rueter-hess water purification facility2015/07/23  · presentation overview • history of parker...

34
Rueter-Hess Water Purification Facility North America’s First Ceramic Membrane Filtration Plant Jamie Langer Stephanie Sansom, PE

Upload: others

Post on 26-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Rueter-Hess Water Purification Facility

North America’s First Ceramic Membrane Filtration Plant

Jamie LangerStephanie Sansom, PE

Page 2: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Presentation Overview

• History of Parker Water & Sanitation• Reclaimed Water Loop• Rueter-Hess Reservoir • Rueter-Hess Water Treatment Facility

• Pilot Testing• Major Processes – Actiflo, Ceramic Membranes• Schedule• Startup and Commissioning Challenges• O&M Challenges

Page 3: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

• Approximately 50,000

Customers

• 27,600 Acres (43 Square

Miles)

• 17 Well Houses

• 30 Operational Deep

Groundwater Wells

• Alluvial Water

• 2 Wastewater

Reclamation Facilities

• 1 Surface Water Plant

PWSD Service Area

Page 4: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

PWSDPWSDPWSD

Page 5: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

404 Permit Process First 404 Permit Granted in Feb 2004, 16,200 ac-ft

Amended 404

Phase 1 Dam/ReservoirConstruction

Phase 2Dam/Reservoir

ConstructionCherry Creek Diversion

Structure Built

Membrane Testing/Actiflo Pilot

TestingDesign RHWPF Water

First Pumped to RHR RHWPF

Construction

Expanded to 72,000 ac-ft

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

Re-Use Loop

1985 Reservoir Concept

24,000 acre-ft in storage

Page 6: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Rueter-Hess Water Purification Facility7/23/2015

Page 7: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Piloted Process Alternatives

Microfiltration

Ceramic Polymeric

Oxidation of Fe and Mn

Potassium Perm.

Chlorine Dioxide

Enhanced Organics Removal

Enhanced Coag.

Magnetic Ion

Exchange (MIEX)

Conven-PAC

addition

Recirc-PAC

Page 8: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Ceramic MembranesActiflo CarbActiflo Turbo

Selected Treatment Process

Page 9: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Selected Treatment ProcessCeramic MembranesActiflo CarbActiflo Turbo

Actiflo Turbo Water Quality Goals• pH for Enhanced Coagulation• Turbidity - 1.5-3 NTU• DOC removal - ~50%

Actiflo Turbo Special Features• Small footprint• Uses Microsand for rapid settling• Hydrocyclones recycle sand • Option for enhanced coagulation

Page 10: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Ceramic MembranesActiflo CarbActiflo Turbo Actiflo Carb Special Features

• PAC removes:• DOC/TOC• CEC• Taste and odor

• PAC particles recirculated for complete utilization

Actiflo Carb Water Quality Goals

• Turbidity 1-2 NTU

• DOC < 2 mg/L, 70% removal

• Fe < 0.3 mg/L

• Mn < 0.05 mg/L

• PAC conc. ≈ 1000mg/L

Selected Treatment Process

Page 11: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Ceramic MembranesActiflo CarbActiflo TurboCM Water Quality Goals

• 0.1 NTU 95% of the time

• Not to Exceed 0.5 NTU

• 4-log removal Crypto

• 0.5 log removal Virus

CM Special Features• High flux smaller

footprint

• Absolute barrier: no solids/pollutant breakthrough

• Durable – can withstand PAC/microsand

• 20 year warranty

• FIRST of its kind in the North America

Selected Treatment Process

Page 12: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Actiflo® Turbo

1. Coagulated raw water enters / microsand and polymer added

2. Rapid settling and material recirculation

3. Clarified water continues to Actiflo Carb

4. Settled solids microsand recirculated to hydrocyclones

Page 13: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Actiflo® Carb1. PAC added2. Coagulant added / floc formation

begins3. Microsand and polymer added to

remove organics and turbidity4. Rapid settling and material

recirculation5. PAC / microsand recirculation

Page 14: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess
Page 15: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess
Page 16: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Ceramic Membranes

Page 17: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

How KCM differs from “conventional” membranes• High Flux (approved to 175 gfd at 20 deg C) • High Recovery (> 97%)• Longest membrane warranty – 20 years • High chemical and pressure tolerance • Most durable element (microsand, PAC)• Highest Quality Control – every element tested; others are batch

tested

Page 18: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Ceramic Membrane Element

• 7.1 in x 59.1 in (D x L)• 0.1 μm pore size• 2000 channels per element• Inside-out Flow• Aluminum Oxide material

Courtesy: Kruger, 2014

Page 19: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Ceramic Membrane Element

Courtesy: Kruger, 2014

Page 20: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Skid Layout

• Skids consist of 8 or 10 Racks• Each rack consists of 10

elements

Page 21: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess
Page 22: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Startup and Commissioning

