Inluminando a Transformação de Moçambique 2

1. Transformation process in EDM

2. Role of EDM in Renewable energy;

3. Master Plan Vs National Electrification Strategy;

4. On-going Renewable Projects and on the portfolio;

5. PROLER

Content

Inluminando a Transformação de Moçambique 3

Transformation process in EDM

Transformation goals:

The purpose of the EDM transformation is not privatization but rather to make it a company whose owner is still the state but managed using the same business practices that are used in the private sector;

Have a transparent inclusive governance and the company orientation to results, efficiency and profitability;

Ensure universal access of electricity for all Mozambicans by 2030;

Transformation of Mozambique into a energy Hub in the region;

It is expected that EDM will be transformed into a "Smart Utility" with high ethical and professional values

.

Inluminando a Transformação de Moçambique 4

Institutional Transformation

Reforms:

- Elaboration of a Ethics code and conduct

- New organizational structure of the company with less Hierarchy and more functional (reduction of 75 Directors to 34 Directors. Reduction of 7 Hierarchy Levels to 4 levels)

- Selection in the competition basis of the Directors, Officers and Managers (Internal and External)

- Procurement Reform (Procurement Committees) and short-term Audit and Financial Control Committee

- Closing company accounts within the deadlines defined by law

- Development of the new remuneration policy

- Encourage the gender equality policy

- Plan to mitigate loss reduction

- Ensure adequate integration of IPPs

and Reinforce of the Regulatory System

Mobilization of Funds since 2015: - World Bank 150 MUSD

- KfW 15 MUSD, JICA 53,5 MUSD

- IFC, Proparco, FMO, ABSA, 266 MUSD

- AFD 4 MUSD

- BEI, KFW, Norway (STIP), 44,7 MUSD

Strategic Studies:

- EDM 10 years Strategy

- National Electrification Strategy

- Integrated Master Plan

- Study on the new tariff system

- Studies on the cost of supply

-Auditoria e Avaliação de Activos

Institucional Transformation

Inluminando a Transformação de Moçambique 5

3600 Employees 1.4 million clients

Institutional Transformation – New Structure

Inluminando a Transformação de Moçambique 6

Role of EDM in Renewable Energy

• EDM intends to diversify the mix of energy with the implementation of renewable energy projects in order to achieving universal access by 2030;

• EDM intends to develop renewable energy projects to be integrated in and out of the network (on-grid & off-grid) in the commercial perspective while FUNAE in the social perspective and in small scales;

• The National Electrification Strategy should clearly define the boundaries between EDM and FUNAE as well as the mapping and zones of action of each one

Inluminando a Transformação de Moçambique 7

National Electrification Strategy vs Master Plan

National Electrification Strategy:

• It is based on the electrification of the country without distinction of customers in which presents the commercial and social aspects and EDM will focus on the Commercial component;

• It will define the process of how access to energy should be provided;

Integrated Master Plan:

• It is the plan to identify the type, quantity of on-grid and off-grid investments needed in generation, transmission and distribution for the country's electrification in order to provide universal access by 2030.

Inluminando a Transformação de Moçambique 8

On-going Renewable Projects

PV Mocuba:

• PV with capacity 40MW to be connected on grid to Mocuba Substation, at Zambezia Province;

• Signed contract with SIEMENS to the integration of the PV to EDM grid;

• Construction to start end of 2017;

PV Metoro:

• PV with capacity of 40MW to be connected on grid to a Metoro Substation, Cabo Delgado Province;

• On-going mobilization funds .

Inluminando a Transformação de Moçambique 9

Portfolio on the Renewable Energy

Solar:

• Cuamba (20MW), Lichinga (20MW); Dondo (40MW), Nacala (50MW), Beluluane (30MW); Nicoadala (60MW); Mocimboa da Praia (50MW), entre outras

Wind:

• Namaacha (60-120MW), Manhiça (50MW), Xai-Xai (60MW), Mulambe (50-300MW), Cahora Bassa (50-300MW);

Biomass:

• Monapo (40MW), Gurué (40MW)

Inluminando a Transformação de Moçambique 10

Next steps: Implementation of PROLER

Inluminando a Transformação de Moçambique 11

Next steps: Implementation of PROLER

Funds:

• Financiamento (Grant), 4ME from EU-AITF to AFD under EDM management.

Goals:

• Design and implement a competitive scheme(auction) and transparent on grid renewable energy projects with commercial size up to 50MW;

Projet duration :

• The project will have duration of 4 years and pilot project will be launch in 2018. By the end of these 4 years, it is expected to launch a competition of 2-3 solar projects and 1-2 wind projects aligned to the Integrated Master Plan

Inluminando a Transformação de Moçambique 12

Next steps: PROLER Struture

Inluminando a Transformação de Moçambique 13

PROLER

• With the PROLER Project, EDM and MIREME are expected to capitalize on the lessons learned from the Mocuba and Metoro Projects;

• EDM and MIREME are also expected to lead the process of integrating Renewable Power Plants into the National Electric Network and not lead by promoters, has is been taking place;

• It is also expected Competitive, Transparent Implementation, Maximizing Quality and Minimizing Costs

• On the other hand, this initiative will strengthen our Planning Capacity, Procurement Process and transparency.

Inluminando a Transformação de Moçambique 14

THANK YOU FOR YOUR ATENTION!

Renewable Energy and Eficiency Directorate

Olga Utchavo Madeira

[email protected]

+258 82 418 9080