  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    1/26

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    2/26

    On air Week (All)

    SITE TYPE BTS\CORE (Multiple Items)

    SPECIAL PROJECT (Multiple Items)

    PHASE NO PROJECT (All)

    Count of SITECODE

    RPREGION Total

    1 1

    2 3

    4 5

    5 1

    6 2

    Grand Total 12 1000

    12 SITE TYPE BTS\CORE

    988 SPECIAL PROJECT

    ON AIR DATE

    Site Secured Year

    On air year 2013 Count of SITECODE

    On air Week 5 RPREGION

    SITE TYPE BTS\CORE (Multiple Items) 1

    SPECIAL PROJECT (Multiple Items) 2

    4

    Count of SITECODE 5

    STATE Total 6

    CHITTAGONG 1 Grand Total

    RAJSHAHI 1

    SYLHET 1

    Grand Total 3

    Pending S

    On air year

    On Air Week 46

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    3/26

    RFS WR Total

    Zone 1 #REF! 8 #REF! 94

    Zone 2 5 6 11 33

    Zone 3 5 1 6 60

    #REF! 15 #REF!

    (Multiple Items)

    (Multiple Items)

    (blank)

    (Multiple Items)

    Total

    2

    11

    4

    2

    1

    20

    ites

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    4/26

    10818 10818 10802 10813 10818

    7 7 7 7 7

    SITECODE SITENAME SEARCH AREA Site Build bySITE TYPE

    BTS\CORE

    BH1206_1 BHATK1

    fasson, bhola GP BTS\RBS

    BS1210_1 BSTKH1

    Barishal GP BTS\RBS

    DH4160_1 DHBKB8 az m u n roa , a a GP BTS\RBS

    DH4164_1 DHBSL7 az ra azar, a a GP BTS\RBS

    DHM105_1 DHCK2Maw azar, a a

    GP BTS\RBSNA0227_2 NATMD1 Thakur Manda, Manda, Naogaon GP BTS\RBS

    NP0122_1 NPNBT1 Nekeboktu bz, Jaldhaka,Nilphamari GP BTS\RBS

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    5/26

    10818 10818 10064 10807 10768 10804 3475

    7 7 7 7 7 7 7

    For Col locationPHASE NO

    PROJECTPURPOSE DISTRICT STATE

    SITETYP

    ECW Site Last Status

    BTS\RBS ROD 2012 Capacity Bhola BARISAL GF GF-Power

    BTS\RBS ROD 2012 Capacity Barisal BARISAL GF GF-Power

    BTS\RBS ROD 2012 Capacity Dhaka DHAKA RT RT-Ready for PISM

    BTS\RBS ROD 2012 Coverage Dhaka DHAKA RT RT-Ready for PISM

    BTS\RBS ROD 2012 Capacity Dhaka DHAKA MC RT-Ready for PISMBTS\RBS ROD 2012 Capacity Naogaon RAJSHAHI GF GF-Ready for PISM

    BTS\RBS ROD 2012 Coverage Nilphamari RAJSHAHI GF GF-Ready for PISM

    CW STATUS REPORT

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    6/26

    1273 10818 370 6650 330

    0 7 0 3 0

    SPECIAL PROJECTBTS & COL

    TOGETHERSITE CRITERIA BORDER SITE

    DISTANCE FROM

    BORDER

    NO

    NO

    NO

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    7/26

    7900 10108 3848 8706 251 8242 9478

    0 6 1 7 0 5 1

    SITE HUNTING

    DONE

    CW

    SITEBUILD

    BY

    CW TOWER

    PLAN

    CW TOWER

    TYPE

    BORDER

    PERMISSION

    RECEIVED

    PLAN ON AIR ON AIR DATE

    GP 42mM

    GP 42mM

    GP Pole 1/30/2013

    GP Pole 1/29/2013 1/30/2013

    GP Pole 1/30/201342mM 2/4/2013

    GP 42mM 42mM 1/31/2013

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    8/26

    18 4307 5438 1 18 9956

    0 0 5 0 0 6

    SITE ON HOLD

    TR SKETCH DONE

    BY

    (CW ENGINEER)

    TR REQUIRED

    [RP]

    TR REQUIRED

    [CW]

