![Page 1: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/1.jpg)
RUE «MINSKENERGO»REPUBLICAN UNITARY ELECTRIC POWER ENTERPRISE
«MINSKENERGO»
![Page 2: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/2.jpg)
2MINSKENERGO
Mr. Alexander Moroz,
General Director of Minskenergo
The strategy of Minskenergo development is based on provision of long-lasting, reliable, qualitative,
affordable electricity and heat supply of consumers on the basis of modern solutions, with the introduction of
high-tech equipment for the generation, transmission and distribution of electricity and heat, relying on
conceptual solutions of SPA «Belenergo», in terms of heat and electricity supply.
Minskenergo is the largest and most important
enterprise among regional power systems of the Republic of
Belarus, which generates one fourth of the electric power
and heat output in the SPA «Belenergo», it carries out
complex activity on production, transfer, distribution and
sales of electrical and thermal energy.
Мission of Minskenergo
• Provision of reliable and regular power supply of
customers of Minsk and Minsk region.
• Reliable, good, economically effective functioning and
innovation development of production, transfer, distribution
and sales of electrical and thermal energy to customers.
• Establishment of modern power system for steady social
and economic growth of Minsk, Minsk region and the
Republic of Belarus on the whole.
![Page 3: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/3.jpg)
RUE «Minskenergo» (hereinafter – Minskenergo) is a single technological complex, which provides
production, transfer and distribution of electrical and heat energy.
Minskenergo includes: 16 branches
Minsk TPP-3
TPP-5
Zhodino TPP
Borisov electric network
Minsk thermal networks
Minsk cable networks
Minsk electric networks
Minsk TPP-4
Molodechno electric networks
Slutsk electric networks
Stolbtsy electric networks
Energy service company
Energy supervision company
Training center
Minskenergospetsremont
«Lebedevo» agricultural Co. 3MINSKENERGO
Minskenergo
in the part related to
heat supply
unites and manages:
6 TPPs in
Minsk
and Minsk
region
Big regional
boiler plants
in Minsk,
Molodechno,
Borisov
Mini-TPPs
in Vileika,
Molodechno,
Soligorsk,
Slutsk
General description of RUE “Minskenergo”Organizational structure
![Page 4: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/4.jpg)
General description of Minskenergo
>32 % electric power
generation
>37 % thermal power
generation
Minskenergo in power system of
Belarus:
Minskenergo in power system of Belarus
>34 % fixed assets
Priorities:
reliability accessibility effectiveness modernization
2 419,45 МW
Installed electrical capacity of the power system
> 9 thousand Gcal/h
Total thermal power of boiler units
5 442,3 MVATransformer capacity (МVА)
15 017 persons
Total number of employees as of
01.01.2017
9 712 mln kW·h 12 768 thousand Gcal.
Electrical power generation Thermal power output
in 2016 in 2016
Number of population living on the
serviced territory: 3 397 900 persons,
or 36 % of the total population of
the Republic of Belarus
Number of consumers: 1 675 916, or 34 % of consumers
of the Belarusian Power system, including individuals –
1 575 931, legal entities – 99 984
4MINSKENERGO
![Page 5: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/5.jpg)
Territory of servicing:
Minsk (9 administrative districts and
Minsk region (22 districts)
Area of servicing 40 237 km², or more
than 19 % of the total territory of the
Republic of Belarus
Number of substations: 17 938 шт.