Page 23: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Schedule

• Pilot Testing – 2007 • Design – 2008 to 2012

• One-Year Delay due to Economic Downturn

• Construction – 2012 to 2015• Operational Startup – February 2015• Water to Distribution

• Original – February 2015• Revised – May 2015• Actual – July 2015

Page 24: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Startup and Commissioning• First surface water plant for the

District• No prior standards/process due to

first of its kind• Planned operation of 8-10 hours per

day and seasonal shutdowns• Long start up duration, almost 6

months• Operator intensive training

throughout construction and startup• Difficult contracting model• SCADA integration

Page 25: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Chemical System Issues

• PAC Silo• Level sensors• Wetting cone sensors; low hopper

levels• PAC bridging in silo• Air compressor

• Chlorine Dioxide System• Generator alarms• Recirculation pump would not

hold suction

• Microsand• Seal water alarms / leaking pumps

Page 26: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Optimization• Pre-treatment

• Chemical dosing• PAC system / recirculation /

wasting• High metals (Fe/Mn)

• Due ferric addition for coagulation• Source water quality

• Ammonia levels higher than anticipated

• Source Water• Top of reservoir too clean• Bottom of reservoir too dirty

• Sequencing• Designed for 24 hours / day

operation• Planned operation of 8-10 hours /

day and seasonal shutdowns

Page 27: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Optimization• Ceramic Membranes

• Valves• ~ 700 Bray valves installed

• Water quality• Low influent turbidity (~1 NTU from

Actiflo®)• Consistent effluent turbidity (~0.1

NTU)• Fe Goal: 100 ppb (soluble)• Mn Goal: 50 ppb (soluble)

• CEB chemicals – residual issues• Relocation of chemical dosing

locations (ferric)

• Turbidimeter replacement

Page 28: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Total/Dissolved Manganese Levels

0

0.1

0.2

0.3

0.4

7/23/2015 7/28/2015 8/2/2015 8/7/2015 8/12/2015 8/17/2015 8/22/2015

Raw

Post Actiflo Turbo

Membrane Feed

Filter Effluent

0

0.1

0.2

0.3

0.4

7/23/2015 7/30/2015 8/6/2015 8/13/2015 8/20/2015

Raw

Post Actiflo Turbo

Membrane Feed

Filter Effluent

• Majority of Manganese through the system is dissolved

• SMCL = 0.05 mg/L

Total Fe (mg/L)

Dissolved Fe (mg/L)

Page 29: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

0

1

2

3

4

7/23/2015 7/30/2015 8/6/2015 8/13/2015 8/20/2015

Total/Dissolved Iron Levels

Raw

Post Actiflo Turbo

Membrane Feed

Filter Effluent

Raw

Post Actiflo Turbo

Membrane Feed

Filter Effluent

• SMCL = 0.3 mg/L

Total Fe (mg/L)

Dissolved Fe (mg/L)

0

0.5

1

1.5

2

2.5

3

7/23/2015 7/30/2015 8/6/2015 8/13/2015 8/20/2015

Raw

Post Actiflo Turbo

Membrane Feed Filter

Effluent

Page 30: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

0.002.004.006.008.00

10.0012.0014.0016.0018.00

Perm

eabi

lity

(gfd

/psi)

T2S2 Permeability NormKCM - Train 2, Skid 2 Permeability - NormalizedKCM - Train 2, Skid 2 Backwash StatusKCM - Train 2, Skid 2 CEB Status

Membrane Monitoring

Chemically Enhanced BW

Permeability Recovers

Chemically Enhanced BW

Page 31: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

0.000

0.500

1.000

1.500

2.000

2.500

3.000

3.500

4.000

4.500

5.000

0.000

0.050

0.100

0.150

0.200

0.250

0.300

0.350

0.400

Influ

ent T

urbi

dity

(NTU

)

CFE

Turb

idity

(NTU

)

CFE 8/1/2015 6:30 AM to 4:30 PM

Membrane Monitoring

Plant Start

Filter Effluent Turbidity

0.1 NTU, 95% of OperationInfluent Turbidity

Page 32: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

O&M Challenges – First 6 Months

• Ceramic Membrane System• Bray valves; actuator replacement

• PAC System• Bridging / Alarms / Compressor

• Compressor Room• Poor HVAC design

• Slide Gates• Failed bearings• Replacement of gate stems

Page 33: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Acknowledgments • Dewberry – Engineer

• Garney/Weaver – Construction Manager

• Western Summit – Contractor

• Kruger – Actiflo, KCM

• MWI – Electrical

Page 34: Rueter-Hess Water Purification Facility2015/07/23  · Presentation Overview • History of Parker Water & Sanitation • Reclaimed Water Loop • Rueter-Hess Reservoir • Rueter-Hess

Questions?