  • 8/3/2019 Romania Europen Corridors Mt 2011

    1/21

    ansports

    Ministry of Transports and InfrastructureGeneral Directorate for Infrastructure, Multimodal Transport and

    Private Sector Participation

    Stelian PLATON

    Senior Adviser

    M

    ultimodalT

    Conference on Transportation Infrastructures in the Balkans 04th - 08th July,, 20112011 MadridMadrid

  • 8/3/2019 Romania Europen Corridors Mt 2011

    2/21

    Position Romania in Trans European NetworkPosition Romania in Trans European NetworkPosition Romania in Trans European NetworkPosition Romania in Trans European Network

    ansports

    M

    ultimodalT

    Conference on Transportation Infrastructures in the Balkans 04th - 08th July,, MadridMadrid

    IV Prioritaire Axis 22 for RailDresden/Nuremberg BucharestConstanta/Thessaloniki/Istanbul

    VII Prioritaire Axis 18

    Danube River 2,300 km long

    IX Helsinki Kiev - Bucharest Odessa/Alexandropoulos

  • 8/3/2019 Romania Europen Corridors Mt 2011

    3/21

    ansports

    In order to allow multimodal transport of freight and passengers, transport modes

    shall be connected in freight terminals, passenger stations, inland ports, airports and/ormaritime ports. These nodes shall connect at least two transport modes.

    Realization of inter-modal transport in and through Romania is seen of key

    importance to:

    Maximize the utilization of currently under-used freight infrastructure (rail +

    Danube) Attract cargo to inter-modal solutions into the transport market in Romania

    Support the development of efficient green logistics corridors via Romania in CEE

    Lower external costs in Europe (e.g. CO2 emissions)

    Objectives of Romania

    M

    ultimodalT

    Conference on Transportation Infrastructures in the Balkans 04th - 08th July,, 20112011 MadridMadrid

    Romania in

    midst TEN-T

    PortsConstanta and

    Trieste-Koper-Reijka range

    Central Position in South East Europe

  • 8/3/2019 Romania Europen Corridors Mt 2011

    4/21

    ansports

    MTI Organisation

    -Functional Review of the Transport Sector in Romania (WB, 2010)

    GENERAL DIRECTOTATE FOR

    REGLEMENTATION INTRANSPORTS

    MINISTRY OFMINISTRY OFMINISTRY OFMINISTRY OF

    TRANSPORTS ANDTRANSPORTS ANDTRANSPORTS ANDTRANSPORTS AND

    INFRASTRUCTUREINFRASTRUCTUREINFRASTRUCTUREINFRASTRUCTURE

    GENERAL DIRECTORATE FOR

    INFRASTRUCTURE,MULTIMODAL TRANSPORTS

    AND PRIVATE SECTORPARTICIPATION

    OTHER DIRECTORATES

    GD 318/2011

    M

    ultimodalT

    Conference on Transportation Infrastructures in the Balkans 04th - 08th July,, 20112011 MadridMadrid

    - Need for a policy-oriented multi-modal national transport strategythat can guide both public and private participants and is consistent with a

    realistic assessment of the budgetary resources to sustain it over the next few

    years.

    - Need for harmonization of the legal environment for multimodal transport

    to ensure a uniform liability regime that protects the interests of all concerned-Need for an adequate intermodal policy involving coherent articulated

    objectives, clear specific outcomes that are expected and defined steps that

    will be taken to deliver the outcomes

  • 8/3/2019 Romania Europen Corridors Mt 2011

    5/21

    ansports

    TASKS

    Hard Infrastructure

    MULTIMODALDEPARTMENT

    (tasks)

    Soft Infrastructure

    Key tasks, e.g.:

    Planning InfrastructureKey tasks ,e.g.:

    Develo su ort tools

    M

    ultimodalT

    Conference on Transportation Infrastructures in the Balkans 04th - 08th July,, MadridMadrid

    TEN T terminals, nodesand Inland ports

    Inter-modal strategy

    Trade Development

    Education

    Master plans

    RFID, GPS solutions

    Key tasks, e.g.: :

    VAT deferment, Fiscal measures, Customs operations

    Key tasks, e.g.: :

