Teknologidag – 5 Juni 2014
New regulations for offshore rigs
Jan Forsell – Roxel Solutions AS
![Page 2: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/2.jpg)
My background:
Siemens O&G:- Responsible for F-systems, offshore- Eng manager, Eldfisk SAS upgrade- Eng manager, Statfjord Safety Systems
F&G, ESD, HIPPS, IOPS, OPPS- Project manager, Safety systems
Roxel Solutions AS:- General manager
Jan Forsell – Roxel Solutions AS
![Page 3: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/3.jpg)
Agenda:
• A minute about Roxel
• Short introduction to norms, standards and NPD rules
• SIL in Control System Projects – How to approach?– Rules and regulations– Project execution and verification– Programming tools– Equipment
![Page 4: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/4.jpg)
Roxel Group
• Revenue: 240 MNOK • Resources: 140• 13.400 m2
![Page 5: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/5.jpg)
Supplier of onshore and offshore solutions
LANDBASERT
![Page 6: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/6.jpg)
Drilling equipment packages
Independent system integration of 3’rd party suppliers
Product line:
• Drilling and utility systems• Cabins and LER• Instrumentation• EX equipment• Drives
![Page 7: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/7.jpg)
Mud & Cement – Integrated Solutions
MUD HANDLING SYSTEM
COMPLETE MUD & CEMENT SYSTEM
![Page 8: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/8.jpg)
References PSD EXPRO – Well Testing:
– 6 PSD SIL2 systems delivered– NORSOK – IEC61508/511/OLF070 – DNV– EX zone 1
Halliburton – Well Testing:– 1 PSD system, Under Balanced Drilling– 2 PSD systems, Well Testing
![Page 9: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/9.jpg)
New PSD system presentation Challenges:
High risk potentialHarsh environment Critical processPortable equipment
SAFETY SYSTEMS - Offshore
![Page 10: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/10.jpg)
Safety Systems - OffshoreSafetyIntegrityLevel
SIL4: Not used offshore (Nuclear power plants, train signalling systems)SIL3: Emergency/Critical systems (ESD/HIPPS)SIL2: Process and protection systems (PSD/F&G)SIL1: Lowest level, not used offshore
![Page 11: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/11.jpg)
Safety Instrumented Systems (SIS)
SafetyIntegrityLevel
SIL4: Not used offshore (Nuclear power plants, train signalling systems)SIL3: Emergency/Critical systems (ESD/HIPPS)SIL2: Process and protection systems (PSD/F&G)SIL1: Lowest level, not used offshore
![Page 12: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/12.jpg)
Safety Integrity Levels:
Focus on the complete system (Equipment Under Control)Mandatory risk evaluations – must be documented (SRS)Supplier must document that SIL is obtained
Focus on the complete lifecycle:
Design-Specification-Engineering-Testing-Operation-Demolition
![Page 13: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/13.jpg)
Standards for implementation offshore:
Ptil, Styringsforskrift §5 barriersPtil, Innretningsforskriften §8 safety functions
IEC61508 – Functional safety of control systems, framework, definition of SILIEC61511 – Engineering of safety systems for Process systemsOLF070 – NPD Guideline for minimum SIL levels on the NCS: - Define SIL levels, guidance on how to implement NPD demands
API RP 14C – Risk analysis, failure-mode-effects analysis (FMEA) and hazard-and-operability studies (HAZOPS), define risk levels and barriers, safe charts.
OLF070 specifies API RP 14C / ISO10418 (guideline for analysis, design, installation and testing of process safety systems)
![Page 14: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/14.jpg)
Connections between IEC norms:
![Page 15: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/15.jpg)
Standards for implementation for rigs:
DNV-OS-A101 – Safety Principles and Arrangements
Basic requirments for DNV verification, shutdown logic and alarms.
![Page 16: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/16.jpg)
Standards for implementation rigs:
DNV-OS-D202 – General requirements for safety and control systems: Design, fabrication, installation, testing, commissioning, operation, mainenance, re-qualification, and abandonment.
