Summary
A program of reverse circulation overburden drilling was completed during June, 1981 on two separate claim groups within the Cook Project area. The overburden holes were designed to test for gold mineralization in tills in the up-ice direction from areas where anomalous gold values had been recorded in previous overburden holes. Eleven holes were drilled for a total of 1,515 feet.
Location and Access
The claims are located as follows - 23 claims lie within Lots 3 , 4 and 5, Concessions III and IV in Currie Township and, 8 claims lie within Lots 11 and 12, Concession IV in Bowman Township.
The claim blocks are accessible by means of a series of gravel roads and abandoned concession roads which extend southwards from Highway 101. The locations of the overburden holes are plotted on location maps which are attached to this report.
Property
The property consists of thirty-one (31) claims comprising two separate groups. The claims are numbered as follows:
Currie Township, Lots 3, 4, 5, Concessions III and IV Claim Nos. 555139 to 555143 inclusive
549050 to 549052 inclusive594509 to 594511 inclusive624446 to 624457 inclusive
Bowman Township, Lots 11 and 12, Concession IV Claim Nos. 545370 to 545373 inclusive
545376 to 545379 inclusive
ir i
- 2 -
Previous Work
Asarco Exploration Company of Canada Limited and the Tillex Syndicate have been active in the general area since 1973. Several overburden holes were drilled in and around each of the two claim blocks prior to 1980. Three overburden holes were drilled in the Currie Township claim block and two holes were drilled in the Bowman Township claim block during 1980.
Overburden Drill Program
The overburden drill provided by Bradley Brothers Limited consists of a Longyear 1-38 drill modified for dual-tube reverse circulation drilling. The drill is mounted on an eighteen ton diesel FN160 Flextrack Nodwell, and has a hydraulic derrick capable of handling twenty feet of rods.
In each hole, continuous sample return was logged and monitored through the complete Pleistocene section, and bedrock chips were collected for several feet into bedrock. Whenever till was identified or suspected, samples of the minus 10 mesh material were collected. These samples would average about fifteen pounds each. A large amount of the plus 10 mesh pebbles and boulder chips was included with each sample to assist in studies of till composition.
Individual drill holes were located in such a way as to confirm the results of previous drilling and to trace anomaly trains up-ice from the holes in which they were originally discovered. In general the anomaly trains were found to trend approximately 155 to 170 .
Pleistocene Geology
Most of the area is underlain by clay deposits from glacial lake Barlow-Ojibway. In a few places the clays grade laterally and upwards into coarse sand and gravelly outwash material which may be proximal to a former shoreline. The lake deposits are under lain by glacial tills.
Overburden holes in the Currie Township claim block intersected the lake clays near surface and then penetrated at least two tills before they reached bedrock at depths ranging from 80 to 170 feet. The basal till has been strongly compacted by over-riding ice sheets and the clay material within the till has been very highly compacted to form a "super-clay".
- 3 -
Overburden holes in the Bowman Township claim block intersected 52 to 100 feet of lake clays near the surface and then penetrated 7 to 33 feet of sand and gravel and glacial till before reaching highly weathered and decomposed bedrock. There appears to be only one till overlying bedrock in the Bowman claim block and no "super-clay" was encountered in the holes.
Anomalous gold values were found to occur in the heavy mineral concentrates from overburden samples collected from one hole on the Currie Township claim block and from all three holes drilled on the Bowman Township claim block.
Conclusions
Good basal tills were encountered in the Cook Project overburden holes drilled during 1981. These tills provided an excellent sampling medium.
Anomalous gold' values were recorded for heavy mineral concentrates from overburden samples collected in some of the holes.
Respectfully Submitted,
J. J. Sample
DATE
DRILLER
HOLE NO. 1-8 GEOLOGIST T* ."PINULE: * 5". Cs/rrfe-Twf , CI. 55*5*142.
HOLE LOCATION LbC
BIT NO. fe 0000*2.1 FOOTAGE ON BIT ______.^.^.^^.^.^.
HOURS MOVE __ ' HOURS DRILL 3 '/L hrg OTHER
X! 4JQ0) Q
-
-
10.
^CL
3o
—'
W,
1[TO
B(P^1
j 70.
IBO
1 9o
IIOQ.
f
—o ——•riA Cn Q* OrtJ n5 M 0
- ————
*— ——— "~~
———— ,
————
06660 O O
it
^ 6
*o e
———
M*"? . |0 '.•\v-6.^V.v0 . Q). o "
?0?
H 0//^
K?
^;Y 'A'-^0*06?V
e^ o -d ~ ^C-Xx WA1 -^^•^
/i*U)' r r-*'^r^r — -^^A-±U :* 3•'^'
SAMPLENO.
-
-
-
-
y^s o /^. il,a"O-OI
-
.
Cu'^-02.
-Cu-8-03
,Cu-8-01-
Cu-8-OS"
-
Cu-8-Ofo
;Cn-S-07
tiOCKjLirJ.lVt JjUu
Oraojoic- /^(xHerBro'iunClcxy Y- Sl.'fth-l-ly Sandy
G-rc\^ ^ lo^y
. . . . . .. r- — ... . .-,- --..... .- ....
Local pebbly laiVft^possible 'nil
Til] do^b^all \ \
minor rare, pebbly "
Clevj/. |"il) l - V JJ ( JpebbW and \™bcdaed oaod
pcxrri^cs ,
Crra\Jcl -h SoftA-- - -- — -"Scwtve, cxDoblcs
CUw Idj ^ pebWes f i/hbeJJcJ So^no pa^Ticles.
Gro^/eJ pier) bana~G^; oUy lil)
Cobbled .'
B*oo Mer
Sapt^ Cl^y 1 pos^.blt ^1|
;-
L N A L y s
d
-
J
E S
.
--
"
•V"
——
DATE .TtJKir. iQftl HOLE NO. C.U-8 GEOLOGIST t T *
DRILLER pQL)g KJE^- HOLE LOCATION foET .
BIT NO. QOQCyZ.1 FOOTAGE ON BIT - -——
HOURS MOVE HOURS DRILL g VL OTHER
4J Q O Q
-
no-
130,
140iTVi.
-
f
Graphic: Log
W\ * ' **^*
' * \
- ———— —
- ———
— - — .
W:0 0
D '/O;iQ9 *
/^f*'/
'
SAMPLE NO.
Ca-8-06
Ca-8-09
Cu-a-io
Cu-8-n
Ca-S-JZ
—
-
-
DESCRIPTIVE LOG
O'o^y^i^r Pebbl-ts tx,nd ifr\bzfLdu{ Sfcod po-r i)cl^S
"Saoo and pebbles btpon^in^j. rxv6- Q./TXML C'ltx*-! fo 3uP*'~ C^OLM (j 600 dSuper Glatj .
O cx.y i lil 1| ' C i^-vi ,^?ft.^\a j HCxbblc-5
^,u.per,Cl(xy
urcMjei pcxrt^i 001)1^6^ . ^ MaVics oofninodc locrea-Si"r\A •s.oo^o f K
l^pYDcJ\. WcoJ-Tx,^C4l i/v Up^er 3^T- y w .-s o^r,. o ^ n.
i -* -^ /^ i P i ri i— 13 7 f f. foot of ho le, Y —————
X^^c-^A- ^ RKyd {rioJ rcx/x^ cjri.t! led, f fo d\)rt s. ooco-s J 6^ o, l* p^ cry^s D act opy 4.
ANALYSES
s
-" '
-
DATE 9,198! HOLE NO. Gu-9 GEOLOGIST
DRILLER
BIT NO. Q8Q 125 FOOTAGE ON BIT —---——-
HOURS MOVE _____________ HOURS DRILL 2.'A KrS. OTHER
HOLE LOCATION Currie Twp. OnJ j 6 \ O m E , \ &O j* SC\. 5'5S"14-2- '
1 "^ 1 ^
1 Q
1 S
1
I ICL-
r•30-
1^0 -
1k1IfoO
1l 70-
1Isp-
|i0-
1 :• iQCL
•H X! DI CXO (0 (-5M o
~ "'
— ; ————
——————
—— T*
———— .
——— -
————
————
- ——— -
——— -
•^•S:;S*• \"t * *f-:s:'.o -^
•^•* ' t 'O ' O * *: f ; * ".
V'l^' 6-.* *•i^ 'l 0/^ . .'
.TA vo ^ ^^,•'^
M'.^•A 1:
——— ~--*
SAMPLE NO.
-
-
-
-
(X-9-01
~
-
-
^tx-9-02.Cu-9-03
Cu-9-C*
Cu-^OS
lCu^iOfc
DESCRIPTIVE LOG
Jta RtVurnBroUnCUy , *Dlighfly S^n^y
oy clayQood reWA
Locally S\iah}y Sandy
Possibly Qv olay rill horizon.oy.clciy
-
Gy.S^^d '
. nv:-cWftllli2. . ... .J/ 7
Poorly 5orM SftAd + Gnwtl
Till - Cltxy , scxnci Some pebbles1 " ' "~ - -
3vper^C\ay ^ -——
ANALYSES
*
—— . ..
-
.. ; — -. ,—
— .
— ..-
-
— ..-
|:
-
-
DATE
DRILLER
WUNE: m,i98\ HOLE NO. Cur 9 GEOLOGIST j xHOLE LOCATION Currie. Twp. OnrK \ fei O y^v E. ISfr m S.————, ———-i- '—.——i——f—-—f—
BIT NO. O&O 13-3 FOOTAGE ON BIT
HOURS MOVE HOURS DRILL OTHER
A -Pa0) Q
uo
no
^
no 1 jw
1*0
Ml
-e —— r•Hfi tri OuO (d i-3 M Oi*'/^ -e. "^~ \*'*
^\ft 1s '^feV'?^i 0 . ,^- s'O y\ \ "**l*' C
m
SAMPLE NO.
