Inluminando a Transformação de Moçambique 1
ROLE OF EDM IN
RENEWABLE
ENERGY
Casablanca, November de 2017
Inluminando a Transformação de Moçambique 2
1. Transformation process in EDM
2. Role of EDM in Renewable energy;
3. Master Plan Vs National Electrification Strategy;
4. On-going Renewable Projects and on the portfolio;
5. PROLER
Content
Inluminando a Transformação de Moçambique 3
Transformation process in EDM
Transformation goals:
The purpose of the EDM transformation is not privatization but rather to make it a company whose owner is still the state but managed using the same business practices that are used in the private sector;
Have a transparent inclusive governance and the company orientation to results, efficiency and profitability;
Ensure universal access of electricity for all Mozambicans by 2030;
Transformation of Mozambique into a energy Hub in the region;
It is expected that EDM will be transformed into a "Smart Utility" with high ethical and professional values
.
Inluminando a Transformação de Moçambique 4
Institutional Transformation
Reforms:
- Elaboration of a Ethics code and conduct
- New organizational structure of the company with less Hierarchy and more functional (reduction of 75 Directors to 34 Directors. Reduction of 7 Hierarchy Levels to 4 levels)
- Selection in the competition basis of the Directors, Officers and Managers (Internal and External)
- Procurement Reform (Procurement Committees) and short-term Audit and Financial Control Committee
- Closing company accounts within the deadlines defined by law
- Development of the new remuneration policy
- Encourage the gender equality policy
- Plan to mitigate loss reduction
- Ensure adequate integration of IPPs
and Reinforce of the Regulatory System
Mobilization of Funds since 2015: - World Bank 150 MUSD
- KfW 15 MUSD, JICA 53,5 MUSD
- IFC, Proparco, FMO, ABSA, 266 MUSD
- AFD 4 MUSD
- BEI, KFW, Norway (STIP), 44,7 MUSD
Strategic Studies:
- EDM 10 years Strategy
- National Electrification Strategy
- Integrated Master Plan
- Study on the new tariff system
- Studies on the cost of supply
-Auditoria e Avaliação de Activos
Institucional Transformation
Inluminando a Transformação de Moçambique 5
3600 Employees 1.4 million clients
Institutional Transformation – New Structure
Inluminando a Transformação de Moçambique 6
Role of EDM in Renewable Energy
• EDM intends to diversify the mix of energy with the implementation of renewable energy projects in order to achieving universal access by 2030;
• EDM intends to develop renewable energy projects to be integrated in and out of the network (on-grid & off-grid) in the commercial perspective while FUNAE in the social perspective and in small scales;
• The National Electrification Strategy should clearly define the boundaries between EDM and FUNAE as well as the mapping and zones of action of each one
Inluminando a Transformação de Moçambique 7
National Electrification Strategy vs Master Plan
National Electrification Strategy:
• It is based on the electrification of the country without distinction of customers in which presents the commercial and social aspects and EDM will focus on the Commercial component;
• It will define the process of how access to energy should be provided;
Integrated Master Plan:
• It is the plan to identify the type, quantity of on-grid and off-grid investments needed in generation, transmission and distribution for the country's electrification in order to provide universal access by 2030.
Inluminando a Transformação de Moçambique 8
On-going Renewable Projects
PV Mocuba:
• PV with capacity 40MW to be connected on grid to Mocuba Substation, at Zambezia Province;
• Signed contract with SIEMENS to the integration of the PV to EDM grid;
• Construction to start end of 2017;
PV Metoro:
• PV with capacity of 40MW to be connected on grid to a Metoro Substation, Cabo Delgado Province;
• On-going mobilization funds .
Inluminando a Transformação de Moçambique 9
Portfolio on the Renewable Energy
Solar:
• Cuamba (20MW), Lichinga (20MW); Dondo (40MW), Nacala (50MW), Beluluane (30MW); Nicoadala (60MW); Mocimboa da Praia (50MW), entre outras
Wind:
• Namaacha (60-120MW), Manhiça (50MW), Xai-Xai (60MW), Mulambe (50-300MW), Cahora Bassa (50-300MW);
Biomass:
• Monapo (40MW), Gurué (40MW)
Inluminando a Transformação de Moçambique 11
Next steps: Implementation of PROLER
Funds:
• Financiamento (Grant), 4ME from EU-AITF to AFD under EDM management.
Goals:
• Design and implement a competitive scheme(auction) and transparent on grid renewable energy projects with commercial size up to 50MW;
Projet duration :
• The project will have duration of 4 years and pilot project will be launch in 2018. By the end of these 4 years, it is expected to launch a competition of 2-3 solar projects and 1-2 wind projects aligned to the Integrated Master Plan
Inluminando a Transformação de Moçambique 13
PROLER
• With the PROLER Project, EDM and MIREME are expected to capitalize on the lessons learned from the Mocuba and Metoro Projects;
• EDM and MIREME are also expected to lead the process of integrating Renewable Power Plants into the National Electric Network and not lead by promoters, has is been taking place;
• It is also expected Competitive, Transparent Implementation, Maximizing Quality and Minimizing Costs
• On the other hand, this initiative will strengthen our Planning Capacity, Procurement Process and transparency.
Inluminando a Transformação de Moçambique 14
THANK YOU FOR YOUR ATENTION!