![Page 1: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/1.jpg)
42C12NWe891 42C12NW8029 MOLSON LAKE 010
REPORT ON
ELECTROMAGNETIC AND MAGNETIC SURVEYS
RADO REEF RESOURCES INC.
BOMBY AND BROTHERS TOWNSHIPS
SAULT STE. MARIE MINING DIVISION, ONTARIO
'-w,/
Deborah A. McCombc February 12, 1984
TENOGA CONSULTANTS INC. 1
![Page 2: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/2.jpg)
42C12NW009) 42CiaNWe0a9 MOLSON LAKE 010C
TABLE OF CONTENTS
1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . l
2.0 LOCATION AND ACCESS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . l
3.0 PROPERTY ............................................... l
4.0 PREVIOUS WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . l
5.0 GEOLOGY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
6.0 SURVEY PROCEDURE AND INSTRUMENTATION . . , . . . . . . . . . . . . . . . . 2
7.0 INTERPRETATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
8.0 CONCLUSIONS AND RECOMMENDATIONS . . . . . . . . . . . . . . . . . . . . . . . . 3
MAPS (in back pocket) Magnetometer Survey VLF Survey "Fraser Method Profiles"
TENOOA CONSULTANTS INC.
![Page 3: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/3.jpg)
. ..,-1-
1.0 INTRODUCTION
Systematic VLF "Fraser Method" and Magnetic Surveys were performed over twenty
mining claims held by Rado Reef Resources Inc. in Bomby and Brothers Townships,
Ontario, in an attempt to delineate favourable targets in the search for precious
metal deposits.
2.0 LOCATION AND ACCESS
The claim group covered by this report is located approximately mid-way between
Thunder Bay and Sault Ste. Marie by road. Both the Canadian Pacific Railway and
Trans Canada Highway 17 are located nearby.
Approximately twenty-six miles west of White River, a bush trail runs south from
Highway 17, a distance of 2 1/2 miles to a point 1/2 mile west of the western Rado
Reef claim boundary.
3.0 PROPERTY
The property consists of twenty contiguous unpatented mining claims about one mile
south of Molson Lake in Bomby and Brothers Townships, Sault Ste. Marie Mining Division,
Ontario. These include:
SSM 694128 694129 694130 694131 694132
SSM 694136 694137 694138 694139 694140
SSM 694141 694142 694143 694146 694147
SSM 694148 694149 694150 694151 694160
4.0 PREVIOUS WORK
Gold was first discovered in the general area in 1945 in a shear zone on ground now
held by International Corona Resources Ltd, approximately three miles northwest of
tf^^ftV^.tfX1*^ TENOGA CONSULTANTS INC.
![Page 4: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/4.jpg)
-2-
the Rado Reef property. Some surface drilling was performed between 1947 and 1957
by Lake Superior Mining Corporation and Teck Exploration Co. Ltd, on adjoining claims
but no further exploration appears to have been performed until 1981 when Corona
intersected encouraging gold values in surface diamond drilling on their property.
No previous exploration vas noted on the Rado Reef claims in the Ontario Geological
Survey Assessment files.
5.0 GEOLOGY
Regional mapping by the Ontario Geological Survey (Manitouwadge-Wawa Sheet -
Map 2220) indicates that the contact between the mafic metavolcanics of the Heron
Bay Sequence and the Pukaskwa Gneissic Complex to the southwest runs through the
northern portion of the claim group. A sequence of dark green, amphibolitized and
foliated flows up to 1/2 mile wide are intruded by the gneissic material to the south.
Northeast of the mafic lavas is the main band of metasediments which are reported to
host the gold deposits located recently in this area. Rock types are striking north
west with steep dips to the northeast.
The western portion of the Rado Reef property appears to be underlain by the
Pukaskwa Gneissic Complex. Rocks forming this unit vary from a foliated feldspar
free granite to a granodiorite. Pegmatite and aplite dikes are common.
6.0 SURVEY PROCEDURE AND INSTRUMENTATION
The Electromagnetic Survey was carried out using an EM-16 unit manufactured by
Geonics. The "Fraser Method" was used to transform the data into an easily con
toured presentation which simplified interpretation.
