Welding reportTRANSCRIPT
ELECTROREF ENGINEERS (PVT) LTD
No :74, Lesly Ranagala Mawatha, Colombo 08.
Tel : 94-11-2677335, 2671096, 2671096
Fax : 94-11-2699124 e-mail : [email protected]
RADIOGRAPHIC INSPECTION REPORT
ELECTROREF ENGINEERS (PVT) LTD
No :74, Lesly Ranagala Mawatha, Colombo 08.
Tel : 94-11-2677335, 2671096, 2671096
Fax : 94-11-2699124 e-mail : [email protected]
RADIOGRAPHIC INSPECTION REPORT
ELECTROREF ENGINEERS (PVT) LTD
No :74, Lesly Ranagala Mawatha, Colombo 08.
Tel : 94-11-2677335, 2671096, 2671096
Fax : 94-11-2699124 e-mail : [email protected]
RADIOGRAPHIC INSPECTION REPORT
ELECTROREF ENGINEERS (PVT) LTD
No :74, Lesly Ranagala Mawatha, Colombo 08.
Tel : 94-11-2677335, 2671096, 2671096
Fax : 94-11-2699124 e-mail : [email protected]
RADIOGRAPHIC INSPECTION REPORT
ELECTROREF ENGINEERS (PVT) LTD
No :74, Lesly Ranagala Mawatha, Colombo 08.
Tel : 94-11-2677335, 2671096, 2671096
Fax : 94-11-2699124 e-mail : [email protected]
RADIOGRAPHIC INSPECTION REPORT
ELECTROREF ENGINEERS (PVT) LTD
No :74, Lesly Ranagala Mawatha, Colombo 08.
Tel : 94-11-2677335, 2671096, 2671096
Fax : 94-11-2699124 e-mail : [email protected]
RADIOGRAPHIC INSPECTION REPORT
ELECTROREF ENGINEERS (PVT) LTD
No :74, Lesly Ranagala Mawatha, Colombo 08.
Tel : 94-11-2677335, 2671096, 2671096
Fax : 94-11-2699124 e-mail : [email protected]
RADIOGRAPHIC INSPECTION REPORT
ELECTROREF ENGINEERS (PVT) LTD
No :74, Lesly Ranagala Mawatha, Colombo 08.
Tel : 94-11-2677335, 2671096, 2671096
Fax : 94-11-2699124 e-mail : [email protected]
RADIOGRAPHIC INSPECTION REPORT
ELECTROREF ENGINEERS (PVT) LTD
No :74, Lesly Ranagala Mawatha, Colombo 08.
Tel : 94-11-2677335, 2671096, 2671096
Fax : 94-11-2699124 e-mail : [email protected]
RADIOGRAPHIC INSPECTION REPORT
EMBED PBrush
DATE : 21/04/2012
REPORT NO :RT/HIA/FH/008
ERE JOB NO :
CONTINUED ON SHEET NO : 01
Client:
BMK Holdings(PvtLtd
Project: Hambantota International Air Port
Fuel Hydrant System-Package-1
Location: Mattala
Time
5 Min
Developer
Kodak
Exposure
135 Sec,
35 Sec
Size
3X2
Strength
21 Ci
Source
Ir 192
Container
Techops660
FFD
Exposure
Energy
Equipment make & Type
X Ray Filtration
Focal Spot Size
Technique
r Ray X
x - Ray
TechnicianClient
Engineer / Inspector (Cont.. to page 2)
Test Restrictions Comments :
Total No. of films: Nos 84
Acceptance
Acceptable
Acceptable
Acceptable
Porosity
None
None
PIT-07/08-250 W50-W6
(0-30)
30-60)
(60-0)
Defects / Remarks
Weld Identification
General Report
Sensitivity
2.2%
IQI: 10 ISO 16
Film Side
Source Side
2.5
Density
Pb-0.025mm
380mm,
240mm
Fuji IX100
Film Length
Screens
Film Type
Date of Inspection: 19/4/2012, 20/4/2012
Item: Welded butt joints of Fuel Hydrent pipe line at Hambantotal International Airport
Welding process: GTAW SMAW
Welding Joint: Butt
Welding Position: 5G
Material : API 5L Grade B
Plate Thickness :
Pipe O. D: 250 mm/150mm
Wall Thickness: 9.27mm/7.11mm
Geometry & Setting Up
Double Wall Single Image
Acceptance Specification: API 1104
Inspection Specification API 1104
SFD
250,
150
Temp
20 C
EMBED PBrush
Date : 21/04/2012
REPORT NO : RT/HIA/FH/008
ERE JOB NO :
CONTENUED ON SHEET NO : 02
Weld Identification
A2
Acceptance
Defects / Remarks
Acceptable
Acceptable
Acceptable
Acceptable
Not Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
PIT-06/07-250-W56-W6
(0-30)
30-60)
(60-0)
PIT-07/08-250-W123-W4,5
(0-30)
30-60)
(60-0)
PIT-07/08-250-W121-W4,5
(0-30)
30-60)
(60-0)
PIT-07/08-250-W137A-W4
(0-30)
30-60)
(60-0)
Porosity
Porosity
None
None
Cluster Porosity
None
None
None
None
Porosity
Porosity
None
Test Restrictions Comments :
Technician Client
