rockin’ the bakken - consortium of universities for sustainable

57
Rockin’ the Bakken Kirk Dewey, PE Section Manager HDR Engineering, Inc. Bismarck, ND 701-557-9710 [email protected]

Upload: others

Post on 12-Sep-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rockin’ the Bakken - Consortium of Universities for Sustainable

Rockin’ the Bakken

Kirk Dewey, PE Section Manager HDR Engineering, Inc. Bismarck, ND 701-557-9710 [email protected]

Page 2: Rockin’ the Bakken - Consortium of Universities for Sustainable

Rockin’ the Bakken

Page 3: Rockin’ the Bakken - Consortium of Universities for Sustainable

Rockin’ the Bakken

Page 4: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Outline

• The Bakken Formation

– What is it? How Big?

– Oil and Gas Development

• Electrical Infrastructure Challenges

– Load Estimates

– System Limitations

– Changes in Infrastructure

Page 5: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Bakken Oil Shale Formation

Page 6: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Shale Plays HDR is Helping Clients Serve

Our initial entry point into the O&G industry has been to sell these traditional HDR services to our clients.

Page 7: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Top oil-producing states as of July 2012

• Top 5 states produce thousands of barrels of oil on a monthly basis

• North Dakota recently jumped ahead of Alaska and California to become the number 2 oil producer

1

59,675

Texas

2

20,896

North

Dakota

4

12,873

Alaska

3

16,430

California

5

5,917

Louisiana

Note: Number of barrels per month as of July 2012

Oct 2013: 23,226

Page 8: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

USGS – 2008 Assessment of Bakken Oil & Gas

Page 9: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Est. Mature Area of Bakken Formation

Page 10: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Well Development

By the Numbers: February 8, 2013

• Price of oil: $96/Barrel

• ND oil production: #2 in USA, Oct 2013: 23.2 MMBO

• Active Rigs in ND: 185 (high: 218, May 29,2012)

Page 11: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Well Facts

• 8100 producing wells

– 4,600 Bakken (57%)

– 3,600 more to secure leases

• 40,000 additional development wells

– 225 rigs – another 16 years

– 100 rigs – another 30 years

Page 12: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

4600 Bakken Hori. / 8100 Total (57%)

North Dakota Wells Producing Each Year

4600 Bakken

Page 13: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Typical 2012 Bakken Well

• 45 year well life

• 615,000 barrels of oil

• $9 million to drill/complete

• $20 million net profit

• $4 million in taxes

• $7 million in royalties

• $2 million in wages

• $2 million in oper. expense

Page 14: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

North Dakota Oil Industry Jobs

Page 15: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

ND Monthly Production – Top 12 Counties

Page 16: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

ND Daily Oil Production (1951-2012)

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

0

100,000

200,000

300,000

400,000

500,000

600,000

700,0001

95

1

19

54

19

57

19

60

19

63

19

66

19

69

19

72

19

75

19

78

19

81

19

84

19

87

19

90

19

93

19

96

19

99

20

02

20

05

20

08

20

11

Avg. BBLS Oil/Day

Producing Wells

666,000 BBLS Oil/Day in 2012 Increased 37% in 10 months to 750,000 BBLS

8100 Producing Wells

Page 17: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Well Development - # of Drilling Rigs

Page 18: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Oil Drilling Rigs in Western ND, Oct 2012

Page 19: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Oil Drilling Rigs in Townships in WND, Oct 2012

Page 20: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Horizontal Drilling in WND, Oct 2012

Page 21: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Typical Minimal Impact Multi-pad Site

Page 22: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Typical Minimal Impact Multi-pad Site

Page 23: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Continental Resources Eco-Pad

Page 24: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Continental Resources Development Plan

Page 25: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Typical Hydraulic Fracture Stimulation

Page 26: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Why Fracture the Rock?

• Already developed easy oil – Oil flows easily without hydraulic fracturing

– Pools where oil is trapped

– Natural fractures in earth

• Unconventional Reserves – Reservoirs are tight

– Uneconomic to produce without hydraulic fracturing

– Must create a path for oil to flow

Page 27: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Frac Water Additives

• 99.5% water and sand

• 80.5% water

• 19.0% sand or ceramic beads

• 0.5% chemicals

• Most are found in every household

Page 28: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

ND and MT Bakken Assoc. Gas Production

Page 29: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Electrical Infrastructure Challenges

• Load Estimating

• Electric Utility System Limitations

• Changes in Design and Infrastructure

Page 30: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Estimating Electrical Load Growth

• Well Sites: 20-30 kW/well, 1 to 8 wells/section

• Salt Water Injection: 100-750 kW/site

Page 31: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Estimating Electrical Load Growth (cont.)

• Compressor Stations: 500 to 10,000 kW/site

• Gas Processing Plants: 10-40 MW/site

Page 32: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Estimating Electrical Load Growth (cont.)