Lines were cut at 400 foot spacings. The data vas collected at 100 foot intervals
with the occasional 50 foot reading. The frequency observed was 17.8 kH. and the
survey was performed by CDI Surveys of Val d'Or.
... ,-.. , . ... .... ,TENOGA CONSULTANTS INC.
![Page 5: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/5.jpg)
-3-
Fhe Magnetic Survey was completed using a UN1MAG li unit manufactured by Geometrics.
Readings were observed at 100 foot intervals in September 1983.
7.0 INTERPRETATION
Two anomalous areas were outlined by the VLF Survey. The strongest VLF anomaly
occurs in the northern portion of the claim group. This northwest-southeast
trending anomaly ie centered on L32+OOW, 26+OON. It extends off the northern portion
of the property at L52+OOW and off the eastern portion at L4+OOW, 19+OON. A broad
moderate magnetic anomaly is associated with this conductor and the anomaly may be
due to sulphides at the contact between the mafic metavolcanics and the Gneissic
Complex.
A second weaker VLF anomaly extends from L4+OOW, 4+OON, northwesterly to L24+OOW,
12+OON. It appears briefly for a few hundred feet centered on L48+OOW, 25+OON.
There is no magnetic expression associated with this anomaly and therefore, it may
be due to a structural feature.
Several east-west trending magnetic features occur in the eastern corner of the
property. There are no associated VLF anomalies.
8.0 CONCLUSIONS AND RECOMMENDATIONS
The Rado Reef Resources Inc. property which consists of twenty contiguous unpatented
mining claims lies approximately three miles southeast of the Hemlo gold discovery of
International Corona. As several geophysical targets have been outlined by the VLF
and Magnetic Surveys, a detailed geological mapping and sampling program is
recommended prior to diamond drilling.
TENOQA CONSULTANTS INC.
![Page 6: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/6.jpg)
SO
UT
H
PA
RT
O
F W
00
6
![Page 7: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/7.jpg)
'•ft
Ontario
Ministry of Natural Resources
GEOPHYSICAL - GEOLOGICAL - GEOCHEMICAL TECHNICAL DATA STATEMENT
FUe.
Type of Survcy(s)
Township or Area
Claim Holder(s)
Survey Company.
Author of Report
Address of Autho
Covering Dates of
Total Miles of Lin
TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORT FACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT
TECHNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS ETC.
VLF-EM, Magnetic
Bomby and BrothersRado Reef Resources Inc.Ste* Q10, 331 Rnv St.. Toronto. Ontario
C.D.I, SurveysD. A. Me Comb e
r 2078 Tenoga Drive, Mississauga, Ont. .toil jivi
Siirwy Sept 5/83 to Feb 10/84
r Cut. 21
SPECIAL PROVISIONS CREDITS REQUESTED
L ENTER 40 days (includes i line cutting) for first j survey.
ENTER 20 days for each additional survey using same grid.
(linecuttini lo office)
DAYS s* , . . per claimGeophysical
F.lrrtrnmagnrtir 40
-Magnrlnm^r. 20.,,,....,
Rariinmrlrir
Olhi-r . . ,
Hi-ologiral ,
AIRBORNE CREDITS (SpecUI provUion credit* do not tpply to airborne lurveyi)
Magnetometer. __ V.lfrtrnrmnmftir. R aHinmrlrir
DATF,-
Res. Geo!.
Previous Surveys
(enter d*yi per claim)
A\A /l /^W\C^ H sir.NATnRF./LMrc/w M ///LfaJirt -Author of Report of Agent
Qualification* , **
File No. Type Date Claim Holder
>:==:=- -:i. ' : - . - - .. ' : .- - .
MINING CLAIMS TRAVERSED Liit numerically
jpVefuj
SSM'SSM'"""""""""""SSMSSM SSM"SSM""""""""""""SSMSSM SSMSSM
SSM SSMSSM SSMSSM 5SKSSM
SSM
(number) 694128
fi H**H***t#*t*************** t**
694129
694131 694132 """"""694136""""""
694138 ...........68AW8..........
694140...........68A1W..........
694142 69A1A3694146
694148 ...........69.A1A9...........
