royal league energy limited profile
DESCRIPTION
ÂTRANSCRIPT
Royal League Energy Limited
ENERGYTODAY
A Member of GroupAGI N T E R N AT I O N A L
SETTINGSTANDARDS
Royal League Energy has a well rounded team of engineers involved in oil, gas and power EPCM projects
ENERGY TODAY
1
ENERGY TODAY
2
Royal League Energy has a well rounded team of engineers involved in oil, gas and power EPCM projects. Our engineering group posses' extensive capabili�es in the design of both onshore and offshore oil, gas and power facili�es. Most of our personnel have extensive experience working alongside top EPCM contractors interna�onally and all are skilled in the use of engineering design so�ware tools.
By incorpora�ng interna�onal best prac�ces in Quality assurance and quality control, Health Safety and Environment management systems in our work processes, we are able to exceed client specifica�on and execute project on �me and within budget.
Royal League Energy has a well rounded team of engineers involved in oil, gas and power EPCM projects. Our engineering group posses' extensive capabili�es in the design of both onshore and offshore oil, gas and power facili�es. Most of our personnel have extensive experience working alongside top EPCM contractors interna�onally and all are skilled in the use of engineering design so�ware tools.
Royal League Energy is in strategic technical collabora�on with the following interna�onal EPCM contractors of repute:
1. Shanghai RICHTECH ENGINEERING CO.LTD based in shanghai- China and Houston Texas2. Muhibbah Engineering Company Limited based in Malaysia with proven records on execu�ng projects for operators in SUDAN.
These strategic partnerships with these companies of repute places us in a premier posi�on among EPCM contractors in South Sudan and East African Sub-regional market.
CAPABILITIES
The broad resource base of Royal League Energy allows us to offer clients a complete range of services for every stage of a project's lifecycle.
ENERGY TODAY
3
ENERGY TODAY
4CAPABILITIES PROFILE
Front End Services:
This services covers field development, conceptual and feasibility studies, project management, FEED and Basic Engineering.
Project Execu�on :
Scope covers EPCI and EPCM project execu�on, Detailed design, Procurement and Procurement supports services, Construc�on and Construc�on Management.
Life Cycle of Engineering:
Scope covers Debo�lenecking, Brownfield Engineering, Opera�on and maintenance, maintenance supports.
Whatever the size and complexity of the project, our services are customized to meet your specific projects needs.
Market Focus
· Industrial facilities· Maritime and Ports- jetties, terminals
· Oil and Gas· Power
ENERGY TODAY
5
ENGINEERING CAPABILITIES
Royal League Energy Limited and her partners u�lizes the extensive collabora�ve experience in forming taskforces for the execu�on of small, medium and large scale engineering projects from conceptual, FEED, detailed up to follow-up engineering. We offer a full range of engineering disciplines, allowing us to provide quality results that are representa�ve of our project driven philosophy. We have the exper�se to undertake the execu�on of both offshore and onshore project from start to finish – from conceptual studies to startup and commissioning – and beyond.
Our engineers are among the industry's most experienced, with our low a�ri�on, provide a work team that is consistent from one project to the next. Our capabili�es include:
Offshore pla�orms
Onshore and offshore pipelines
FPSOs, FSO
Marine terminals and je�es
Pumping and Compression Sta�ons
LPG / LNG and other oil and gas processing plants
White Products and Gas storage and loading facili�es
Refineries and petrochemical plants
Power genera�on and transmission facili�es
U�li�es / Offsite, and other Civil/Mechanical Construc�on Works
ENERGY TODAY
6
Royal League Energy Limited and her alliance partners u�lize strong contacts locally as well the global resources available through our interna�onal partners and strong contracts with world class equipment manufacturers. Royal League procurement personnel in South Sudan/Kenya work in harmony with our partner's global procurement center based in the China/ USA and Asian region. We are able to provide materials on a compe��ve basis and on demand. We also provide procurement services on the basis of long term service agreements. We understand what it takes to support interna�onal loca�ons and also have been effec�ve with working with clients in gaining “control” of inventory.
Royal League Energy Limited also offers fit-for-purpose engineering ensuring that the deliverables are tailored specifically to meet the unique requirement of our client. This type of engineering is relevant for marginal oil field and clients with specific requirement of requiring low cost measures as well as mee�ng interna�onal standards.
FIT FOR PURPOSE ENGINEERING
Our staff provides innova�ve and cost-effec�ve engineering, procurement, construc�on, opera�ons and maintenance services. Maximizing the u�liza�on of technical resources is a prime goal in all disciplines.
