rrc-06 migs, excess and equitable access ebu technical department terry oleary

29
RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY O’LEARY TERRY O’LEARY TERRY O’LEARY TERRY O’LEARY

Upload: carlos-walton

Post on 27-Mar-2015

223 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

MIGS, EXCESS and EQUITABLE ACCESS

EBU

TECHNICAL DEPARTMENT

TERRY O’LEARYTERRY O’LEARYTERRY O’LEARYTERRY O’LEARY

Page 2: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

TOPICS

1. MIG

2. SYNTHESIS

3. EXCESS & EQUITABLE ACCESS

Page 3: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

TOPICS

• DEFINITION OF A MIG

• BIG MIG

• EXCESS XS• SUBTLETIES (1, 2, 3, ..., )

• RELATIVE SPECTRUM DEMAND RSD• WHAT ‘THEY’ LOOK LIKE• COMPLICATIONS

• CONCLUSIONS

1. MIG

Page 4: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

MIGMUTUALLY INCOMPATIBLE GROUP

2 requirements, compatible less than 2 channels needed

2 requirements, IN-compatible 2 channels needed

‘1’ ‘1’

‘1’ ‘2’

‘1’ ‘2’

‘3’

2-MIG

3 requirements, IN-compatible 3 channels needed

3-MIG

‘1’ ‘2’

‘1’

3 requirements less than 3 channels needed

NOT a MIG

4 requirements, IN-compatible 4 channels needed 4-MIG

‘2’ ‘3’

‘4’‘1’

4 requirementsless than 4 channels needed

NOT a MIG

‘2’ ‘3’

‘2’‘1’

Page 5: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

THIS IS A BIGGER MIG WITH 13 REQS

Q: HOW MANY CHANNELS REQUIRED?

BIG

MIG

Page 6: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

XSEXCESS

DRAFT PLAN: BAND IV/V

MIG SIZE = M = 358

# CHANNELS = C = 49

EXCESS = XS = M – C = 358 – 49 = 309

CASE BMIG = 4

ONLY 2 CHANNELS:1, 2

2 REQS CAN HAVE A CHANNEL2 REQS CANNOT HAVE A CHANNEL

THERE IS AN EXCESS OF 2 REQS

EXCESS = XS = 4 – 2 = 2

CASE AMIG = 4

5 CHANNELS:1, 2, 3, 4, 5

EACH REQ CAN HAVE A CHANNELWITH NO INCOMPATIBILITY

THERE IS NO EXCESS IN REQS

RECALL: ‘BIG’ MIG SIZE 13

Page 7: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

NO 3-MIG

2-MIGs

2 CHANNELS ?

1

2

12

?? = 3

MORAL :SOMETIMES

MORE CHANNELSMAY BE NEEDED

THAN THE MIG SIZE INDICATES

SUBTLETIES (1)

Page 8: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

10 requirements

GIVEN REQ

REQs IC with

MIG SIZE 5

MIG SIZE 4

MIG SIZE 4 MORAL :SOMETIMES

LARGE MIGsMAY HIDE SMALLER

MIGs

SUBTLETIES (2)

Page 9: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

Interconnected MIG: size 7 (= 5 + 2 )

A1

B1

E1

C1

D1

R2

S2

Admin '1'

Admin '2'

Figure 2: interconnected MIGs

MIG 2: size 2MIG 1: size 5

SUBTLETIES (3)

MORAL :INTERNAL SMALL

MIGS MAY COMBINE TO EXTERNAL

LARGE MIGS

Page 10: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

5 REQUIREMENTS : A, B, C, D, EMIG SIZE = 2

3 CHANNELS : 1, 2, 3

NO XS REQS ???

REQs ACs

A 1,2,3

B 1

C 1

D 1

E 1

A B

C

D

E MORAL :RESTRICTIONS ON

ACCEPTABLE CHANNELS

MAY ALSO CAUSE

XS

3 1

1––

SUBTLETIES (4)

Page 11: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

5 REQUIREMENTS : A, B, C, D, EMIG SIZE = 2

3 CHANNELS : 1, 2, 3

XS = 2 – 3 = - 1 ?????