694150
694160
"''"^'''Cfx
lftA"'Vo ^W*~^"-.*
- ;-: ' '
TOTAL CLAlMi}-'"' '"'^ '' : -20 •'^••'"'
If tp*cc imufficient. attauk uftt
/
![Page 8: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/8.jpg)
GEOPHYSICAL TECHNICAL DATA
GROUND SURVEYS — If more than one survey, specify data for each type of survey
Number of Stations 905—————————————-—Station interval____100*. 50* over anomaliesProfile scale______EM plotted Fraser Method - contoured 20 Fraser Unit
Number of Readings EM - 905. Mae - 967 Line cparing i 400*-————————
Contour interval. 100* (Mag)
u
x;O
Instrument. UNIMAG II - Geometries
Accuracy — Scale constant. l gammaDiurnal correction method looping along adjacent lines and correcting to base station
Base Station check-in interval (hours) , l hr——————————.———-.——-—-—...——————-———.———Base Station location and value ____BL t 8+OOW_______________________________
59.783 gammas
Instrument EM-16 Geonlcs
ELECTROMAGNETICoil configuration -Coil separationAccuracy .Method: Frequency. .
Parameters measure
Horizontal LoopAOO'
- .25 to - IX
Q Fixed transmitter O Shoot back ED In line 17.8 kH,. Cutler Maine
14 (tpecify V.L.F. tution)d In phase
CJ Parallel line
H
'f. tiO
Instrument.Scale constantCorrections made.
Base station value and location
F.lcvatiun accuracy.
Z
H
O
Instrument ————————— Method D Time Domain Parameters — On time ___
- Off time— Delay time —-—.— Integration time.
Power.Electrode array—— Electrode spacing — Type of electrode .-
[~1 Frequency Domain _ Frequency ____ _ Range ..—.————.
![Page 9: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/9.jpg)
GEOPHYSICAL TECHNICAL DATA
i il'i MJfci M III VI Vi If more than one survey, specify data for each type of survey
Number of Rmtimn 905---^---—--.,--—-—--,—.Station interval___100*. 50* over anomaliesProfile scale_____EM plotted Fraser Method - contoured 20 Froecr UnitContour interval.
Number of Readings EM - 905. Mae - 967
.Line spacing —
100* (Mag)
u;y, c5
UNIMAG II - GeometriesInstrument ^^.Accuracy - Scale constant, l gammaDiurnal correction method looping along adjacent lines and correcting to base station
Base Station check-in interval (Hnun), l hy—...—.——.—.—.——.———.—————..—.-....—.————.— Base Station location and value .—-.-^BL. 8+OOW______________________________
591763 gammas
.ECTROMAGNETICInstrument ... EM-16 Geonicc
Coil configurationC"i| separation
Arrurary
Method: Frequency
Horizontal Loop400'
i .25 to i IXQ Fixed transmitter O Shoot back ED In line
17.8 WU. Cutler MaineO Parallel line
(UlParameters mcauireH r In
Instrument.Scale constant,Corrections made.
Uase station value and location.
Elevation accuracy.
2i
Instrument .————————__ t
Method D Time Domain Parameters — On time ——
-Off
D Frequency Domain _ Frequency _____ Range ^^—^——.
— Delay time.
Power—————— Electrode array— Electrode spacing, Type of electrode
l-t
![Page 10: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/10.jpg)
Ministry ofNaturalResources
Ontario
Report of Work (Geophysical, Geological, Geochemical and Expenditures)
The Mining Act
Instruction!: - Please type or print.-If number of mining claims traversed
exceeds space on this form, attach a list.Note: - Only days credits calculated In the
"Expenditures" section may be enteredin the "Expend. Days Cr." columns.
- Do not use shaded areas below.Type of Survey(s)
[Pr
j
lOite o) Survey (from
Mime end Addrtti of Author (of Gto-V*chnic*l report)
A-
rfoiiirMil*j of line Cut
X) v^T t-SHCredits Requested per Each Claim in Columns at rightSpecial Provitioni
For first survey:
Enter 40 days. (This includes line cutting!
For each additional survey: using the same grid:
Enter 20 days (for each)
Man Dtyi
Complete reverse tide and enter totalls) here
R
MINI
Airborni Croditl
Note: Special provisions credits do not apply to Airborne Surveys.