Minskenergo in power system of Belarus
General description of Minskenergo
*including Minskenergo Specific weight in
power system of
Belarus, %
Overhead electric lines
having voltage
35–750 kV, km., including:
8 374 23
Overhead electric lines
220–750 kV, km
1 984 29
Overhead electric lines
110 kV, km
3 916 23
Overhead electric lines
35 kV, km
2 474 21
Overhead electric lines
0,4–10 kV, km
44 093 22
Cable lines, km 15 154 40
Distance of overhead
electric lines*
67 621 km
5MINSKENERGO
![Page 6: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/6.jpg)
Minskenergo in power system of Belarus
General description of Minskenergo
Zhodino TPP
Structure of electric power generation by
branches, %
Structure of thermal power
generation by branches, %
6
36339
3004028041
34376
127469712 9000
12768
0
5000
10000
15000
20000
25000
30000
35000
40000
Electric power consumption, mln
kW·h
Electric power generation, mln
kW·h
Electric power output, mln kW·h Heat output, thou Gcal
Belarusian power system Minskenergo
MTPP-4
40,2 %
TPP-5
26,1 %
Zhodino TPP
1,0 %
Other
0,4 %
Borisov electric
networks
4,6 %
MTPP-2
4,3 %
MTPP-3
23,3 %
MTPP-2
8,5 % MTPP-3
20,0 %MTPP-4
40,2 %
Minsk heating
networks
15,3 %
Zhodino TPP
3,5 %Borisov electrical networks
1,8 %
TPP-5
1,0 %
MINSKENERGO
![Page 7: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/7.jpg)
43%
3%2%20%
4%
28%
Industrial consumers Railway transport City transport
Non industrial consumers Agricultural consumers Population
Basic technical and economical features
208,7
Specific consumption of fuel for electricity
generation, g/kWh
General description of Minskenergo
166,78
Specific consumption of fuel for thermal
power generation, kg/Gcal
Structure of net electricity supply, %
9,54
Technological consumption of electricity for its
transportation in electrical networks, %
11,63
Technological consumption of thermal power for its transportation in thermal networks, %
Structure of net thermal power
supply, %
7
9% 15%
7%69%
Industrial consumers Other consumers
Budget organizatios Housing organizations
MINSKENERGO
![Page 8: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/8.jpg)
ReliabilityOrganization of reliable and safe power supply for consumers is one of most important tasks of Minskenergo.
Repairs and renewalsin 2016:
5,2 thousand km
overhead electric lines
39 substation
of various voltage classes from 35 kV and more
3,6 thousand hectares
area of cleaning for overhead electric lines
By 3 years:
by 28 % by 28 % by 42,9 %accident rate reduction of reduction of quantity
reduction average duration of of emergency contingencies
technological violations,
associated with interrupts in
power supply
8MINSKENERGO
![Page 9: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/9.jpg)
AvailabilityIn Minskenergo in 2016:
30 servicing points for customers;
4 150 applications to servicing points
Reduction of the number of stages for passing application for connection
Reduction of average cost for connection
Minskenergo operates with the aim of provision of equal
reliability of electric power supply and «transparency» of tariffs
for all consumers.
Required conditions of openness and customer-focused
approach of Minskenergo:
Overhead line 110 kV of Slutsk electrical networks
37th place among
190 states
(rising by 13 positions)of the Republic of Belarus in the World
Bank rating Doing Business – 2017 owing to purpose-oriented work to reach availability of technological
connection of customers to networks
from 74th –
to 24th place
(rising by 50 positions)rising of the Republic of
Belarus for the indicator
«Connection to power supply
system»
Growth of applications during the period of 2015 – 2016 by 4
times for process connection.
Period of readiness of networks of the company for
technological connection is reduced down to 105 days,
the standard being equal to 120-180 days
available infrastructure for customers servicing;
availability of interaction channels;
information and explanations via mass media.
9
0
1
2
3
4
5
6
7
20142017
7
4Number of stages
0
50
100
150
200
250
300
350
400
450
20142017
431.7
119.3
Average cost of
technological
connection to
income per capita,
%
MINSKENERGO
![Page 10: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/10.jpg)
Effectiveness
Minskenergo performs wide-scale work for increasing effectiveness of using material, financial and labor
resources, improvement of financial stability and profitability of the company.
11,71 cop./kWh
expenditures per unit of served energy
211 thousand rubles
proceeds from sales of goods, products, works,
services per 1 average employee
50,7 thousand rubles
added cost per 1 average employee
Minsk TPP-4
TPP-5
10
0
3
6
9
12
2014 2015 2016
10.79
9.54
Reduction of electricity losses in circuits, %
MINSKENERGO
![Page 11: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/11.jpg)
Accounting points in 2016:
40 938 psc. 476 psc.
modernized remote collection of data organized
(automatic system of control and
accounting of electricity is introduced)
Minskenergo implements a complex of measures aimed at optimization (reduction) of losses level of electrical
power.
Overhead line 330 kV of Molodechno electric networks
EffectivenessOptimization of losses level
75 885,7 thousand
kW·hreduction of losses due to introduction of
measures for reduction of technological
consumption of power for its transportation
in electrical networks of Minskenergo in
2016.
sufficient for power supply of a district
in Minsk region with population
up to 35 thousand persons
during a year
11MINSKENERGO
![Page 12: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/12.jpg)
Ecological policy
12
• responsibility for environment protection;
• top priority introduction of advancedtechnologies with the aim of minimizationof ecological loss;
• performance of production activities on thebasis of special decisions of publicauthorities;
• priority of taking preventive measures overmeasures for liquidation of ecologicalnegative impacts.
