roc_cw_status_report_v21.xls
TRANSCRIPT
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
1/26
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
2/26
On air Week (All)
SITE TYPE BTS\CORE (Multiple Items)
SPECIAL PROJECT (Multiple Items)
PHASE NO PROJECT (All)
Count of SITECODE
RPREGION Total
1 1
2 3
4 5
5 1
6 2
Grand Total 12 1000
12 SITE TYPE BTS\CORE
988 SPECIAL PROJECT
ON AIR DATE
Site Secured Year
On air year 2013 Count of SITECODE
On air Week 5 RPREGION
SITE TYPE BTS\CORE (Multiple Items) 1
SPECIAL PROJECT (Multiple Items) 2
4
Count of SITECODE 5
STATE Total 6
CHITTAGONG 1 Grand Total
RAJSHAHI 1
SYLHET 1
Grand Total 3
Pending S
On air year
On Air Week 46
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
3/26
RFS WR Total
Zone 1 #REF! 8 #REF! 94
Zone 2 5 6 11 33
Zone 3 5 1 6 60
#REF! 15 #REF!
(Multiple Items)
(Multiple Items)
(blank)
(Multiple Items)
Total
2
11
4
2
1
20
ites
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
4/26
10818 10818 10802 10813 10818
7 7 7 7 7
SITECODE SITENAME SEARCH AREA Site Build bySITE TYPE
BTS\CORE
BH1206_1 BHATK1
fasson, bhola GP BTS\RBS
BS1210_1 BSTKH1
Barishal GP BTS\RBS
DH4160_1 DHBKB8 az m u n roa , a a GP BTS\RBS
DH4164_1 DHBSL7 az ra azar, a a GP BTS\RBS
DHM105_1 DHCK2Maw azar, a a
GP BTS\RBSNA0227_2 NATMD1 Thakur Manda, Manda, Naogaon GP BTS\RBS
NP0122_1 NPNBT1 Nekeboktu bz, Jaldhaka,Nilphamari GP BTS\RBS
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
5/26
10818 10818 10064 10807 10768 10804 3475
7 7 7 7 7 7 7
For Col locationPHASE NO
PROJECTPURPOSE DISTRICT STATE
SITETYP
ECW Site Last Status
BTS\RBS ROD 2012 Capacity Bhola BARISAL GF GF-Power
BTS\RBS ROD 2012 Capacity Barisal BARISAL GF GF-Power
BTS\RBS ROD 2012 Capacity Dhaka DHAKA RT RT-Ready for PISM
BTS\RBS ROD 2012 Coverage Dhaka DHAKA RT RT-Ready for PISM
BTS\RBS ROD 2012 Capacity Dhaka DHAKA MC RT-Ready for PISMBTS\RBS ROD 2012 Capacity Naogaon RAJSHAHI GF GF-Ready for PISM
BTS\RBS ROD 2012 Coverage Nilphamari RAJSHAHI GF GF-Ready for PISM
CW STATUS REPORT
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
6/26
1273 10818 370 6650 330
0 7 0 3 0
SPECIAL PROJECTBTS & COL
TOGETHERSITE CRITERIA BORDER SITE
DISTANCE FROM
BORDER
NO
NO
NO
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
7/26
7900 10108 3848 8706 251 8242 9478
0 6 1 7 0 5 1
SITE HUNTING
DONE
CW
SITEBUILD
BY
CW TOWER
PLAN
CW TOWER
TYPE
BORDER
PERMISSION
RECEIVED
PLAN ON AIR ON AIR DATE
GP 42mM
GP 42mM
GP Pole 1/30/2013
GP Pole 1/29/2013 1/30/2013
GP Pole 1/30/201342mM 2/4/2013
GP 42mM 42mM 1/31/2013
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
8/26
18 4307 5438 1 18 9956
0 0 5 0 0 6
SITE ON HOLD
TR SKETCH DONE
BY
(CW ENGINEER)
TR REQUIRED
[RP]
TR REQUIRED
[CW]
TR REQUIRED
[SD]TR DONE DATE
8/14/2012
NO 7/12/2012
YES 3/15/2012
YES 7/12/2012
YES 7/17/20124/26/2012
NO
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
9/26
8459 9117 10818 6610 8186 5792
7 7 7 5 7 0
TR DRAWING
VERSION DATE
TR REPORT
RECEIVED
TR REPORT
RECEIVED
WEEK NO
TR FINAL STATUSTR REPORT
APPROVED
RED MARK
DRAWING
RECEIVED
9/10/2012 8/8/2012 37 ACCEPTED 9/10/2012