Gtophyiictl
- Electromagnetic
. M*pnitomet*r
. Rtdiomitric
- Other
Geological
Gtochemical
Geophysical
- ElKt'omapnelic
- Maantiprntuhx 1n r f rx ' F-- ^. \ "^o* - Ridion^ttfic
vL^T' "'B4Gtologicul
lOaoct****** J i*uw.
Eltcl'Omagnttic
Mapnitomctti
Radiometric
Days p*r Oalm
/O
-P-0
Oayt per Claim
V-
~~ 1 ~
Days P** Claim
Expenditures (excludes stripping)Type Of Work Performed
Perlormed on Claim(i)
Calculation of Expenditure Days Credits
Total Expenditures
IS I -J- 15 -
Total Days Credits
Instructions Total Days Credits mav be apportioned at the claim holder's choice. Enter number of days credits per claim selecttd In columns at right.
Date Recorded Holder or Agent ( Signature)
Certification Verifying Report of Work
Mining Claims Traversed (List in numetical sequence)Mining Claim
Prefix Number
SAULT StG, MARIE
R E;C E l V li
A.M.
Expend. Days O.
n
Total numbe' ol mining claims covt'ta by tnis report o' i
JLl hereby certify that l hive a personal and intimate knowledge of the fact* Mt (orth in the Report of Work annexed hereto, having perlormed the work or witnessed tame during and/or after it* completion and th* annexed report li true. ^^^^^^
Nime and Pottal Addreii of Pe'ton Certifying
A f c3~
.?xr3.Cariiiried 7 yJT 1 2 fa t C*ri-,i.ed rv
![Page 11: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/11.jpg)
Our File: 2.63751984 OE 22
Mining RecorderMinistry of Natural Resources875 Queen Street EastDox 669Sault Ste. Marie, OntarioP6A SN2
Dear Madam
We have received reports and maps for a Geophysical (Electromagnetic and Magnetometer) survey submitted under Special Provisions (credit for Performance and Coverage) on mining claims SSM 691128 et tl 1n the Townships of Booby and Brothers.
This material will be examined and assessed and a statement of assessment work credits will be Issued.
Yours very truly,
J.R. MortonActing DirectorLand Management Branch
Whitney Block Room 6643 Queen's Park Toronto, Ontario K7A 1W3 Phone: 416/965-1380
A. Barndgcct Rado Reef Resources Inc.
Suite 910 335 Bay Street Toronto, Ontario M5H 2R3
cct D.A. McCombt2078 Tenoga Drive Mlsslssauga, Ontario L5H 3K2
![Page 12: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/12.jpg)
June 9, 1934 Our File: 2.6375
7
Radl Reef Resources Inc Suite 910 335 Bay Street Toronto, Ontario M5H 2R3
t
Dear Sin
RE* Geophysical (KagnetoMter ft Electronagnatlc) Survey on Mining Claims SSN 694128 et al In tanby and Brothers Townships
Returned herein are the plans (In duplicate) for the above-nentloned survey. On each plan please show all claim lines and dal* numbers and return the* to this office quoting file 2.6375.
For further Information, please contact Mr. Ray fMchette at (416)965-4888.
Yours sincerely*
S.E. YundtDirectorLand Management Branch
Whitney Block, ROM 6643Queen's ParkToronto, OntarioH7A 1U3Phonei(416)965-4888
S* Hurst:we - '
cct Mining RecorderSault Ste. Marie, Ontario
.' ..*; v ,. i
, i : '^'V - "-. -r-f ' v - ' ;.^ ' . ,,. , j- ,.- ( ,
, - t:
'. - y/^: . .;t;,";".-- ;t -:ji-('
fli^lSife^Sl^l^^li'fel^^^
![Page 13: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/13.jpg)
Ministryof
, Ontario
GeotechnicalReportApproval
Flit
Mining Lands Comments
'Mu/j )(k-v|jftl—.fe(fl//^.. L'Ald-OAJ-X/g/A . /mjJxV^. . *kf*filM*-
To: Geopl.ysic* ^ f
Comm*nls
Q Wilh to l*t •8*if with c orrectioni
D To: Geology- Expenditures
Comment!
