road no.1 sha’ar hagay - jerusalem
DESCRIPTION
Road No.1 Sha’ar Hagay - Jerusalem. September 2011. Regional Map. Tel - Aviv. Sha’ar Hagay. Jerusalem. General description and project’s goals. General - PowerPoint PPT PresentationTRANSCRIPT
1
Road No.1Road No.1 Sha’ar Hagay- JerusalemSha’ar Hagay- Jerusalem
September 2011September 2011
2JerusalemJerusalem
Sha’ar Sha’ar Hagay Hagay
Tel - Tel - AvivAviv
Regional Map
3
GeneralGeneral description and project’s goalsdescription and project’s goals
General
Road no. 1 serves as the central artery and access gate to Jerusalem. This road is defined in the regional zoning plan as a “highway”, but in practice does not meet the current functional criteria that define a highway.
The section from Sha’ar Hagay to Jerusalem is comprised of 2 lanes in each direction, and is already incapable of supporting the traffic volumes presently using this section.
The road includes a narrow median, is bordered by narrow shoulders and by safety guardrails that do not comply with the new, currently accepted standards.
4
GeneralGeneral description and project’s goalsdescription and project’s goals
General (cont.)
Long sections of the road are inclined, and the road also includes sharp and dangerous curves.
Delays in the traffic flow in this section are routine, even in non-peak hours, and sometimes even in the late evening hours and at night.
5
GeneralGeneral description and project’s goalsdescription and project’s goals
Project goals:
Upgrading and expanding road no. 1 in the section from the Sha’ar Hagay interchange to the Motza interchange in the Arazim valley area – a total of about 16 Km.
Transforming the national road to Jerusalem into a 3-lane, bi-directional road, with a design speed of 90 KPH, modifying the road to meet safety guidelines, and turning it into an environmentally friendly and scenic road, properly corresponding to its transport importance as the gateway to Israel’s capital city.
6
GeneralGeneral description and project’s goalsdescription and project’s goals
Project goal:•Increasing the design speed to 90 KPH (driving speed of 90 KPH).•Increasing the road’s affective capacity.•Shortening driving times.•Improving driving comfort.•Reducing the incidents of queues or irregularity in the traffic flow.•Safety improvements aimed at reducing the number of road accidents.•Upgrading of lighting and drainage systems, conducting scenic restoration work and treating slopes, quarrying & filling.
7
The basic cross section width for the road will be 35 meters, and will include: 3 lanes in each direction, a median at a reduced width of 4 meters, and 3 meter wide shoulders on each side. The grade will reach a maximum of 8%.
Typical basic cross-sectionTypical basic cross-section
8
GeneralGeneral description and project’s goalsdescription and project’s goals
Major elements:•Construction of 3 interchanges: Kiryat Yearim, Hemmed and Harrel
•Construction of 2 tunnels, each 650 meters long (Harrel Tunnels)
•Construction of 2 bridges, each 800 meters long (Motza Bridges)
•Building of retaining walls, including temporary walls during construction stages
•Building underground agricultural crossings
•Building a 90 meter long ecological bridge
•Executing paving and infrastructure work on a total of 16 km. along road no. 1
•Executing scenic landscaping work, including restoration of slopes
9
Sha’ar Hagay – Shoresh section
10
Sha’ar Hagay – Shoresh section
11
Typical low fill sectionTypical low fill section
1.301.30 10.80 10.80 3.003.00 2.002.00 רוחבפעיל
רוחבפעיל שולייםשוליים מסעהמסעה מפרדה
ע.ת. מתוכנן
ע.ת. מתוכנן
0.70
H 2מעקה בטון לרמת בלימה
12
1.301.30 10.80 10.80 3.003.00 2.002.00
רוחבפעיל
רוחבפעיל שולייםשוליים מסעהמסעה מפרדה
ע.ת. מתוכנן H 2מעקה בטון לרמת בלימה
ע.ת. מתוכנן
Typical high fill sectionTypical high fill section
13
10.80 10.802.00 רוחבפעיל
רוחבפעיל
שולייםשוליים מסעהמסעה מפרדה
0.702.003.00 3.00 1.301.30
ע.ת. מתוכנן
ע.ת. מתוכנן
תעלת בטון מלבנית לניקוז
H 2מעקה בטון לרמת בלימה
Typical cut sectionTypical cut section
14
23,40
21,40
1.01.0 1.01.03.63.63.6 3.6 1.2 1.2
0.6
רוחברוחבפעיל
פעיל
שולייםזמניים
שולייםזמניים
מיסעהזמנית
מיסעהזמנית
מיסעהזמנית
מיסעהזמנית
מפרדהזמנית
Minimal section for execution stagesMinimal section for execution stages
15
מילוי
Typical section for execution stage 1
16
מילוי
קיר תומך זמני
Typical section for execution stage 2
17
מילוי
קיר תומך זמני
Typical section for execution stage 3
18
מילוי
Typical section for execution stage 4
19
מחלף קרית יעריםמחלף שורש
שואבה
לתל אביבקרית יערים/טלזסטון
לירושלים
Shoresh – Kiryat Yearim section
20
לתל אביב
מחלף קרית יעריםלירושלים
מחלף חמד
Kiryat Yearim – Hemmed section
21
Typical cut sectionTypical cut section
22
מחלף חמדמחלף הראל
מנהרת הראלגשר מוצא
ואדי ארזה
Hemmed – Motza section
23
Hemmed Interchange Hemmed Interchange
24
Hemmed Interchange – Long section Hemmed Interchange – Long section
25
Hemmed-Harrel – Long section Hemmed-Harrel – Long section
26
Typical section for execution stage 1
27
Typical section for execution stage 2
28
Typical section for execution stage 3
29
Typical section for execution stage 4
30
Typical section for execution stage 5
31
Final typical section
32
Harrel Tunnels & Interchange Harrel Tunnels & Interchange
Two tunnels, each 650 meters long
33
'מ 15 – 18 'מ15.5 'מ15.5
Harrel Tunnels – Typical section Harrel Tunnels – Typical section
34
Harrel Tunnels – Typical section Harrel Tunnels – Typical section
35
Harrel Tunnel
Motza bridge
Arza Wadi
Arza Wadi
36
Arza Wadi – Typical section for flow drainage
37
Arza Wadi – Quantities, earthworks and filter
38
Motza Bridge - General LayoutMotza Bridge - General Layout
Two tunnels, each 800 meters long
39
Motza Bridge – relocating power lines Motza Bridge – relocating power lines
40
Motza Bridge – Long section Motza Bridge – Long section
41
Motza Bridge –Typical section Motza Bridge –Typical section
42
General ScheduleGeneral Schedule
43
Thank You