ENGINERING/CONSTRUCTION RESOURCES
PROCUREMENT SERVICES
Royal Link energy Limited and her partners provide both onshore and offshore construc�on capabili�es. Extensive experience exists to execute EPCI and EPCM on turnkey basis on construc�on projects.
Our construc�on capabili�es include:∙ Construc�on services of crude oil upstream wellhead �e-in facili�es covering chemical injec�on facili�es, Produced water treatment facili�es.∙ Upgrading of exis�ng field development facili�es∙ Petroleum Product Tank farms and LPG storage facili�es ∙ Offshore and onshore pipelines construc�on∙ Well head pla�orms and offshore and onshore crude oil processing facili�es∙ Power plants systems upgrade and packages.
CONSTRUCTION SERVICES
ENGINEERING CAPABILITIES cont.
PAST PROJECT REFERENCES OF ROYAL LEAGUE ENERGY AND PARTNERS
ENERGY TODAY
7
MUGLAD BASIN OIL DEVELOPMENT – FIELD SURFACE FACILITIES (FSF) PHASE 3A PROJECT, SUDAN
Client - Greater Nile Petroleum Operating Co. Ltd, GNPOC Scope of Works - Procurement, Construction and Commissioning of Crude Oil Upstream Wellhead Tie-in of over 50 oil wells including underground flowlines, above ground piping and electrical facilities, 33kV power distribution, Chemical Injection and separators Contract Duration - May 2003 – Dec 2006
MALA FIELD DEVELOPMENT PROJECT – FIELD SURFACE FACILITIES, SUDAN
Client - White Nile (5B) Petroleum Operating Company (WNPOC) Scope of Works - EPCC of Crude Oil Upstream Wellhead Tie-in including Degassing and Gas Flaring Facilities, Crude Oil Pump station, Product Metering, Chemical Injection, 33kV Power, Transmission and Distribution, plant Distributed Control and Emergency Shutdown System Contract Duration - Oct 2005 – Apr 2007
LIQUID BULK TERMINAL PROJECT, WEST PORT, MALAYSIA
Client - Stolthaven (Westport) Sdn Bhd Scope of Works - Complete procurement and construction scope covering civil, buildings, 35 liquid tanks, piping systems, loading systems, weigh bridge, fire fighting, electrical, pumps installation, nitrogen blanketing and instrumentation works Contract Duration - Apr 1997 – Nov 1997
MG3 LUBE PLANT PROJECT, MALAYSIA
Client - Petronas Penapisan Melaka Sdn Bhd (Larsen & Toubro Ltd) Scope of Works - Procurement and Construction of 11 nos carbon steel storage tanks for Units 72 and 49 Contract Duration - Dec 06 – Nov 07
EPCC OF THE CENTRAL OIL DISTRIBUTION (CODT) TERMINAL AT TG MANIS MUKAH, SARAWAK
Client - Assar Chemical Dua Sdn Bhd Scope of Works - EPCC of Central Oil Distribution Storage Tanks Contract Duration - March 2009 - Dec 2011
FIELD IMPROVEMENT PROJECTS FOR BLOCK 5B OIL FIELDS, SUDAN (3 YEAR CONTRACT)
Client - White Nile Petroleum Operating Company Ltd Scope of Works - EPCC of improvement and upgrading works for existing oil field facilities. Contract Duration - July 2007 – July 2010
YEMEN LNG PROJECT (JV Project)
Client - Yemen LNG Company Limited Scope of Works - Includes LNG Loading Jetties, Water Intake / Outfall GRP Pipes Pumping Station and Outfall Basin, Electrical Substation and Navigation Aids Contract Duration - Sept 2006 to June 2009
PROPOSED HORIZON BULK LIQUID PRODUCTS TERMINAL ON JURONG ISLAND, SINGAPORE
Client - Jurong PrimeWide Pte Ltd Scope of Works - 4 nos. of Jetty at Horizon Terminal with capacity from 50,000 DWT min to 275,000 DWT max Contract Duration - June 2005 – Sept 2006
MUGLAD BASIN OIL DEVELOPMENT – GREATER DIFFRA EXPORT PIPELINE PROJECT, SUDAN
Client - Greater Nile Petroleum Operating Co. Ltd, GNPOC Scope of Works - EPCC of 125km 24” Oil Export Pipeline, civil, mechanical, electrical, instrumentation and telecommunication works Contract Duration - June 2003 – May 2004
THAR JATH DEVELOPMENT – FIELD SURFACE FACILIITES (FSF) PROJECT, SUDAN