Q Approved [~1 W ith to M* B*ln with corrtctlont
DTo: Geochemistry
[n Approved [jW!ihJO****B*ln with cornctloni
tfTJTo: Mining Lands Section, Room 6462, Whitney Block. (Tel: 6-1380)
![Page 14: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/14.jpg)
•w.—
'* .-'
" "*
•- i
? S \.Si ^
4, \ \
C S \
* \ S
a \ s-J. S \ o \ S \(CP \ \ a S s Js
OJ
P \ \ 8^ \ \
u T ^ 5 \ S
G* G \ \ ^ S \"^ ^ JI -u \ \l s S -IM
HH
t. \ \
It)
![Page 15: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/15.jpg)
ft-o o oUJ
\fl\UUL
(Y)
^
H^
UiULl
^r oo
O
lQ oinUJ
:-. tll
![Page 16: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/16.jpg)
si- *o
i-J
O*D
i-J
^010
l-J
"Ol-J
OD^
i•-j
^ ^
i -j
oi-j
S0 l
-Jro
i -j
00C\J
l^J
Sii
-J
8l
-J
^-J
CVj
l-J
00l
-J^h
i^J
T. L.
32 t 00 N
764 969
28 * 00 N
4 f 00 N
B. L.
20 i 0 0 N
900—iodo
76 C
20+00 N —
6 t 00 N —
LOCATION MAP
2 i 0 0 N
8 4 00 N
4 f 00 N
B.L O t 00
4 t 00 SLEGEND
MAG CALCULATION OVER 59,000 GAMMAS
8 i 00 S
T L.12 t 00 S
6 t 00 S —BEAVER DAM
SWAMP
20 i 00 S —
244 00
REGIONAL GEOLOGY
- - , , -GP!rLAIH - QOLDZ^\ ^^ j t i-fc
PROPERTY
T. L.28 t 00 S — 3- 694 13i'
4-686^^5
/.FGF/V0
EARLY PRECAMBRIANFELSIC INTRUSIVE ROCKS
60 Quartz Porphyry .Quarfz- Feldspar Porphyry , Monzonite - Granite.
6c Granodiorite - Monzonite
6d Trondhjemite- Granodiorite
METAVOLCANICS AND METASEDIMENTS
MefasedirnenTary rocks.
Felsic to intermediate Metavolcanic and Pyroclastic rocks
Intermediate to Mafic .Metavolcanic and Pyroclastic rocks.
Geological boundary, inferred
Fault,observed and assumed.
FuTur gold producers
Major gold occurrences-
Diabase dykes
Township boundary,
Road.
Railroad
SCALE
2: 100,000
4 642C12NWC09! 42CI2NW0029 MOLSON LAKE
KILOMETERS
![Page 17: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/17.jpg)
32 4 00 N
24+00 N
20 -f 00 N20 4 00 N
6 t 00 N
LOCATION MAP
12 t 00 N —
8 4 00 N
4 4 00 N
B.L. O t 00
4 t 00 S
VLF Profiles4-20 0Xo In Phase -40 0Xo Out of Phase
8 4 00 S
T L.12 t 00 S
BEAVER DAM
6 4 00 S
20 4 00 S
244 0 0 S
REGIONAL GEOLOGY•a -' r lWSifSJV^^ \ ~~ ~^,•si3.^ tfr-f - ^-\^,^ , T. L.
28 + 00 SGOLIATH :QOLDri ~MINES ^--~~--""U-iiiT( l
GOLDEN
EARLY PRECAMBRIANFELSIC INTRUSIVE R OCKS6a Quartz Porphyry , Quartz- Feldspar Porphyr,
Morzon ite -Gran iteGeological boundary, inferred
Foul', observed and assumed
Futur gold producers
Major gold occurrences
Diabase dykes
Tow nship boundary.
Road.
