round the world round the clock
DESCRIPTION
v2a – S&S EaA External 28-Mar-2006. www.dma-marine.com. DMA Fuel Change-over and MGO Cooling System For Retrofit and Newbuilding REV2011041001. ROUND THE WORLD ROUND THE CLOCK. E ngineering – P roduction – I nstallation – C ommissioning - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/1.jpg)
RO
UN
D T
HE
WO
RL
D R
OU
ND
TH
E C
LO
CK
v2a –
S&
S E
aA
Extern
al 28-M
ar-20
06
DMA Fuel Change-over and MGO Cooling System
For Retrofit and Newbuilding
REV2011041001
Engineering –Production –Installation –Commissioning
Specialist in Marine and Offshore HVAC Systems
www.dma-marine.com
1
![Page 2: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/2.jpg)
Agenda
1. DMA introduction
2. Background
3. Process of HFO/MGO change over
4. Principle of MGO cooler system
5. Scope of Supply for DMA MGO System
6. Engineering and Design
7. Production and Fabrication
8. Installation
9. Commissioning
2
![Page 3: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/3.jpg)
1. DMA Introduction
3
• DM Alscott• Factory established in 2003• JV established in 2008
Together, we do more.
![Page 4: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/4.jpg)
2. Background
4
IMO have ratified 200 NM of the North American coastline as a SECA area by the Aug. 2012 – 0.1% Sulphur effective from January 1st 2015
![Page 5: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/5.jpg)
2. Background
5
![Page 6: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/6.jpg)
3. Process of HFO/MGO change over
6
Preferential position for Cooler
Optional position for Cooler
Change-over valve
![Page 7: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/7.jpg)
3. Process of HFO/MGO change over
7
1. Regulate the index of engine, around 25~40%.
2. Shut off steam tracing & steam to pre-heater.
3. Monitor viscosity: 2 cSt ~ 20 cSt.
4. ViscoSense (4~20mA) signalinput the control box of DMA cooling system.
5. Start DMA cooling system, the chilled water is available in stand-by.
6. Initiate the change-over on touch screen from HFO to MGO. Then the MGO will add into circulating line gradually.
7. The rate of temperature drop of fuel inlet to the circulating line is controlled to not exceed 2 per minute. ℃
8. MGO cooler is ready to cool the fuel oil per the viscosity of fuel oil in circulating line.
![Page 8: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/8.jpg)
4. Principle of MGO Cooler System
8
Basing on P&ID, the 3-way Valve is installed in the cooling water line, whereas the Temperature Sensor is mounted at the Plate Heat Exchanger oil outlet. The temperature of fuel outlet will be controlled by the Controller.
![Page 9: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/9.jpg)
5. Scope of Supply for DMA MGO SYS.
9
5.1. Fuel change-over valve
5.2. Chiller unit
5.3. Pump unit
5.4. Buffer tank
5.5. PHE Cooler unit
5.6. Accessories
![Page 10: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/10.jpg)
5. Scope of Supply for DMA MGO SYS.
10
Fig. 5.1 Change-over Valve
![Page 11: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/11.jpg)
5. Scope of Supply for DMA MGO SYS.
11
Fig. 5.2 Marine Water-Cooled Chiller
![Page 12: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/12.jpg)
5. Scope of Supply for DMA MGO SYS.
12
Fig. 5.3 Water Pump Unit
![Page 13: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/13.jpg)
5. Scope of Supply for DMA MGO SYS.
13 Fig. 5.4 Buffer Tank
![Page 14: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/14.jpg)
5. Scope of Supply for DMA MGO SYS.
14
Fig. 5.5 Fuel Oil Cooler Unit
![Page 15: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/15.jpg)
6. Engineering and Design
15
6.1. Capacity calculation by Software
![Page 16: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/16.jpg)
6. Engineering and Design6.2. P&ID
16
![Page 17: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/17.jpg)
6. Engineering and Design
6.3. Program for MGO change-over
17
![Page 18: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/18.jpg)
7. Production and Fabrication
7.1. Factory
18
![Page 19: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/19.jpg)
7. Production and Fabrication
7.2. Assembly, Painting, Store
19
![Page 20: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/20.jpg)
20
8. Installation8.1. Finding place for plants on vessel
![Page 21: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/21.jpg)
21
8. Installation8.2. Finding place for control box
![Page 22: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/22.jpg)
22
8. Installation8.3. Finding cooling-water source for chiller sys.
![Page 23: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/23.jpg)
23
8. Installation8.4. Finding fresh-water source for chiller sys.
![Page 24: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/24.jpg)
24
8. Installation8.5. Making foundation for plants
![Page 25: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/25.jpg)
25
8. Installation8.6. Rigging and mounting
![Page 26: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/26.jpg)
26
8. Installation8.7. Finding cutting points for AE
![Page 27: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/27.jpg)
27
8. Installation8.8. Finding cutting point for ME
![Page 28: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/28.jpg)
28
8. Installation8.9. Making isolated and bypass valves for fuel pump
![Page 29: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/29.jpg)
29
8. Installation8.10. Connecting fuel piping
![Page 30: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/30.jpg)
30
8. Installation8.11. Connecting water piping
![Page 31: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/31.jpg)
31
8. Installation8.12. Making insulation for fuel piping
![Page 32: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/32.jpg)
32
8. Installation8.13. Routing cable for plants
![Page 33: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/33.jpg)
33
8. Installation8.14. Mounting change-over valve
![Page 34: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/34.jpg)
34
8. Installation8.15. Mounting change-over valve
![Page 35: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/35.jpg)
35
9. Commissioning9.1. Checking wiring
![Page 36: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/36.jpg)
36
9. Commissioning9.2. Signing check list by Owner
![Page 37: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/37.jpg)
37
9. Commissioning9.3. Signing check list by Owner
![Page 38: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/38.jpg)
38
9. Commissioning9.4. Signing check list by Owner
![Page 39: ROUND THE WORLD ROUND THE CLOCK](https://reader035.vdocuments.us/reader035/viewer/2022062301/56814876550346895db57e58/html5/thumbnails/39.jpg)
Thanks for your interest in DMA.
For more information,
Please visit our Website :
Website: www.dma-marine.com
www.dma-marine.com
39