31
Route 1 Milepost 8 to 14.5 From CR 533 (Quakerbridge Rd) to Ridge Rd 2019 NJ Asphalt Paving Conference VAHID GANJI, Ph.D., P.E. YASHVI PATEL, P.E.

Upload: others

Post on 01-May-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Route 1 - njapa.com

Route 1Milepost 8 to 14.5

From CR 533 (Quakerbridge Rd) to Ridge Rd

2019 NJ Asphalt Paving Conference

VAHID GANJI, Ph.D., P.E. YASHVI PATEL, P.E.

Page 2: Route 1 - njapa.com

Pavement Designer: Vahid Ganji, Ph.D., P.E., Michael Baker International

Pavement Designer: Yashvi Patel, P.E., NJDOT

Field Manager: George Carroll

Resident Engineer: Rajesh Kabaria

Assistant RE: Yashvi Patel, P.E.

Prime Contractor: Della Pello Paving

Subcontractor: Trap Rock Industries

Page 3: Route 1 - njapa.com

Ground Penetrating Radar

Pavement Evaluation

Contact: Vahid Ganji, Ph.D., P.E. | Pavement Department Manager | Michael Baker International300 American Metro Boulevard | Hamilton, NJ 08619 | [O] 609-807-9557 | [M] 732-648-9002 [email protected] | www.mbakerintl.com

Falling Weight Deflectometer

Page 4: Route 1 - njapa.com

Pavement Evaluation Scope of Work• Ground Penetrating Radar (GPR) Testing• Coring• Falling Weight Deflectometer (FWD) Testing• Visual Pavement Distress Survey• As-Built Review• Roadway Geometry Survey• Pavement Design Recommendation• Project Cost Estimate

Page 5: Route 1 - njapa.com

• Continuous Pavement Layer Thicknesses Compared to Individual Cores

This Core Could Be Misleading

Benefits of GPR Testing:Increased SafetyNo Interruptions to TrafficCost-SavingsContinuous Data

GPR Testing

Page 6: Route 1 - njapa.com

Dashed Lines Indicate Presence of PCC below AC

Typical GPR Results

GPR Testing

Page 7: Route 1 - njapa.com

Typical GPR Results

GPR Testing

Page 8: Route 1 - njapa.com

Contact: Vahid Ganji, Ph.D., P.E. | Pavement Department Manager | Michael Baker International300 American Metro Boulevard | Hamilton, NJ 08619 | [O] 609-807-9557 | [M] 732-648-9002 [email protected] | www.mbakerintl.com

• Continuous Pavement Layer Thicknesses Compared to Individual Cores• (Literally at Speed of Light)

Takes 15 Minutes

Takes 15 Nanoseconds60 Billion Time Faster

GPR Testing

Page 9: Route 1 - njapa.com

Contact: Vahid Ganji, Ph.D., P.E. | Pavement Department Manager | Michael Baker International300 American Metro Boulevard | Hamilton, NJ 08619 | [O] 609-807-9557 | [M] 732-648-9002 [email protected] | www.mbakerintl.com

Benefits of FWD Testing:Nondestructive Simulates Wheel LoadsFast (1 min/test)Cost-SavingsObjective Data Highly Recommended by FHWA

FWD Testing

Page 10: Route 1 - njapa.com

Contact: Vahid Ganji, Ph.D., P.E. | Pavement Department Manager | Michael Baker International300 American Metro Boulevard | Hamilton, NJ 08619 | [O] 609-807-9557 | [M] 732-648-9002 [email protected] | www.mbakerintl.com

As-Built Review

Page 11: Route 1 - njapa.com

Contact: Vahid Ganji, Ph.D., P.E. | Pavement Department Manager | Michael Baker International300 American Metro Boulevard | Hamilton, NJ 08619 | [O] 609-807-9557 | [M] 732-648-9002 [email protected] | www.mbakerintl.com

Joint Blow-Up

Reflection CrackingBroken Slabs

Patches

Visual Pavement Distress Survey

Page 12: Route 1 - njapa.com

Remaining Service Life Analysis and Pavement Design

Contact: Vahid Ganji, Ph.D., P.E. | Pavement Department Manager | Michael Baker International300 American Metro Boulevard | Hamilton, NJ 08619 | [O] 609-807-9557 | [M] 732-648-9002 [email protected] | www.mbakerintl.com

Minimum 10 years Required Pavement Sectionalization

Pavement sectionalization involves analytical sections – sections with uniform pavement type and thickness, traffic loading, and pavement condition. For practical reasons and constructability, the analyzed sections are combined for pavement rehabilitations. Other factors such as schedule, geometry constraints, project needs other than pavement, and budget during PE and FE need to be considered before final pavement design recommendation.