    Develop supply chain & logistics education and training

  • 8/3/2019 Romania Europen Corridors Mt 2011

    6/21

    Empowering Romania as the Eastgate Trade Hub of Europe

    Priority of the development of intermodal transport

    RANSPO

    RT

    Overall Trade & Logistics

    Policy from Romania

    . x st ng mar et s m te an concentrate aroun orr ors nr. , ey

    corridors within existing & new EU TEN-T, reflecting area where most new

    industries established locations

    Corridor nr.4 is the route most in demand and used for inter-modal transport

    Constanta Port is key entry port into Europe in new EU TEN-T

    Key hubs for phase one development: South Port of Constanta, Bucharestside, Timisoara North side, and Oltenita / Giurgiu

    MU

    LTIMODAL

    SAMNET/SAMRAIL Workshop 8th April 2005, ParSAMNET/SAMRAIL Workshop 8th April 2005, ParisisTOK EVALUATION 28th June 2005, TrondheimTOK EVALUATION 28th June 2005, Trondheim

  • 8/3/2019 Romania Europen Corridors Mt 2011

    7/21

    ansports

    N1) Constanta

    N2) Giurgiu - Ploiesti

    N3) Craiova - Pitesti

    N4) Targu Mures - Cluj

    Freight villages

    N4N5

    Market Potential Romania 2030:

    - Domestic: 600mln tonnes

    - Transit/trade: 200mln tonnes

    Develop Romania Logistics Corridor

    M

    ultimodalT

    Conference on Transportation Infrastructures in the Balkans 04th - 08th July,, MadridMadrid

    N5) Timisoara - Oradea

    Infrastructure

    Road

    Rail

    IWT

    NEW

    N1N3 N2

  • 8/3/2019 Romania Europen Corridors Mt 2011

    8/21

    ansports

    Priority axis 1

    Modernization and development of TEN-T priority axes aiming at sustainable transportsystem integrated with EU transport networks

    Modernization and development of road infrastructure along the TEN-T priority Axis 7

    Modernization and development of railway infrastructure along the TEN-T priority Axis 22

    Modernization and development of water transport infrastructure along the TEN-T priority axis 18

    Priority axis 2

    Modernization and development of the national transport infrastructure outside the TEN-T

    priority axes aiming at sustainable national transport system

    SOP Transport Funding Romanian Logistics Corridor

    M

    ultimodalT

    Conference on Transportation Infrastructures in the Balkans 04th - 08th July,, MadridMadrid

    o ern zat on an eve opment o nat ona roa n rastructure

    Modernization and development of national railway infrastructure and passenger service

    Modernization and development of river and maritime ports

    Modernization and development of air transport infrastructure

    Priority axis 3 - Modernization of transport sector aiming at higher degree of environmentalprotection, human health and passenger safety

    Promote inter-modal transport

    Improve traffic safety across all transport modes

    Minimize adverse effects of transport on the environment

  • 8/3/2019 Romania Europen Corridors Mt 2011

    9/21

    ansports

    MULTIMODAL PILLARS FINANCINGRAIL

    MULTIMODAL

    pillars

    IWT

    ROAD

    METRO

    Priority

    axis

    Beneficiaries % TOTAL

    ALOCATIONS

    (EU+GoR)

    Area of

    interventio

    n

    Cohesion

    Fund

    European Regional Development Fund

    Road - Motorway

    sections on

    the priority

    axis TEN-T

    7

    - Roads rehabilitation, construction of by-passes

    Railway - Railway

    sections on

    the priority

    axis TEN-T

    22

    - Rehabilitation of the rail stations, bridges and

    tunnels

    M

    ultimodalT

    Conference on Transportation Infrastructures in the Balkans 04th - 08th July,, MadridMadrid

    Priority

    axis 1:

    CNADNR, CNCFR, AFDJ 60%

    Priority

    axis 2:

    CNADNR, CNCFR, SNTFC

    CFR Cltori

    Port Constanta, Adm. Portuare

    dunrene, Adm. aeroportuare

    34%

    Priority

    axis 3:

    Adm. infrastructurilor

    intermodale, CNCFR, CNADNR 5%

    Priority

    axis 4:

    Technical

    Assistance

    MA SOPT 1%

    ~ 5bl.

