royce total suspended solids systems · 2016. 2. 4. · royce total suspended solids systems...
TRANSCRIPT
-
Royce Total SuspendedSolids Systems
EASTERN ENERGY SERVICES PTE LTD.60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 SingaporeTelephone: +65-6748 6911 Fax: +65-6748 6912Email: [email protected] Website: www.eesgroup.com
-
Portable and Continuous TSS Systems
Two complete analyzers in one package (TSS & Interface Level)
MODEL 711 PORTABLE MLSS/ILA SYSTEM
MODEL 7110/7120 SINGLE/DUAL CHANNEL ANALYZER
MODEL 7011A SINGLE CHANNEL ANALYZER
2
FEATURES
FEATURES
Series Continuous System
EASTERN ENERGY SERVICES PTE LTD.60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 SingaporeTelephone: +65-6748 6911 Fax: +65-6748 6912 Email: [email protected] Website: www.eesgroup.com
-
digital
Instrument Ambient Conditions:
Input Power:
Outputs:
Readout Device:
Calibration:
Enclosure:
Weight:
Range:
Standard Outputs:
Standard Setpoints:Two programmable setpoint relays
Readout Device:
Input Power:
Enclosure:
Instrument Ambient Conditions:
Analyzer Options:
Weight:
3
SPECIFICATIONS
SPECIFICATIONS
EASTERN ENERGY SERVICES PTE LTD.60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 SingaporeTelephone: +65-6748 6911 Fax: +65-6748 6912Email: [email protected] Website: www.eesgroup.com
-
18.5REQUIRED FORMAINTENANCE
DOOR SWING OUT
13.5REQUIRED FORMAINTENANCE
U–BOLT FOR2” HAND RAIL(2 SUPPLIED)
14.0
12.0
TECHNOLOGIES
MENU ENTER
WATER PROCESS ANALYZER
WATER PROCESS ANALYZER
1/4–20 UNCINSERT, 4 PLCS0.31 CLEARANCE DRILL
(4) 1/4–20 X 0.500 LONG PAN HEAD SCREWS SUPPLIED WITH MOUNTING KIT
BACK VIEW
FRONT VIEW
9.37
8.30
10.50TECHNOLOGIES
MENU ENTER
10–24X1.00 LG S.S.PAN HEAD SCREW
SIDE VIEW
18.5
13.00
NOTES:1. CONSTRUCTION POLYCARBONATE NEMA 4X ENCLOSURE2. APPROXIMATE WEIGHT: 6 LBS.
WATER PROCESS ANALYZER
10.50
4
14.0
12.0
TECHNOLOGIES MODEL 7011A
SUSPENDED SOLIDS ANALYZER
18.5REQUIRED FORMAINTENANCE
DOOR SWING OUT
13.5REQUIRED
FORMAINTENANCE
U–BOLT FOR2” HAND RAIL(2 SUPPLIED)
TECHNOLOGIES MODEL 7011A
SUSPENDED SOLIDS ANALYZER
FRONT VIEW
8.45
7.3210–24X1.00 LG S.S.PAN HEAD SCREW
MODEL 7011A ANALYZER DIMENSIONS, RAIL KIT OUTLINE AND MOUNTING
SERIES 7110/7120 ANALYZERS
EASTERN ENERGY SERVICES PTE LTD.60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 SingaporeTelephone: +65-6748 6911 Fax: +65-6748 6912 Email: [email protected] Website: www.eesgroup.com
-
Type:
Range:
Resolution:
Accuracy:
Repeatability:
Operating Limits:
Size:
Weight:
Construction:
ambient
FLOW DIRECTION
1-1/2” PVC PIPE(CUSTOMER SUPPLIED)
PROBE PIPE MOUNTING BRACKET KIT
ROYCE COMPRESSOR OR VALVE FOR HOUSE
AIR/WATER
1/4” AIR TUBING @ 60 PSI
(TO COMPRESSOR ASSEMBLY OR SOLENOID VALVE)
CLEANING JET
1 1/2” PVC PIPE(CUSTOMER SUPPLIED)1/4” AIR TUBING
@60 PSI
1/4” COMPRESSIONFITTING
(ROYCE SUPPLIED)
CABLE TO ANALYZEROR JUNCTION BOX
FLOWDIRECTION
4.75
3.87
Range:
Construction:
Limits:
Optical:
5
SPECIFICATIONS SENSOR MOUNTING
SPECIFICATIONS
EASTERN ENERGY SERVICES PTE LTD.60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 SingaporeTelephone: +65-6748 6911 Fax: +65-6748 6912 Email: [email protected] Website: www.eesgroup.com
-
Type:
compensation
Range:
Accuracy:
Repeatability:
Operating Limits:
Size:
Weight:
Construction:
available
vided
1 1/2” PVC PIPE(CUSTOMER SUPPLIED)
ROYCE COMPRESSOROR VALVE FOR
HOUSE AIR/WATER
SENSORCABLE
1/4” OLD TUBINGFOR JET CLEAN
3”–150# ANSI FLANGE(SCH. 80 PVC)
+
7.6+.5–
+ +
+
+
2.90
6.00
7.50
7.50
6
MODEL 72P SENSOR MOUNTING
MODEL 73B SUBMERSIBLE MLSS SENSOR
SPECIFICATIONS
EASTERN ENERGY SERVICES PTE LTD.60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 SingaporeTelephone: +65-6748 6911 Fax: +65-6748 6912 Email: [email protected] Website: www.eesgroup.com
