60 Kg CMS Crossing

1 in 12, and Rs 17.75 Lac for 52

Kg CMS Crossing 1 in 81/2

Transportation: Rs 2.53 Lac for

60 Kg CMS Crossing 1 in 12, and

Rs 0.24 Lac for 52 Kg CMS

Crossing 1 in 81/2.

Rs 2.53 Cr 31.10.2010

(extended)

13 RVNL/New Delhi/B-B-

H/PMC/Pt-II

15.10.2009 Project Management Consultancy forConstruction of

Road Bed, Major and Minor Bridges, Track Linking

(excluding supply of rails, thick web switches &

sleepers), S&T and OHE & General Electrical work in

connection with 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India)

Notification of Award No

RVNL/New Delhi/B-B-

H/PMC/Pt-II dated

23.03.2010

M/s Aarvee Associates

Architects, Engineers &

Consultants Pvt Ltd, Ravula

Residancy, Srinagar Colony,

Hyderabad-82.

Renumerations for -Rs 6.57 Cr

for staff & Provision &

maintenance of Office for- Rs

2.70 Lacs.

Rs 6.60 Cr 22.10.2012

14 No. RVNL/P-

III/TWS/2009/Pt I

25.02.2010 Manufacture and Supply of Curved Switches with ZU-

1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880

Grade) Stock Rail conforming to Indian Railway

Specifications IRS-T-10-2000 for various rail road

projects in different regions of India.

Notification of Award No

No. RVNL/P-

III/TWS/2009/Pt I

Dated 26.05.2010

M/s VAE VKN RTT (JV),

Century Towers,

5th Floor,

45 Shakespeare Sarani,

Kolkata. - 700 017

Manufacture and Supply: Rs

17.79 Cr for 60 kg 1 in 12 TWS

Transportation: Rs 36.84 Lac

for 60 kg 1 in 12 TWS.

Rs 18.16 Cr 25.05.2011

(Extended upto

31.12.2011)

Detail of Contract awarded upto October, 2011

Project Planning & Development Department

Sr. No.

Tender No. Date of opening (Tender)

Description of work/study

Contract No. & date (LOA)

Contractor’s Name

Estimated cost of

work (Rs.)

Tendered cost (Rs.)

Scheduled completion date

Physical Progress

( upto 31.10.11)

1 RVNL/PP&D/Bankability/Buramara -Chakulia/10

25/03/10 Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER.

RVNL/PP&D/Bankability/Buramara-Chakulia/10 30/04/2010

M/S Feedback Ventures Pvt. Ltd.

15,0

0,0

00/-

1

3,1

8,0

85/-

3 months from the date of submission of Bank Guarantee (14/05/2010) 15/08/2010 (extended)

Final Report sent to Railway Board on 16.08.11 for acceptance.

2 RVNL/PP&D/Bankability/Nallapadu -Guntakal/RE/10

09/04/10 Bankability study of electrification of Nallapadu-Guntakal section

RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10 11/06/2010

M/s PricewaterhouseCoopers Pvt. Ltd

15,0

0,0

00/-

9,9

1,5

14/-

3 months from the date of submission of Bank Guarantee (25/06/2010) 25/09/2010 (extended)

Final Report sent to Railway Board on 04.08.11 for acceptance.

3. PP&D/RFP/BOT/CONSULT/2009/Pt. II

21.08.10 Project Consultancy services for development of PPP model in Railway projects.

PP&D/RFP/BOT/CONSULT/2009/Pt. II dated: 25.03.2010

M/s. RITES Ltd.

30,9

3,2

93/-

15,0

0,0

00/-

26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended)

Final Report sent to Railway Board on 21.09.11 for acceptance.

4. PP&D/RVNL/ HX-SBC/2010

23.08.10 Bankability study for Cuddapah-Bangalore New Line project.

PP&D/RVNL/ HX-SBC/2010 24/09/2010

M/s PricewaterhouseCoopers Pvt. Ltd.

12,8

9,3

40/-

1

4,5

0,1

00/-

8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010

Revised Final Report submitted on 03.10.11 and under examination by RVNL Finance.

5. PP&D/RVNL/ KUR-BOLANGIR/2010

21.09.10 Bankability study for Khurda Road-Bolangir New Line project.

PP&D/RVNL/ KUR-BOLANGIR/2010 04/10/2010

M/S Deloitte Touche Tohmatsu India Pvt. Ltd.

15,0

0,0

00/-

9,6

5,1

25/-

10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011)

Final Report sent to Railway Board on 02.02.11 for acceptance.

6. PP&D/RVNL/DHD-INDB/Bank/2010

N.A. Study done in house.

Bankability study for Dahod-Indore New Line project in Western Railway.

PP&D/RVNL/DHD-INDB/Bank/2010 dated 24.12.2010

Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54

----

---

1,9

5,0

00/-

6 weeks from LAO (24.12.10) for Traffic Study which is out sourced.

Study done in house. Only Traffic Study Out sourced. Final report submitted on 20.06.2011 and under examination.

7. PP&D/FT/HUK/2010 21.01.11 Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway.

PP&D/FT/HUK/2010 dated 08.02.2011

M/S Deloitte Touche Tohmatsu India Pvt. Ltd.

5,0

0,0

00/-

8,7

6,8

85/-

16 weeks from the date of acceptance of CV(18/02/2011) 10/06/2011)

Draft Final report submitted on 15.07.2011 and under examination.

8. PP&D/RVNL/MCLA- NLDA/Bank/2010

N.A. Study done in house.

Bankability study for Macherla-Nalgonda New Line project in South Central Railway.

PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11

Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.-43, Gurgaon.

----

--

1,7

5,0

00/-

4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. 20.03.2011

Study done in house. Only Traffic Study Out sourced. Revised Final report submitted on 09.08.2011 and under examination.

9. PP&D/RVNL/ADI -UDZ/Bank/2010

N.A. Study done in house.

Bankability study for Ahmedabad -Udaipur Gauge Conversion project in Western Railway.