Client - White Nile (5B) Petroleum Operating Co. Ltd (WNPOC) Scope of Works - EPCC of Crude Oil Upstream Wellhead Tie-In of 28 oil wells and 6 Oil Gathering Manifolds including 33kV Power Transmission and Distribution, Chemical Injection and Flow Monitoring Systems Contract Duration - Mar 2005 – Mar 2006
Experiences 1. EPCI Project Management
2. Shallow Water Oil Field Development
3. Marginal Field Development
4. Deepwater Oil Field Development
5. Brownfield Engineering
6. Engineering Data Information System
PL19-3 RUP modification
HOT TAP
Fitting
CFD11-6 WHPD modification
12”45km
Pipeline
12”17km
pipeline
BZ36-3
BZ36-2
BZ34-7
BZ34-6
BZ34-5
BZ34-2/4 BZ34-1
BZ27-5
BZ27-4
BZ22-1
BZ29-
3
CFD12-1
CFD12-1S CFD18-1 CFD18-2
BZ25-1/S
CFD11-1
CFD11-2
CFD16-1
CHENGBI Field
CFD14-1
CFD2-1
CFD1-6
CFD13-1
QK17-2
QK17-1
QK17-
3 QK17-9
QK18-9 QK18-2
赵东油田
BOXI Terminal
15.1km
CFD11-6 CFD11-3/5
7.8
km
BZ35-2
BZ29-
4
BZ34-3
LONGKO
U Terminal
BOXI Field
BONAN Field
CFD11-6 Field
6.3
km
CFD18-1
18km
48km
76km
BZ26-3
34km
水下三通 水下三通
58km
54km
BZ13-1
BZ28-1 SPM
QK18-1
BZ26-2
PL19-3 Field
CNOOC – KMG - COPC, EPCI PM
PL19-3 and CFD11-6 Natural Gas Utilization
EPCI Project Management
Feasibility Study
Basic Engineering, Detailed Design
Procurement Services
Construction/Installation management
A green environment project utilization the flared
associated gas (1.1x 106Sm3/d associated gas)
A first subsea production hot tap fitting 14”/12” in China
A first pipeline net in China (the management system)
CNOOC, EPCI PM
Longkou Gas Terminal Expansion EPCI Project Management
Feasibility Study
Basic Engineering, Detailed Design
Procurement Services
Commission and startup service
Construction/Installation management
Adding a set of 70x104 Sm3/d LPG recovery unit
• Molecule sieve dehydration
• Mercury Removal
• Expander- compressor refrigeration
• DHX
Utility system modification
• Three 600 m3/h cooling water towers
• 4000kw hot oil system
• 220 x104 Sm3/d gas compressor
• A new UA/IA compressor
• A new 400m3 light hydrocarbon tank
EPC Project Management
Detail Engineering
Procurement services
Construction Management
Hull - Extension operation for further 15 years
Production System - Modification and Recovery
for new field
Living Quarter Upgrade
China Shipping Industry, EPC PM
CNOOC Changqing FPSO Conversion
Construction yard in COSCO Nantong,
China
Conversion from cable lay to pipe lay
vessel
With dynamic position system
Max. working water depth up to 2,000 m
Pipeline diameter range : 6”~42”
Tension capacity : 400 t
Helix, EPC PM
CAESAR Pipelay Vessel Conversion
Before
After
EPC Project Management
Feasibility Study
Detailed Design
Procurement Services
Construction Management
OXY Yemen, EPC PM
An Nagyah Block S-1 CPF
Location: Yemen
Duration: 06/2004-03/2008
EPCI Project Management
FEED, Detailed Design
Procurement Services
Construction/Installation management
Capacity:20,000 BOPD, 15 MMSCFD
Storage:20,000 barrel
Two 4” and 6” flow lines
One 35 km x10” long export pipeline
TGE, EPCI PM
Shanghai LNG Peak-Shaving Station
EPCI Project Management
Detailed engineering
Procurement service
Technical Support for construction and
commission
Construction Management
Two LNG tanks with capacity of 5×104 m3
and associated facilities
Experiences 1. EPCI Project Management
2. Shallow Water Oil Field Development
3. Marginal Field Development
4. Deepwater Oil Field Development
5. Brownfield Engineering
6. Engineering Data Information System
CNOOC, FEED
LuDa Oil Field
LD10-1CEP LD10-1 WHPA
Location: Bohai Bay,China
Duration: 03/2003-12/2003
CNOOC, FEED
BJT Gas Field
Location: East Sea China
Duration: 03/2004-09/2004
7km, 8”
Gas
Pipeline
CNOOC, FEED
PY34-1 Gas Field
Wave dynamic effect
analysis with the dynamic
amplification factors (DAFs)
Fatigue – For joints in the
lowest elevation of