REQs ACs

A 1,2,3

B 1

C 1

D 1

E 1

A B

C

D

E

CONSIDER SUBSETS (B,C) OR (C,D) OR (D,E)

MIG SIZE = 2; 1 AC

XS = 2 – 1 = 1

MORAL :MIG SUBSETS CAN LEAD TO LARGER

XS

SUBTLETIES (4 CONT)

Page 12: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

SUBTLETIES (5)

CH 17 CH 18 CH 19

56

7

12

34

MIG = 3

R5

R6

R7

1 AC R4

R3

R2

R1

1 AC

MIG = 5

MIG = 4

PROBLEM

XS = 2

PROBLEM

XS = 3

LET’S LOOK AT REQ NUMBER “5” MORAL :

ADDING ACs CAN LEAD TO

LARGER XS

Page 13: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

RSD (1)RELATIVE SPECTRUM DEMAND

CASE AMIG = 50 = MCHANNELS = 49 = C

XS = 50 – 49 = 1

CASE BMIG = 2 = MCHANNELS = 1 = C

XS = 2 – 1 = 1

RSD M/C 100 %CASE A: RSD = 50/49 x 100 = 102 %

CASE B: RSD = 2/1 x 100 = 200 %

XS CAN BE REDUCED BY RESOLVING 1 IC AMONGST

1225 ICS:

MORE ‘FLEXIBILITY’

XS CAN BE REDUCED BY RESOLVING 1 IC AMONGST

1 IC:

LESS ‘FLEXIBILITY’

Page 14: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

XS M – C

RSD M/C 100 %

RSD (2)RELATIVE SPECTRUM DEMAND

DRAFT PLAN BAND IV/VOTHER CASES

M = 50 C = 25 : XS = 25 , RSD = 200 %

M = 196 C = 49 : XS = 147 , RSD = 400 %

M = 35 C = 1 : XS = 34 , RSD = 3500 %

M = 42 C = 49 : XS = (- 7) , RSD = 85 %

M = 358 C = 49 : XS = 309 , RSD = 731 %

Page 15: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06BIG MIG ZONE

WHAT THEY LOOK LIKE (1)

EXAMPLE FROM 1ST PLANNING EXERCISE

Page 16: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

MIG size = 227RSD = 463 %

CLOSER LOOK

WHAT THEY LOOK LIKE (2)

SOME MIGS HAVE SIZE 358 IN THE DRAFT PLAN!!

Page 17: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

COMPLICATIONSUHF vs. VHF

UHF: UNIFORM CHANNELING 4 ACs = 4 x 8 MHz = 32 MHz

MIG SIZE = 10 10 x 8 MHz = 80 MHz SPECTRUM NEEDED

XS = 10 – 4 = 6 REQS = 48 MHz = 10 x 8 – 4 x 8

RSD = 10/4 x 100 = 250% = (10 x 8)/(4 x 8) x 100

VHF: NON-UNIFORM CHANNEL WIDTH 4 ACs = 4 x ? MHz

MIG SIZE = 10 10 x ? MHz SPECTRUM NEEDED

ACs CAN BE 1.75, 7, OR 8 MHz WIDEMIGs CAN CONSIST OF DAB (1.75), DVB (7), DVB (8 MHz)

XS = SPECTRUM NEEDED–SPECTRUM AVAILABLE

RSD = (SPEC NEEDED)/(SPEC AVAIL)x100

Page 18: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

MIG CONCLUSIONS1. MIGs ARE A SIMPLIFICATION OF A COMPLEX PROBLEM

2. MIGs ARE USED TO PINPOINT DIFFICULT PLANNING SITUATIONS

3. MIGs INDICATE MORE REQUIREMENTS THAN THE AVAILABLE SPECTRUM CAN HOLD

4. MIGs CAN BE RESOLVED BY • REDUCING THE NUMBER OF REQUIREMENTS• INCREASING THE NUMBER OF ACCEPTABLE CHANNELS• ACCEPTING INTERFERENCE• ACCEPTING SMALLER COVERAGE AREAS ...