N.A. N.A. Study done in house.

----

--

--

----

N.A. Study done in house and Completed, Report sent to Rly. Board on 31.12.2010.

10. No. PP&D/RVNL/BJP -SDB/BANK/2010

20/12/10 Bankability study of Bijapur - Shahabad New line in South Western

Railway

No. PP&D/RVNL/BJP-SDB/BANK/2010 Dated: 08/03/2011

M/s Deloitte Touche

Tohmatsu India Pvt. Ltd.

15,0

0,0

00.0

0

12,2

8,1

79.4

7

(3 months from LOA dated 08.03.2011) 06/06/2011

Revised Final report submitted on 07.10.2011 and under examination by RVNL Finance.

11. No. PP&D/RVNL/DWR -BGM/BANK/ 2010

27/12/10 Bankability study of Dharwad – Belgaum New line

in South Western Railway

No. PP&D/RVNL/DWR-

BGM/BANK/Tender/2010 Dated: 04/04/2011

M/s ARKITECHNO Consultants (India)

Pvt. Ltd

14,8

9,0

00.0

0

9,7

1,1

68.0

0

(3 months from LOA dated

04.04.2011)

03/07/2011

Revised Final report submitted on 05.10.2011 and under examination by RVNL Finance.

12. No. PP&D/RVNL/ RDG-TK / BANK/2010

04/01/11 Bankability study of Rayadurg-Tumkur

New line in South Western Railway

No. PP&D/RVNL/ RDG-TK

/BANK/2010 Dated: 19/04/2011

M/s Deloitte Touche Tohmatsu

India Pvt. Ltd.

14,8

9,0

00.0

0

12,2

8,1

79.4

7

(3 months from LOA dated 19.04.2011) 18.07.2011

Revised Final report submitted on 07.10.2011 and under examination by RVNL Finance.

S.No Tender No. Date of

Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)

Estimated Cost (for

Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tendered Cost (for

Engg./Elect./S&T/Mech.)

Scheduled Completion

Date

1 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges, Track

Linking (excluding supply of rails, thick web switches &

sleepers), S&T and OHE & General Electrical work in

connection with 3rd

line between Habibganj & Bina (144.76

Km) on Bhopal Division of West Central Railway in the

state of Madhya Pradesh (India) - Package No. 1 between

Bina (Incl) to Ganj Basoda (Incl) chainage 975.16 to

928.500 (Km 46.66).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-1 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.--

Rs 141.88 Cr March, 2012

2 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges, Track

Linking (excluding supply of rails, thick web switches &

sleepers), S&T and OHE & General Electrical work in

connection with 3rd

line between Habibganj & Bina (144.76

Km) on Bhopal Division of West Central Railway in the

state of Madhya Pradesh (India) - Package No. 2 between

GanjBasoda (Excl) to Sanchi (Incl) chainage 928.500 to

879.750 (Km 48.75).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-2 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.

--

Rs. 150.05 Cr March, 2012

3 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges, Track

Linking (excluding supply of rails, thick web switches &

sleepers), S&T and OHE & General Electrical work in

connection with 3rd

line between Habibganj & Bina (144.76

Km) on Bhopal Division of West Central Railway in the

state of Madhya Pradesh (India) - Package No. 3 between

Sanchi (Excl) to Habibganj (Incl) chainage 879.750 to

830.850 (Km 48.9).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-3 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. NCCL-ECIECCL-ARPL

(JV), C/o M/S Nagarjuna

Construction Company

Limited,4th Floor, Uma Enclave,

Road No. 9, HYDERABAD-

500034.

--

Rs 135.65 Cr March, 2012

4 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches; Lot No.

31030801

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches dated

30.03.2009

M/s VAE VKN Industries Pvt. Ltd.,

24/5 Sriram Road, Civil Lines,

Delhi-110054.

Manufacture and Supply: Rs

1.25 Cr for 60 kg 1 in 12 Switches

and Rs 16.97 Lakh for 60 kg 1 in 8

1/2 Switches & Rs 4.24 Lakh for 52

kg 1 in 8 1/2 Switches.

Transportation: Rs 26.50 Lac for

60 kg 1 in 12 Switches and Rs 4.50

Lac for 52 kg 1 in 8 1/2 Switches &

Rs 1.12 Lakh for 60 kg 1 in 8 1/2

Switches.

Rs 1.77 Cr 25.12.2010

(extended)

5 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing; Lot

No. 31030802

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing dated

30.03.2009

M/s VAE VKN Industries Pvt. Ltd.,

24/5 Sriram Road, Civil Lines,

Delhi-110054.

Manufacture and Supply: Rs

2.47 Cr for 60 kg 1 in 12 CMS

Crossing and Rs 0.5 Cr for 60 kg 1

in 8 1/2 CMS Crossing.

Transportation: Rs 3.18 Lac for

60 kg 1 in 12 CMS Crossing and

Rs 0.6 Lac for 60 kg 1 in 8 1/2

CMS Crossing.

Rs 3.02 Cr 30.08.2010

(extended)

6 RVNL/Mumbai/Bina-

BPL/ 2006 dated

30.08.2006

30.08.2006 Conducting Final Location Survey (FLS) marking the

center line of the final alignment on the ground and

Detailed Design Engg (DDE) for BG third line between

Bina-Bhopal (138.423 Km) in WC Rly.

RVNL/Mumb/RPS/FLS(Bi

na- BPL)/ 2006 dated

11.12.2006

M/s Monarch Services &

Contractors, Sinhagad Road,

Pune-411030

--- Rs 1.23 Cr 31.03.2011

(extended)

Details of Contracts Placed upto the month of Oct' 2011 under GM/P-III

7 RVNL/BPL/S&T/HBJ-

BPL-BIN/2

09.06.2009 Supply, installing, modification, testing &commissing of

electronic interlocking system alongwith modification, in

relay based indoor signaling arrangement at PI/RRI/LC

gates, IBH etc. alongwith yard remodeling in connection

with the work of 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central Railway

in the state of Madhya Pradesh (India)

No: RVNL/BPL/S&T/HBJ-

BPL-BIN/2 dated

23.10.2009

M/s Bharat Rail Automations (P)

Ltd. B-107, Mandpeshwar

Industrial Estate, SVP ROAD,

Borivali (W), Mumbai-400092

Signaling & Telecommuction - Rs

23,32,40,706/-

Rs 23.32 Cr 22.10.2011

8 RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901 dated

13.11.2009.