• acknowledgment of the constitutional rightfor favorable environment;
• reduction of production wastes andecologically safe handling of them.
The main principle of activities by
Minskenergo in the field of environment
protection is sustainable development, to be
understood as dynamic economic growth
with the maximum rational use of natural
resources and maintenance of favorable
environment
for future generations.
In order to achieve sustainable
development Minskenergo fulfills the
following conditions:
MINSKENERGO
![Page 13: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/13.jpg)
Борисовская ТЭЦ
13MINSKENERGO
Reconstruction of Minsk TPP-3 (CCGT 230 МW) –commissioning in 2009;
Borisov TPP (CCGT 65 МW) – 2015.
Reconstruction of MTPP-2 (2xCCGT 32,5 MW) – 2010;
Reconstruction of TPP-5 (CCGT 399,6 МW) – 2012;
Within the frameworks of the State Complex Program of modernization of fixed capital assets of the Belarusian
Power System, other standard acts of the general state and industrial value Minskenergo carries out modernization and
reconstruction of equipment of power plants, electric and thermal networks to ensure their reliable and efficient
operation, it develops power systems of the region.
Investment activities
Borisov TPP
General data and biggest implemented projects
330 kV outdoor switchgear of TPP-5
200
271
167
106 106.5
0
50
100
150
200
250
300
2012 2013 2014 2015 2016
Vo
lum
e o
f in
vest
men
ts t
o f
ixed
ass
ets
,
mln
US
D
Major implemented projects Generating sources
![Page 14: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/14.jpg)
MINSKENERGO14
Investment activitiesImplemented projects
Substation 110/10 kV «Petrovshchina»
Substation 110/10 kV «Staroborisovskaya»
Substations and overhead lines 35 kV and moreConstruction of substation 110/10 kV «Dolginovskaya» with cable
lines 110 kV – commissioning in 2012;
Construction of substation 110/10 kV «Grushevskaya» with cablelines 110 kV «Petrovshchina» – «Grushevskaya» and reconstruction ofthe main switchboard 110 kV of substation 110/10 kV «Petrovshchina»in Minsk – 2013;
Construction of substation «Kamennaya Gorka» with base RES-6and lines 110 kV (stage I – without construction of RES-6 base – 2014);
Construction of substation 110/10 kV «Brestskaya» with lines110 kV – 2014;
Construction of substation 110/10 kV «Kolodishchi» of overheadline having voltage 110 kV Minsk-Vostochnaya – Kolodishchi and anaccess road – 2015;
Construction of substation 110/10 kV «Staroborisovskaya» with cable
lines 110 kV in Minsk – 2016;
Reconstruction of substation 110/10 kV «Drazhnya» in Minsk – 2016;
Reconstruction and expansion of broiler poultry breeding plant JSC
«Smolevichi Broiler Poultry Breeding Farm». Construction of substation
110/10 kV «Lavlya» with branch from overhead line TPP-25 Minsk-
Vostochnaya and from overhead line 110 kV TPP-25 – Smolevichi-Traction
of Smolevichi district of Minsk region – 2016;
Substation 110 kV «Dubovlyany» with branch from overhead line
110 kV «Minsk-Severnaya – Vishniovka No. 1 and No. 2 and an access
road» – 2016;
Chinese-Belarusian Industrial Park. Internal transport infrastructure.
Stage I. Substation 110 kV «Technopark» – 2016.
![Page 15: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/15.jpg)
Prospective investment projects
Within the framework of the Industrial Programof power engineering development for the years2016–2020 Minskenergo is planning to implement thefollowing investment projects:
Reconstruction of Zhodino TPP along withinstallation of steam turbine 12 MW;
Measures for regime integration of theBelarusian Nuclear Power Plant to the balance of thepower system (construction of peak-standby powersource at Minsk TPP-5 and reconstruction of TPP-2);
Reconstruction of substation 220 kV«Stolbtsy» with transition to voltage 330 kV;
Construction and reconstruction of electricnetworks, including to residential areas of about400 km annually;
Construction and reconstruction of thermalnetworks – main ones and in residential areas(volumes of replacement of thermal networks areannually determined by taking into account theirtechnical condition and allocated financing). In 201745 km of thermal networks are to be replaced in singlepipe estimate.