    TR REQUIRED

    [SD]TR DONE DATE

    8/14/2012

    NO 7/12/2012

    YES 3/15/2012

    YES 7/12/2012

    YES 7/17/20124/26/2012

    NO

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    9/26

    8459 9117 10818 6610 8186 5792

    7 7 7 5 7 0

    TR DRAWING

    VERSION DATE

    TR REPORT

    RECEIVED

    TR REPORT

    RECEIVED

    WEEK NO

    TR FINAL STATUSTR REPORT

    APPROVED

    RED MARK

    DRAWING

    RECEIVED

    9/10/2012 8/8/2012 37 ACCEPTED 9/10/2012

    9/11/2012 7/14/2012 37 ACCEPTED 9/11/2012

    3/20/2012 3/18/2012 16 ACCEPTED 4/22/2012

    7/16/2012 7/11/2012 30 ACCEPTED 7/29/2012

    9/2/2012 7/24/2012 35 ACCEPTED 9/2/20127/23/2012 4/26/2012 30 7/24/2012

    9/16/2012 9/13/2012 38 9/17/2012

    Technical Review

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    10/26

    7434 7208 7299 1806 8074 3878

    7 7 7 0 7 7

    TR DRAWING

    DONE BY

    TR DRAWING

    GIVEN ON

    TR DRAWING

    RECEIVED

    ON

    TR

    APPROVAL

    CW USER

    Go for Site Build Expected On Air

    Communication 8/8/2012 8/13/2012 7/15/2012 Q3-2012

    Panthonir 7/14/2012 7/16/2012 6/10/2012 Q2-2011

    Pathikrith 3/18/2012 3/19/2012 2/9/2012 Q1-2012

    D-Tech 7/11/2012 7/15/2012 6/14/2012 Q3-2012

    D-Tech 7/24/2012 7/24/2012 5/29/2012 Q2-2012Abacus 4/26/2012 4/30/2012 2/9/2012 Q2-2012

    MRJ 9/13/2012 9/16/2012 7/15/2012 Q4-2012

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    11/26

    3730 1524 1523 1521 5906

    7 6 6 6 3

    Revised Expected

    On AirGrowth factor

    EOY forecasted

    traffic

    EOY average site

    utilization

    SITE

    SECURED

    PLAN

    Q3-2012 1.10 90.00 85.00 8/28/2012

    Q2-2011 1.30 70.00 130.00 9/3/2012

    Q1-2012 1.17 50.00 100.00

    Q3-2012 1.17 50.00 100.00

    Q2-2012 1.17 50.00 100.00Q2-2012 7/19/2012

    Q4-2012 1.10 145.00 146.00

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    12/26

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    13/26

    3407 5728 8606 9036 9699 4136 3387

    0 0 7 7 7 4 0

    Drawing

    Handed Over To

    Imp

    Drawing BOQ

    received from PIP

    CW INST

    PLAN STARTKick Off CWSTART PILE FRAME

    9/17/2012 9/11/2012 9/17/2012 YES

    9/17/2012 9/11/2012 9/25/2012 YES

    5/13/2012 5/9/2012 5/17/2012

    9/22/2012 9/17/2012 9/22/2012

    9/24/2012 9/20/2012 11/24/20127/29/2012 7/24/2012 9/13/2012 NO

    11/17/2012 11/12/2012 11/27/2012 YES

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    14/26

    847 3245 7588 6588 8338

    0 0 7 4 7

    Handed Over

    To Vendor

    Site Awarded to

    Contractor

    CW GP

    SUPERVISOR

    CW TOWER

    SUPPLIER NAMECW CONTRACTOR

    Md. Al Amin-83628 Confidence Steel Dhaly construction limited

    Md. Al Amin-83628 Confidence Steel Dhaly construction limited

    Ahsanur Russel as ern onsu ng ng neers v .

    Rezaul Karim-0562 n e es gn ons ruc on

    Ahsanur Russeln e es gn ons ruc on

    Sohel Rana Confidence Steel Dhaly construction limited

    ALIM UDDIN-1760 Confidence Steel United Design & Construction (UDC)