    Waterway -

    Improvement of

    navigation

    on the

    priority axis

    TEN-T 18

    - Modernization and development of Constanta

    Port; Modernization and development of Danubeports (studies and works)

    Airway n/a - Modernization and development airports which

    fulfil the traffic criteria (studies and works)

    Horizontal

    issues

    n/a - Safety: linear villages, level crossings , rail

    intermodal platforms, automatic barriers, train

    detection systems

    Technical

    Assistance

    n/a - Support for effective SOPT management,

    monitoring, and control, Information and

    publicity regarding SOPT, Transport Master plan

  • 8/3/2019 Romania Europen Corridors Mt 2011

    10/21

    ansports

    -10.821 km railway network,- 2.909 km double track;

    - 3.974,5 km electrificated lines 25kV/50 Hz;

    -170 tunnels,-Total lenght 60,436 km;

    Corridor 4 Corridor 9

    Romanian railway network in the europan context

    M

    ultimodalT

    Conference on Transportation Infrastructures in the Balkans 04th - 08th July,, MadridMadrid

    -18.170 bridges-Total lenght 143,70 km;

    -Modern telecommunication network fiber optic;

    - 992 section points(459 stations and 533 stops)

    -1.500 passengers trains and 780 freighttrains / day

  • 8/3/2019 Romania Europen Corridors Mt 2011

    11/21

    ansports

    Intermodal Transport Terminals CFR Marfa (Freight)

    Strategic rail hubs

    Objectives of railways infrastructuremodernization:

    Modernization of the European

    Corridors crossing Romania

    Speed increase with minimum 20 %

    Implementation of modern interlockingsystems in main stations

    M

    ultimodalT

    Conference on Transportation Infrastructures in the Balkans 04th - 08th July,, MadridMadridDir. Gen. Dumitrescu Claudiu 11

    Modernization of main railwaysstations

    Construction of railway infrastructureconnecting Romanian Railways withthe new bridge over Danube inCalafat-Vidin

  • 8/3/2019 Romania Europen Corridors Mt 2011

    12/21

    ansports

    Railway line between Bucureti Nord station Internaional airport

    Henri Coand

    Lenght: 19,36 km.Budget : 300.000.000 Euro;Implementation period 2012-2013

    M

    ultimodalT

    Conference on Transportation Infrastructures in the Balkans 04th - 08th July,, MadridMadrid

    Travel time:30 min.Transport capacity:37 train pairs,(0500 2330 )

    Frequency 30 min

  • 8/3/2019 Romania Europen Corridors Mt 2011

    13/21

    ansports

    Railway perspectives included in the Bucharest Metropolitan Transport Plan

    Lun ime: 82 km

    M

    ultimodalT

    Conference on Transportation Infrastructures in the Balkans 04th - 08th July,, MadridMadrid

    Bugetul indicativ:

    600.000.000 Euro

  • 8/3/2019 Romania Europen Corridors Mt 2011

    14/21

    14

    Targeted IWT hub locations

    Development of inland (river) ports

    large multi-modal business & logistics parks

    sports

    Location plannedinter-modal

    terminal

    Terminal lay-out

    Mu

    ltimodalTr

    a

    Conference on Transportation Infrastructures in the Balkans 04th - 08th July,, MadridMadrid

  • 8/3/2019 Romania Europen Corridors Mt 2011

    15/21

    ansports

    Danube Black Sea Canal (banks reinforcement and protection)

    110 mEUR;

    Poarta Alba Midia Navodari Canal (banks reinforcement and

    protection)

    55 mEUR;Locks - rehabilitation and modernization on the Danube Black Sea Canal

    and Poarta Alba- Midia Navodari Canal

    120 mEUR;

    Improvement of the conditions for navigation on Calarasi Braila sector

    IWT INFRASTRUCTURE PROJECTS

    M

    ultimodalT

    Conference on Transportation Infrastructures in the Balkans 04th - 08th July,, MadridMadrid

    m m , o enec s

    Value of works: 40 MEURO (ISPA and state budget),The contract for works was signed

    Bankprotections

    Bottomsill

    Guidingwall

    Dredging

    Banks protectio

    Bottomsill

    Breakwater

    Waterdepths

    BALABRANCH

  • 8/3/2019 Romania Europen Corridors Mt 2011

    16/21

    ansports

    Canal Danube Bucharest

    UCRAINA

    HUNGARY MOLDOVAMARITIME PORTS

    TEN-T Extension proposition

    Legend :