-
Mid-Range:
Range:
Construction:
available
provided
1/4” TO 1/3”DRAIN HOLE
4.9 (73B)4.7 (75A)
1.85
2.10
2.00
1 1/2” (NPT) THREADS OR MALE ADAPTER
PVC COUPLING
1 1/2” FNPT
1/4” COMPRESSION FITTINFOR JET CLEAN TUBING(ROYCE SUPPLIED)
FLOWDIRECTION
RUBBER SEAL
SEAL ASSEMBLYROYCE SUPPLIED
FLO
W
INSERTION STOP
NUT
SAFETY CABLETOP VIEW
7
MODELS 73P SENSOR MOUNTING
EASTERN ENERGY SERVICES PTE LTD.60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 SingaporeTelephone: +65-6748 6911 Fax: +65-6748 6912 Email: [email protected] Website: www.eesgroup.com
-
Type:
74A Range:
76A Range:
Accuracy:74A:76A:
Repeatability:74A:76A:
Operating Limits:
Size:
Weight:
Construction:
available
provided
or
FLO
W
FLO
W
2” NPT. X 3” LONG3/8” S.S. NIPPLE
MAXIMUM DISTANCE TOMIDDLE OF PIPE
TO INSURE IMMERSIONOF SENSOR = 5.78
14.5
CONNECT 3/8” TUBINGFOR CLEANING FLUID
3/8” COMPRESSION (ROYCE SUPPLIED)
CHECK VALVE(ROYCE SUPPLIED)
BALL VALVE HANDLEIN OPEN POSITION
(CLOSED = 9.0” SWING)
8.0
ADDITIONAL CLEARANCE SPACEREQUIRED FOR SENSORINSTALLATION AND REMOVAL
LENGTH OF PROTRUDING PORTION WITH SENSOR INSTALLED17.63
12.6LENGTH OF PROTRUDING PORTION
WITH SENSOR REMOVED
1.4
SENSORHEAD
8
MODELS 74A & 76A OUTLINE AND MOUNTING
SPECIFICATIONS
EASTERN ENERGY SERVICES PTE LTD.60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 SingaporeTelephone: +65-6748 6911 Fax: +65-6748 6912 Email: [email protected] Website: www.eesgroup.com
-
Construction:
Options:
Weight:
8.5
4.9
8.5 4.9
U–BOLT FOR2” HAND RAIL(2 SUPPLIED)
MOUNTING ON EITHER HORIZONTAL OR VERTICAL RAIL
TECHNOLOGIES
9
RAIL KIT OUTLINE AND MOUNTING
EASTERN ENERGY SERVICES PTE LTD.60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 SingaporeTelephone: +65-6748 6911 Fax: +65-6748 6912Email: [email protected] Website: www.eesgroup.com
-
Channels:
Compatibility:
Compressor Ambient Conditions:
Input Power:
Outputs:
Enclosure Protection:
Enclosure:
Enclosure Dimensions:
Weight:
are programmed by surfaces are soiled by organic or
JC compressoris drastically
used on any combination suspended solids
MODEL JC-1 COMPRESSOR – SINGLE CHANNEL MODEL JC-4 COMPRESSOR – FOUR CHANNEL
COMPRESSOR OUTPUT 1/4” TUBING
BULKHEADFITTING
BOTH POSITIONS SHOWN, ONLY ONE U-BOLT REQUIRED ON VERTICAL RAIL
U-BOLT FOR2” DIA HANDRAILMINIMUM OF 3 PLACES(3 SUPPLIED)
1/2” NPT CLEARANCEHOLE WITH PLUG,2 PLACES
MOUNT PANEL WITH 2 U-BOLTS ON HORIZONTAL RAIL,
1 U-BOLT ON VERTICAL RAIL
TECHNOLOGIES
10
SPECIFICATIONS
EASTERN ENERGY SERVICES PTE LTD.60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 SingaporeTelephone: +65-6748 6911 Fax: +65-6748 6912 Email: [email protected] Website: www.eesgroup.com
-
rigors in waste
and interface level in two separate nonvolatile memory locations
Two analyzers in one package:
Range:
Readout Device:
Input Power:
Enclosure:
Size:
Weight:
Type:
Accuracy:
Repeatability:
Range:
Operating Limits:
Size:
Weight:
Construction:
cable
11
SPECIFICATIONS
SUPPLIED STANDARD WITH MODEL 711 SYSTEMSPECIFIC FEATURES
EASTERN ENERGY SERVICES PTE LTD.60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 SingaporeTelephone: +65-6748 6911 Fax: +65-6748 6912 Email: [email protected] Website: www.eesgroup.com
-
MEASUREMENT TECHNOLOGIES BY ROYCE
Dissolved Oxygen Monitoring and Control
Total Suspended Solids Monitoring and Control
Interface Level analyzers
control instrumentation and sensors specifically designed for
EASTERN ENERGY SERVICES PTE LTD.60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 SingaporeTelephone: +65-6748 6911 Fax: +65-6748 6912Email: [email protected] Website: www.eesgroup.com