Availability class (R0) redundancy
Documentation,Ch3.1 Table B2
![Page 17: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/17.jpg)
NORSOKThe D series: Ongoing updates after Macondo incident:
D-002: Well Intervention, BOP SIL demand (also for well intervention)D-007: Well testing, mandatory SIL2 demand after july 2017
NORSOK points to OLF070 for minimum level.
![Page 18: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/18.jpg)
What must be adressed in a SIL project?
BeforeStartDuringAfter
- Government requirements- Customer demands- Internal requirement- Certifying body (DNV/ABS/…)
How to implement:- How to interpret Rules & Regulations- Failure Mode Effect Analysis (FMEA)- Hazard and operability studies (HAZOP)
- Documentation for SIL:Functional Design Specification (FS/FDS)Safety Requirement Specification (SRS)Safe Charts with Cause & EffectSIL loop definition
![Page 19: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/19.jpg)
What must be adressed in a SIL project?
BeforeStartDuringAfter
Interface Meeting:- How to interpret Rules & Regulations- How to document that SIL level is achieved- Responsibility interfaces
Technical (Instrumentation and loops)Formal meetingsContact with certifying body
![Page 20: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/20.jpg)
What must be adressed in a SIL project?
BeforeStartDuringAfter
Personnel qualification:
- Key personnel must be qualified and trained:- Project management- Lead engineers
![Page 21: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/21.jpg)
What must be adressed in a SIL project?
BeforeStartDuringAfter
Ensure that SIL is achieved:
- Project quality control- Documented traceability- Testing and verification- Documented conformity
![Page 22: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/22.jpg)
What must be adressed in a SIL project?
BeforeStartDuringAfter
Project quality control according to ISO9001:
• QA Plan with QA Activity List:- Technical Reviews (FDS/SW/HW/HMI)- Validation according to IAT/FAT procedures
• Safety Assessment and Validation Plan (SA&VP)- Identify and manage all safety aspects - How to verify and test (Nordtest Checklists)- How to implement IEC61508/511/OLF070- Change management (Risk&Impact analysis)
• Node Book:- All required design documents and reports
![Page 23: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/23.jpg)
What must be adressed in a SIL project?
BeforeStartDuringAfter
Installation and Commissioning:
• Procedures for - Storage and transportation- Installation - Commissioning - Testing
• Training:- Operator and Maintenance personnel
![Page 24: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/24.jpg)
What must be adressed in a SIL project?
BeforeStartDuringAfter
After delivery:
• SIL level must be maintained throughout the system lifetime:
- Documentation- Test intervals (instruments and control system)- Modifications and reconfiguration- Repair
![Page 25: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/25.jpg)
Roxel is approved as Solution Integrator by Siemens:
International program:1300 partners world wide7 partners in Norway
Roxel is approved for the following areas:
Process Control System SIMATIC PCS7, specializing on PCS 7 Safety Human Machine Interface SIMATIC HMI Automation System SIMATIC
![Page 26: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/26.jpg)
How the program works:
Support network- Siemens IADT in Oslo- Product experts in Germany
Competence through mandatory training- SIL courses in Germany (3 x 2 weeks)- Work shops- Partner Summits- Information on new products- Demo busses
![Page 27: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/27.jpg)
Siemens Safety Integrated
Why Siemens:
• Most common standard for O&G
• Largest portefolio of IEC61508 equipment
• Reliable and well proven
• Simatic expertise within Roxel
![Page 28: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/28.jpg)
Siemens Safety Integrated Safety according to IEC 61508/61511:
– Programming based on Siemens F-Tools:- Part of Simatic PCS 7 tools- Tested by TÜV
