8/17/2019 Roof Tiling
http://slidepdf.com/reader/full/roof-tiling 1/2
[Member Company Name]Standard Risk
Assessment
ROOF – 007a
Operation: Roof Tiling
Potential
Hazards:
• Fall of persons from height.
• Fall of materials from height.
• Manual handling.
• Slips/trips.
• Dust inhalation.
• Ee in!uries.
Persons
"#e$ted:
Operati%es / Site
&or'ers
(lient
Sta# ☐Pu)li$ ☐
(ontrol
Measures
* Refer to Ris' "ssessment +o , &-H , * 0 1 for &or'ing at Height E2uipment.0 Prior to $ommen$ement of roof tiling 3or's the s2uad super%isor 3ill %isuall inspe$t the
s$a#olding to ensure it is free from o)%ious defe$ts / hazards. This 3ill in$lude %eri4$ation
of the pro%ision of edge prote$tion at all 3or'ing platforms and ga)le edge prote$tion to
pre%ent falls from the roof. &here faults are identi4ed these 3ill )e reported to the P(
and s2uad 3ill not $ommen$e 3or' until P( has underta'en suita)le remedial a$tion.
1 The distan$e )et3een the top platform and s$a#old should not e5$eed 6mm. &here
platforms are found to )e lo3er than this the P( 3ill )e ad%ised.
6 +o s$a#old 3ill )e altered ) an person during the tiling 3or's unless the ha%e )een
trained and authorised to do so.
7 &here re2uired to mitigate the $onse2uen$es of an falls through the roof Soft 8anding9ags or a (rash De$' sstem 3ill )e installed.
"ll tiles and other materials 3ill )e loaded onto the s$a#old through use of the loading )a
to3er spe$i4$ to that s$a#old. 8oading )a gates 3ill )e $losed at all times 3hen not in
use.
; Me$hani$al lifting aids 3ill )e utilised to transport material to the 3or'ing area 3here
possi)le.
< Emploees 3ill ensure s$a#old platform remains tid free from e5$essi%e de)ris and that
a$$ess / egress routes remain $lear.
= Tiles 3ill not )e $ut on the roof. " dedi$ated $utting area 3ill )e esta)lished on the
s$a#old platform 3ith a sa$ri4$ial )oard to prote$t s$a#old $omponents.
*
&hen $utting an tiles 3ater suppression 3ill )e used at all times. "ppropriate P.P.E 3ill
)e used ) operati%es $utting the tiles and an person 3ithin the immediate areas.
*
*
"n person using RPE 3ill )e fa$e 4t tested to ensure there is an ade2uate seal )et3een
to the user and mas'.
*
0
De)ris and o#>$uts 3ill )e remo%ed from s$a#olding at the end of ea$h da.
*
1
S$a#old edge prote$tion 3ill )e ere$ted at the ga)les of an stru$ture to pre%ent an falls.
*6
+o tiles 3ill )e stored on the roof during poor 3eather $onditions.