Implemented investment projects
Reconstruction of Minsk TPP-3 withreplacement of old capacities of stage 14 MPa;
Reconstruction of substation 330/110/10 kV«Minsk-Severnaya» with overhead line 110 kV ofMinsk district of Minsk region;
Reconstruction of Main Switchboard330–750 kV and RZA and substation 750 kV«Belorusskaya» of Starye Dorogy district of Minskregion;
Measures for regime integration of theBelarusian Nuclear Power Plant to the balance of thepower system (Installation of electric boilers atMinsk TPP-3, Minsk TPP-4, Molodechno TPP andSoligorsk mini-TPP);
Construction of cable lines 110 kV TTPP-3 –substation 110/10 kv «Podlesnaya»;
Reconstruction of substation 110 kV«Atolino» with expansion of transformer capacity ofMinsk district of Minsk region.
15MINSKENERGO
Investment activitiesImplemented and prospective investing projects
![Page 16: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/16.jpg)
Partner banks of
Minskenergo include foreign
banks: China Development Bank
Corporation (China), Export-
Import Bank of China (China),
International Bank for
Reconstruction and
Development, CJSC «UniCredit
Bank» (Russian Federation), JSC
«Promsvyazbank» (Russian
Federation), JSC
«Roseximbank» (Russian
Federation), AKA Bank
(Germany), Societe Generale
Bank (France), Raiffeisen Bank
International AG (Austria).
16MINSKENERGO
Development of power engineering, its high capital intensity, necessity of permanent renewal of capacities for
production, procurement, transfer and distribution of electrical and thermal power require increase of investments
to fixed capital from all sources, including attraction of foreign investors’ funds.
Minskenergo successfully cooperates with such companies as General Electric GmbH (Switzerland), Siemens
Industrial Turbomachinery (Sweden), MH Power Systems Romania S.R.L. (regional office MH Power Systems
(Japan)), North China Power Engineering Co Ltd. (China), China Machinery Engineering Corporation (CMEC),
«RIKO d.o.o» (Slovenia), JSC «Uralsky Turbinny Zavod» (Russian Federeation), Violawater SIA (Latvia), etc.
Steam turbine STT-400 Siemens of Borisov TPP
International cooperation
![Page 17: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/17.jpg)
Within the frameworks of implementation of theproject «Electrification of the territory of priority
mastering of the Chinese-Belarusian Industrial Park»Minskenergo along with the Chinese Contractor ChinaMachinery Engineering Corporation on 02.08.2016 built theproject Chinese-Belarusian Industrial Park. Internalengineering and transport infrastructure. Stage I.Substation 110 kV «Technopark» along with installation oftwo power transformers having voltage 110/10 kV power40 МVА each. The project funding was carried out from thefunds of technical and economical assistance of the People’sRepublic of China.
Construction of the biogas complex was implemented nearMolodechno within the frameworks of the project of
international technical assistance «Support of complex powerengineering policy of the Republic of Belarus implementation».Financing of the pilot project was equal to 2 million EUR forsupport of various industries and organizations in Belarus.Currently, EU annually spends about 20 million EUR for thesupport of various industries and organizations in Belarus.Equipment for the biogas complex was supplied by LTVLandmaschinen und Transporttechnik Vertriebsgesellschaft mbH(Germany). A contractor of LTV company was represented byKEMPI Co. (Molodechno). The unit was transferred for furtheroperation to Minskenergo (the branch – Molodechno electricnetworks).
17MINSKENERGO
International cooperation
![Page 18: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/18.jpg)
Long-term complex project «Automated
control system over technological processes of
Minsk thermal networks» is being implemented
Increased single-circuit supports
were used by Minskenergo for the first time in
the power system of Belarus for construction of
20,5 km of the overhead line having voltage 330 kV at
the 8th launching complex of the Belarusian Nuclear
Power Plant
18MINSKENERGO
Innovative developmentMinskenergo introduces new products within the frameworks of the state scientific and technical program
«Development and mastering of methods, technologies equipment and systems ensuring effective and sustainable
functioning of the fuel and energy complex of the Republic of Belarus».
356 thousand Belarusian rubles
are to be directed
for research and development of new products,
services and production methods in 2017.