M/s Patil Rail Infrastructure Pvt

Ltd., The Grand, 3rd & 4th Floor 6-

3-1090/B-4 Raj Bhawan Road,

Somaji guda, Hyderabad-500082.

Manufacture and Supply: Rs

3.22 Cr. for PSC Turnout Sleeper

Set for 1 in 12, 60 kg and Rs

52.63 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg .

Transportation: Rs 32.86 Lac for

PSC Turnout Sleeper Set for 60 kg

1 in 12 and Rs 6 Lakh for PSC

Turnout Sleeper Set 1 in 8 1/2 for

60 kg.

Rs 4.14 Cr 30.11.2010.

9 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803 dated

17.11.2009

M/s Rayalaseema Concrete

Sleepers Pvt Ltd., The Grand, 3rd

& 4th Floor 6-3-1090/B-4 Raj

Bhawan Road, Somaji guda,

Hyderabad-500082.

Manufacture and Supply: Rs

3.34 Cr. for PSC Turnout Sleeper

Set for 1 in 12, and Rs 25.26 Lac

for PSC T/out Sleeper Set 1 in 8

1/2 60 kg & Rs 10.9 lac for PSC

Turnout Sleeper Set for Derailing

Switch 60 Kg, Transportation: Rs

20.90 Lac for PSC Turnout Sleeper

Set for 60 kg 1 in 12 and Rs 1.68

Lakh for PSC Turnout Sleeper Set

1 in 8 1/2 for 60 kg & Rs 0.84 lac

for PSC Turnout Sleeper Set for

Derailing Switch 60 Kg.

Rs 3.92 Cr 28.02.2011.

10 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120801

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120801 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

5.70 Lac for 1 in 8 1/2 52Kg

Curved Switches and Rs 5.10 Lac

for 1 in 81/2 Derailing Switches

52Kg. Transportation: Rs 1.31

Lac for 1 in 8 1/2 52Kg Curved

Switches and Rs 1.08 Lac for 1 in

8 1/2 Derailing Switches

Rs 13.19 Lac 10.09.2010

(extended)

11 RVNL/BPL/Elect/HBJ-

BIN/TSS

23.07.2009 Design, Supply, Erection, Testing & commissioning of

132/25 KV Traction Sub-station, Feeding Post, Fixed

Capacitor, bank System & other associated works at

BARETH & SANCHI, TRACTION SUB STATIONS,

Augmentation & replacement of traction transformers AT

BINA TSS, by providing 3rd bay & modification in existing

Feeding Posts at Sukhisewania, Gulabganj in connection

with Electrification of 3rd line on BINA- BHOPAL section of

BHOPAL DIVISION of WCR.

RVNL/BPL/Elect/HBJ-

BIN/TSS

dated18/19.01.2010

M/s S. L. Enterprises 41-A,

Phase-II, Mayapuri Industrial

State, Delhi-110064

Electrical Items-Rs 3.89 Cr for

CORE SOR Items, Rs 11.36 Cr for

Traction Transformer, Rs 0.12 Cr

for Maintenance spares,Rs 0.09

Cr for Maintenance Tools, Rs 0.35

Cr for Site Facilities & Rs 2.65 Cr

for Misc. Items,etc.

Rs 18.47 Cr 18.01.2012

12 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120802

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120802 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

2.33 Cr for 60 Kg CMS Crossing 1

in 12, and Rs 17.75 Lac for 52 Kg

CMS Crossing 1 in 81/2

Transportation: Rs 2.53 Lac for

60 Kg CMS Crossing 1 in 12, and

Rs 0.24 Lac for 52 Kg CMS

Crossing 1 in 81/2.

Rs 2.53 Cr 31.10.2010

(extended)

13 RVNL/New Delhi/B-B-

H/PMC/Pt-II

15.10.2009 Project Management Consultancy forConstruction of Road

Bed, Major and Minor Bridges, Track Linking (excluding

supply of rails, thick web switches & sleepers), S&T and

OHE & General Electrical work in connection with 3rd line

between Habibganj & Bina (144.76 Km) on Bhopal Division

of West Central Railway in the state of Madhya Pradesh

(India)

Notification of Award No

RVNL/New Delhi/B-B-

H/PMC/Pt-II dated

23.03.2010

M/s Aarvee Associates

Architects, Engineers &

Consultants Pvt Ltd, Ravula

Residancy, Srinagar Colony,

Hyderabad-82.

Renumerations for -Rs 6.57 Cr

for staff & Provision &

maintenance of Office for- Rs

2.70 Lacs.

Rs 6.60 Cr 22.10.2012

14 No. RVNL/P-

III/TWS/2009/Pt I

25.02.2010 Manufacture and Supply of Curved Switches with ZU-

1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880

Grade) Stock Rail conforming to Indian Railway

Specifications IRS-T-10-2000 for various rail road

projects in different regions of India.

Notification of Award No

No. RVNL/P-

III/TWS/2009/Pt I

Dated 26.05.2010

M/s VAE VKN RTT (JV),

Century Towers,

5th Floor,

45 Shakespeare Sarani,

Kolkata. - 700 017

Manufacture and Supply: Rs

17.79 Cr for 60 kg 1 in 12 TWS

Transportation: Rs 36.84 Lac for

60 kg 1 in 12 TWS.

Rs 18.16 Cr 25.05.2011

(Extended upto

31.12.2011)

Detail of Contract awarded upto November, 2011

Project Planning & Development Department

Sr. No.