5. RESOLUTION OF ONE MIG MAY REVEAL THE EXISTENCE OF ANOTHER MIG, INVOLVING THE SAME REQ

6. MORE EXACT METHODS TO DETERMINE RSD SOUGHT

7. MIGs ARE NOT JUST ‘THE OTHER GUY’S PROBLEM’

Page 19: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

2. SYNTHESIS

1. AIM ALL REQUIREMENTS ASSIGNED

MAXIMUM NUMBER ASSIGNED

2. CONSTRAINTS AMOUNT OF SPECTRUM

NUMBER OF REQUIREMENTS

ALL REQUIREMENTS “EQUAL”

NO “FAVOURITES”, NO “PRIORITIES”

Page 20: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

3. EXCESS & EQUITABLE ACCESS

1. NO EXCESS ALL REQUIREMENTS SATISFIED

EQUITABLE ACCESS TO SPECTRUM

2. EXCESS NOT ALL REQUIREMENTS SATISFIED

NON-EQUITABLE ACCESS

SIMPLE SELF-CONTAINED EXAMPLES TO ILLUSTRATE THESE POINTS

Page 21: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

MIG size = 44 channels

A B

EQUITABLE DISTRIBUTION

PROBABILITIES

2 - 100.0 %

4

23

1

NO EXCESS REQUIREMENTS

PROBABILITIES

2 - 100.0 %

Page 22: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

EXCESS REQUIREMENTS

A B

MIG size = 84 channels

PROBABILITIES

0 - 1.4 %

1 - 22.9 %

2 - 51.4 %

3 - 22.9 %

4 - 1.4 %

4

23

1

4

2

3

1

PROBABILITIES

0 - 1.4 %

1 - 22.9 %

2 - 51.4 %

3 - 22.9 %

4 - 1.4 %

ONLY 4 CAN BE

ASSIGNED

Page 23: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

SUPER-EXCESS REQUIREMENTS

MIG size = 124 channels

A B

4

2

3

1

4

2

3

1

PROBABILITIES

0 - 0.2 %

1 - 6.5 %

2 - 33.9 %

3 - 45.3 %

4 - 14.1 %

PROBABILITIES

0 - 14.1 %

1 - 45.3 %

2 - 33.9 %

3 - 6.5 %

4 - 0.2 %

ONLY 4 CAN BE

ASSIGNED

“EQUITABLE ACCESS”

DESTROYED

Page 24: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

A B

C

16

16

16

MIG SIZE = 48ACs = 49

100% PROBABILITYA : 16 CHANNELsB : 16 CHANNELsC : 16 CHANNELs

THIS IS “EQUITABLE

ACCESS”

Page 25: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

A B

C

50

50

50

MIG SIZE = 150ACs = 49

98% PROBABILITYA, B, C : 11 – 22 CHANs

IS THIS “EQUITABLE ACCESS” ???

12% : 15, 16, 18 7% : 16, 16, 176% : 15, 17, 17

ONLY 49 CAN BE

ASSIGNED

Page 26: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

A B

C

200

100

50

MIG SIZE = 350ACs = 49

98% PROBABILITY50 : 2 – 12 CHANs100 : 8 – 20 CHANs200 : 21 – 35 CHANs

THIS IS NOT “EQUITABLE

ACCESS”

ONLY 49 CAN BE

ASSIGNED

Page 27: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

XS CONCLUSIONS

1. EXCESS SUBMISSIONS NO INCREASE THE NUMBER OF SATISFIED REQUIREMENTS OVERALL

2. EXCESS SUBMISSIONS DISTORT THE DISTRIBUTION OF SATISFIED REQUIREMENTS

3. EXCESS SUBMISSIONS DESTROY EQUITABLE EXCESS

4. EXCESS SUBMISSIONS INCREASE COORDINATION

5. EXCESS SUBMISSIONS INCREASE DISAPOINTMENT

Page 28: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

MI G

DON’T LET

THE MIGs

SHOOT YOU DOWN !!!

TAKE HEART

Page 29: RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY

RRC-06

MIG, XS, EA

Terry O’Leary

THANK YOU!

NO

EXCESS

TIME