(in 2014–2016 220 thousand BYN were directed)
For introduction of products
1,37 million Belarusian rubles
are to be spent in 2017
(in 2014–2016 products for the amount of > 1,0 million
BYN were introduced)
110 kV outdoor switchgear of MTPP-4
Minsk TPP-3
![Page 19: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/19.jpg)
Personnel developmentWith the aim of having highly experienced personnel, effective use of staff potential special attention is paid to the
personnel selection, arrangement and professional training.
The company cooperates with more than 30
educational institutions of the Republic of
Belarus to provide the enterprise with the required number
of specialists, workers of the required professions and
skills.
Starting from 2016 teams of
students are being annually
formed, during summer holidays, from students of
educational institutions of Minsk
19
are annually trained in branches of Minskenergo
> 800 students
MINSKENERGO
![Page 20: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/20.jpg)
Minskenergo team annually participates and gets medalplaces in competitions of professional skills amongrepairing and servicing teams for overhead lines 110 kVand over and among teams of distributing electricnetworks 0,4–10 kV:
20MINSKENERGO
Personnel developmentOne of the forms of personnel training in branches of electric networks of Minskenergo includes holding and
participation in various competitions – district, regional, republican competitions and concourses among teams of
national power systems of CIS member-states.
Republican and regional competitions among teams
for repair and servicing of distributing electric networks
0,4–10 kV, for repair and servicing of overhead lines
110 kV and higher;
Competitions among teams for repair of electric
equipment of substations, distribution networks 0,4–10 kV
organized by SPA «Belenergo».
International competitions of professional skillsamong the personnel of power engineering among CISmember-states, organized by the Electric PowerEngineering Council of CIS;
![Page 21: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/21.jpg)
Historical backgroundThe beginning of electric power usage in Minsk from stationary sources, fixed in historical documents, relates to January
1895, when first power sources – steam machines by 100 and 50 h.p. with dynamo machines 110 V DC were commissioned at
the electric water pipeline pump station «Elvod».
Apart from water supply, houses of the governor and bishop and Zakharievskaya street were electrified.
The year 1895. Commissioning of TPP-1 in Minsk. Reconstruction in 1927 and expansion, with commissioning of tram route
since 1930-ies TPP-1 capacity increased by 6,7 MW.
In 1934 the first stage of Minsk TPP-2 was commissioned (subsequently TPP-2) having capacity 6,8 MW, Komarovka boiler
plant. Centralized heat supply was started in Minsk.
Summarized data on power engineering of Minsk region before World War II are unavailable.
Locomobile and diesel units by 54–167 kW in regional centers with few LV networks belonged to
the local industry. They supplied small enterprises and insignificant part of the population.
The year 1945. Minsk TPP-2 was restored and launched.
1950-s. The first unit of Minsk TPP-3 having capacity 25 MW, Smolevichi SDPP having
capacity 32,7 МW and overhead line 110 kV with Minsk power unit, overhead line 110 kV,
Smolevichi SDPP-substation Orsha were commissioned. The central part of the republican
power system was formed.
1960-s. Substation 220 kV «Kolyadichi» was commissioned.
The 8th unit of Minsk TPP-3 was launched, the plant reached capacity 420 MW.
The first republican overhead line 330 kV Kolyadichi – Vilnius was put into operation.
The power system of Belarus was connected with the North-Western system of the USSR.
Electrification of villages in the region was completed.
1970-s. The first unit of Minsk TPP-4 having capacity 60 МW was commissioned.
Reconstruction of TPP-3 was reconstructed and boilers were transferred to gas–fuel oil.
21MINSKENERGO
![Page 22: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/22.jpg)
Historical background1980-s. Commissioning of the unique district heating system based on Minsk TPP-4 and district boiler
plants of Minsk.
The unique republican cable line 110 kV was commissioned in Minsk.
Reconstruction of Smolevichi SDPP along with transition of boilers to gas–fuel oil and
modernization of turbines. The station was renamed to Zhodino TPP.
Commissioning in dimensions 750 kV overhead line 330 kV Substation «Belarusian» – Ignalinsk NPP.
1990-s. Commissioning of the first republican substation 750 kV with overhead line 750 kV to Smolensk
Nuclear Power Plant.
Commissioning of the 6th power unit of Minsk TPP-4, the plant reached the designed capacity of
1030 МW, 1519 Gcal/h.