Tender No. Date of opening (Tender)

Description of work/study

Contract No. & date (LOA)

Contractor’s Name

Estimated cost of

work (Rs.)

Tendered cost (Rs.)

Scheduled completion date

Physical Progress

( upto 30.11.11)

1 RVNL/PP&D/Bankability/Buramara -Chakulia/10

25/03/10 Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER.

RVNL/PP&D/Bankability/Buramara-Chakulia/10 30/04/2010

M/S Feedback Ventures Pvt. Ltd.

15,0

0,0

00/-

1

3,1

8,0

85/-

3 months from the date of submission of Bank Guarantee (14/05/2010) 15/08/2010 (extended)

Final Report sent to Railway Board on 16.08.11 for acceptance.

2 RVNL/PP&D/Bankability/Nallapadu -Guntakal/RE/10

09/04/10 Bankability study of electrification of Nallapadu-Guntakal section

RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10 11/06/2010

M/s PricewaterhouseCoopers Pvt. Ltd

15,0

0,0

00/-

9,9

1,5

14/-

3 months from the date of submission of Bank Guarantee (25/06/2010) 25/09/2010 (extended)

Final Report sent to Railway Board on 04.08.11 for acceptance.

3. PP&D/RFP/BOT/CONSULT/2009/Pt. II

21.08.10 Project Consultancy services for development of PPP model in Railway projects.

PP&D/RFP/BOT/CONSULT/2009/Pt. II dated: 25.03.2010

M/s. RITES Ltd.

30,9

3,2

93/-

15,0

0,0

00/-

26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended)

Final Report sent to Railway Board on 21.09.11 for acceptance.

4. PP&D/RVNL/ HX-SBC/2010

23.08.10 Bankability study for Cuddapah-Bangalore New Line project.

PP&D/RVNL/ HX-SBC/2010 24/09/2010

M/s PricewaterhouseCoopers Pvt. Ltd.

12,8

9,3

40/-

1

4,5

0,1

00/-

8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010

Revised Final Report submitted on 03.10.11 and under examination by RVNL Finance.

5. PP&D/RVNL/ KUR-BOLANGIR/2010

21.09.10 Bankability study for Khurda Road-Bolangir New Line project.

PP&D/RVNL/ KUR-BOLANGIR/2010 04/10/2010

M/S Deloitte Touche Tohmatsu India Pvt. Ltd.

15,0

0,0

00/-

9,6

5,1

25/-

10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011)

Final Report sent to Railway Board on 02.02.11 for acceptance.

6. PP&D/RVNL/DHD-INDB/Bank/2010

N.A. Study done in house.

Bankability study for Dahod-Indore New Line project in Western Railway.

PP&D/RVNL/DHD-INDB/Bank/2010 dated 24.12.2010

Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54

----

---

1,9

5,0

00/-

6 weeks from LAO (24.12.10) for Traffic Study which is out sourced.

Study done in house. Only Traffic Study Out sourced. Final report submitted on 20.06.2011 and under examination.

7. PP&D/FT/HUK/2010 21.01.11 Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway.

PP&D/FT/HUK/2010 dated 08.02.2011

M/S Deloitte Touche Tohmatsu India Pvt. Ltd.

5,0

0,0

00/-

8,7

6,8

85/-

16 weeks from the date of acceptance of CV(18/02/2011) 10/06/2011)

Draft Final report submitted on 15.07.2011 and under examination.

8. PP&D/RVNL/MCLA- NLDA/Bank/2010

N.A. Study done in house.

Bankability study for Macherla-Nalgonda New Line project in South Central Railway.

PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11

Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.-43, Gurgaon.

----

--

1,7

5,0

00/-

4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. 20.03.2011

Study done in house. Only Traffic Study Out sourced. Revised Final report submitted on 09.08.2011 and under examination.

9. PP&D/RVNL/ADI -UDZ/Bank/2010

N.A. Study done in house.

Bankability study for Ahmedabad -Udaipur Gauge Conversion project in Western Railway.

N.A. N.A. Study done in house.

----

--

--

----

N.A. Study done in house and Completed, Report sent to Rly. Board on 31.12.2010.

10. No. PP&D/RVNL/BJP -SDB/BANK/2010

20/12/10 Bankability study of Bijapur - Shahabad New line in South Western

Railway

No. PP&D/RVNL/BJP-SDB/BANK/2010 Dated: 08/03/2011

M/s Deloitte Touche

Tohmatsu India Pvt. Ltd.

15,0

0,0

00.0

0

12,2

8,1

79.4

7

(3 months from LOA dated 08.03.2011) 06/06/2011

Revised Final report submitted on 07.10.2011 and under examination by RVNL Finance.

11. No. PP&D/RVNL/DWR -BGM/BANK/ 2010

27/12/10 Bankability study of Dharwad – Belgaum New line

in South Western Railway

No. PP&D/RVNL/DWR-

BGM/BANK/Tender/2010 Dated: 04/04/2011

M/s ARKITECHNO Consultants (India)

Pvt. Ltd

14,8

9,0

00.0

0

9,7

1,1

68.0

0

(3 months from LOA dated

04.04.2011)

03/07/2011

Revised Final report submitted on 05.10.2011 and under examination by RVNL Finance.

12. No. PP&D/RVNL/ RDG-TK / BANK/2010

04/01/11 Bankability study of Rayadurg-Tumkur

New line in South Western Railway

No. PP&D/RVNL/ RDG-TK

/BANK/2010 Dated: 19/04/2011

M/s Deloitte Touche Tohmatsu

India Pvt. Ltd.

14,8

9,0

00.0

0

12,2

8,1

79.4

7

(3 months from LOA dated 19.04.2011) 18.07.2011

Revised Final report submitted on 07.10.2011 and under examination by RVNL Finance.

S.No Tender No. Date of

Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)

Estimated Cost (for

Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tendered Cost (for

Engg./Elect./S&T/Mech.)