(V9-ofe
Cu-9-07
Cu-9-08
Cu-9-09-Cu-9-lO
—
DESCRIPTIVE LOG
Clay Till PebWes * Imbedded Sand pOLrVicUs
aiavTiiJPeV&Ws t I mKdicd S(xn^ panrlcle^ t
Some cobbles
CUyT.ll
Bedrock TaWs :T;|| w;fhh:^V*Wreckfyrit.fei rook.: Uulnt-rnU ar*tn felsic voU0io
ptxs'itly a "Da.eiWc.Tuff . So/nt ft\l*f*f pnCfysTs VX**"y5fift o.mr\ **"^TJf Qt'di^e/nirtOcUd ^0*^*08'*.
\30ff. Foot- of.HoU................ —
#
ANALYSES
•— - -
-
DATE Wune-9,1981 HOLE NO. Cu- GEOLOGIST . S ftPlPtTCurn'e. ~TW p. ; CI. 5"55"l4-'2.
DRILLER FOUAtJEU HOLE LOCATION L6E . 75mS
BIT NO. BOOOnift FOOTAGE ON BIT
HOURS MOVE HOURS DRILL S '/Z- HrS. OTHER
-P a oQ
-
1 10-
r1.40 :
1
• 50
IfcO
• 70.
1llQOi "
\j - ' —•r)45 (y
n3 1-5 0
' —— ;'
———
———
———- ~
— — -
— —
— —
!Z H3
o - o
*** f
f, "- ^
^ .^
v- i'o '
SAMPLE NO.
-
. . ,.
-
-
-
-
Cu-IO-Ol
;Cu- 10-02.
Cu-lO-03
—
D, ..C. IP, IV, LOO
No P.eturr\
*Z2Z**~"~
::i^i\V ' Ro-*"1^ Cotxret-' OOwOo
Grt*y Clcxy f Silt
Sil* frxre. Coexrse. Scxrvd
Grray Clcxy QwdSilVJ
5txr\ti ^ GrrexV&l
\rnbe.ao-cel o^^f^^ x* ^*\ \* ^ Pebbles * K.CKTC, Cobbles.
-
. '
ANALYSES
: \-
-— -
'
"
"
i
i
!
- ——
-
, —— -
——
DATE \961 HOLE NO. GEOLOGIST
DRILLER
BIT NO.
FouRhfCU HOLE LOCATION I . J
FOOTAGE ON BIT
HOURS MOVE HOURS DRILL 5 OTHER
X!4JQa)Q
110-
-
-
• 130.
1-140.:H -
1)S*L
lifeO;
MBM
— o ——•Hx; en
o
f^.
j-@
"^y vt * p
:ff'^v.•O-'.A; 6
tf//,^rs.^SS^^^S
//s/;'
••^
SAMPLET3OINx^ .
C..-IO-M-Cu-lO-OS"
Cu-(0-06
Cu- 1007
;Cu-10-O6
Cv - * o - oq
Cu-lO-io
,
-
-
D T?C^"1 T3T'D rnT 1\71? T/^^ri,OV.,KXlrJ.J.Vri Jj U Vj
Mom^rous fo.fYiis of tuKi^e. Vein q-J-z..0 ^
i/l - R U- VoicosOiCx DoU'oer
o- roic r
DI L . oo^Ap r vyrcx.v6i .1 V/ 1 -R^k'i^h r^pr0"^! 3r*?J- t 0 p.0 ,0^' 0"— - 1 J j " j r*aJi J * , * i f^ J * JiC^iSTftnT. l"" j /i O i SS C*^n lOCXTfiO jP\' * '^5
134ft. 4W of hole.fMi fior qrapn'TC- ft'o^fv rnvoTU^es. S {T. aodCtx*^ Carbontrfc. P! H td tWVes.
ck^-t roo^or hol-e. pnoy be o-.fjsicdike or pos5*Diy a te,iS)O InVustVC.Ora.ra.nire.
*
J\ N A
' ' '
L Y s E S
*
~~ ' ' '
\
. .....—.. ,,
*
DATEDRILLER
BIT NO.
HOURS MOVE
HOLE N0 - Cu H GEOLOGIST
HOLE LOCATION 7.6.0 m F . 5*v* M.
FOOTAGE ON BIT
HOURS DRILL
T.
OTHER
4J OQ)Q
-
-
Ift
-
?n
-
30.
.
40,
50^
fco^
70,
80,
90-
lOCL
m^tm
o•H X! tnao(0 Mno
1
' —— -
—
. . . t -* * * *
* " * *
* * * *
. .f. .* * * *
Y.;.'*!
* * * * i * * * * * * *
* * * * * * * *
a * * *
* * * *
* ' * '
* * 1 *
* * * *
* * t *
* t * t
* . * ^. -** *^
* * * *
.'.'-' -
* * * * * * * *
* * * *v.y-* * * *
* * * *
e . e-* O *e . a-. * - 'e . o .AA
^^" ^
V . ^
as ^? j^
^.^7
••••i
SAMPLENO.
-
"
-
-
-
-
-. -. . .. ....-
—
-
-
f^i\-oi.
Cu-U-OCZ-
-
-—
-^u'U'O^-
BBBHB|H|H
DESCRIPTIVE LOG
IS/0 Rfc^orri ^
SrouJn Clcxy
Grtxy Clay
— , Sf'own Clay band
ScvndfSllf , j—— 6/^wn Clay bojaa. — —— —..— ..— ... .
i
tOe.ll u)cxsncjd voh'te Sand
Rare, peJsbt
. - . . -. . - - . - ,- - . .
KjiAor Oraanics.lOmrd Sand QfAaJria i oro ara^ sand 0 ^
^Inor G.imounT or Coarse^"CV^^'^S .V
11
-
UJOOQ vS'MI pS
^fOv.^C'l w""^ •^.'"0*, ^Ok.no vRxcdrioriJ
rlA vi T- lirTl^y 1P' LH - L J J J J reopfes , v^obbles } l rti DWoed ^txno
GraxnHex ooolaef
~~ ~"- - ~-- -- -~- — -~ . — . . ——— — — —. — . . . . —. — — — -.^. -.^ . . ... ... . -... _
Scxbbroic BooMtr
ANALYSES
-
-
•^•M ^•••H
'
*
'
'
. \
. f ". -
r——
BBJJ^B
DATE
DRILLER
BIT NO.
HOURS MOVE
9 IQftl HOLE NO. Cu li GEOLOGIST
HOLE LOCATION
\ 9 FOOTAGE ON BIT
HOURS DRILL OTHER
X! 4JQ(l) Q
-
1)10
jizo
1 ^~I
1• |40-|
L
—o ——•Hx; enOLI Om ^Mo
o . o. o . O - o
V"* ^
T^/6
^7
P';;.\V
S///*///
SAMPLENO.
Ca-H-04
.Carl l -OS-
Cu- H -Ob
;Cu-\l-07
-Cu-\l-08
:cux-n-09
Cu-U-IO-
-
-
jj O V-* AX X ir A JLVC* Jj v VJ
Gnxvcl 1- *S*xno.
GloujTiU ,
^^-. , P l * j ",nxy O! ocy s-ok.f~e, T •c.bbl'C-5
Clcxy Till I'nb-ecUexJ "sound pCX/^Hcl-e^
fxA.re- rabbleso 1 -r— ,J| --oo-o4y 1 i U
o x- f 1 T- \ 1
nftFlC COfeSlE"Sup-er G\cxyJ ill on) 1
fse-d r ocX.' iS ro to rv c^Q 1 y decon^poscacxna O**ehs-eci. OK ^M^a. •rnxc.Tur^'S .
-^ i L ! *i r l - J- JiPcvfk. often cj^ 'Or i TIC. i A~oi ^cx^i
14-Zfi. fooUf Ue. volc^^c
P * 1 1 \ k 1 j ^^ ossibly CXA cxflaesmC- TO' r
'
;i N A L y s E S
-
-
M ' J '
'
DATE W*e C, , 1^81 HOLE NO. Cu-lZ GEOLOGIST J e. t? S aw\f U
DRILLER Roy FourneJ HOLE LOCATION CuvvCe. Two. U8 v*. S. ^58 m, E-.
BIT
CI, S"S-fTl4l '
NO. ou ft:* FOOTAGE ON BIT
HOURS MOVE HOURS DRILL 6 3/* h*S. OTHER
XJ
Dd) Q
O
|0-
-
Zjo
3o
•7O.
80
\^•H X! C" CUO nJ i-lO
nmm.
^~ — ——
- ——
^——
B^— - ———— ——— —
. ——— .— —
~r*T'~7~?'
( *
" * .^. f ~~
J . v*^1 f —f f
f ^ *"
~ * ^ Jf
*p— *p* ** *
\
SAMPLE NO.
-
-
-
^
-
: 0^oz
Jit O x* JC* -i JT X -L V r* j f \s \y
No Re-V u *-v,Br^ C\o,y
Cv-fcOkVrt to brv\ C\ay
Creivwi Cotot-cJ
^r^J,-w^ ^* ojy Clay
Brv^ C l ex. y
^r^-^u ?,-^Brw ^o ore^ C Uy , vw,'v,or S fit.
' ^y ; v^i't-ac.. S.'l^-. Vtutvs -f pebbltj © Opptr C.*t
Sa.^a < S; it
^niCAC.. 5^1 li *^ ow\y yv\i"v\ol" S^wo
l ^Y 5*\T" 4 f S ano
ivverc.A.Si'^4 r\*. *f V Jtvil pebble; Me*r \pa.Je l r
---. Ora.v*l v t^ivsot- S*.*iJ C 5il*
* *l ' WN^.**f\\y O- 1 0O/ J t^ WW PC voices t t^^lVlftV*
sH ij sd.