9/11/2012 7/14/2012 37 ACCEPTED 9/11/2012
3/20/2012 3/18/2012 16 ACCEPTED 4/22/2012
7/16/2012 7/11/2012 30 ACCEPTED 7/29/2012
9/2/2012 7/24/2012 35 ACCEPTED 9/2/20127/23/2012 4/26/2012 30 7/24/2012
9/16/2012 9/13/2012 38 9/17/2012
Technical Review
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
10/26
7434 7208 7299 1806 8074 3878
7 7 7 0 7 7
TR DRAWING
DONE BY
TR DRAWING
GIVEN ON
TR DRAWING
RECEIVED
ON
TR
APPROVAL
CW USER
Go for Site Build Expected On Air
Communication 8/8/2012 8/13/2012 7/15/2012 Q3-2012
Panthonir 7/14/2012 7/16/2012 6/10/2012 Q2-2011
Pathikrith 3/18/2012 3/19/2012 2/9/2012 Q1-2012
D-Tech 7/11/2012 7/15/2012 6/14/2012 Q3-2012
D-Tech 7/24/2012 7/24/2012 5/29/2012 Q2-2012Abacus 4/26/2012 4/30/2012 2/9/2012 Q2-2012
MRJ 9/13/2012 9/16/2012 7/15/2012 Q4-2012
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
11/26
3730 1524 1523 1521 5906
7 6 6 6 3
Revised Expected
On AirGrowth factor
EOY forecasted
traffic
EOY average site
utilization
SITE
SECURED
PLAN
Q3-2012 1.10 90.00 85.00 8/28/2012
Q2-2011 1.30 70.00 130.00 9/3/2012
Q1-2012 1.17 50.00 100.00
Q3-2012 1.17 50.00 100.00
Q2-2012 1.17 50.00 100.00Q2-2012 7/19/2012
Q4-2012 1.10 145.00 146.00
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
12/26
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
13/26
3407 5728 8606 9036 9699 4136 3387
0 0 7 7 7 4 0
Drawing
Handed Over To
Imp
Drawing BOQ
received from PIP
CW INST
PLAN STARTKick Off CWSTART PILE FRAME
9/17/2012 9/11/2012 9/17/2012 YES
9/17/2012 9/11/2012 9/25/2012 YES
5/13/2012 5/9/2012 5/17/2012
9/22/2012 9/17/2012 9/22/2012
9/24/2012 9/20/2012 11/24/20127/29/2012 7/24/2012 9/13/2012 NO
11/17/2012 11/12/2012 11/27/2012 YES
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
14/26
847 3245 7588 6588 8338
0 0 7 4 7
Handed Over
To Vendor
Site Awarded to
Contractor
CW GP
SUPERVISOR
CW TOWER
SUPPLIER NAMECW CONTRACTOR
Md. Al Amin-83628 Confidence Steel Dhaly construction limited
Md. Al Amin-83628 Confidence Steel Dhaly construction limited
Ahsanur Russel as ern onsu ng ng neers v .
Rezaul Karim-0562 n e es gn ons ruc on
Ahsanur Russeln e es gn ons ruc on
Sohel Rana Confidence Steel Dhaly construction limited
ALIM UDDIN-1760 Confidence Steel United Design & Construction (UDC)
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
15/26
4675 6823 6534 2564 2582 7126
4 4 4 3 4 7
ACTUAL TOWER
CALL OFF
CW TOWER
ERECTED
CW TOWER ON
SITE
PLAN
FOUNDATION
CASTING
FOUNDATION
CASTING
ACTUAL
CW
FORECAST
COMPLETION
DATE
11/20/2012 12/2/2012 11/24/2012 9/27/2012 11/10/2012 12/15/2012
11/24/2012 12/11/2012 12/1/2012 11/10/2012 11/16/2012 12/31/2012
11/30/2012
1/20/2013
12/13/20121/14/2013 1/27/2013 1/18/2013 12/26/2012 12/27/2012 1/31/2013
1/10/2013 1/27/2013 1/18/2013 12/27/2012 1/27/2013
Civil Works Part
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
16/26
9660 3372 1180 2577 9404
7 7 0 5 7
CW
COMPLETE
COMMERCIAL
POWER
CONNECTION
AVAILABLE
TENTATIVE
COMMERCIAL
POWER
CONNECTION
POWER
CONNECTION DATE
RO PISM
MEETING
DONE
12/12/2012 Gen(Power Exemption) 1/30/2013
12/15/2012 Gen(Power Exemption) 1/30/2013
8/5/2012 Com.Power 12/22/2012 1/26/2013