Scheduled Completion

Date

1 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General

Electrical work in connection with 3rd

line between

Habibganj & Bina (144.76 Km) on Bhopal Division of

West Central Railway in the state of Madhya Pradesh

(India) - Package No. 1 between Bina (Incl) to Ganj

Basoda (Incl) chainage 975.16 to 928.500 (Km 46.66).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-1 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No.

979,Mount Poonamalle

Road,Manakakkam, Chennai-

600089. --

Rs 141.88 Cr March, 2012

2 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General

Electrical work in connection with 3rd

line between

Habibganj & Bina (144.76 Km) on Bhopal Division of

West Central Railway in the state of Madhya Pradesh

(India) - Package No. 2 between GanjBasoda (Excl) to

Sanchi (Incl) chainage 928.500 to 879.750 (Km 48.75).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-2 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No.

979,Mount Poonamalle

Road,Manakakkam, Chennai-

600089. --

Rs. 150.05 Cr March, 2012

3 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General

Electrical work in connection with 3rd

line between

Habibganj & Bina (144.76 Km) on Bhopal Division of

West Central Railway in the state of Madhya Pradesh

(India) - Package No. 3 between Sanchi (Excl) to

Habibganj (Incl) chainage 879.750 to 830.850 (Km

48.9).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-3 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. NCCL-ECIECCL-ARPL

(JV), C/o M/S Nagarjuna

Construction Company

Limited,4th Floor, Uma Enclave,

Road No. 9, HYDERABAD-

500034.--

Rs 135.65 Cr March, 2012

4 RVNL/P-III/P.way

items/Guntakul-

Raichur/1 of

2009/Switches; Lot No.

31030801

27.06.2008 Manufacture and supply of P.way items for BG

(1673mm) for patch doubling of Guntakul-Raichur

Section under CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

1.25 Cr for 60 kg 1 in 12 Switches

and Rs 16.97 Lakh for 60 kg 1 in

8 1/2 Switches & Rs 4.24 Lakh

for 52 kg 1 in 8 1/2 Switches.

Transportation: Rs 26.50 Lac

for 60 kg 1 in 12 Switches and Rs

4.50 Lac for 52 kg 1 in 8 1/2

Switches & Rs 1.12 Lakh for 60

kg 1 in 8 1/2 Switches.

Rs 1.77 Cr 25.12.2010 (extended)

5 RVNL/P-III/P.way

items/Guntakul-

Raichur/1 of 2009/CMS

Xing; Lot No. 31030802

27.06.2008 Manufacture and supply of P.way items for BG

(1673mm) for patch doubling of Guntakul-Raichur

Section under CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

2.47 Cr for 60 kg 1 in 12 CMS

Crossing and Rs 0.5 Cr for 60 kg

1 in 8 1/2 CMS Crossing.

Transportation: Rs 3.18 Lac for

60 kg 1 in 12 CMS Crossing and

Rs 0.6 Lac for 60 kg 1 in 8 1/2

CMS Crossing.

Rs 3.02 Cr 30.08.2010 (extended)

6 RVNL/Mumbai/Bina-

BPL/ 2006 dated

30.08.2006

30.08.2006 Conducting Final Location Survey (FLS) marking the

center line of the final alignment on the ground and

Detailed Design Engg (DDE) for BG third line between

Bina-Bhopal (138.423 Km) in WC Rly.

RVNL/Mumb/RPS/FLS(Bi

na- BPL)/ 2006 dated

11.12.2006

M/s Monarch Services &

Contractors, Sinhagad Road,

Pune-411030

--- Rs 1.23 Cr 31.03.2011 (extended)

Details of Contracts Placed upto the month of Nov' 2011 under GM/P-III

7 RVNL/BPL/S&T/HBJ-

BPL-BIN/2

09.06.2009 Supply, installing, modification, testing &commissing of

electronic interlocking system alongwith modification, in

relay based indoor signaling arrangement at PI/RRI/LC

gates, IBH etc. alongwith yard remodeling in connection

with the work of 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India)

No: RVNL/BPL/S&T/HBJ-

BPL-BIN/2 dated

23.10.2009

M/s Bharat Rail Automations (P)

Ltd. B-107, Mandpeshwar

Industrial Estate, SVP ROAD,

Borivali (W), Mumbai-400092

Signaling & Telecommuction - Rs

23,32,40,706/-

Rs 23.32 Cr 22.10.2011

8 RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901

04.09.2009

.

Manufacture and supply of P.way items for BG

(1673mm) for for patch doubling of Guntakul-Raichur

Section under CPM/RVNL/SC

RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901 dated

13.11.2009.

M/s Patil Rail Infrastructure Pvt

Ltd., The Grand, 3rd & 4th Floor

6-3-1090/B-4 Raj Bhawan Road,

Somaji guda, Hyderabad-

500082.

Manufacture and Supply: Rs

3.22 Cr. for PSC Turnout Sleeper

Set for 1 in 12, 60 kg and Rs

52.63 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg .

Transportation: Rs 32.86 Lac

for PSC Turnout Sleeper Set for

60 kg 1 in 12 and Rs 6 Lakh for

PSC Turnout Sleeper Set 1 in 8

1/2 for 60 kg.

Rs 4.14 Cr 30.11.2010.

9 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803

04.09.2009

.

Manufacture and supply of P.way items for BG

(1673mm) for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803 dated

17.11.2009

M/s Rayalaseema Concrete

Sleepers Pvt Ltd., The Grand,

3rd & 4th Floor 6-3-1090/B-4

Raj Bhawan Road, Somaji guda,

Hyderabad-500082.

Manufacture and Supply: Rs

3.34 Cr. for PSC Turnout Sleeper

Set for 1 in 12, and Rs 25.26 Lac

for PSC T/out Sleeper Set 1 in 8

1/2 60 kg & Rs 10.9 lac for PSC

Turnout Sleeper Set for Derailing

Switch 60 Kg, Transportation:

Rs 20.90 Lac for PSC Turnout

Sleeper Set for 60 kg 1 in 12 and

Rs 1.68 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg &

Rs 0.84 lac for PSC Turnout

Sleeper Set for Derailing Switch

60 Kg.

Rs 3.92 Cr 28.02.2011.