ANALYSES
-
-
iPOLO^ T
DATE ™ HOLE NO. Co - \1 GEOLOGIST
DRILLER HOLE LOCATION
BIT NO. FOOTAGE ON BIT
HOURS MOVE HOURS DRILL OTHER
tt-.
-P O Q) Q
\oo.
j i-.
m n*
Graphic Log
f\H
Q:
i'iy.
li *. * .•A* '^,
"^••s*.'j
SAMPLE NO.
-
-
04-
-
: os"
- 06
~~ '
os
: 0^
-
Jio^i\J.irllVri Jj U w
iV^C^C-^5tLo C^'o^y -V KA.C. vi'ovx * QCrCf^^CC
i vi r\o. of pebble-^ vo (ieftVN
^v^\ fttb'fc^ ti C- Set; Vav*. VJOcxi cWpi
^ ^o.* t^ .^^ P*WW.i
It li ! ^V*-Vt\\y N*1 V/A.V ftvnV" QY-yr c.\
^ —— aA^CiTC oOulo^V"
V\ovA T*^*^*iX ^ Pyt*1*T"l^ i o OVV\
CV\\ot-,'\-* C- V-otV..
Bedrock,'. U.'^My o^*^ittJ c* c-t.
HZ.5--P4. Foot of Hole.
l
ANALYSES
-
s
:
l
•tt
T*'
i
DATE
DRILLER
HO 7.A-O BIT NO. U O-2-4.&
HOURS MOVE
HOLE NO. Co - \3 GEOLOGIST J
HOLE LOCATION i
FOOTAGE ON BIT
HOURS DRILL 7
C K- S.. 2.S9.WV E..
OTHER
^.X! -PDd) Qo-
^9-
-
"^S.
3o.
4*:
fo.
60
•70.
8a
. 35.
loo
—o ——•HJ3 enaom HPM 0
. ———— .
————
r
Hill.
-T'.~-* * " * *
* *. **" * **
E"^
* * * * t * * , *. ** * v **•- v- -'.* * * * . " .* * - -' i ' t ,* " * * . . i. .• : , \ \* * t'•' : -'
* . * *
f , t i* * *- t * *" . *
SAMPLENO.
-
w
-
-
riOL.KJ.JrJ.xVri J-i tj Va
No fct-Vor*^S f** io^v\ Cxevy
f
Sy Clo^yBr^ CVcky
Brv^ SU^
at-tK(},'inci to
\ oy wxieat. SiH" J lot. lrv4{i^\or C. Sawi
t
S^A 4 S(\t
*v^o..V\y S,' |f j JoV**. f SaVSti
l *^y Sft,vs*i -j poorly Soft-*J
/
fi N A
,
L Y S
-'
E S
l•A \ :
**^ f *JpmfVF'.
-
•P^ISJf^pl
DATE
DRILLER
BIT NO.
HOURS MOVE
HOLE NO. Cu - GEOLOGIST
HOLE LOCATION
FOOTAGE ON BIT
HOURS DRILL OTHER
**A
O Q) Q
\OD
xl
-
no
w•H X! tn
(0 M
O"'.V- v
0'* K-o
,-Vifii
H
SAMPLENO.
o\
o^
03
—
lLoL.KiJrlJ.Vr. ijvju
v7V"AVC,\ l SOV^N*- {J (l S \4"
*T"i\\ t Ay c.\o.y j v\ow\ pc.V^ \^S \ t 6v**c ^4 j? ^ \^~— — - ^* tv\i *f f 4 ff C"!^"
t
B *-droc.k*. FeUie XMvofiic ^ocl^ j wkutk cV VnucU epijot*; V-*rt.-occ SpKt ti'S
l\8.o -Pf. F^oV o^ Hole
;
ev-i^py
l N A
j We f\9t. S
' ;'
L Y S
t3
v'-'-' :-
E S
,
:
-
DATE JWfcSj^Sl HOLE NO. Co-\A- GEOLOGIST J e f -P So,yv\ple
DRILLER Rov Foo*-rN*.\ HOLE LOCATION Currie Tvs/p , 32.4. vw. 5. , G O. m. E.
BITC\. 555-14-1 ' '
NO. !C5-2.fc-7 FOOTAGE ON BIT
HOURS MOVE HOURS DRILL 6 '/A OTHER
f*.4J
O) Q
o
'-
w
go
I0P
•H•C tnaom Mo———
nnnz———
nuzz
EE——
. ————
7—;; —— T
* * *
* — L J— a-
* * *
-^* ^ j^^^
,*-r-^
j^iv*-^-
1 " -• *IV*JA'^V
.'•'/A*'
X* /*
SAMPLE NO.
-
-
-
-
-
K
——
-
01
01
03
- 04-
l 'j ^ ^^ i\ ti XT X *L v Xj iLj ^^ V*
,,.c,r
Sr^ ^ tre^-toU^e.*i C l*y - ^v,p^ SiW"
G^ C\a,y
Gj^ Clay j bucJj Jilt-^ p**Hy JorteJ Jftni
Cvea^ te 1 oy Clay
Cls.y tt.^ •JW.v^j^ro.d.'w^ t* l Ojr jV^ic*-C. Sil 1!- .
^iC^*^y Tf i' J 5o*~*c 5}*T {f p***A j **cc p*Vbi*j
^•^y l^i li j jttwAt 5i Ir C VAVIJ t oci,- MotM* f 9 f' t
dfcvssc C\*.y "Till j {..vv^i. 5,-ti ^ ?o^v\i j
r *" s' j . , ^ . . ^ b. wide. r? .
ANALYSES
,' . ' ' !-'-.
-
\
i
.
|
DATE ^^ HOLE NO. OA - \ *c GEOLOGIST
DRILLER HOLE LOCATION
BIT NO. FOOTAGE ON BIT
HOURS MOVE HOURS DRILL OTHER
x:4Ja
\\fl_
VJ•r(^3 tnPU o
o'A' /.i S*
•^/A
1* *'*-*.
Vi;.')0 * *
k c *•d ;
H
SAMPLE NO.
-
04
-
-
: o,lo
-
d *-**7*. Clay T" l \\ ^-S Ckbox/e \ 5 "f*.t\(J y
• *C~ V* Ow-t"^, V^/OOO C |-^ ^ O^
J— p- p* j^y- ^-V c CIVV^ i C^ \ot"t V*C Voc\C
P ^j t too\r iNfT"VJV"V\
"**^lo^-1"5 j ^"O*?o)c,5 ^f \3*" A we. i "* VKyrc * J
PC o D jft-^5 V^s o^S 5 w^. TO oy ' j *
Z nuw\ Sw\1 Vsaf \\J df ^ryujU e. l *K.y pv-
f*Wci w epidotc i VSM'W&V A*S(frw\. pyJ : t * . .
,' . "••' ;
ANALYSES
-
-
-
';'^ ..-....'i'-.'j
: ; L'
-
lDATE fei HOLE NO. Co - \S" GEOLOGIST
J T C. Jo**./ DRILLER R oy Fouryst\ HOLE LOCATION Currie T^o. ; 4R rv* W. ^-2.C* r*. S,
BIT
cu 5-5-5-14-1 ' 'NO. 10-2.4.7. FOOTAGE ON BIT
HOURS MOVE HOURS DRILL 8 OTHER
1
1hi oii:-i:
•H X! tp CUO (fl i-}O
————
. ———
. ————
- — —
. * * ' *
'•jl'Zi.' "/~5~~7- *.'*•MM
IjjrA
SAMPLE NO.
-
-
-
—
01
oz
: 03
-
Njo ^^Turi^8rw CUy""" "'"" 0" '\ c^y SrH
i
i ft y ^ \v\tcft-C.' jilT j WM'^OV* SO^VN^ t
C-'^y j r^-re- ^w\\ fcc^p\j\s-^ Cj upper CT",
S-, H ^ ? So,v,,i
P Sc^^ci w \*j**r avH^ ?('Hj V TAT*- ^el)V\e
poorly S orte.4 ^;H Sj P- c ^o^
C CJ^.C.1 J v imie C^y J *o^ f*** 4 S,\r
C\*y TiU : 7^y^*;** V CUy i S*v-t 5tti jj
u , : .s^^rl^ol
ANALYSES
f
fpekVU
'i
\
f
'
,
v;
DATE
DRILLER
BIT NO.
HOURS MOVE
HOLE NO. Co - 15 GEOLOGIST
HOLE LOCATION
FOOTAGE ON BIT
HOURS DRILL OTHER
"i-U QJ
•HJ3 Cn
MO
SAMPLE NO. D
N A L Y S E S
"*-
JUo
leo
s®-f
•^
05 a. s
Ofe
liviore. pe-tt\ffi-S
l| 5 y j v i*(
4 oee -
pot-
Till t vvvft.,'v\\
ve?v*
\\
:MK
2
J\T.
•x IV J t* \iVtA w
ft Foot
1 DATE 9k TlJKJF 19 A | HOLE NO. Rv/- 9 GEOLOGIST T} . TfcMfJr* A.tiOfrW^
DRILLER FniJffMm HOLE LOCATION ftft,,lMaJ TWo. LkW . *7S"mS .
BIT. C\. 54-5372. '
NO. K-f)rmf)9n FOOTAGE ON BITHOURS MOVE HOURS DRILL ? (4 hfT OTHER
X3 4J Q 0) Q
ICr
&L
36-
-40-yF• 80.
1 9A
1 1001
—o ——•HJG O* D*0 (0 ^
0
———
———
, ——
———
——"
———
O'O.' a .'©P6?6 • * '0 ' 0 ' O "o- o
SAMPLE NO.
