roads and ramps of ae3, faridanad
TRANSCRIPT
The “ramps” connecting newly built 60 Ft. Central Road
with internal roads were not made by the contractor anywhere in AE3.
The RWA had explained, that the contractor has refused to make the ramps citing it is not in his contract with MCF.
The level of Central Road has been raised by 10 inches, and it is well above the level of quite a few homes now.
Have you noticed . . . .
Surprisingly, the same contractor has built pretty
good ramps for roads connecting Vasundhra and
Gulmohar pockets.
Please check yourself, if you haven’t noticed yet.
Don’t you think, this is because the RWAs of Vasundhra and Gulmohar pockets are genuinly concerned and involved in issues that matter.
While our self elected RWA office bearers and their handful of supporters are always busy in
beating their own drums and exaggerating small things like repair of a street light.