October 4-7, 2014 Rosen Shingle Creek Golf Resort Orlando, FL, USA Derek Folmer, Chief Marketing Officer Rutile Economics The outlook for a raw material critical to manufacturing high quality sponge

Upload: others

Post on 04-Apr-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rutile Economics The outlook for a raw material …...October 4-7, 2014 •Rosen Shingle Creek Golf Resort •Orlando, FL, USADerek Folmer, Chief Marketing Officer Rutile Economics

October 4-7, 2014 • Rosen Shingle Creek Golf Resort • Orlando, FL, USA

Derek Folmer, Chief Marketing Officer

Rutile Economics

The outlook for a raw material critical to

manufacturing high quality sponge

Page 2: Rutile Economics The outlook for a raw material …...October 4-7, 2014 •Rosen Shingle Creek Golf Resort •Orlando, FL, USADerek Folmer, Chief Marketing Officer Rutile Economics

October 4-7, 2014 • Rosen Shingle Creek Golf Resort • Orlando, FL, USA

DisclaimerForward-Looking Information This document may contain forward-looking statements. These forward-looking statements are made as of the date of this document and Sierra Rutile Limited (the “Company”) does not intend, and does not assume any obligation, to update these forward-looking statements, whether as a result of new information, future events or otherwise, except as required under applicable securities legislation.

Forward-looking statements relate to future events or future performance and reflect Company management’s expectations or beliefs regarding future events and future performance and include, but are not limited to, statements with respect to the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, success of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage. In certain cases, forward-looking statements can be identified by the use of words such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative of these terms or comparable terminology. By their very nature forward-looking statements involve known and unknown risks, uncertainties, assumptions and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward looking statements. Such factors include, among others, risks related to actual results of current exploration activities; changes in project parameters as plans continue to be refined; future prices of mineral resources; possible variations in ore reserves, grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities; as well as those factors detailed from time to time in the Company's interim and annual reports. These risks, uncertainties, assumptions and other factors could adversely affect the outcome and financial effects of the plans and events described herein.

Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward- looking statements.

Page 3: Rutile Economics The outlook for a raw material …...October 4-7, 2014 •Rosen Shingle Creek Golf Resort •Orlando, FL, USADerek Folmer, Chief Marketing Officer Rutile Economics

October 4-7, 2014 • Rosen Shingle Creek Golf Resort • Orlando, FL, USA

Contents

• Mineral sands overview• A strategic raw material• Not all rutile is created equal • Factors for success

2

Page 4: Rutile Economics The outlook for a raw material …...October 4-7, 2014 •Rosen Shingle Creek Golf Resort •Orlando, FL, USADerek Folmer, Chief Marketing Officer Rutile Economics

October 4-7, 2014 • Rosen Shingle Creek Golf Resort • Orlando, FL, USA

Rutile Overview• Commonly found with ilmenite, zircon, and other heavy minerals• The highest quality TiO2 feedstock• Affected by co-product economics• Titanium dioxide pigment is largest end-use market

Zircon Ceramics & other applications

Welding

TiO2 FeedstockNatural Rutile

Synthetic RutileLeucoxene

Titanium Slag Ilmenite

Paper

Plastics

Paints & Coatings

TiO2 PigmentChlorideProcess

SulphateProcess

Chloride FeedstockNatural rutile

Synthetic RutileChloride Slag

Titanium metalTi Sponge

Sulphate FeedstockSlag

Ilmenite

3

Page 5: Rutile Economics The outlook for a raw material …...October 4-7, 2014 •Rosen Shingle Creek Golf Resort •Orlando, FL, USADerek Folmer, Chief Marketing Officer Rutile Economics

October 4-7, 2014 • Rosen Shingle Creek Golf Resort • Orlando, FL, USA

Industry trends affecting rutile

• Declining reserves and grades• Increasing ore body complexity• TiO2 pigment consumption growth

outpacing rutile supply• Aerospace growth• Vertical integration• Emerging Chinese chloride TiO2

sector• New entrants operate at loss and

struggle to repay debt

TiO2 companies with degree of upstream integration:

International TiO2 companies without:

4

Page 6: Rutile Economics The outlook for a raw material …...October 4-7, 2014 •Rosen Shingle Creek Golf Resort •Orlando, FL, USADerek Folmer, Chief Marketing Officer Rutile Economics

October 4-7, 2014 • Rosen Shingle Creek Golf Resort • Orlando, FL, USA

Dredge Mine1,000 tph bucket line dredge and integrated processing plant

Dry MineTruck and shovel operation feeding a 500 tphprocessing plant

Mineral Separation PlantCapacity in place to process 225 ktpa of rutile following upgrade

Supporting InfrastructureStorage, port and fleet support product delivery to markets globally

Sierra Rutile Operations

5

Page 7: Rutile Economics The outlook for a raw material …...October 4-7, 2014 •Rosen Shingle Creek Golf Resort •Orlando, FL, USADerek Folmer, Chief Marketing Officer Rutile Economics

October 4-7, 2014 • Rosen Shingle Creek Golf Resort • Orlando, FL, USA

Global rutile supply

• Only three companies able to produce over 100,000 tonnes per annum rutile

• Over 20% of supply held by vertically integrated companies

• Mine life of less than 15-years not uncommon

15%

49%

22%

15%

2014 Rutile Production745 thousand metric tonnes

Sierra Rutile

Australia

Africa

Other

6

Page 8: Rutile Economics The outlook for a raw material …...October 4-7, 2014 •Rosen Shingle Creek Golf Resort •Orlando, FL, USADerek Folmer, Chief Marketing Officer Rutile Economics