-
--
-
-
l5^-9-oi
6w-9-Oi
CiO\^t\j.ciJivCi Ij \J \a
No Re^ura .
Gray CJay loyally V- ^l.'aWy Sandy
. ™-......: _ ——.aoeojreraCQ.
--
- . •*-.' '
. . . ' . —.- . . . . ...... .
artu/d. h*ak 5and ffocfjo,ni i i.flfi^1^ P*poi*s ma^ly iJermtaiiv-l ydlcaOics m.nor^Jz. , 7 ^
bcwlder'ivolcft.ni'c fi.n4tsiTi"c ruff fnlr\or 5^^ . 1 iVrvesfone Onec^. , , *
Volc-anfcQ, mo,y bt alWeei **tt cKu/ite
. . ...-. . — .. —— —
ANALYSES
———
-•-- --
- -.-"~-
•:— - : -
- ——
— ———— -
. ..., ..
•f '
#
*
-.
^-.
,
'
.i:-:4 '".'•y''
f
. 'A ' "" i , '
- - ,4' l
' j
J;
^ VT
— - —
4 'i'.^ .5
. ^,H* f
,"'V.^ ,
^,- ——— -
I DATE WtTOfOr I9B1 HOLE NO. few 9 GEOLOGIST D.TJ^JT/T f A . \\ftfc\f AT#
DRILLER FOlX2.fOE7L HOLE LOCATION ^Oi^fl^] TV/p. Lkfc/, *7*TmS. ;
HTT OXJ. 4.nw. j^j vyi JIJLV^-^ ~ ~ — — — --- — -- ,,--,-.NO. R nr\r\r\9r\ FOOTAGE ON BIT
HOURS MOVE HOURS DRILL *7 K*. h^ OTHER
- 1
JC, 4J O Q) Q
-
HO:
\ZQ
I3a
!4oj
4
-o ——•H X! frao m ^ M oa ' o ' o -0 . 0
* a *o': *-*~sssm
SAMPLE NO.
bW-9'02.
iw/'M-OS6v^-g-of
-
DESCRIPTIVE LOG
Grrocvcl *"^a.A^I. i
SoJiQfte,r: plWed, \jo\c,aj\{ii,~cJr\W)h'S' — V3- ti'M T^^^1^^
G-ftv/eJ -, p^droc,k r evtyi . , , j— .. ^6w roc k i Jn l*w !y. ,^ .lt*"?i ^ fKf^^f!" -
o,oU hroujnft h\cvWly sKeerei v/olux/vVc J UnidCrttiTiabft..1 . Ali11HK (W of hole
. . ,. -. .- .....^™..,..^ - .
^ ' .
* - .
ANALYSES
—~-- -
;
...... . -.
- - --
- '!±
1 ' f
- ' ' i ". t
' j
i
jags!!
i
•i
- ; * *
• - ' • 1 *j'.v- i ; ;*V
*-
^ ,: ' ' -"
^ i
1;i
*Bfr*nf*":
DATE 19BI HOLE NO. Rwu l Q GEOLOGIST
DRILLER F Q, HOLE LOCATIONC\.
TO m tBIT NO. __M FOOTAGE ON BIT
HOURS MOVE HOURS DRILL 3 hrg OTHER
Od)CU
O
SAMPLE NO. DESCRIPTIVE LOG
ANALYSES
3CL
70
80
100
oro
Locxx y ^.
o . o. o -
•. o .o . o' o '
bw-io-oimnor
{,'a or arz.
. ie boo l
DATE ^ClJKir 1*5 l^&l HOLE NO, ]^^j j Q GEOLOGIST ^."pjflOrr f f(. Ho^vjTAT^
DRILLER PftOfivlFV HOLE LOCATION ft/s.-lm/sn Tv/o. L(0W. ISO m ^
BIT
. . — . ., . ....... , ^. ,.
NO. llr^9<9_ FOOTAGE ON BIT
HOURS MOVE HOURS DRILL 3h^ OTHER
Od) Q
HCL
120-
1301
— v— i —•H J3 tTi O, Qm H n o
0 - O
0 . 0
0 ' 6
ft * O
o o* *
o^
'o):fs
W
SAMPLE NO.
-
Bw-IO-03
-CW'lO'Of4Sv*J"JO-OS"-SW"|0"'0(0.6w- 10-0?
-
IjO^IVXirliVjj Jj U vs
CrrxxvC'l Grft^AiTi'c iSot'lcl't^
t
Volcanic SooU-e^ . .......... . ......
CLAVTluut:G-ft^/jTl; -il ^ i t -j
f*^ J a^vir K * t
179-Pf 'Poof or hok. ,
"' ' ' ' - ' -' - '\
ANALYSES
.
-
'
!"'y ' . :
•- - ' ' i -. . -
. . r (v\ ;
/t";
j. */.
.•'j 1 '•['"i:
•];|
-:' \
.-•*u
.* ,
—
* i : '
DATEDRILLER
BIT NO.
HOURS MOVE
HOLE NO. GEOLOGIST T) t A
HOLE LOCATION L (D W 2-Z5"mS feouJmgin TyP '*r.l'. *i*r**n oi l
FOOTAGE ON BITCI. S'4-53'72.
HOURS DRILL 2 HrS . OTHER
1 fH SH Q
rIzo.
II 30
HHH j
1m
l^^l t/5 vx
1
1 10
lI^H O^
• 90
I 100.
—o ——•HA tnnJ h3M U
————
————
———
———
- ———
———
T —
- ———
. ———
———
———
. —— -—
. ——— .
———
*— —
* * *
* ' *
SAMPLENO.
.
-
-
"™*
-
-
-
-
.
-
-
-
-
—
D T?Crl DTD'PT^71? T f\ f
No Reborn
(sr&v ^ I^V ' 0^**- 0 k ,^^.7 * r 00^ INCTOTn-
Fftk Wurn
- - ..
'1 1 rt 11 r 1 o i
.-.fee VOA-.^OO - T j v)ir^n.
y , '
- - -'
1 J- "JL- Ml^A ^\* O™ ^*-W Oi r /A rt 1 1/^ w. ' j ^^\ i i ~o rt 7 0 O ;
1. L JA f OkAiY'\^ ' 0 S(Xnd-. . -,, ...
7
' . '
r**1 '- - . /'
•.^."•- :
l N A
'
, . ,
j '
7' "' "' 1 ?1 '.
.'• k ^
L Y S
L ..\ V '
,. -' "- '
E S
..., :JM . __ ,,^. ,
,
_ ,;.^.
^'
~—
---.,——
-
Y"('...
1 DATE Jjb. TMME: iQftl HOLE NO. 8w II GEOLOGIST T^.TvMcr-* A Hoe M #1 DRILLER
1 BIT NO.
FOU^hlrU HOLE LOCATION RniiiMem Tu)p . L/O W ^25Th
1 1 fl"2 'v? FOOTAGE ON BIT .
1 HOURS MOVE HOURS DRILL 2, hrs OTHER
1 1m d)H Q
li ~~
H
—o ——•H A {71ac)(d ^ M O0 ' 0r e ;6 . fr
/yyy
SAMPLE NO.
&0-U-OI
6u)-U-07.
-
-
-
•B
-
——
-
——
DESCRIPTIVE LOG
G-ftM/eT ^ S&od . sornCx cobble^Ar'aAi'lc cvno 0JW*d \^ol tonicsTfaf ' ^ OiOOo Qi^^irftlflCU **Q Su'rdltf i*\ ^OlCft^Jcir
— Dfrw'"ftfc-iC " ^/v^~^-'n Vo(jCO^niC-S Vw IM
(^fi'cull ^"0 to^OTify n Ol
-
ANALYSES
-t/.-- ' *
; ' ; '
i
' "' v "\
•. ; f1 . . ' ""
;-
-;*
'-- : :
^i5
\
t
ii. .
f
... --
-
j
Ontario
Ministry ofNaturalResources
4aA07NE0137 3 .4477 CURRIE
THE MINING ACT REPORT OF WORK | rl'cord.d.
900
J
To the Recorder of. ...^F.Sg3T..MHS......................................................................:.....Mining Division
i Asarco Exploration Company of Canada Limited A22916•l ••••••••••••••••••••••••••••••••••••••••••••••••••T*****n..B**. clv ***..***** aBV *********Ba***B***a** v ** B * (akABMCB * vft *c* v *aa** BM * v ** vc *v * vv ** v * v * BV
name of Recorded Holder Prospector's Licence ......1.2.tk.F.l.o.or^...3.5.p...^^
Post Office Addressdo hereby report the performance of .....S.Q.Q............................ days of .Pyerb.urdejC
type of work not before reported to be applied on the following contiguous claims
Claim No. Days Claim No. Days Claim No. Days
.See Attachment — l ~..
AH the work was performed on Mining Claim (s)(In the cose of geological and/or geophysical survey (s) where more than 18 claims ore involved attach a schedule)
READ CAREFULLY: THE FOLLOWING INFORMATION IS REQUIRED BY THE MINING RECORDER.
For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations — Names andoddresses of the men who performed the work ond the dates and hours of their employment.For Diamond ond other Core Drilling - Footoge, No. and angle of holes ond diameter of core. Name and address of
owner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate.For Compressed Air or Other Power Driven or Mechanical EquipmentType of drill or equipment. Names ond oddresses of men engoged in operating equipment and the dates and hours oftheir employment. . -For Power Stripping - Type of equipment. Nome ond address of owner or operator. Amount expended. Dates on which
work was done. Proof of actual cost must be submitted within 30 days of recording. 'With each of the above types of work sketches ore required to show the location ond extent of the work In relationto the nearest claim post. In the case of diamond or other core drilling the sketch must be submitted in duplicate.For Geophysical, Geological, Geochemical Surveys ond Expenditure Credits - the name of author of report. Coveringdotes of survey (linecutting 8, office). Type of instrument used. Total amount of expenditure. Technical reports,
Overburden Drilling;
J. A, D.
Saraple-Horvath-Dance-
.'.15,-,: .s-.-'i.'..-^^ *V-'-;-i *',Avr;-" K ^^•^^.'^^ "Canada -Ltav^^^ .j: jjjj :. Tor onto'v^l^^-l' l!