12/12/2012 Com.Power 1/16/2013 1/26/2013
12/5/2012 Com.Power 12/20/2012 1/26/20131/27/2013 Com.Power 1/26/2013 1/30/2013
1/20/2013 Com.Power 1/19/2013 1/30/2013
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
17/26
2439 1206 5561 5121 5135 205
0 0 0 0 0 0
PISM Drawing
Received
PISM Handed Over
To Doc
PISM
CHECKLIST
RECEIVED
POINTS
ACQUIRED
RO PISM
SNAG
CLEARED
CW SNAG
LIST ISSUED
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
18/26
1589 692 148 747 3553
0 0 0 1 0
CW SNAG
LIST
CLEARED
GENERATOR
ROOM READYCW CRITERIA 1 CW CRITERIA 2 CW CRITERIA 3
Power problem
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
19/26
4172 199 9409 8049 9316
6 0 3 5 3
CURRENT STATUS CW CW Not InvolvedRO INST
STARTED
RO INST
PLAN
COMPLETED
RO INST
COMPLETE
17-Nov-12. BTS floor casting not done due to height
16-Nov-12
20/12/12. 12/12/2012 1/31/2013 12/15/2012
12/6/2012 12/9/2012 12/9/2012isolation transfermer can not be installed for H/O objection. 12/7/2012 1/30/2013 12/10/2012note submitted 2/2/2013
1/28/2013
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
20/26
2983 8360 36 8125 6793
7 7 0 4 0
TI EQP CALL OF
ISSUED
RO
EQUIPMENT
DELIV
RO SUPERVISOR
CONTRRO SUPERVISOR GP
RO
SITEFOLDER
COMPL
7/15/2012 12/4/2012
6/10/2012 12/4/2012
2/9/2012 12/11/2012 FRF-FRF
6/14/2012 12/5/2012 FRF-FRF
5/29/2012 12/6/2012 FRF-FRF1/27/2013 1/28/2013 FAT-FAT
7/15/2012 1/21/2013
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
21/26
6740 6890 1202 8775 4520 119
0 0 0 0 0 0
RO SITE
FOLDER TO OM
RO PRELIM
ACCEPTENS
TELE SNAG
LIST CLEARD
RO OM SNAG
LIST CLEARED
RO FINAL
ACCEPTECE
DONE
RO CRITERIA 1
Roll O
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
22/26
73 21 1558 9942 9263
0 0 5 6 6
RO CRITERIA 2 RO CRITERIA 3 Go for Site Securing Sanaction Load Phower Phase
8/27/2012 12 3
9/3/2012
4/5/2012 12 3
12 3
12 37/19/2012 8 1
10/1/2012 8 1
t Part
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
23/26
10103 1761 1761
6 7 7
BTS VENDOR NAMEUPLOAD AT WEB
( Infrastructure Input )
COMPLETION DAYS (28 DAYS)
( Infrastructure Input )
7/26/2012 0:00 8/23/2012 0:00
Huawei 6/18/2012 0:00 7/16/2012 0:00
Huawei 2/13/2012 0:00 3/12/2012 0:00
Huawei 6/21/2012 0:00 7/19/2012 0:00
Huawei 6/18/2012 0:00 7/16/2012 0:00Huawei 2/13/2012 0:00 3/12/2012 0:00
Huawei 8/12/2012 0:00 9/9/2012 0:00
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
24/26
1511 708 681
4 0 0
INTIMATION LETTER ISSUED
( Infrastructure Input)
TR SKETCH SEND TO
PLANNING
TR SKETCH
RECEIVED FROM
PLANNING
8/26/2012 0:00
3/19/2012 0:00
7/29/2012 0:00
3/19/2012 0:00
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
25/26
8190 8190 615 564
7 7 0 0
TR APPROVED BY PIPTR APPROVED DATE OF
PIP
OPTION
APPROVED BY PIP
APTION APPROVED DATE
OF PIP
ACCEPTED 9/10/2012 0:00
ACCEPTED 9/11/2012 0:00
ACCEPTED 3/20/2012 0:00
ACCEPTED 7/16/2012 0:00
ACCEPTED 9/2/2012 0:00ACCEPTED 7/23/2012 0:00
ON HOLD 9/16/2012 0:00
PIP PART
-
7/27/2019 ROC_CW_STATUS_REPORT_V21.xls
26/26
10812 10818
7 7
RPREGIONOn air
year
On air
Week
Site
Secured
Year
3 1900 0 20123 1900 0 20121
1 2013 5 2012
1 1900 0 20124 1900 0 2012
4 1900 0 2012