Page 13: Route 1 - njapa.com

Core Locations

Pavement Design Recommendations Summary

Page 14: Route 1 - njapa.com

Ramp Recommendations

Pavement Design Recommendations Summary

Page 15: Route 1 - njapa.com

Contact: Vahid Ganji, Ph.D., P.E. | Pavement Department Manager | Michael Baker International300 American Metro Boulevard | Hamilton, NJ 08619 | [O] 609-807-9557 | [M] 732-648-9002 [email protected] | www.mbakerintl.com

Estimated Pavement Cost $6.7 Million(Pavement Only)

Cost Estimate

Page 16: Route 1 - njapa.com

Pavement Recommendation

Surface Distress Index (SDI): 1.84 Existing International Roughness Index (IRI): 128 in/mile 20 years design ESAL’s: ~ 34.93 million for composite pavement &

22.46 million for flexible pavement in the northbound direction and 28.57 million and 18.30 million in the southbound direction.

Treatment Performance: last treatment performed on this section was mill 2” and pave 2” Surface Course in 2005

Overlay Design consisted of milling 3” depth and resurfacing with:• 2” Stone Matrix Asphalt 12.5 MM Surface Course• 1” Binder Rich Intermediate Course, 4.75 MM

Page 17: Route 1 - njapa.com

Binder Rich Intermediate Course, 4.75 MM

Evaluated changes in SDI to evaluate performance of BRIC on NewJersey pavement sections

BRIC analysis is difficult as it is always overlaid with a surfacecourse• Compared performance with and without BRIC• Compared performance with different surface courses• Compared performance life for different scenarios

Performance of BRIC material highly dependent on the surfacecourse overlaying the BRIC

Page 18: Route 1 - njapa.com

0

0.5

0 4 5 6

Time After Construction (Years)7 8 9 10

SDI

9.5mm SMA with BRIC12.5mm SMA with BRIC

9.5mm SMA with 12.5M64

12.5mm SMA with 12.5M64

12.5mm Surface with BRIC

9.5 or 12.5 Surface - No BRIC

1 2 3

1

1.5

5

4.5

4

3.5

3

2.5

2

BRIC – Performance Analysis

Page 19: Route 1 - njapa.com

3/15/201919

Page 20: Route 1 - njapa.com

Surface Preparation & Issues

Full Depth HMA Repair Manhole Reset Milling Tack Coat Forestdale Road Bridge

Page 21: Route 1 - njapa.com
Page 22: Route 1 - njapa.com

Test Strip

BRIC Location: Trap Rock Plant Number of rollers

SMA Location: Route 1 Number of rollers

Page 23: Route 1 - njapa.com

Material Usage

BRICTotal: 13349 TAverage Night: 785 TNumber of Nights: 17

SMATotal: 25826 TAverage Night: 1614 TNumber of Nights: 16

Page 24: Route 1 - njapa.com

Ride Quality

Before PavingSDI: 1.84Existing IRI: 128 inch/mileTarget IRI: 63 inch/mileRequired improvement: ~ 50%

After PavingSDI: 5.0IRI: 43.8 Inch/mileProvided Improvement: ~ 66%

Page 25: Route 1 - njapa.com

Exclusions

NB Lane 1 - 2 NB Lane 2 - 2 NB Lane 3 - 10 NB Lane 4 - 35

SB Lane 1 - 13 SB Lane 2 - 19 SB Lane 3 - 26 SB Lane 4 - 56

Page 26: Route 1 - njapa.com

3/15/201926

29 24 28 31 26 25 28 29

77 7589

73 70 6782

60

91 96

137

348

133149

384

346

NL-1 NL-2 NL-3 NL-4 SL-1 SL-2 SL-3 SL-4

IRI

Min Max Max IRI before Exclusions

Target IRI: 63 in/mile

Page 27: Route 1 - njapa.com

363 365

292

60

408 405

317

133

6 4

33

10 11 8

49

0

NL-1 NL-2 NL-3 NL-4 SL-1 SL-2 SL-3 SL-4

Number of Lots

# of Lots with IRI≤Target IRI # of lots with IRI > Target IRI

Page 28: Route 1 - njapa.com

Air voids

BRIC• Requirement: 0-6%• Achieved: 3.49% (avg) • Achieved rang: 1.4-7.4%• Bonus: 0.78%

SMA• Requirement: 1-7%• Achieved: 3.88% (avg) • Achieved rang: 2.4-6%• Bonus: 4% (Maximum)