Bradley Bros, Limited, V\- - * - June 4 to'June-'IT,,' 1981^-'-
Author/Geologist Asarco Exploration Co. of \Field Assistant 12th Floor, 350 Bay Street, Toronto 'Field Assistant June 4 to June 11, 1981^is" iV-c - : " ; ; l,278 feet in 8 "vertical 'holes of "3 inch"••'".••".':*";*; '-'' -. ":-':."- :" -X'- r '-' diameter " ^ • r*i"*'';'--'\.r ''-s?tf'v^-?;' :; ~'
i . Total Expenditure $14,048.75. *'. - . - 4 i
November 271981Signature of Recorded Holder or Agent
The Mining Act Certificate Verifying Report of Work * :\
" '
UI
O
,tii9.n...(5?lf...9^...lP.5l.nS^.9...?J.|jRi5r.?A,.
12th Floor, 350 Bay Street, Toronto, Ontario M5H 2S6 ^ *^ ^*^^t^ 2••••••••••••••••••••••••••.••••••••••.•^••••••••••••••••/••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••*********B*******,^fr*f i
(Post Office Address) , . ; - ^; - : J J"' - - "' ' ' ,' *" * - ' ' . . - ' * - - , " . : ' l ft^
hereby certify: "--..... , ' . . -.-1 -••. - -- . " //•. : , - '.--t -. -- \-:--.-~ - ' . '- -r- ;- e *-:;^'-'-: v.''V5 ::^C"". ! -*' -V . "- ' ' . - . ' -- - . " . .y,-- -.:- . .'^ :-'y ,..,. -- , - -j,, . -,....' ;^-. •;",'V , V- 7 '•...-'''"- - -^i'fr-, ^
1. That l hove a personal and intimate knowledge of the facts set forth in the report of work annexed riere-.V to, having performed the work or witnessed some during ond/or ofter its completion. V -: -; " ; - i -'Vri'' l ^
2. That the annexed report is true. .'; . " : ,- : ~j -" , r t ' .-' ' '••'l •xf . ' i- . . - - ^. - . '-- -.. ~ - . *'. . "' * - . - . -^ 1 L .. -. '; .' - i .t" t ^
Signature ,j''^ ;' -"^'"',.-' :-,'- 1 "-' '.•".L."."-'' "
•C--' C^i
*S!4
r-% ^mm-
768 (8/77) LA 041
Attachment - l -
Claims Submitted for Assessment Credit
Township Claim No. Credit/Days
(Project)
Currie L594509 60(Cook) L594510 60
L594511 60L624446 60L624447 6 0L624448 60L624449 6 0L624450 60L624451 60L624452 60L624453 6 0L624454 60L624455 6 0L624456 60L624457 60
Total Credit/Days 900
' 'LOT s
loo
COOK 701NT VENTUREGRID S; O.B. HOLS LOCATIONS
LOTS 7-5", CONC. 311-iv, CURFUE SCM.E: i: 10,000'.
MAY Sloo toe yoo
TWP
VI ?t
0 Z
^ rt
OP
o o
T x
J.
o*
fiC
5 s? 3 o
i z
o
a
in1] t
BO
WM
AN
. TW
P
S -0 UT 3 ED M {j S
vi
ft
3 S
a li
i^ -*—
/ri
*
? ?
'r*
t
i s
r 6
w
-^
1V*
f
W
J
•f if
H*- h*-
w
Nr
o
r Ei
? t
* ^
N ^.y
s 9
iw
| 3
3 w
W
MH
-
O
Currie Township
Attachment - 2 -
1) Overburden Hole CU-8
Cost
Equipment Rental Tricone BitTotal
Footage 138
$189/Hour $675
Claim No. L555142
$ 661.50 ( 3h Hours) $ 675.00 (Bit 80000121)$1,336.50
2) Overburden Hole CU-9
Cost
Equipment Rental Tricone BitTotal
3) Overburden Hole CU-10
Cost
Equipment Rental Tricone BitTotal
Footage 130
$189/Hour $675
Footage 135
$189/Hour $675
Claim No. L555142
$ 472.50 ( 2h Hours) $ 675.00 (Bit 080123)$1,147.50
Claim No. L555142
$l / 039.50 (5*5 Hours) $ 675.00 (Bit B000018)$1,714.50
4) Overburden Hole CU-11
CostEquipment Rental Tricone BitTotal
Footage 143
$189/Hour $675
Claim No. L594511 .
$ 945.00 (5 Hours) $ 675.00 (Bit 62219)$1,620.00
Attachment - 2
Page 2
Currie Township
5) Overburden Hole CU-12
Cost
Equipment Rental Total
Footage 173
$189/Hour
Claim No. L555141
$l,275.75 (6 3/4 Hou^rs) $l,275.75 r
6) Overburden Hole CU-13
Cost
Equipment Rental Tricone Bit
Total
7) Overburden Hole CU-14
Cost
Equipment Rental Tricone Bit
Total
Footage115118
$189/Hour $675
Claim No. L555141
Footage 149
$189/Hour $675
$l,464.75 (7 3/4 Houjrs) $1,350.00 (Bits 110240 Se _______ 110248)$2,814.75
Claim No. L555141
$l,275.75 (6 3/4 Hours) $ 675.00 (Bit 11026?)
$l,952.75
8) Overburden Hole CU-15
CostEquipment Rental Tricone BitTotal
Footage 177
$189/Hour $675
Claim No. L555141
$1,512.00 (8 Hours) $ 675.00 (Bit 110242)$2,187.00
Attachment - 2 -
Page 3
Cost Summary
Overburden Holes CU-8, CU-9, CU-10, CU-11, CU-12, CU-13, CU-14,CU-15
Total $14,048.75
Assessment Breakdown
Number of Claims L594509, L594510, L594511, L624446 to L624457 (Work To Be Applied)inclusive
15 Claims
Total Expenditures $14,048.75
Total Expenditure Per Claim $ 936.58
Credit $15/Man Day = 936.58 Man Days or 62.44 Days Per Claim
We therefore wish to apply the maximum allowable credit for overburden drilling of 60 days per claim (60 x 15 s 900 days).
I hereby certify that the aforementioned expenses were incurred by Asarco during all phases of their overburden drilling project in the Township of Currie.
R. J. Deanfor Asarco Exploration Co. of Canada Limited
November 27, 1981
-- J.Asarco Exploration
R. S. GrayManager
November 27, 1981
Mr. G.J. KoleszarMining RecorderMinistry of Natural Resources4 Government Road EastP.O. Box 984Kirkland Lake, Ontario
Currie Township
Dear Sir:
Please find enclosed a Mining Act Report of Work form upon which we report an overburden drilling.programme carried out in Currie Township during June 1981. Also enclosed is a drill hole location map and a list of claims to which we are applying credit.
We are reporting eight overburden holes with total expenditure of $14,048.75 for an assessment credit of 900 days distributed evenly over fifteen claims.
Some of this work was done on several claims within the continuous block of claims to which we are not applying credit. These claims (coloured yellow) already have been submitted for the maximum allowable credit of 60 days (OVB Drilling). We wish to distribute the work credit to the remainder of the claim group (coloured green)
Copies of the reports, including drill hole logs, location maps and an.invoice supported cost breakdown covering this work will be submitted to the Mining Lands Section, Queen's Park Toronto.
Yours truly,
R. J. Dean
RJD:mm
RECF"'ED
JAN-81983'MININGAsarco Exploration Co. of C-anada Ltd.
12th Floor, 350 Bay StreetToronto, Ontario M5H 2S6 A subsidiary of l(416} 366-T993 ASARCO
1982 10 05 2.4477
Mining RecorderMinistry o f Natural Resources4 Government Road EastP.O. BOx 984Kirkland Lake, OntarioP2N 1A2
Dear Sin
RE t Data for Overburden Drilling on Mining Claims L 594509 et al in the Township of Currie
The Overburden Drilling assessment work credits as shown on the attached statement have been approved as of the above date.
Please inform the recorded holder of these mining claims and so indicate on your records.
Yours very truly,
E.F. AndersonDirectorLand Management Branch
Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A 1W3Phone: 416/965-1380
A. Barrtsc
Encls:
cct Asarco Exploration Co of Canada Limited Toronto, Ontario Attnt Mr. R.J. Dean.
cct Resident GeologistKirkland Lake, Ontario
Ministry of Natural
ipurcesOntario
Technical Assessment Work Credits
File
2.4477
Recorded HolderASARCO EXPLORATION COMPANY OF CANADA LIMITED
Township or AreaCURRIE TOWNSHIP
Type of survey and number of Assessment days credit per claim Mining Claims Assessed
GeophysicalElectromagnetic ,
Magnetometer —
Radiometric -—
Induced polarization ———
77(19)Section ffityjfa s'
Geological
Geochemical.
.days
.days
.days
.days
.days
.days
.days
Man days [~1
Special provision d
Airborne D
Ground
$14,048.75 spent on overburden drilling on Mining Claims L 594511
555141-42937 assessment work days are allowed which may be grouped in accordance with Section 77(16) of the Mining Act R.S.O. 1980.
For Mining Recorder's uset
The work assignment for each of the above listed 3 claims is 312 days per claim.
