ruben massarelli - challenge of managing human waste in high altitude, aconcagua

19
Challenge of managing Challenge of managing human waste in high human waste in high altitude. altitude. Case study of the Case study of the Aconcagua Provincial Aconcagua Provincial Park. Park. Sustainable Summits Conference July 20-24, 2014 Rubén Massarelli

Upload: sustainable-summits-initiative

Post on 14-Apr-2017

36 views

Category:

Environment


0 download

TRANSCRIPT

Page 1: Ruben Massarelli - Challenge of managing human waste in high altitude, Aconcagua

Challenge of managing human Challenge of managing human waste in high altitude. waste in high altitude.

Case study of the Aconcagua Case study of the Aconcagua Provincial Park.Provincial Park.

Sustainable Summits ConferenceJuly 20-24, 2014

Rubén Massarelli

Page 2: Ruben Massarelli - Challenge of managing human waste in high altitude, Aconcagua
Page 3: Ruben Massarelli - Challenge of managing human waste in high altitude, Aconcagua

Aconcagua Provincial Park

Aconcagua

Provincial Park

Campsites

Localities

PeaksRailwayHighwayRivers

Natural Protected Area System Mendoza, Argentina

Sup. 710 Km2

Page 4: Ruben Massarelli - Challenge of managing human waste in high altitude, Aconcagua

Climate

•Cold and dry (above 4000m below 0°C)

•Freezing days all year round

•Strong winds (200 km/h)

•Mountain rivers

•Under ground water

•Glacier lakes

•Wetlands in meadows

Geology and Soils

U- shaped valleys, moraine deposits

Mountain glaciers

Thin soils, sandy loam

Meadows soils: rich in organic matter

Page 5: Ruben Massarelli - Challenge of managing human waste in high altitude, Aconcagua

Climbing Season

15 Nov – 15 MarDay treking (1 Day)Short Trekking (3 Days)Long Trekking (7 Days)Climbing (20 Days)

70 % Horcones Valley

30 % Vacas Valley

Season 2013-2014 3.056 Climbers2.480 Trekkers

Page 6: Ruben Massarelli - Challenge of managing human waste in high altitude, Aconcagua

2400 – 3000 mts. 3000 – 3500 mts. 3500 – 4500 mts. 4500 – 6960 mts.

Horcones - Vacas Confluencia - Leñas Mulas - Argentina Nido - berlín- SummitEntrance Aproaching Camps Base Camps High Camps

Page 7: Ruben Massarelli - Challenge of managing human waste in high altitude, Aconcagua

Front country toilets

•leaching field is in a alpine meadow

•New Sistem for water extraction – connected to general pipe.

•Visitor Center•50.000 visitors (in summer)•700 people day•Toilets, shower and dishwasher• Information –Tickets sales

• Check In – Check Out • Plastic Bag delivery (for rubbish)

Page 8: Ruben Massarelli - Challenge of managing human waste in high altitude, Aconcagua

Mid altitude toilets

toilets, shower and dishwashes exits connected to the septic tank.

•chemical products (liquids) affect the pit absorption capacity= new pits constructed

• lixiviation to the soil

• pollution of under ground water and river

septic tank pit

Page 9: Ruben Massarelli - Challenge of managing human waste in high altitude, Aconcagua

4

Toilets base camps•Each company has its own bathroom (some has 2)•We try to take the barrels in pairs (because the weight)•The barrels are left in a temporary deposit

Page 10: Ruben Massarelli - Challenge of managing human waste in high altitude, Aconcagua

Toilets high altitude

Page 11: Ruben Massarelli - Challenge of managing human waste in high altitude, Aconcagua

1

2

3

Why is a challenge? No money from government (NO budget)

Aconcagua produces 98% money for all sistem (16 NPA). Around U$S 1.500.000

$ Only 3 NPA collect money

Mendoza has 16 natural protected areas. The money is for: fuel, food, vehicles, uniforms, personnel, helicopter, doctors, tools, etc.

1 Aconcagua Provincial Park2 Diamante Lagoon3 Las brujas Cavern

Page 12: Ruben Massarelli - Challenge of managing human waste in high altitude, Aconcagua

Why is a challenge? Limited resources

2 Vehicles

10 Park Rangers30 asistants (Limited training)

16 Rescue patrols (Only for victims in the mountains)

22 Doctors

240 Hours of helicopter

•Tourist assistance•Patrol•Research assistance•Supervise camps•Interpretation•Safety and law enforcement•Work with helicopter•etc

•Staff relay•Medical care •Logistics•Take out of garbage and human waste•Search and Rescue

1 Person for mules control

Page 13: Ruben Massarelli - Challenge of managing human waste in high altitude, Aconcagua

Why is a challenge?

Management plan has not ended - No study of capacity -

Page 14: Ruben Massarelli - Challenge of managing human waste in high altitude, Aconcagua

No income limit for climbers or mules Why is a challenge?

Climbers Mules

Page 15: Ruben Massarelli - Challenge of managing human waste in high altitude, Aconcagua

However…

•Take out 22.500 Kg of human Waste (aprox. 80 fly hours)

Page 16: Ruben Massarelli - Challenge of managing human waste in high altitude, Aconcagua

•Take out 13.800 Kg of rubbish

•Begin to separate liquid from solids in base camps bathrooms

Page 17: Ruben Massarelli - Challenge of managing human waste in high altitude, Aconcagua

•100 Days stay in high camps•259 Patrols = 460 Kg High camps garbage

Page 18: Ruben Massarelli - Challenge of managing human waste in high altitude, Aconcagua

•Mules control in both entries

•52 New Signs

"Other than respect and affection, mountains DO NOT need any of your belongings. Please, take your rubbish with you" 

•Implementation of good practices

Page 19: Ruben Massarelli - Challenge of managing human waste in high altitude, Aconcagua

thank you!

Photos Thanks to A. Barros – G. Araujo – S. Rossi – P. Betancourt – D. Ferrer