deepwater jacket
Transportation analysis &
Launch analysis
Location: South China Sea
Duration: 05/2011-11/2011
CNOOC, FEED
LH19-5 Gas Field – Subsea System
Location: South China Sea
Duration: 08/2011-02/2012
Various Fixed Structures
Experiences 1. EPCI Project Management
2. Shallow Water Oil Field Development
3. Marginal Field Development
4. Deepwater Oil Field Development
5. Brownfield Engineering
6. Engineering Data Information System
SPC, Concept Selection
Marginal Gas Field Development
Location – East China Sea,70-90m
Reservoir – 5~15 x 10 8 Sm3 Gas
Reserve
Number of Well – 1 to 2
Host – Nearby Platform 3, 5, 7km
Distance
Concept selection based on 20 margin
field development cases study
CNOOC, Research
Unmanned Platform Application Class 1A Class 1B Class 1C Class 1D Class 1E
Caisson Monopod Bipod Three-Leg Four-Leg
N/A
Free
standing
Spread
Base
Conventio
nal
Conventio
nal
Guyed Pile Leg Pile Leg Skirt Pile Skirt Pile
Class 2A Class 2B Class 2C Class 2D Class 2E
Caisson Monopod Bipod Three-Leg Four-Leg
Braced Braced Braced Extended
Base
Extended
Base
N/A
Jacketed Gravity
Based
Suction
Pile
Suction
Pile
CNOOC, Feasibility Study
Mini-FPSO for Margin Oilfield Development
The technical and economic feasibility study
Compared schemes for marginal fields development - New built vs.
Conversion
Develop the PFD, topside arrangement, mooring system and connection
method with unmanned platform
Sinopec, Overall Development Plan
Australia EP Field Offshore
Australia East Puffin Filed water depth 70-100m
A marginal oil field,3 well location
Three production development plan
• Production Capacity Relay
• Production Capacity Increase
• Latest Production Capacity
• Develop 7 offshore engineering options
• Option analysis and selection
• Novel structural model, including self installed jacket
platform
Richtech Patented Technology
for Marginal Field Development
Experiences 1. EPCI Project Management
2. Shallow Water Oil Field Development
3. Marginal Field Development
4. Deepwater Oil Field Development
5. Brownfield Engineering
6. Engineering Data Information System
Sinopec, Conceptual Study
Qiongdongnan Deepwater Gas Field
Location: South China Sea
Duration: 11/2010-09/2011
批 准
UPPER DECK 审核
版次
比 例
工号
设计证书号
校对
单立柱平台上层甲板布置图
修改明
日期签署 签字
版次 日期
项目名称
说版
业主
改
修
图号
批 准
审 核
审 定
校 对
设 计
绘 图
( 0) 2011. 06. 29
2011. 06. 29琼东南深水浮式生产平台优选
中石化上海海洋油气分公司
2011. 06. 29
2011. 06. 29
2011. 06. 29
PSVM – Flying Leads
Installation Analysis
Description:
BP Angola Block 31 NE – PSVM, west Africa
Connecting manifolds and FTA/ITA
Water depth 2000m
Work scope of installation analysis:
Determine buoyancy requirements of HFL Termination Head weights
Carry out static & dynamic installation analysis to determine the allowable sea-states
To calculate the lay catenary details
PSVM - Flexible Risers Jumper
Installation Analysis
Description:
BP Angola Block 31– PSVM, west Africa
Connecting SLHR and FPSO turret via flexible jumpers
Water depth ranging from 1800m to 2100m
Work scope:
Six flexible riser jumpers installation analysis
• 2 no. off 11” Service dynamic jumpers • 1 no. off 11” WI dynamic jumper • 1 no. off 9” Service dynamic jumper • 1 no. off 9” Production dynamic jumper • 1 no. off 8.75” GI dynamic jumper
Bid Support - Gorgon/ Jansz Umbilicals
Installation Analysis Description
Chevron - Gorgon and Jansz fields, Australia’s Northwest Cape
Umbilicals tied back to an LNG processing facility on Barrow Island
Water depth: 20m ~ 1350m
Work scope
Gorgon main umbilical
Gorgon Infield umbilical
Jansz Main umbilical near shore
Jansz Main umbilical offshore
Jansz Infield umbilical
Umbilical APS calculation
East Irish Sea Cable Replacement
Description:
Centrica Energy - Block 110/8a, East Irish Sea
Replacing the redundant cable between two existing platform