10 RVNL/BPL/Elect/HBJ-

BIN/TSS

23.07.2009 Design, Supply, Erection, Testing & commissioning of

132/25 KV Traction Sub-station, Feeding Post, Fixed

Capacitor, bank System & other associated works at

BARETH & SANCHI, TRACTION SUB STATIONS,

Augmentation & replacement of traction transformers

AT BINA TSS, by providing 3rd bay & modification in

existing Feeding Posts at Sukhisewania, Gulabganj in

connection with Electrification of 3rd line on BINA-

BHOPAL section of BHOPAL DIVISION of WCR.

RVNL/BPL/Elect/HBJ-

BIN/TSS

dated18/19.01.2010

M/s S. L. Enterprises 41-A,

Phase-II, Mayapuri Industrial

State, Delhi-110064

Electrical Items-Rs 3.89 Cr for

CORE SOR Items, Rs 11.36 Cr

for Traction Transformer, Rs 0.12

Cr for Maintenance spares,Rs

0.09 Cr for Maintenance Tools,

Rs 0.35 Cr for Site Facilities & Rs

2.65 Cr for Misc. Items,etc.

Rs 18.47 Cr 18.01.2012

11 RVNL/New Delhi/B-B-

H/PMC/Pt-II

15.10.2009 Project Management Consultancy forConstruction of

Road Bed, Major and Minor Bridges, Track Linking

(excluding supply of rails, thick web switches &

sleepers), S&T and OHE & General Electrical work in

connection with 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India)

Notification of Award No

RVNL/New Delhi/B-B-

H/PMC/Pt-II dated

23.03.2010

M/s Aarvee Associates

Architects, Engineers &

Consultants Pvt Ltd, Ravula

Residancy, Srinagar Colony,

Hyderabad-82.

Renumerations for -Rs 6.57 Cr

for staff & Provision &

maintenance of Office for- Rs

2.70 Lacs.

Rs 6.60 Cr 22.10.2012

12 No. RVNL/P-

III/TWS/2009/Pt I

25.02.2010 Manufacture and Supply of Curved Switches with ZU-

1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880

Grade) Stock Rail conforming to Indian Railway

Specifications IRS-T-10-2000 for various rail road

projects in different regions of India.

Notification of Award No

No. RVNL/P-

III/TWS/2009/Pt I

dated 26.05.2010

M/s VAE VKN RTT (JV),

Century Towers,

5th Floor,

45 Shakespeare Sarani,

Kolkata. - 700 017

Manufacture and Supply: Rs

17.79 Cr for 60 kg 1 in 12 TWS

Transportation: Rs 36.84 Lac

for 60 kg 1 in 12 TWS.

Rs 18.16 Cr 25.05.2011

(Extended upto

31.12.2011)

S.No Tender No. Date of

Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)

Estimated Cost (for

Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tendered Cost (for

Engg./Elect./S&T/Mech.)

Scheduled Completion

Date

1 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General

Electrical work in connection with 3rd

line between

Habibganj & Bina (144.76 Km) on Bhopal Division of

West Central Railway in the state of Madhya Pradesh

(India) - Package No. 1 between Bina (Incl) to Ganj

Basoda (Incl) chainage 975.16 to 928.500 (Km 46.66).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-1 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No.

979,Mount Poonamalle

Road,Manakakkam, Chennai-

600089. --

Rs 141.88 Cr March, 2012

2 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General

Electrical work in connection with 3rd

line between

Habibganj & Bina (144.76 Km) on Bhopal Division of

West Central Railway in the state of Madhya Pradesh

(India) - Package No. 2 between GanjBasoda (Excl) to

Sanchi (Incl) chainage 928.500 to 879.750 (Km 48.75).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-2 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No.

979,Mount Poonamalle

Road,Manakakkam, Chennai-

600089. --

Rs. 150.05 Cr March, 2012

3 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General

Electrical work in connection with 3rd

line between

Habibganj & Bina (144.76 Km) on Bhopal Division of

West Central Railway in the state of Madhya Pradesh

(India) - Package No. 3 between Sanchi (Excl) to

Habibganj (Incl) chainage 879.750 to 830.850 (Km

48.9).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-3 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. NCCL-ECIECCL-ARPL

(JV), C/o M/S Nagarjuna

Construction Company

Limited,4th Floor, Uma Enclave,

Road No. 9, HYDERABAD-

500034.--

Rs 135.65 Cr March, 2012

4 RVNL/P-III/P.way

items/Guntakul-

Raichur/1 of

2009/Switches; Lot No.

31030801

27.06.2008 Manufacture and supply of P.way items for BG

(1673mm) for patch doubling of Guntakul-Raichur

Section under CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

1.25 Cr for 60 kg 1 in 12 Switches

and Rs 16.97 Lakh for 60 kg 1 in

8 1/2 Switches & Rs 4.24 Lakh

for 52 kg 1 in 8 1/2 Switches.

Transportation: Rs 26.50 Lac

for 60 kg 1 in 12 Switches and Rs

4.50 Lac for 52 kg 1 in 8 1/2

Switches & Rs 1.12 Lakh for 60

kg 1 in 8 1/2 Switches.

Rs 1.77 Cr 25.12.2010

(extended)

5 RVNL/P-III/P.way

items/Guntakul-

Raichur/1 of 2009/CMS

Xing; Lot No. 31030802

27.06.2008 Manufacture and supply of P.way items for BG

(1673mm) for patch doubling of Guntakul-Raichur

Section under CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

2.47 Cr for 60 kg 1 in 12 CMS

Crossing and Rs 0.5 Cr for 60 kg

1 in 8 1/2 CMS Crossing.