– Equipment based on SIMATIC Safety Integrated Systems (SIS):- S7-315F, single Fail-safe SIL2/3- ET200iSP combine SIL and Ex- F-SM I/O modules «Yellow series»
– Equipment based on SIMATIC PCS7:- S7-400F, single Fail-safe SIL2/3- Safety Matrix- ET200iSP combine SIL and Ex- F-SM I/O modules «Yellow series» Communication:- ProfiSAFE Single communication for Zone 1
Design review by 3rd party (Sintef, DnV, Scanpower…)
![Page 29: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/29.jpg)
Small systems
S7-300F:
• CPU: S7-315F mid-range SIL 3 w/ProfiSAFE DP• Integrated F-SM i/o-cards AI/DI/DO• Redundant power
Benefits:
+ Cheap hardware+ F-SM in one box AI/DI/DO+ Based on F-Library IEC1311 by TÜV+ Good for Small systems with low degree of changes
![Page 30: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/30.jpg)
PCS 7 systems
Technology:– Siemens S7-400 PLC
Software:– Siemens PCS 7– Safety Matrix
Benefits:+ Simplified programming+ More configuring+ Simplified documentation+ Close integration between logic and HMI+ Single or redundant+ Powerful
Drawbacks:÷ More expensive than S7-300, but cheaper in the long run…÷ Larger in size
![Page 31: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/31.jpg)
RIO units – Safe area Protection level IP20 Operating range 0...60°C (-20...60°C) Redundant connection (for H CPUs) I/O Module Redundancy (1 Sensor -> 2 Modules) Modularly expandable Max. 12 I/O modules per station I/O Modules with comprehensive diagnostics
Power supply Interface module for Profibus DPIM153-2
I/O moduleExpandablebackplane
Aluminium rail
![Page 32: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/32.jpg)
RIO units – Ex zone 2 or 1 - ET200iSP ET200iSP
– Specifications:- AC 85 … 264VAC- -20C … +70C - ATEX II 2 G (1)
Ex de [ia/ib] IIC T4
– Profibus DP:- Intrinsic safe communication Ex ib- Plug/unplug under Ex conditions- Single (or redundant) communication- Active EOL compensation
– Power supply- Ex d- Redundant power
![Page 33: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/33.jpg)
RIO units ET200iSP
– Possible housing:- EEx e for Zone 1 and 2- Wall mount- Stainless steel: DIN 1.4404 1.5 mm- Non-Corrosive materials- Expandable up to 32 modules
RS485-iS cables withBuccaneer
![Page 34: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/34.jpg)
Cause & Effect Requirements:
– Flexibility– Online verification– SIL demands
![Page 35: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/35.jpg)
Safety Matrix
![Page 36: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/36.jpg)
Benefits
The SIMATIC Safety Matrix as - Engineering Tool- Real time Viewer
Configuration of the Safety Functions with the Cause & Effects Method
Automatic TÜV-certified Creation of the Safety Logic from the Cause & Effect matrix
Easy Configuration without special Programming Knowledge
![Page 37: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/37.jpg)
Configuration, auto-generation and diagnostic tool for SIL3 application:
First-in alarm display and saving Integrated commands: bypass, reset, override, parameter modification Sequence of event display and savings Operator interventions Automatic version tracking Automatic documentation of modifications
Benefits
![Page 38: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/38.jpg)
HMI
![Page 39: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/39.jpg)
HMI
![Page 40: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/40.jpg)
HMIHMI Screens
Alarm Screen – YA711
Process Screens
Trending
![Page 41: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/41.jpg)
HART Interface
Simatic Process Device Manager HART Instrument Validation
![Page 42: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/42.jpg)
Agenda:• One minute about Roxel• Short introduction to Safety Integrity Levels - SIL• SIL in Programmable Electronic Systems (PES):
– Rules and regulations– Project execution and verification– Programming tools– Equipment
![Page 43: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/43.jpg)
![Page 44: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/44.jpg)
PCS 7 systems
Technology:– Siemens S7-400 PLC