Railroad
6c Granodiorite - Morzon-te
6d Trondhjemite-GranodioriTe
METAVOLCANICS AND METASEDlMENTS
MeTased', mentor y TOCKSPROPERTY
t A W hiteFelsic to intermediate Metavoicamc and Pyroclastic rocks
.nrermediate to Maf:c. M eta vole a me a nd Pyroclastic rocks
KILOMETEPS4^,21*6*29 MOLSON LAKE
![Page 18: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/18.jpg)
(Ql
-J
O^0
l-J -J10
-Jl
-J
^o
-J
(Q
-Ji
-J
00c^l
-Jl
-J
R (Q
i -J
00 l
-Jl
-J
T.L.
32 f 00 N
20 t 00 N —20 4 00 N
LOCATION MAP
PROPERTY
B. L. O 4 00
LEGEND
BACKGROUND (Regional Value in FRASER UNIT) 0-10
T L 12 t 00 S
REGIONAL GEOLOGY
T.L.28 t 00 S —
LEGEND
EARLY PRECAMBRIAN
FELSIC INTRUSIVE ROCKS6a Quartz Porphyry , Quartz- Feldspar Porphyry,
Monzonite - Granite.
6c Granodiorite - Monzonite.
6d Trondhjemite- Granodiorite
METAVOLCANICS AND METASEDlMENTS
Metasedimentor y rocks.
Metavolcanic andFelsic to Intermediate Pyroclastic rocks
Intermediate to Mafic Pyroclastic rocks
Geological boundary, inferred
Fault,observed and assumed.
Futur gold producers
Major gold occurrences
Diabase dykes
Township boundary.
Road.
Railroad)
Metavolcanic and
100,000
4
42C12NW0091 t2C12NW0029 MOLSON LAKE
![Page 19: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/19.jpg)
*l
\l•^lJ
00 l
-J
PROPERTY
BROTHERS TWP
ONTARIO
MAGNETOMETER SURVEYnsT : UN l MAG
SCALE
INDEX MAP 200 100 O 2OO 40O
EXECUTED BY C Z? 7 S UTVCyS IHC.
COMPILED a DRAWN B r 5. Rheaume. c -
APPROVED BY
VAL DOR QUEBEC , SEPTEMBER 198?-
Uj
O t 00 B.L
00 S
4/32 { 8 * 00 S
2 t 00 S
6 t 00 S
G8G '20+00 S
00 S
2 - 6 -3413 9
28 t 00 S
![Page 20: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/20.jpg)
12
\i*^.
l-J
00l
-Jl
-J
U L/ 1 Vi ID lo 0,0 -r/./ /r .o O t\ (s i f 11-. I\
-J0
PROPERTY
INDEX MAP
R A DO REEF
BROTHERS TWP
ONTARIO
VLF SURVEY "PROFILES"nsf E.M.-I6 Statiorv CUTLER (NAA)
SCALE
Freq : 17.8 KHz
2OO 100 O 200 400
EXECUTED B Y C D l surveys inc.
COMPILED a DRAWN
APPROVED BY
5. Rheaume,
^-.-'*- '
VAL DOR QUEBEC , SEPTEMBER 1 983
Uj
O i 00 B.L
J 4 f 00 S
24 4 00 S
28 t 00 S
![Page 21: RPT ON EM & MAG SUR€¦ · 6.0 SURVEY PROCEDURE AND INSTRUMENTATION The Electromagnetic Survey was carried out using an EM-16 unit manufactured by Geonics. The "Fraser Method" was](https://reader033.vdocuments.us/reader033/viewer/2022061001/60b05fd2e2499266c957228b/html5/thumbnails/21.jpg)
-Jt
-J
O O/i/TO l 11~ O T ///-/TO
-1/1/7Vif t.
PROPERTY
INDEX MAP
R A DO REEFBROTHERS TWP
ONTARIO
VLF SURVEY "FRASER METHOD"Inst' E.M-- 16 Station' CUTLER (NAA)
SCALE
Freq; 17.8 KHz
200 ~ 100 O ZOO 4OO
EXECUTED BY; C D l surveys inc.COMPILED a DRAWN BY: S . Rheaume.
APPROVED BY
VAL DOR QUEBEC , SEPTEMBER 1983
O * 00 B.L
4 f 00 S
8 * 00 S
2 t 00 S
6 t 00 S
20+00 S
24 4 00 S
28 i- 00 S
rf AC//3*J