CH Credits have been reduced because of partial coverage of claims.
CD Credits have been reduced because of corrections to work dates and figures of applicant.
Special credits under section 86 (15a) for the following mining claims
No credits have been allowed for the following mining claims
l—l not sufficiently covered by the survey l—l Insufficient technical data filed
The Mining Recorder may reduce the above credits If necessary In order that the total number of approved assessment days recorded on each claim does not exceed the maximum allowed as follows: Geophysical — 80; Geological — 40; Geochemical — 40; Section 86(181-60:
828
Ontario
Ministry of NaturalResources Recording Office 4 Government Road East KIRKLAND LAKE, Ontario P2N 1A2
Lands Administration Branch
Mining Lands Section
Ministry of Natural Resources Room 1617, Whitney Block
Queen's Park, Toronto
M7A 1W3
Notification of recording
of assessment work creditsAJO.
RECEIVED
MINING LANDS SECTION
Dale of recording of work: .DECEMBER l, 1981
Recorded holder:..—.. ASARCO EXPLORATION COMPANY OF CANADA LIMITED
Address:^...., 12th-.FJ.DQr, JSD-JJajL^rBet^JEQBQNEQ, Ontario M5H 2S6
Township or Area:--..-.--CUERIEJBaMSHIP———————^^————————————————————
Type of survey and number of Assessment days credit per claim
Geophysical
Electromagnetic- -days
Magnetometer—..—.—._...—...________days
Radiometric -_—..._. _.-... -..—.—...-......-__days
Induced polarisation-..,.-......— ... ...._..__._days77-19 fin
SectioriXBKKDBT--.-.-------- — -. ..-._.days
GeologicaL .
GeochemicaL
Man days L J
Special provision [D
—. ..- - _____days
Airborne Lj
Ground LXJ
Mining claims
L 594509 to L 594511 inclusive L 624446 to L 624457 inclusive
Notice to recorded holder:
LX Survey reports and maps in duplicate be submitted to the Lands Administration Branch, Toronto with in 60 days from the date of recording of this work.
tH Reports and maps are being forwarded to the Lands Administration Branch with this letter.
Acting Min'^g ^reorder /bsc.c. Asarco Exploration Company of Canada
Limited c.c. R. J. Dean - Asarco Exploration
79? (6/77) LA. 065
1982 07 16 2.4477
Aaarco Exploration Co. of Canada Llaitad 12th Floor, 350 Bay Straat Toronto, Ontario MSB 286
Attni Mr. R*J. Daan
Daar Slrt
RE i Data for Ovarburdan Drilling aubalttad onMining Claims L 594509 at al, in tha
______Toirnahip of Cur ri a--—-.m.—-—M—...—-—..-——
In ordar to conplata your aubaiaaion for tha abova •antionad aurvey va raquira racaipta tfr eancallad ehaquaa (in duplleata) to varify your axpandituraa of ei4,048.75.
Upon raeaipt of thia data, a atataaant of aaaaaavant work cradlta will ba iaauad.
For furthar information, plaaaa call Mr* F.W. Matthava at 965-1360.
Toura vary truly,
E.F. AndtraonDiractorLand Managanant Branch
Vhitnay Block, ROOM 6450Quaan'a ParkToronto, OntarioM7A 1V3Pbonai 416/965-1380
A. Barr/ac
cct Mining Racordar, Kirkland.
l ' '. ' .l IV J tV \.x ' -i - . ci ciO-:,.. it, Approval
Mining Lands Comments
7f/yy/VVVjo,/) ^; -f-
l JTo: Geophysics
Commcntt
LjApp'Ov0d Q With lo tee efisin with conectiomDaw
i: Geology- Expenditure*
Comments
k Appiovvd With to *c* apain with corrections ml*- ,To: G eochemistry
ApptpvMl With ID tt* (pain wilh coriacliDntDal*
Mining Lands Section, Room 6462. \Vhitney Block- {Tel: b-13BO)
January 21, 1982 2.4477
Office of the Mining Recorder Miniatry of Natural Resources 4 Government Road Eaat P.O. Box 984 Kirkland Lake, Ontario P2M 1A2
Dear Siri
We have received data for Assaying submitted under Section 77(19) of the Mining Act R.B.O. 1980 on Mining Claims L.394309 et al, in the Township of Currie.
This material will be examined and assessed and a abatement of assessment work creddie will be issued*
Yours very truly,
E.F. AndersonDirectorLand Management Branch
Whitney Block, Room 6450Queen*a ParkToronto, OntarioM7A 1W3Phonet 416/965-1380
J. Skura/bk
cct Aaarco Exploration Company of Canada Limited Toronto* Ontario Attentiont R.J. Dean
Asarco Exploration
R. S. GrayManager
January 8, 1982
Mr. F.W. Matthews, Supervisor Lands Administration Branch Whitney Block, Room 6450 Queen's Park, Toronto M7A 1W3
Currie Township/Overburden Drilling Larder Lake Mining Division—-——.——
Dear Sir,
Please find enclosed duplicate copies of a report on overburden drilling during June 1981 in Currie and Bowman Townships.
This report includes a descriptive text and logs covering eight overburden holes in Currie Township and three overburden holes in Bowman Township which together constitute the Cook Project. We are reporting here on eight of the holes (1,278 feet) in Currie Township. This amounts to an expenditure of $14,048.75 for an assessment credit of 900 days to be distributed evenly over fifteen claims, numbered L594509 to L594511 inclusive and L624446 to L624457 inclusive. Included in this report is a cost breakdown on these eight overburden holes with copies of expenses incurred, drill logs and a drill hole location map.
The Mining Act Report of Work has been previously submitted to the Mining Recorder, Larder Lake Mining Division Ontario.
We trust that all the necessary data to record this assessment credit is in order. Please do not hesitate to call me if you have any queries concerning our submission.
Yours truly,
R. J. DeanRJD:mm
Encl.
cc: Mining Recorder, Kirkland Lake
Asarco Exploration Co. of Canada Ltd. 12th Floor, 350 Bay Street Toronto, Ontario M5H 2S6(4) B) 338-7 993
A subsidiary of
ASARCO
BRADLEY May 31, l i* CI
/M/TED
Asarco Exploration Co12th Floor, 350 Bay SToronto, OntarioH5H 2S6
HOLE NO.
A2-81-1 j\p2 k q3 ftft4 *65 ^M6 f\ tp7 hQ8 AQ9 An
lo fto
-.
TO COVER DIAMOND DRILLING TOR J'av
FROM TO
Kacklein Township
Mobilization*25 miles
\,/ 0' 163'2* 0* 190'1 ' 0' 138'f 1" 0' 187'4^ 0' 199'k *^0' 140' l-T^ 0' 152'11-*" 0' 214'13^ 0' 160'q^ 0' 124*
Equipment rental:53 houro
— — —————————————————————————— ~ CONTRACT DIA MOND DKILIIHC
; ,' . . -;-. of CanetJa Lindtedtreet,
25 to 31, 1981FOOTAGE COMPLETED
6 ?4.50163'190'133'1D7 1499'140' , .152'214 1160'124*
8 189.00
Do\m the hole con s linkable s:6 tricone bits Q1 adapter g
June 15, 1981.
RECEIVED PAYMENT*
IN FULL 'ff fi — 4-~~-
#675. 00 - ^4050.00495.00 - 495.00
14545.00
Plus 15fc 681.75
.- ' - - .
* * - * *** * ^!v*B **
Bradley Bros. Limited
?112
1C, 017
5,226$15,356
STHCCT r.o. BOX xr NORA.NDA. oue. JSXSAS T f L. ttt-Jtl-OJSS
•KALM.EY June 15, 1981
1/M/TED.- CONTK ACT DIAMOND DHILliyC
Asarco Exploration Co. of Canada limited ' 12th Floor, 350 Bay Street, Toronto, Ontario M5H 2S6
HOLE NO.
AQ-81-10 -11
1-12
TO COVER DIAMOND DRILLING FORj*
FROM
June l to 15, 1981TO rODTACE COMPLETED
' .MackTetn TowrVship
Equipment rental: 113 hours
1 *
Breakdown: 6-hours"
e
6
Down the hole consumables: 15 Tricone bits 8 *675. 00 2 Adapters e 495.00
Plus
?189.00
150.00
^10,125.00 ' " 990.00 311,115.00 ' 1,661.25
50
?21,357
900
12,782 ?35,O39
*
00
30
f5' P5
HADLEY VROS. LIMITED—
June 30, 1981
, i . -
Asarco Exploration Co. of Canada Limited 12th "Floor - 350 Bay Street Toronto, Ontario M5H 2S6
' CONI* ACT DIAMOND DfilltING
?,RECEIVED
JUL131981R. S. .GRAY.
HOLE NO.
(Aft l 81-31 -X W k -32^V :jU -33 -V, 5(\Ul -34 ^
i tJ1 " 35"V ^ -35A\ ^ -35BJ^
^ V - 36 ^ X. ^ ~ 37 ^i,V^ ~ 38 ±\i\J -39-^ j. -40— V.