Transportation: Rs 3.18 Lac for

60 kg 1 in 12 CMS Crossing and

Rs 0.6 Lac for 60 kg 1 in 8 1/2

CMS Crossing.

Rs 3.02 Cr 30.08.2010

(extended)

6 RVNL/Mumbai/Bina-

BPL/ 2006 dated

30.08.2006

30.08.2006 Conducting Final Location Survey (FLS) marking the

center line of the final alignment on the ground and

Detailed Design Engg (DDE) for BG third line between

Bina-Bhopal (138.423 Km) in WC Rly.

RVNL/Mumb/RPS/FLS(Bi

na- BPL)/ 2006 dated

11.12.2006

M/s Monarch Services &

Contractors, Sinhagad Road,

Pune-411030

--- Rs 1.23 Cr 31.03.2012

(extended)

Details of Contracts Placed upto the month of Dec' 2011 under GM/P-III

7 RVNL/BPL/S&T/HBJ-

BPL-BIN/2

09.06.2009 Supply, installing, modification, testing &commissing of

electronic interlocking system alongwith modification, in

relay based indoor signaling arrangement at PI/RRI/LC

gates, IBH etc. alongwith yard remodeling in connection

with the work of 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India)

No: RVNL/BPL/S&T/HBJ-

BPL-BIN/2 dated

23.10.2009

M/s Bharat Rail Automations (P)

Ltd. B-107, Mandpeshwar

Industrial Estate, SVP ROAD,

Borivali (W), Mumbai-400092

Signaling & Telecommuction - Rs

23,32,40,706/-

Rs 23.32 Cr 22.10.2011

8 RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901

04.09.2009

.

Manufacture and supply of P.way items for BG

(1673mm) for for patch doubling of Guntakul-Raichur

Section under CPM/RVNL/SC

RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901 dated

13.11.2009.

M/s Patil Rail Infrastructure Pvt

Ltd., The Grand, 3rd & 4th Floor

6-3-1090/B-4 Raj Bhawan Road,

Somaji guda, Hyderabad-

500082.

Manufacture and Supply: Rs

3.22 Cr. for PSC Turnout Sleeper

Set for 1 in 12, 60 kg and Rs

52.63 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg .

Transportation: Rs 32.86 Lac

for PSC Turnout Sleeper Set for

60 kg 1 in 12 and Rs 6 Lakh for

PSC Turnout Sleeper Set 1 in 8

1/2 for 60 kg.

Rs 4.14 Cr 30.11.2010.

9 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803

04.09.2009

.

Manufacture and supply of P.way items for BG

(1673mm) for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803 dated

17.11.2009

M/s Rayalaseema Concrete

Sleepers Pvt Ltd., The Grand,

3rd & 4th Floor 6-3-1090/B-4

Raj Bhawan Road, Somaji guda,

Hyderabad-500082.

Manufacture and Supply: Rs

3.34 Cr. for PSC Turnout Sleeper

Set for 1 in 12, and Rs 25.26 Lac

for PSC T/out Sleeper Set 1 in 8

1/2 60 kg & Rs 10.9 lac for PSC

Turnout Sleeper Set for Derailing

Switch 60 Kg, Transportation:

Rs 20.90 Lac for PSC Turnout

Sleeper Set for 60 kg 1 in 12 and

Rs 1.68 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg &

Rs 0.84 lac for PSC Turnout

Sleeper Set for Derailing Switch

60 Kg.

Rs 3.92 Cr 28.02.2011.

10 RVNL/BPL/Elect/HBJ-

BIN/TSS

23.07.2009 Design, Supply, Erection, Testing & commissioning of

132/25 KV Traction Sub-station, Feeding Post, Fixed

Capacitor, bank System & other associated works at

BARETH & SANCHI, TRACTION SUB STATIONS,

Augmentation & replacement of traction transformers

AT BINA TSS, by providing 3rd bay & modification in

existing Feeding Posts at Sukhisewania, Gulabganj in

connection with Electrification of 3rd line on BINA-

BHOPAL section of BHOPAL DIVISION of WCR.

RVNL/BPL/Elect/HBJ-

BIN/TSS

dated18/19.01.2010

M/s S. L. Enterprises 41-A,

Phase-II, Mayapuri Industrial

State, Delhi-110064

Electrical Items-Rs 3.89 Cr for

CORE SOR Items, Rs 11.36 Cr

for Traction Transformer, Rs 0.12

Cr for Maintenance spares,Rs

0.09 Cr for Maintenance Tools,

Rs 0.35 Cr for Site Facilities & Rs

2.65 Cr for Misc. Items,etc.

Rs 18.47 Cr 18.01.2012

11 RVNL/New Delhi/B-B-

H/PMC/Pt-II

15.10.2009 Project Management Consultancy forConstruction of

Road Bed, Major and Minor Bridges, Track Linking

(excluding supply of rails, thick web switches &

sleepers), S&T and OHE & General Electrical work in

connection with 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India)

Notification of Award No

RVNL/New Delhi/B-B-

H/PMC/Pt-II dated

23.03.2010

M/s Aarvee Associates

Architects, Engineers &

Consultants Pvt Ltd, Ravula

Residancy, Srinagar Colony,

Hyderabad-82.

Renumerations for -Rs 6.57 Cr

for staff & Provision &

maintenance of Office for- Rs

2.70 Lacs.

Rs 6.60 Cr 22.10.2012

12 No. RVNL/P-

III/TWS/2009/Pt I

25.02.2010 Manufacture and Supply of Curved Switches with ZU-

1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880

Grade) Stock Rail conforming to Indian Railway

Specifications IRS-T-10-2000 for various rail road

projects in different regions of India.

Notification of Award No

No. RVNL/P-

III/TWS/2009/Pt I

Dated 26.05.2010

M/s VAE VKN RTT (JV),

Century Towers,

5th Floor,

45 Shakespeare Sarani,

Kolkata. - 700 017

Manufacture and Supply: Rs

17.79 Cr for 60 kg 1 in 12 TWS

Transportation: Rs 36.84 Lac

for 60 kg 1 in 12 TWS.