Ring formation of overhead line and substation 330 kV around Minsk.
Commissioning of the first power unit of Minsk TPP-5 having capacity 330 MW.
2000-s Gas expansion machine-generator with total capacity 5 MW was put into operation at Minsk TPP-4.
Launching complexes 1 and 2 were commissioned for reconstruction of substation 330 kV «Kolyadichi» and
putting in operation of automatic transformers Nos. 1 and 2 having capacity by 200 MVA. So, reconstruction of
the 2nd stage of the substation was completed.
A steam boiler having capacity of steam 22 t/h and a steam turbine having capacity 2.4 MW were installed to
mini-TPP-DB-3 of Molodechno electric networks operated with fuel wood.
The largest republican steam and gas block having capacity 230 MW was put into operation at Minsk TPP-3.
The head specimen of boiler unit E 60-9,5-510 was put into operation at Zhodino TPP, which operates with
local fuel (crushed peat blocks, wooden chips), capacity 60 tons of steam per hour, pressure 95 kgf/сm2.
2011 Reconstruction of TPP-2 along with installation of 2 Steam generators 32,5 MW with total capacity of 65 MW.
2012 A steam-gas block having capacity 400 MW (SGB-400) was put into operation at TPP-5.
2014 Reconstruction of boiler shop No. 3 of Zhodino TPP in Borisov along with construction of a gas and steam unit
having capacity 65 MW and conferring the status of «Borisov TPP».
22MINSKENERGO
![Page 23: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/23.jpg)
Historical background2015. The following projects were implemented:Distribution and transport
Substations and overhead lines 35 kV and over:Construction of substation 110/10 kV «Rogachev» with lines 110 kV and reconstruction of substation 110 kV«Ozerishche».Reconstruction of substation 110 kV «Chizhovka» in Uborevicha str. – Tashkentsky lane.Reconstruction of substation 110/10 kV «Yougo-Zapadnaya» along with replacement of a transformer andconstruction of distribution board-10 kV.Reconstruction of substation 110 kV «Poultry farm» of Dzerzhinsk region along with application of digitalprotection.Construction of substation 110/10 kV «Kolodishchi» and overhead line 110 kV Minsk-Vostochnaya –Kolodishchi and access road.
Networks 0,4–10 kVIn 2015 569,9 km of overhead lines 0,38–10 kV, or 135,6 % of the annual task were put into operation in Minsk region.
Heat supplyIn 2015 26,3 km of thermal networks were built and reconstructed in single pipe estimate, including Minsk – 24,3 km, inMinsk region – 2,0 km.In 2015 the following heat supply schemes were worked out:
«Heat supply for Soligorsk by 2020 and further by 2025»;«Heat supply of Vileika by 2025 and further by 2030»;«Scheme of development of Minsk power system by 2025 and further by 2030».
2016. Implemented projects:Distribution and transport
Substations and overhead lines 35 kV and over:Construction of substation 110/10 kV «Staroborisovskaya» with cable lines 110 kV in Minsk;Construction of substation 110/10 kV «Lavlya» and branches from TPP-25 – «Minsk-Vostochnaya» andfrom overhead line 110 kV TPP-25 – «Smolevichi-Traction»;Chinese-Belarusian Industrial Park. Constructionj of substation 110 kV «Technopark»;Construction of repair and operation point for Slutsk power distribution zone;Reconstruction of substation 110/10 kV «Drazhnya» in Minsk.
Networks 0,4–10 kVIn 2016 531,627 km of overhead lines 0,4–10 kV were built with planned 300 km.
Heat supply
In 2016 47,98 km of thermal networks were repaired in single pipe estimate with planned 40,2 km.
23MINSKENERGO
![Page 24: RUE «MINSKENERGO»€¦ · Zhodino TPP 3,5 % Borisov electrical networks 1,8 % TPP-5 1,0 % MINSKENERGO. 43% 20% 2% 3% 4% 28% Industrial consumers Railway transport City transport](https://reader034.vdocuments.us/reader034/viewer/2022052617/60b25862fc7fc453247fd0f7/html5/thumbnails/24.jpg)
Minskenergo
220033, Minsk, Aranskaya str., 24
(+375 17) 223-81-03 (reception office)
(+375 17) 327-21-11
https://www.facebook.com/minskenergo/
https://twitter.com/minskenergo
https://vk.com/minskenergo