^W -41 ^ 0 ^ -42 ^t^ ~ 43 VS.^ -44 ^
^ -45 ~
^
\ K1 ^ ^
**\*ty-
* ^
i
TO COVER DIAMOND DRILLING FOR June lg ^O 30, 1981
FROM TD FOOTAGE COMPLETED
Mack'1 em ToWn'shlp , .i /^ y *7 *? i "i. *2-
f?wi4 0* 124' 124' 8 ^ '** f ' Buir 0' . 155' 155' . a ,? t 1^0 BwU, 0' 134' 134' ' *' rjw i7 0' 105' 105'
-0' ^18' 118'ft ,7.x 0 ' .* 1 75 ' 1 75 ' Bs) XOU '±^00' 200'B^,^\ 0' 46' 46' -Bfclfe 6' - 132' 132' Bul^O' 80' 80'ULl 0' M,i) op 40'. 40' UUZ 0' rj* J 31' 31V •UL3 O 1 ' f' 128' .128' M.l-4 o*. 49' 49' Htr 0' 117' 117' -HLt 0' " 92* 92' -ULl'o 0' 160'. 160'~nnFc"
Equipment rental: 89 "hours @ ?189.00
Down the hole consumables: 9 Tricone bits -6 ?675.00 - ?6.075.00 1 adapter ' e 495.00 - 495.00 10 bags mud ' ' . ' B ' 12.50 - ' ' 125.00
' - 36695.00 Vti^-vui 7-4 v rj ^ *-
j. /* t 1 ' ' Plus 15% ' : -10-04-.25 .*. f"** ***^ 1 4? (-'-fr . . . . -
". * t t' t ,'-'#ij4f i X/*? ft. o* //r.
d ' y /v^^ *t 44^//(st.
^16
* ^ j.l.2.-(
,821
',699,520'
• :
BRADLEY BROS.
July 15, 1981
CONTRACT DIAMOND DRILLING
Aearco Exploration Co. of Canada Liicited 12th Floor - 350 Bay Street Toronto, Ontario
HOLE NO.
81-45-46-47 V-48 V
TO COVER DIAMOND DRILLING FOR
FROMJuly 13 to 15, 1981
TD FOOTAGE COMPLETED
m^lo 160* HL^ 0* 44L-? 0' UL--7 O 1
166* 90 1 82' 71*
6' 90' 82* 71*
Equipnent rental t 27 hours
Down the hole consumables i 2 Triconft bits 6 *675.00I Adapter e 495.00II rode 0 475.00
Plus 151
Truck t float rental t 50 miles
?189.00
*1350.00495.00
5225.00$7070.00
1060.50
8 4.50
8,130
225313,458
CO
so
00So
BS. UTM STRlfT P.O. BOX NORANDA. Off. J9X SA9 TfL. MW6J-07K
f31, 1961
- CONTRACT DIAMOND DRILLING
Asarcd Exploration 66* of Canada limited 12th Floor - 350 Bay Street Toronto* Ontario
t v 11,
HOLE NO.
8i-49^c. 50\
53\DP-1
23
• 435
DP-5678910111213
,~ptf^^~~ — "
)*yoff '"' J u- /y. A/*
i — i/-f^C.t' * t** " ' **- T i
^e rS^fy^s ,/.,^--:
A j
i
:i
TO COVER DIAMOND DRILLING FOR tJulV 16 t6 31 i 1981
FROM TO FOOTAGE COMPLETED
e. 6* 174* 174 1"^ t' "l * , . * ? J? 4
10* 4b* 46*•J 6* 104* 104 14 0* 106* l66*r d* 116* ile*
0 1 Ib2' 102*0! io4 104*0' 44 l 44*D* 20' 20'0* 142 1 .... 142* ..b' 75! 75*p* 5.3' 13*0' .58* 5S* ,^^/0* 100' iOO' KO 1 62' 62*P* 9 8 'i 98* tA^'^t0? 46 \ 4 6! VK^JKP 1 55' 55' W^0' 51' 51* \-
Equipment rental*^ 89 j hours g H89.00
/T* Breakdown t /^,^rs /M* /n^^f/^v^..
^^ •'.-. . r *- , i - Pff*1 *?* . c-A*- 1-*}* gl*r* breajtct(**sK .
Down the hole. cottsumablest 7 tricorie bits B ?675.DO - ?4725.bO
;^ Plus 15% ^^7081-75
^ Trucking: l^pc^*^ *135 ioaiies @ ' 4;^b
Hotel Windsor - attached
Stan-Kaa Hotel - attached
Meals - attached
fi^ert* TA/T^^M^*^^.
x-. ^, ^L*'*
J^ ^ ^-^^fy
r* ^~,vJ*'i l^*-/* N
$16,915
"3 o Oc?'
1 -
5,433
607
687
1,985
94Jtnftj4 nA
Lr*-^3^^
x^""""'' k*'^
j
50*" 0
)0 — -
75
ib
is52
70I*-
August 15, 1981
Asarco Exploration Co. of Canada Ltd. 12th* Floor/-•350'Bay Street '?-'- ? " - ' v - Tordritby-Ontario --.V o* ^v -
CONTRACTDIAMCWPDfUUING
•~HOLeVN D r . '
-. - * — -
DP- 141-15--16'-17'-18'-19'-20-21-22 X-23^
•24: 25 ^
-26--27 --28'-29*-30 :-31-32.-332-34
. 'ea * r \ . ,
TO COVER, plAMOND DRILLING FOR Aug. 1 tO 15, 1981' * H, - '' ' ~* *- *
FROM. , TD V, ' FOOTAGE COMPLETED -.
0' 80' . 80' RECEIVE10' 80' 80'o- 72' 72* AUG261980* 76' 78*0' 67* 67' R.S.GRAY0' 60'- 60' '0' 65* 65 1 )/^ S7O 1 24^ 24' C 'ff j/'^'O 1 18' 18' f 0' 19' 19' f0* 34' 34'
i 0' - 13' 13'i O f 14? 14'
0!" 18' 18'i 0*. 36' 36'i O!/' 45* 45'
0* ' 23' 23'O?/ 03' 03'O*' 44' 48'05' 36' 36?'or- 74J' J4 1 ;
i Equipment rental: ^-~*~7/livJipurs- j...;-;-!:.-*;. @ $189.00
1 -i"6 favXV * ?-3*S*Breakdown:
, AUgvitl^lBvv-r 23Jallowefl "-r** - ?i*15 hours @ 150.00
r- "i 'c j*i"V '^ " ' * 'ti\yfff ' * y ^^ ^"'Down the hole consumable:6Mricone bits *^ ; *46.75:00 -. $4050.001 /.Adapter-/,. i*i ;* @v 495.00 — ^495^00-
.tvAf.ty^-'i; !v *n.r, *', "* $454-5;^-b- Plus 15% J681V75:
^'.f-f.^** n^^ ' V"^'-5^Hotel Windsor - attached
• " '^••^••w* w - P I;* 7.^.,x*. ..—— r. - - ,, -. l
*"'*1^'
S~"^'*f*^?js~r*jtfS^?
$14,080; B i 5 ,. "". b 'i;f ;
| 2,250;i ^7 . -*nJJ
5,226. 3 t t J4
997**
422,554
50•J f-
00GO
7575
25. ;-
50
'
BRADIEYAROS.LIMITED
August 31, 1981
^mmmj mm m m m mm m
HOLE NO.
AQ-81-14 -15 -16 -17 -17A -18 -18A -19 -20m
i
mm mmw ———————————————————————————————————————————————————————————————————— - ————
——————————————————————————————————————————————————————————————— - ———— CONTRACT DIAk
Asarco Exploration Co. of Canada Limited R t f 12th Floor - 350 Bay Street n*Cf;y Toronto, Ontario Cm*S*pl 5 29
K- s- GRAV
TO COVER DIAMOND DRILLING FOR - ,, , c ,^ o o -IQQIAUg.. J.O CO *O, J. y O J.
FROM TO FOOTAGE COMPLETED
0' ' 180' 180' 0' 294' 294' 0' 174' 174' O 1 194' 194' 0' 220' 220' 0' 246' 246' 0' 278' 278' O 1 220' 220' O 1 250' 250*
Equipment rental: ' ———— 87 hours @ S189. 00
Breakdown
Dowp the hole consumables: 5 Trigone bits @ f675.00 - ( 3375. 00 1 Adapter @ 495.00 - 4 95.00 21 bags mud @ 12.50 - 262.50
?4132.50
Plus 1 5 1 619.87
Truck transportation from Quebec ' ^o. Ontario, -. i5 Q mile?. Q 4 .3Q
Demobi^iza.tion, T, il mA3-es . .^ 4.50
~-.
fS. UTM STRICT 0 P.O. BOX 367 NORANDA, OUf, J9X SA9 * TCL. tll-Hi-OTK
IIOND DRILLING*
81
^$16 f 443
n/
4,752
675
121,937
-
^^— -
00
c
37
00
5087
-
Taylor Twp
630455 [630456 ————— -———-t,
OEo
OD
8765
Egan Twp.42A07NEC137 2 .4477 CURRIE 200
J . v. Kolben
THE TOWNSHIP OF
CURRIEDISTRICT OF COCHRANE
LARDER LAKE MINING DIVISION
SCALE'I-INO^40 CHAINS
LEGENDPATENTED LANDCROWN LAND SALE LEASES
LOCATED LANDLICENSE OF OCCUPATIONMINING R IGHTS ONLYSURFACE RIGHTS ONLYROADSIMPROVED ROADSKING'S H IGHWAYSRAILWAYSPOWER LINESMARSH OR MUSKEGMINES
or C S
Lo c.LO.
M.R.O. S.R.O.
NOTESDATE OF ISSUE
SEP Z Z
Ministry of Natural Resources____ TORONTO
AREA MARKED THUS Files: 11693
EI312WITHDRAWN FROM STAKING UNDER SEC. 3 3 (D) OF MINING ACT
L\
400* Surface rights reservation around oil lakes and rivers.
Areas w ithdrawn from staking under Section 43 o f the Mining Act ( H .S.Q I S7O). order H o. F ile Date Disposition
9PLAN NO.- M.341
U.VJARIO
MINISTRY Or NATURAL RESOURCES-,.\\J /v.Ar i j \?l. f 'i. Z i\ ANCH
Cu-ll Cu-IZ Cu- 13 Cu - 73-25-44-South
T. t
—— i--; —
•~':^
- * . '
;;. 0
' O '- '
Q 0 O '".e..00 "
. a f o D-C
• A " A.x®*''
^ y - ^ X
N 6 '' ' 0~~ A.