October 4-7, 2014 • Rosen Shingle Creek Golf Resort • Orlando, FL, USA

Historically a supply constrained market

7

Limited Growth in Rutile Supply Going Forward1

000 tonnes rutile

(1) Includes likely new projects and mine expansions

Page 9: Rutile Economics The outlook for a raw material …...October 4-7, 2014 •Rosen Shingle Creek Golf Resort •Orlando, FL, USADerek Folmer, Chief Marketing Officer Rutile Economics

October 4-7, 2014 • Rosen Shingle Creek Golf Resort • Orlando, FL, USA

Rutile as a strategic raw material

• Maintaining existing TiO2 feedstock output requires investment

• Security of supply• Purchasing quality

criteria• Lowest environmental

footprint

8

Page 10: Rutile Economics The outlook for a raw material …...October 4-7, 2014 •Rosen Shingle Creek Golf Resort •Orlando, FL, USADerek Folmer, Chief Marketing Officer Rutile Economics

October 4-7, 2014 • Rosen Shingle Creek Golf Resort • Orlando, FL, USA

Critical components need quality raw materials

• Not all rutile is created equal• Customers value: High TiO2 Low tin Low alkalis Low metals content Low radioactivity Low level contaminants

9

Presenter
Presentation Notes
Customers value: High TiO2 = lower cost and lower energy consumption Low tin = higher quality sponge Low alkalis = efficient chlorination Low metal contamination = stable quality TiCl4 and lower treatment costs Low radioactivity = regulatory compliance and responsible operation Low contaminant = lower waste volumes and lower treatment costs Raw material selection important for high quality sponge used in critical components
Page 11: Rutile Economics The outlook for a raw material …...October 4-7, 2014 •Rosen Shingle Creek Golf Resort •Orlando, FL, USADerek Folmer, Chief Marketing Officer Rutile Economics

October 4-7, 2014 • Rosen Shingle Creek Golf Resort • Orlando, FL, USA

Mining economicsGangama expansion and its impact on annual production

Current Operations

Expansion Stage 1 Expansion Stage 2

10

Page 12: Rutile Economics The outlook for a raw material …...October 4-7, 2014 •Rosen Shingle Creek Golf Resort •Orlando, FL, USADerek Folmer, Chief Marketing Officer Rutile Economics

October 4-7, 2014 • Rosen Shingle Creek Golf Resort • Orlando, FL, USA

Miners work to reduce capital costs

• Non-mining costs are significant:– Exceed inflation– Control scope– Project management – Engineering– Exploration– Community– Financing

• Experience mitigates risk

Gangama Dry Mining Project Capital Cost

Phase 1

Phase 2

11

Page 13: Rutile Economics The outlook for a raw material …...October 4-7, 2014 •Rosen Shingle Creek Golf Resort •Orlando, FL, USADerek Folmer, Chief Marketing Officer Rutile Economics

October 4-7, 2014 • Rosen Shingle Creek Golf Resort • Orlando, FL, USA

In situ characteristics can drive competitive advantage• For example, Sierra Rutile benefits

from:– Proximity to existing infrastructure– Underutilized capacity– Number of expansion opportunities– Low over burden (top soil)– Water & power– Ore grade and quality

12

Taninahun BokaGrade: 1.65%

0 10km

NyandehunGrade: 1.93%

JagbahunGrade: 0.97%

GambiaGrade: 1.03%

Area 1Mosavi

Grade: 0.50%LantiGrade: 1.01%Rutile: 854kt

GbeniGrade: 1.09%Rutile: 708kt

GangamaGrade: 1.19%Rutile: 888kt SRL plant

KibiDodo

Benduma

Komende

Gbap

SembehunGrade: 0.99%Rutile: 3.6Mt

Kamatpo

NdendemoiaGrade: 0.80%

MogbwemoGrade: 0.88%

Sierra Rutile has extensive reserves

Page 14: Rutile Economics The outlook for a raw material …...October 4-7, 2014 •Rosen Shingle Creek Golf Resort •Orlando, FL, USADerek Folmer, Chief Marketing Officer Rutile Economics

October 4-7, 2014 • Rosen Shingle Creek Golf Resort • Orlando, FL, USA

Track record is key

• Low cost structure key to sustained competitiveness

• Cost management culture

• Retain ability to respond to demand

Sierra Rutile production performance000s Tonnes

13

1 Assumes mid-point of the 2015 production guidance

Page 15: Rutile Economics The outlook for a raw material …...October 4-7, 2014 •Rosen Shingle Creek Golf Resort •Orlando, FL, USADerek Folmer, Chief Marketing Officer Rutile Economics

October 4-7, 2014 • Rosen Shingle Creek Golf Resort • Orlando, FL, USA

Sierra Rutile experience suggests a combination of conditions required for long term success

Orebody Long life, high grade geology that is well understood and can be mined in low cost manner

Financial Able to fund required capital from cash flow with support by lenders who value publicly traded profile in combination with strong share holder base while carrying low debt load

Operational Experienced team managing fully owned infrastructure – from power plant to port

Country Risk Established player and leading exporter in stable, mining friendly jurisdiction

License to Operate Proven track record results in strong employee, community, national, and international support

14

Page 16: Rutile Economics The outlook for a raw material …...October 4-7, 2014 •Rosen Shingle Creek Golf Resort •Orlando, FL, USADerek Folmer, Chief Marketing Officer Rutile Economics

October 4-7, 2014 • Rosen Shingle Creek Golf Resort • Orlando, FL, USA

SRL committed to supplying world’s titanium sponge requirements

15

Strategic - access to supply

Critical components require high quality

raw materials

Mining company performance and flexibility are important