robotic football project review board 3 team members: nathan rosenbaum, me keegan ross, me zachary...

10
Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering Ed. Advisors: Dr. LeBlanc Dr. Yoder

Upload: victoria-singleton

Post on 04-Jan-2016

218 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering

Robotic Football Project Review Board 3Team Members:Nathan Rosenbaum, ME

Keegan Ross, MEZachary Myers, EEJoshua Chenault, EE

Tyler Hertenstein, Engineering Ed.

Advisors:Dr. LeBlancDr. Yoder

Page 2: Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering

Overview

• Wide Receiver Assembly• Wide Receiver Bluetooth Communication• Pivot and Vision System for WR/QB• Quarterback Assembly• Test Stand Assembly

Page 3: Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering

Wide Receiver Assembly

• Completed– Construction and assembly– Sensor Mast assembled– “RobotCore” implemented

• To be Completed– Soldering final connections– Protective netting– Testing– Pre-game preparations

Page 4: Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering

Wide Receiver Bluetooth Communication

• To be Completed– Parsing data from characters to give proper commands

• LED• Mast Motor control• Manual Override Controls

• Completed– Sending

individual bytes from lower to upper Arduino microcontrollers

Page 5: Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering

Pivot and Vision System for WR/QB

• Completed– Implemented PID controller (QB)– Moving Average filter of last 5 readings

• To be Completed– Manual Override– False Positive Filter– Gain Scheduling– Conversion factor for PID Controller (WR)

Page 6: Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering
Page 7: Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering
Page 8: Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering

Quarterback Assembly

• Completed– CNC cut plastic for lower

assembly– Lower base completed

• To be completed– Pitching system– Upper Platform

Construction– Sensor Mast

Page 9: Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering

Test Stand Assembly

• Completed– Cut Pieces– Machined Components– Frame and swinging arm

assembled

• To be Completed– Sliding Base– Testing– Configuration of swinging

height