New cable is 3.8km, in WD 22~26m
Work scope
Existing Redundant Cable Recovery
New Replacement Cable Installation
J-tube pull in analysis
Droshky Subsea Manifolds
Work scope:
• Piping Layout
• Insulation and
Thermal expansion
analysis
• Structure Design and
FEA model for whole
structure
• FAT procedure
Description:
• In 884m WD in GOM
• 2 manifolds, 5 well
connectors,
pigging spool
Connection
of Tree Connection
of Tree
Connected by
Pigging Spool
Experiences 1. EPCI Project Management
2. Shallow Water Oil Field Development
3. Marginal Field Development
4. Deepwater Oil Field Development
5. Brownfield Engineering
6. Engineering Data Information System
CACT-OG, Huizhou Oil Field Brown field engineering
CNOOC, Overall Development Plan
BONAN Oil Field Adjustment
Gas Hub / Export Hub
Oil Hub / Power Center
Gas Hub
Oil Hub
Power Center
IW Hub
Oil Hub
Gas Hub
Power Center
Gas Hub
IW Hub
Oil Hub
Power Center
Gas Hub
CNOOC, Detailed Engineering
Replacement of PY 4-2/5-1 Subsea PLETS • In 100m WD in South China Sea
• Removing old spools, connecting old pipeline, new pipeline and old PLEM
• Free connector for future tie-in
Before
After
Experiences 1. EPCI Project Management
2. Shallow Water Oil Field Development
3. Marginal Field Development
4. Deepwater Oil Field Development
5. Brownfield Engineering
6. Engineering Data Information System
Control
Center
•Information
•Visualization
•Knowledge
•Action
Data
Data
EDIS -
Engineering Data Information System Why EDIS:
• Flexible project execution
• 60-80% reduction in man-
hours searching for
information
• Single point access to 98%
of engineering data
• Reduction in handover costs
• Enhances plant maintenance
productivity
• Reduced project risk
• Improved data quality
EDIS Interface
Smart P&ID
3D model Linked
Explorer
Component
3D Laser Scanning
Cloud Point
Existing Facility EDIS Projects
PDMS Model
EDIS Project Summary
Name Type Year
BZ28-2S CEP EDIS Project New Facility 2009 Finished
BZ28-2SN WHP EDIS Project New Facility 2009 Finished
BZ34-1N WHPB EDIS Project New Facility 2009 Finished
BZ29-4 WHP EDIS Project New Facility 2009 Finished
WZ11-1 WHPA EDIS Project New Facility 2009 Finished
LD27-2 WHP EDIS Project New Facility 2010 Finished
LD32-2 WHP EDIS Project New Facility 2010 Finished
BZ19-4 WHP EDIS Project New Facility 2010 Finished
SZ36-1 WHPJ EDIS Project Existing Facility (+10years) 2010 Finished
LD10-1 CEPA EDIS Project Existing Facility (7years) 2012 Ongoing
LD10-1 WHPA EDIS Project Existing Facility (7years) 2012 Ongoing
LD4-2 WHPB EDIS Project Existing Facility (7years) 2012 Ongoing
LD5-2 DPP EDIS Project Existing Facility (7years) 2012 Ongoing
Project Summary Line Product Qty Phase* Summary
Facility Offshore/ Onshore
Offshore Topside
28 BD/DD Total 50282t, 480t~18000t, 359 well slots
Living Quarters 15 BD/DD Each from 10~110 person, 100t~1200t
Drilling Rig 3 FS/DD Drilling Support Module modification and upgrading
CPF 3 BD/DD CPF with capacity 20,000BOPD,15 MMSCFD gas,25 wells. Seperation facility with 80,000 BOPD oil,20,000 BWPD,
520 MMSCFD gas,20 wells manifold
Gas Plant 3 FS
BD/DD
Capacity increase from 420 to 520MMSCFD
New LPG plant 80 X104 Sm3/d
LNG Terminal 4 BD/DD Each Capacity 6 million ton per year, each tank capacity
up to 160k m3
Jacket Jacket 27 BD/DD Total 100,357t, each from 352t to 29000 t, WD from 20
to 205m Jackup Jackup 2 FS/DD 400FT, JU2000
SURF Subsea 8 FS/BD/DD PLET/PLEM, tie-back system
Pipeline 10 FS/BD/DD OD 8"~16", Length 7~37km, WD 90~200m
Floater TLP 2 CS/FS Water depth: 350-160m
FPSO 2 CS/DD Water depth: 20-300m
CONTACTS
South Sudan Office
Royal League Energy Limited,Salaam Building,2nd Floor, Suite 201.
Postal Address ; 154 Juba,Republic of South Sudan.
Royal League Energy Limited