Rs 18.16 Cr 25.05.2011

(Extended upto

31.01.2012)

Detail of Contract awarded upto December, 2011

Project Planning & Development Department

Sr. No.

Tender No. Date of opening (Tender)

Description of work/study

Contract No. & date (LOA)

Contractor’s Name

Estimated cost of

work (Rs.)

Tendered cost (Rs.)

Scheduled completion date

Physical Progress

( upto 31.12.11)

1 RVNL/PP&D/Bankability/Buramara -Chakulia/10

25/03/10 Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER.

RVNL/PP&D/Bankability/Buramara-Chakulia/10 30/04/2010

M/S Feedback Ventures Pvt. Ltd.

15,0

0,0

00/-

1

3,1

8,0

85/-

3 months from the date of submission of Bank Guarantee (14/05/2010) 15/08/2010 (extended)

Final Report sent to Railway Board on 16.08.11 for acceptance.

2 RVNL/PP&D/Bankability/Nallapadu -Guntakal/RE/10

09/04/10 Bankability study of electrification of Nallapadu-Guntakal section

RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10 11/06/2010

M/s PricewaterhouseCoopers Pvt. Ltd

15,0

0,0

00/-

9,9

1,5

14/-

3 months from the date of submission of Bank Guarantee (25/06/2010) 25/09/2010 (extended)

Final Report sent to Railway Board on 04.08.11 for acceptance.

3. PP&D/RFP/BOT/CONSULT/2009/Pt. II

21.08.10 Project Consultancy services for development of PPP model in Railway projects.

PP&D/RFP/BOT/CONSULT/2009/Pt. II dated: 25.03.2010

M/s. RITES Ltd.

30,9

3,2

93/-

15,0

0,0

00/-

26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended)

Final Report sent to Railway Board on 21.09.11 for acceptance.

4. PP&D/RVNL/ KUR-BOLANGIR/2010

21.09.10 Bankability study for Khurda Road-Bolangir New Line project.

PP&D/RVNL/ KUR-BOLANGIR/2010 04/10/2010

M/S Deloitte Touche Tohmatsu India Pvt. Ltd.

15,0

0,0

00/-

9,6

5,1

25/-

10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011)

Final Report sent to Railway Board on 02.02.11 for acceptance.

5. PP&D/RVNL/ HX-SBC/2010

23.08.10 Bankability study for Cuddapah-Bangalore New Line project.

PP&D/RVNL/ HX-SBC/2010 24/09/2010

M/s PricewaterhouseCoopers Pvt. Ltd.

12,8

9,3

40/-

1

4,5

0,1

00/-

8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010

Final Report sent to Railway Board on 30.12.11 for acceptance.

6. PP&D/RVNL/DHD-INDB/Bank/2010

N.A. Study done in house.

Bankability study for Dahod-Indore New Line project in Western Railway.

PP&D/RVNL/DHD-INDB/Bank/2010 dated 24.12.2010

Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54

----

---

1,9

5,0

00/-

6 weeks from LAO (24.12.10) for Traffic Study which is out sourced.

Study done in house. Only Traffic Study Out sourced. Final report under preparation & finalization by RVNL.

7. PP&D/FT/HUK/2010 21.01.11 Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway.

PP&D/FT/HUK/2010 dated 08.02.2011

M/S Deloitte Touche Tohmatsu India Pvt. Ltd.

5,0

0,0

00/-

8,7

6,8

85/-

16 weeks from the date of acceptance of CV(18/02/2011) 10/06/2011)

Draft Final report submitted on 15.07.2011 and under examination.

8. PP&D/RVNL/MCLA- NLDA/Bank/2010

N.A. Study done in house.

Bankability study for Macherla-Nalgonda New Line project in South Central Railway.

PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11

Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.-43, Gurgaon.

----

--

1,7

5,0

00/-

4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. 20.03.2011

Study done in house. Only Traffic Study Out sourced. Revised Final report submitted on 09.08.2011 and under examination by RVNL Finance.

9. PP&D/RVNL/ADI -UDZ/Bank/2010

N.A. Study done in house.

Bankability study for Ahmedabad -Udaipur Gauge Conversion project in Western Railway.

N.A. N.A. Study done in house.

----

--

--

----

N.A. Study done in house and Completed, Report sent to Rly. Board on 31.12.2010.

10. No. PP&D/RVNL/BJP -SDB/BANK/2010

20/12/10 Bankability study of Bijapur - Shahabad New line in South Western

Railway

No. PP&D/RVNL/BJP-SDB/BANK/2010 Dated: 08/03/2011

M/s Deloitte Touche

Tohmatsu India Pvt. Ltd.

15,0

0,0

00.0

0

12,2

8,1

79.4

7

(3 months from LOA dated 08.03.2011) 06/06/2011

Final Report sent to Railway Board on 30.12.11 for acceptance.

11. No. PP&D/RVNL/DWR -BGM/BANK/ 2010

27/12/10 Bankability study of Dharwad – Belgaum New line

in South Western Railway

No. PP&D/RVNL/DWR-

BGM/BANK/Tender/2010 Dated: 04/04/2011

M/s ARKITECHNO Consultants (India)

Pvt. Ltd

14,8

9,0

00.0

0

9,7

1,1

68.0

0

(3 months from LOA dated

04.04.2011)

03/07/2011

Final Report sent to Railway Board on 30.12.11 for acceptance.

12. No. PP&D/RVNL/ RDG-TK / BANK/2010

04/01/11 Bankability study of Rayadurg-Tumkur

New line in South Western Railway

No. PP&D/RVNL/ RDG-TK

/BANK/2010 Dated: 19/04/2011

M/s Deloitte Touche Tohmatsu

India Pvt. Ltd.

14,8

9,0

00.0

0

12,2

8,1

79.4

7

(3 months from LOA dated 19.04.2011) 18.07.2011

Final Report sent to Railway Board on 30.12.11 for acceptance.