• Oil Loading Facilities – Truck and Rail: 1-4 MW

• Workforce Camps: 4-6 kW/bed

Page 33: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Estimating Electrical Load Growth (cont.)

• Williston, ND Growth: 2-4 MW/section for Residential

– Up to 10 MW/section for Comm./Industrial

• Other Communities: 3-5 MW/section

Page 34: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Regional Electric Supply

Page 35: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

North Dakota/Montana Electric Cooperatives

Page 36: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

0

100

200

300

400

500

600

700

71

/72

74

/75

77

/78

80

/81

83

/84

86

/87

89

/90

92

/93

95

/96

98

/99

01

/02

04

/05

07

/08

10

/11

13

/14

16

/17

19

/20

22

/23

De

man

d (

MW

)

2004

2007

2009

2012

Load Forecast – Coop X

KLJ projects 820 MW by 2025

Page 37: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

0

50

100

150

200

250

300

350

4007

1/7

2

74

/75

77

/78

80

/81

83

/84

86

/87

89

/90

92

/93

95

/96

98

/99

01

/02

04

/05

07

/08

10

/11

13

/14

16

/17

19

/20

22

/23

De

man

d (

MW

) 2004

2007

2009

2012

2013

Load Forecast – Coop Y

KLJ projects 561 MW by 2025

Page 38: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

2012 Load Forecast for Coops Serving the Bakken Area

Feb 2012 Peak 500 MW

Page 39: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Basin Electric – 2011 Oil Load Study Area

Page 40: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

2011 Pocket Area Load Forecast

0

200

400

600

800

1000

1200

1400

1600

1800

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

MW

SYSTEM INTACT LOAD SERVING CAPABILITY

Xcel Load at Souris MDU Load in Study Area Coop Bottineau Area Load

Coop Minot Area Load Coop West ND, East MT Area Load

2800 MW in 2021, 3721 MW in 2032

Page 41: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Williston Load Pocket (500 MW Jan 31 ‘13)

Page 42: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Williston Load Pocket Profile Jan 31, 2013

Page 43: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

2011 Transmission System in WND

Page 44: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Blaisdell

Proposed 345kV Line 345kV Line

230kV Line

115kV Line

Des Lacs

Tioga

AVS

Williston

Proposed 345 kV Additions

CCR

Page 45: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

No. of Substations – Coop X

17

43

0

5

10

15

20

25

30

35

40

45

50

No.of Subs

2007

2012

Page 46: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

95 118

568

912

0

100

200

300

400

500

600

700

800

900

1000

Base MVA Upper MVA

2007

2012

Substation Capacity – Coop X

Page 47: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Substation Design Changes

• 2007 Design

• Radial 57 and 69 kV Source

• Single Bus Design, 69-12.47/7.2 kV

• HS Fuses, 7.5/10.5 MVA Transformer, Regs, and 4 to 6 Feeders

• 2012 Design

• Looped 115 kV Source

• Ring Bus Design (4 to 6 Position), 115-24.94/14.4 kV,

• HS Breaker or Cir Sw, One or Two 15/20/25 MVA Transformers, Regs, 6 to 12 Feeders

Page 48: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Miles of Transmission Line – Coop X

14

65

1 14 18

215

0

50

100

150

200

250

57 kV Line 69 kV Line 115 kV

2007

201260 Yr Old Line

New Line

Page 49: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

1105

259

52

498

102

1015

0

200

400

600

800

1000

1200

Small Cond -1PH Small Cond - 3PH Large Cond -3Ph

Mile

s o

f D

ist

Lin

e

2007 2012

60 Yr Old Line 12.47/7.2kV

New Line 24.94/14.4kV

Miles of Distribution Line – Coop X

Page 50: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Distribution Line Changes - 2007 to 2012

• 2012: 1090 miles of 3Ø (red) • 24.94/14.4kV

• 2007: 395 miles of 3Ø (red) • 12.47/7.2kV

Page 51: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Meters in Rural Mountrail County

1848

195

2043

4714

1688

6402

0

1000

2000

3000

4000

5000

6000

7000

1Ø Meters 3Ø Meters Total

2007

2012

Page 52: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

• Transmission, distribution and substation design

• Transportation – truck bypass

• Railroad oil loading facility

• Water and waste water facilities

• Power generation

HDR Activities in the Bakken

Page 53: Rockin’ the Bakken - Consortium of Universities for Sustainable

Build Out and Expansion

Page 54: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Workers and worker housing

Water: fresh water and water treatment – Frac water

Product transportation -- trucks, rail, pipelines

Electrical infrastructure and power supply

Environmental laws – future of hydraulic fracturing

Limitations to Development

Page 55: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

The Mystery City

Page 56: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Questions?

Page 57: Rockin’ the Bakken - Consortium of Universities for Sustainable

www.hdrinc.com

Typical Load Factor – Dec 15 to 22, 2012

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

1.00 49.00 97.00 145.00 193.00 241.00 289.00

Robinson Lake

Stony Creek

LF = 82%

LF = 97%