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    15/26

    4675 6823 6534 2564 2582 7126

    4 4 4 3 4 7

    ACTUAL TOWER

    CALL OFF

    CW TOWER

    ERECTED

    CW TOWER ON

    SITE

    PLAN

    FOUNDATION

    CASTING

    FOUNDATION

    CASTING

    ACTUAL

    CW

    FORECAST

    COMPLETION

    DATE

    11/20/2012 12/2/2012 11/24/2012 9/27/2012 11/10/2012 12/15/2012

    11/24/2012 12/11/2012 12/1/2012 11/10/2012 11/16/2012 12/31/2012

    11/30/2012

    1/20/2013

    12/13/20121/14/2013 1/27/2013 1/18/2013 12/26/2012 12/27/2012 1/31/2013

    1/10/2013 1/27/2013 1/18/2013 12/27/2012 1/27/2013

    Civil Works Part

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    16/26

    9660 3372 1180 2577 9404

    7 7 0 5 7

    CW

    COMPLETE

    COMMERCIAL

    POWER

    CONNECTION

    AVAILABLE

    TENTATIVE

    COMMERCIAL

    POWER

    CONNECTION

    POWER

    CONNECTION DATE

    RO PISM

    MEETING

    DONE

    12/12/2012 Gen(Power Exemption) 1/30/2013

    12/15/2012 Gen(Power Exemption) 1/30/2013

    8/5/2012 Com.Power 12/22/2012 1/26/2013

    12/12/2012 Com.Power 1/16/2013 1/26/2013

    12/5/2012 Com.Power 12/20/2012 1/26/20131/27/2013 Com.Power 1/26/2013 1/30/2013

    1/20/2013 Com.Power 1/19/2013 1/30/2013

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    17/26

    2439 1206 5561 5121 5135 205

    0 0 0 0 0 0

    PISM Drawing

    Received

    PISM Handed Over

    To Doc

    PISM

    CHECKLIST

    RECEIVED

    POINTS

    ACQUIRED

    RO PISM

    SNAG

    CLEARED

    CW SNAG

    LIST ISSUED

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    18/26

    1589 692 148 747 3553

    0 0 0 1 0

    CW SNAG

    LIST

    CLEARED

    GENERATOR

    ROOM READYCW CRITERIA 1 CW CRITERIA 2 CW CRITERIA 3

    Power problem

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    19/26

    4172 199 9409 8049 9316

    6 0 3 5 3

    CURRENT STATUS CW CW Not InvolvedRO INST

    STARTED

    RO INST

    PLAN

    COMPLETED

    RO INST

    COMPLETE

    17-Nov-12. BTS floor casting not done due to height

    16-Nov-12

    20/12/12. 12/12/2012 1/31/2013 12/15/2012

    12/6/2012 12/9/2012 12/9/2012isolation transfermer can not be installed for H/O objection. 12/7/2012 1/30/2013 12/10/2012note submitted 2/2/2013

    1/28/2013

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    20/26

    2983 8360 36 8125 6793

    7 7 0 4 0

    TI EQP CALL OF

    ISSUED

    RO

    EQUIPMENT

    DELIV

    RO SUPERVISOR

    CONTRRO SUPERVISOR GP

    RO

    SITEFOLDER

    COMPL

    7/15/2012 12/4/2012

    6/10/2012 12/4/2012

    2/9/2012 12/11/2012 FRF-FRF

    6/14/2012 12/5/2012 FRF-FRF

    5/29/2012 12/6/2012 FRF-FRF1/27/2013 1/28/2013 FAT-FAT

    7/15/2012 1/21/2013

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    21/26

    6740 6890 1202 8775 4520 119

    0 0 0 0 0 0

    RO SITE

    FOLDER TO OM

    RO PRELIM

    ACCEPTENS

    TELE SNAG

    LIST CLEARD

    RO OM SNAG

    LIST CLEARED

    RO FINAL

    ACCEPTECE

    DONE

    RO CRITERIA 1

    Roll O

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    22/26

    73 21 1558 9942 9263

    0 0 5 6 6

    RO CRITERIA 2 RO CRITERIA 3 Go for Site Securing Sanaction Load Phower Phase

    8/27/2012 12 3

    9/3/2012

    4/5/2012 12 3

    12 3

    12 37/19/2012 8 1

    10/1/2012 8 1

    t Part

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    23/26

    10103 1761 1761

    6 7 7

    BTS VENDOR NAMEUPLOAD AT WEB

    ( Infrastructure Input )

    COMPLETION DAYS (28 DAYS)

    ( Infrastructure Input )

    7/26/2012 0:00 8/23/2012 0:00

    Huawei 6/18/2012 0:00 7/16/2012 0:00

    Huawei 2/13/2012 0:00 3/12/2012 0:00

    Huawei 6/21/2012 0:00 7/19/2012 0:00

    Huawei 6/18/2012 0:00 7/16/2012 0:00Huawei 2/13/2012 0:00 3/12/2012 0:00

    Huawei 8/12/2012 0:00 9/9/2012 0:00

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    24/26

    1511 708 681

    4 0 0

    INTIMATION LETTER ISSUED

    ( Infrastructure Input)

    TR SKETCH SEND TO

    PLANNING

    TR SKETCH

    RECEIVED FROM

    PLANNING

    8/26/2012 0:00

    3/19/2012 0:00

    7/29/2012 0:00

    3/19/2012 0:00

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    25/26

    8190 8190 615 564

    7 7 0 0

    TR APPROVED BY PIPTR APPROVED DATE OF

    PIP

    OPTION

    APPROVED BY PIP

    APTION APPROVED DATE

    OF PIP

    ACCEPTED 9/10/2012 0:00

    ACCEPTED 9/11/2012 0:00

    ACCEPTED 3/20/2012 0:00

    ACCEPTED 7/16/2012 0:00

    ACCEPTED 9/2/2012 0:00ACCEPTED 7/23/2012 0:00

    ON HOLD 9/16/2012 0:00

    PIP PART

  • 7/27/2019 ROC_CW_STATUS_REPORT_V21.xls

    26/26

    10812 10818

    7 7

    RPREGIONOn air

    year

    On air

    Week

    Site

    Secured

    Year

    3 1900 0 20123 1900 0 20121

    1 2013 5 2012

    1 1900 0 20124 1900 0 2012

    4 1900 0 2012