Software:– Siemens PCS 7– Safety Matrix
Benefits:– Less programming– More configuring– Simplified documentation
Drawbacks:– More expensive– Cheaper in the long run
![Page 45: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/45.jpg)
Documentation DNV-OS-D202 October 2008 - AUTOMATION, SAFETY, AND TELECOMMUNICATION SYSTEMS
– System Availability: R0 - Continuous available
– Certification and Classification requirements:
![Page 46: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/46.jpg)
Documentation
![Page 47: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/47.jpg)
DocumentationNODE Documentation according to Safety Validation and Assessment plan
Section 1, General:
Functional Specification, FS, FDS, (SRS and SAR)Node Plan and Progress Reports Revision recordCPI, Computer Point IndexC&E's, SCD's, SEQUENCE LOGIC/SFC'sSerial Links SpecificationsStatic Pictures Design BasisChange LogOther technical basis documents (MOM, TQ etc)Node software backup
Section 2, Hardware:
System Block DiagramGeneral Arrangement DrawingsPower Distribution DrawingsHardware Typicals Equipment Lists / SPIRInterface and Connection DrawingsX-Wiring and Circuit Diagrams
Secton 3, Test Dossier:
Test procedure (NORDTEST checklists)Certificates, Approvals and Statements.HW Test SheetsObject Test Report / Sheets Application Test ReportNode to node communication Test SheetsTest Reports for Test of Serial LinksPunch log
![Page 48: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/48.jpg)
DocumentationNORSOK Z-015:
1. Overall frame GA‘s.2. All junction box/enclosure GAs.3. Hydraulic Schematic Diagram if applicable.4. Electrical Schematic Diagram.5. Any Mimic Panel Drawings.6. System Block Diagram.7. Electrical Interconnection Diagrams and/or cable
schedules for all system/subsystems.8. Tubing Diagram if applicable.9. Operations Manuals for all system/subsystems.10. Maintenance Manuals for all system/subsystems.11. Recommended spares for all system/subsystems.12. Certification for all systems/subsystems including but not limited to:-
Hazardous area inspection schedule.Instructions for safe use.Special conditions of use.Any calculations to allow correct installation of
equipment in a hazardous area.Hazardous area equipment schedule.
13. EC declaration of conformity for all system/subsystems. (European directive).14. Interface Drawings.15. FAT/SIT procedures.16. Manufacturers and vendor test results for cabling used (IR and continuity).17. Manufacturers and vendor test results fibre cabling.18. All calculations and documentation pertaining to the achieved SIL rating.
![Page 49: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/49.jpg)
DocumentationNode book:
Documentation of relevant documents:
- Design documents and drawings- Specifications- Procedures- Change logs- Test reports
Purpose:
- System documentation- Conformity- Traceability
![Page 50: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/50.jpg)
DocumentationOther relevant activities:
- QA plan and QA activity list - Documentation review (Spec/C&E)- Technical reviews, HW, SW and HMI- Configuration Review- Participation in HAZID/HAZOP- Validation of procedures FAT/IAT- Internal Roxel procedures
- Experience transfer
![Page 51: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/51.jpg)
Instrumentation
Ea 8-23°
General:• All sensors SIL 2 (not Gamma), exd, exi
• Flow• Level• Temp.• Pressure• Mass
• Prosess Connection in SS316 (wet parts)• All type Signals incl.
• 4-20mA• Field bus (FF, PA, Hart)
• All sensors can be delivered w/options• Housing (ss 316)• Hasteloy c, titan, monel (wet parts)• Diagnostics tool kit
![Page 52: Roxel Solutions Presentasjon Teknologidag 2014](https://reader034.vdocuments.us/reader034/viewer/2022051612/54bd08d84a7959da268b45b1/html5/thumbnails/52.jpg)
Valves and actuators
General:• SIL 2, exd, exi, exm,
• Prosess Connection in brass, SS316 (wet parts)• Signals that can be provided
• 3-15 psi• 4-20mA• Field bus (PA, AS)• «most common supplies» (AC/DC)
• Can be delivered w/options• Housing (ss 316)• Hasteloy c, titan, monel (wet parts)