^x rt " ^ *
ix ^ s H;-\\^.\ A^A A 'A.
^'i-
- - ' 2*"N^A'V
13. 14-
NO Return
Gr^y Clay
B r w ti \ ^o w ri v my o (A^O
"Sand *v S, Ht; ——— Brown Clay P.a^d
Well washed WKite Sand
l-are p c b I.* 1 e s ^~~~~~~*~~~~~~~—^.
W K, f e Sand \
Q r ad ' n o "to "~\^ Gre.ySa.nd w i Vi
' "-.minor o t a a n i C rn G. t e v ; a. 1 ^ -,
\ "~--..
\
^ W oe d Chips
Gravel ^ abundant S cvr\ d ^--
Clay T. l) ^\^-^ ^^-----^
.
- ....^ ~ ~~Gravel ^ S o. r\d
Clay Till ~-----."^ -
"C lay T. M ~" - -
3 Sandy Till~"~~~~~—--,
flf" i * "^~~— -^S^pe-rcldy ^"- --^
^Bedrock'. Andes'tic Tuff ? ^~~^--
Z ft. ~ - ^^
J— - -"-.— - — - —
' ———————
__ --
- — -.-
cz r~
—r 1-,--
i J* rlr-'i I,J ^
-J-.— -...-—— - -: —
——— . —f-
*---f~i^.
—— ,^.
-^ -T-r
ZT~ 1^,"
r'"^^'.v'
A" a VJ/*v.r'
•' A'" ^'N ( i^VA o . . *c^ A -^A
V/*^
A- A"' fr
.^Avv]
^X As 7,/N - ^ A
^('f/V
' --'S/ - , '''/' ' '- y/'.'////A
Wo RtfVor^
B*-own Clay
Cream \ c- H rov-vn Clo-y
Creo-Wx ar^diviq ^o ^fev Cl*y
B^o^A,/n Clay ^-' ^-"
B^own C'av aracimo to S'Mt J-^^"
ri i 'TT" f i a C 14-
*- —— nun^ero^s Vine pebbles
m L c ac Silt ^^.— — """ '
S an^^^S^Mt^-
^-^^'woo^ CK.PS
wu c a c . Silt f Minor S^^o
-e n ebbus^ - — - - _ pSilt t ^ ne ^arvci - —— - —— -~--^, __
orckVff. i t l O ^'cxi^i'Te Go'-'Io* r~~ — . —
1 i | | : mavnly clay ~~~~~ — -^^
1 - -. . .
//
1 i 11 '. Ci Q.\i v^.tK v^-\ut h t 3a*"o ^
s noirwei oo j Svv.o-11 pebtnle^ ( ' -
Till : rvi a i n i y C t a. y
/'
-T" - 1 1 II ,.
boo Id f r s /
sx
Bedrock: R Vi y o \ \ \ \ e *?
or Dacite??
——— ..^,
r^-."-:zr:
___ .,—— ~ -
—-
ZUZZ'
'^^J
.-^ '-r- ~
-±X'T-'-J:
T-^-.-.r"r^.'-^r-.
^:-.rr '^ — j — .j— - — .'
'.V '; - -*
- " - . - .*..-•••.•--•,--.-'' e *5"a.O 0 * i* **
^Lr*il -A'A^'^*'A*/.
y//////xyxxX-y
D. II
No p,*U'tr-.
Gr-, j C Vay
'Brc>^1^<T^ C^C-y
P. rnv/n S ' '^ qra.-li r^a
"V o or ey , rn i ^ a- c . j i j T *.
Sand 4 S ' ' t
l ^^ ' \ -Ln^ 0.1 nl y J ' n j
1
s/
/^s/
^^
P ooriv/ SOT"T^d 7DCi.l\[4 f
-^ _ _^-^^ — " —— "". — — —— ~~
T il 1 t r C~ \ 1 j :~" \
Bedrock,'. Fe. Isic In+v^rive,l ^~T- i IL r r. f
rv,u,. v-' epiJo'te . ^-^-^^^^B ft, ^ -^^
T. D
^. __ , -™-^. v—— '
.
— —
-^ —
— .-1;"
— - ~-
. A . ^V* A*
0 ©n A
* il . o
- " a
0 . 0 .
A * "- . . .6-'-•;A-,'^.'.
y"AX ; x . . y
•^ x xi - \ A ^ "" --/*\ ^\a
l^A'i,,-A y
/A 0 *
Mffi/J////*
. ! ZT
No Retort, - ..^
"— - — . _
~ ^ ——— —————— —————
Silt ^rodina to fine So h ci ~ ' —— - — — -
I i h ' qravel ^ Sand T Some bou idevs ~~~~^~^^^ ~" " ~'~" ~ ———————— — —— - ——— - — - - -- . --
-—^^~~~~~~~ -^.^
^^^- -^^^^
^^~^^ -^
^~~~ ^^~~~~-~-^.^
Till? tna.r-ly S^J
T -il-n i lit L II 1 u ordve IE5and, 1*1*'^* boy l d e r
" T 'HI i r- lil) : clayjivvimot- ^,j^ ^ Savidj few pebbles
-Clay ~~---^— - — — — . - -..^ ~-~~
\i\\ : Very qravelly ~~^ ——— -— -— — -
1 1 U . clfly t. Orn^"l l " —— -- -
• i li i ver-/ "3 r *welly ' x i f
..- -- - ~--— - ".. - -- - -
__ .^... -- — -- "--— — T.- Bedrock . DociteT?
f-V.
-——
*' o D " 0* •:" : .
" * *'o O ' 0 -- .
o -. 'B : " 'o -
. o " . ' -'
— —— —— —— ——— ——
— —b . '. a ' * ' ;'
. . ." - -o
1 J * " * ,' '-"
••' - . ' - , .e - - ' '
• •- ' "
o " A t * * o *B -a'^" . *,*'*^S0 -/il \ AA \
'^/Y^//S s/ ///s.
D. 1 U
H U^USClay
Sand ^ Sa^dy aravel
C lay ^ si H j m T n or very fine Sand
Coarse qraye\W Sand
Coarse coboly *3ra.ve.l
Till ? Coarse. tobt*\y araycl plu5 hnjiftor clayQ 1 . \s . s- 1 *- DedrocK. , ora.r\odior i Tc.
D f f,
4
T. D 17 Z. 5 Ft
H oi- J z. orv fa l Scale : l in*k to l OO feet
Vertices.! Scale : l inck fro "ZOfeet
42A07NE0137 2 .4477 CURRIE 210
PROVINCE
DISTRICT
TWP
NTS
ASARCO EXPLORATION OF CANADA
COMPANYASARCO
COOK JOINT VENTURE. OVERBURDEN DRILL SECTIONS
LOTS 3- 5 , Cone. UT, C urrie TownsVMp } O ntario.SCALE
A1?
DRAWN
J-J. S.DATE
July 1 ,flit NO.
42.- A-7
WoV-izonVa\ Scale
Vertical Scale
i-o tOO Peet
to "ZO
42A07NE0I37 2 .4477 CURRIE
Cu-IO Cu-9 Cu-8 Cu-Z
~c:rTz:
— ---
^— ,. — *-^.
~ ~.E
— — -t — fr~T"~ -~~C
7 X*A
A ' n
A ^ l
' "~ ' - f
no a a\ -, A
\ '. A ".'A "" '
-^ A .
^. ;f^///^//sl.
Wo Return
Brcwn Clay t m-|T.., Sand
GI r e- y C \o-y ( Vv,i nov ^at^3
5 i \\ ^ rar^ coarse s'aviti
Si H , vare c rao.rsf ^a^^ "" " — - — - — -
TJH 6"^"^"^^
— —— - — — i r __
S o-nd ^ Gravel
C, l o- v I'll vv'i tU variable
S&t-^^ pp V'f P i ^ Varr Cobblfj
^.r^erivj ru,^i~ie"S
GTTT"——" " " """"" ^Tby^Jv^i^J^T^^1*"
-i - . -Jr
4- -
^rVli.r-.
0 ' ^ \
7-^-*^*-
' * ' A
." v A
' .' '^ f A - . '
t. ,' . ft - "
' ^* '.'
S
M^ Re^^T-nBr^^CUy.^WWs^
lofaUy O'Til'l'iy '".kV^c
^ G rey S ant-\
Clay T, 11 ?
^CKXi-K , ^ 1-as/e \
Cla,y^ Super O ' \ y T
Bedrock Ta\u s
T.D. 134 ft.
Soul' h
r
C. '- '"A
T.
d f a v f C l o, y *
C lev T, H
^I Savid f1 Bc-" I d f t
t).
/Z
No Re
Clay
^ l' -t- i r t- j M , y lo S d 1"1 Oy L lav
t~ r \ c l f' i . rve Of'avelj.i'l'^o t;,
l til - (TIB mi y clny,5(ihLen',c r.f ^\'i-e clay
y
av l i, Sai\(i
Vat i at l c viL.^-itt^i- at' pebbles
Ti 1 | - c la. -y j pebble^, b
T i
Gravel
pels"- F\ii-r^
T. D. 160
FHF
PROVINCE
DISTRICT
TWP
NTS
ASARCO EXPLORATION OF CANADA
COMPANYASARCO
COOK JOINT VENTURE: OVERBURDEN DRILL SECTIONS
LOTS 3," 5 , Cov^c. HI } Currie TownsY-.-; p tSCALE
AsDRAWN
J- J. S.
DATEJ ul
FILE NO.4Z-A-7