    RIVER-MARITIME PORTS

    INLAND WATERWAYS PORTS

    TEN-T Extension proposition

    Lenght: 104 kmTotal : 2.588 mil. EuroTransportation capacity 20 milion tons/yearTechnical data:- Waterway length on Arge 73 km

    - Waterway length on Dmbovia 31 km- minimum width of the bottom of fairway section 80 m- minimum water deepth 4,5 m- reference convoi 2.000 to

    M

    ultimodalT

    Conference on Transportation Infrastructures in the Balkans 04th - 08th July,, MadridMadrid

    BUCURESTI

    GALATI

    BRAILA

    TULCEA

    SULINA

    CONSTANTAMEDGIDIA

    CALARASIOLTENITA

    CERNAVODA

    GIURGIU

    CORABIABECHETCALAFAT

    DROBETA TURNUSEVERIN

    ORSOVA

    MOLDOVA VECHE

    BLACK SEA

    BULGARIA

    SERBIA

    UCRAINA

    ROMANIA

  • 8/3/2019 Romania Europen Corridors Mt 2011

    17/21

    Port of Constanta extension- Container Terminal-terminal -logistic area =19 ha-surface=71 ha

    - PPP contract

    ansports

    M

    ultimodalT

    Conference on Transportation Infrastructures in the Balkans 04th - 08th July,, MadridMadrid

  • 8/3/2019 Romania Europen Corridors Mt 2011

    18/21

    ansports

    METROU LINESFUTURE METRO LINES CostsM4 Gara de Nord Gara Progresu

    M5 Drumul Taberei Pantelimon

    M6 1 Mai OtopeniM7 Bragadiru Voluntari

    Semi-Inelul de Sud

    Total estimated

    950 M Euro

    1.700 M Euro

    850 M Euro1.900 M Euro

    1.300 M Euro

    6.700 M Euro

    Network extension Costs

    Pacii Linia de Centura Vest

    Laminorului Mogosoaia

    Metro lines perspectives

    Pipera - Tunari

    250 M Euro

    290 M Euro

    650 M Euro

    M

    ultimodalT

    Conference on Transportation Infrastructures in the Balkans 04th - 08th July,, MadridMadrid

    - Linii in exploatare

    - Linii in executie

    - Linii in pregatire

    - Linii in perspectiva

    Pantelimon - Cernica

    Ghencea - DomnestiTotal estimat

    M7 Bragadiru Voluntari

    Contracting process

    Length 25 km

    Stations number -30 unitDepot 1 unit

    Parking lot- 1 unit

    250 M Euro

    400 M Euro

    1.840 MEuro

  • 8/3/2019 Romania Europen Corridors Mt 2011

    19/21

    ansports

    Financial Plan

    North breakwater extension with 1 km

    121 MEURO SOPT 2007 2013

    Under implementation, 2010 - 2013

    Railway system development in the river

    maritime area

    18 MEURO (ERDF and state budget);

    Application Form for SOPT 2007 2013 approved

    Railways

    Constanta Port

    M

    ultimodalT

    Conference on Transportation Infrastructures in the Balkans 04th - 08th July,, MadridMadrid

    Bridge over the Danube Black Sea Canal

    30.5 MEURO (ERDF and state budget)Under implementation

  • 8/3/2019 Romania Europen Corridors Mt 2011

    20/21

    ansports

    CONCLUSIONS

    The key conclusion for the short term development scope is that the principle

    base infrastructure for bothrail and water on the Corridors no. 4 and 7 is

    available.

    The Ministry has to develop a minimum financial exposure strategy by adding

    the missing links and support elements focused on these Corridors, thereby

    M

    ultimodal

    T

    Conference on Transportation Infrastructures in the Balkans 04th - 08th July,, MadridMadrid

    The private sector, should determine the practicability and profitability of

    multimodal transportation companies. In this regard, government should not

    impede the formation of multimodal transport firms if the private sector is

    willing to invest capital in the concept

    The multimodal system is the solution for reducing the environmental effect

    and contribute to an efficient management of transports

    .

  • 8/3/2019 Romania Europen Corridors Mt 2011

    21/21

    Contact DataMinistry of Transports and Infrastructure

    General Directorate for Infrastructure, Multimodal Transport and

    Private Sector Participation

    Dana GALBEN

    General [email protected]

    Stelian PLATON

    Senior [email protected]