Engineer / Inspector (Contpage 3)
EMBED PBrush
Date 21/04/2012
REPORT NO : RT/HIA/FH/008
ERE JOB NO :
CONTENUED ON SHEET NO : 03
Acceptance
Defects / Remarks
Weld Identification
PIT-07/08-250-W135A-W6
(0-30)
30-60)
(60-0)
PIT-07/08-250-W141-W4
(0-30)
30-60)
(60-0)
PIT-07/08-250-W104-W6
(0-30)
30-60)
(60-0)
PIT-06/07-250-W98-W6
(0-30)
30-60)
(60-0)
Porosity
Cluster Porosity
None
None
Porosity
Root under cut
None
Porosity
Porosity
None
None
None
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Test Restrictions Comments :
Technician Client
Engineer / Inspector Cont.. to page-04)
EMBED PBrush
Date :21/04/2012
REPORT NO : RT/HIA/FH/008
ERE JOB NO :
CONTENUED ON SHEET NO :04
Acceptance
Defects / Remarks
Weld Identification
PIT-06/07-150-W118-W4,5
(0-20)
20-40)
(40-0)
PIT-06/07-150-W111-W4
(0-20)
20-40)
(40-0)
PIT-06/0-150/W104-W4
(0-20)
20-40)
(40-0)
PIT-06/07-150-W63-W6
(0-20)
20-40)
(40-0)
None
None
None
None
None
Porosity
Porosity
None
None
None
None
None
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Test Restrictions Comments :
Technician Client
Engineer / Inspector
EMBED PBrush
Date : 21/04/2012
REPORT NO : RT/HIA/FH/008
ERE JOB NO :
CONTENUED ON SHEET NO : 05
Acceptance
Defects / Remarks
Weld Identification
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
None
None
Porosity
None
None
Porosity
None
None
None
Porosity
None
None
PIT-06/07-150-W97-W4
(0-20)
20-40)
(40-0)
PIT-06/07-150-W91-W6
(0-20)
20-40)
(40-0)
PIT-06/07-150-W83-W6
(0-20)
20-40)
(40-0)
PIT-06/07-150-W76-W6
(0-20)
20-40)
(40-0)
Test Restrictions Comments :
Technician Client
Engineer / Inspector
EMBED PBrush
Date :21/04/2012
REPORT NO : RT/HIA/FH/008
ERE JOB NO :
CONTENUED ON SHEET NO : 06
Acceptance
Defects / Remarks
Weld Identification
PIT-06/07-150-W89-W6
(0-20)
20-40)
(40-0)
PIT-06/07-150-W70-W6
(0-20)
20-40)
(40-0)
PIT-06/07-150-W78-W4,5
(0-20)
20-40)
(40-0)
PIT-06/07-150-W72-W4,5
(0-20)
20-40)
(40-0)
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
None
Porosity
None
None
None
None
None
None
None
None
None
None
Technician Client
Engineer / Inspector
Test Restrictions Comments :
EMBED PBrush
Date :21/04/2012
REPORT NO : RT/HIA/FH/008
ERE JOB NO :
CONTENUED ON SHEET NO : 07
Acceptance
Defects / Remarks
Weld Identification
PIT-06/07-150-W99-W4,5
(0-20)
20-40)
(40-0)
PIT-06/07-150-W65-W4,5
(0-20)
20-40)
(40-0)
PIT-06/07-150-W106-W4,5
(0-20)
20-40)
(40-0)
PIT-06/07-150-W113-W4,5
(0-20)
20-40)
(40-0)
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
None
None
None
Porosity
None
Porosity
None
None
None
None
None
None
Technician Client
Engineer / Inspector
Test Restrictions Comments :
EMBED PBrush
Date :21/04/2012
REPORT NO : RT/HIA/FH/008
ERE JOB NO :
CONTENUED ON SHEET NO : 08
Acceptance
Defects / Remarks
Weld Identification
PIT-06/07-150-W120-W4,5
(0-20)
20-40)
(40-0)
PIT-06/07-150-W85-W4,5
(0-20)
20-40)
(40-0)
PIT-06/07-150-W93-W4,5
(0-20)
20-40)
(40-0)
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Porosity
None
None
None
None
None
None
None
None
Technician Client
Engineer / Inspector
Test Restrictions Comments :
EMBED PBrush
Date :8/03/2012
REPORT NO : RT/HIA/FH/007
ERE JOB NO :
CONTENUED ON SHEET NO : 09
Acceptance
Defects / Remarks
Weld Identification
PIT-06/07-150-W114-W4
(0-20)
20-40)
(40-0)
PIT-07/08-150-W128-W4
(0-20)
20-40)
(40-0)
PIT-07/08-150-W169-W4
(0-20)
20-40)
(40-0)
PIT-07/08-150-W142-W4
(0-20)
20-40)
(40-0)
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Porosity
None
None
None
None
None
Cluster Porosity
None
Porosity
None
None
None
Technician Client
Engineer / Inspector
Test Restrictions Comments :