ROAD & HIGHWAY PROJECT BOOK Over 65 years opening the way underground

Upload: lytu

Post on 07-Feb-2018

217 views

Category:

Documents


3 download

TRANSCRIPT

ROAD & HIGHWAY

PROJECT BOOKOver 65 years opening the way underground

PRESENTATIONOSSA, founded in 1952, is a leading company in the underground construction sector specializing in three business

areas: Construction, Energy and Mining.

Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

OSSA is a solid underground works partner for important industrial and construction groups internationally. At OSSA

we are highly commited to Quality, Health and safety, and Environment, and we invest in Research and Development

Projects at an international level. We promote a culture of respect and teamwork among our team.

OSSA has vast recent experience both in high speed railway tunnels with over 60 km of high speed rail tunneling projects

in the last five years, leading the Spanish market in this specialty, and also in underground power plants, having built

over fifteen underground plants with some of the largest underground caverns in the world. As a recent highlight, we are

participating in the design and construction of the Hong Kong to Shangai High Speed Rail Line.

Internationally OSSA has executed works in Hong Kong, Taiwan, Chile, Peru, Colombia, Panama, Costa Rica, Brasil and

Nicaragua and is recently focusing its tendering activity in North America, Central America, Asia, Canada and Great Britain.

After 65 years of success, our strategy is to continue expanding internationally, and to support large civil engineering and

mining industry clients at all levels, contributing our vast technical expertise and our equipment fleet, while prioritizing

health and safety and innovation in all our projects.

SAFETYSafety is Obras Subterraneas, S.A.’s main asset from the time when its operations begin, demanded by the specialisation

required for the works carried out underground.

The company’s staff have a high degree of professionalism and specialisation, which has been achieved after many years

of training and the transfer of know how. Working in confined spaces with the presence of gas, dust, noise, low visibility

and the use of explosives means that the Obras Subterraneas, S.A.’s security department is the most relevant in the

company.

The use of cutting-edge, innovative techniques in the field of underground works requires the continuous training of the

company’s human resources.

Project photos

Conventional top heading and benching with drilling and blasting or mechanical means support in accordance with natm

STRUCTURE

NayaritPROVINCE

MexicoCOUNTRY

CompostelaPLACE

The work consists of the excavation and support, using top heading and benching, of three road tunnels with a trunk section of 21.1 m x 11.4 m. The total length of the excavation of the 3 tunnels is 595 m (240 m, 235 m, 120 m), with a longitudinal slope of between 0.3 to 3.0% and a maximum and minimum overburden of 40 m and 12 m respectively. The excavation will be done using conventional means. The supports used will be based on: Shotcrete, corrugated grout rock bolts, metallic trusses with IR type profile 203 x 59.6k kg/m. The final reinforced concrete lining will be installed to thickness of 40 cm. During this stage 6 false tunnels will be also be built, one for each tunnel mouth, resulting in a total of 245 m of false tunnels.

Cross section: 21.1 m x 11.4 m 192 m²

Lenght: Mine Tunnels: 595 m, False Tunnels: 245 mGEOMETRY

12-40 mOVERBURDEN

Excavation by drilling and blasting or mechanical means support in accordance with natm

METHODOF TUNNELING

Volcanic rocks: rhyolitic ignimbrites, andesitic ignimbrites, rhyolitic breccias, andesitic breccias and andesitic lavas

GEOLOGY ANDGEOTECHNICAL DATA

Three-arm hydraulic drilling jumboShotcrete robotExcavatorFront bucket loader

TUNNEL EQUIPMENT

8,404,567 USDBUDGET(EXCLUDING VAT)

ROAD & HIGHWAY

Type Project

Owner: AZVI-GIA

CONSTRUCTION DATA SHEET

01

Start: 05/2017STATUS

End: Currently being executed

GUADALAJARA-PUERTO VALLARTA MOTORWAY, COMPOSTELA LAS VARAS;PASO DEL JAGUAR” TUNNEL , “LAS TRUCHAS” TUNNEL, “PASO DEL PUMA” TUNNEL

LOCATIONANDADDITIONALINFORMATION

Project photos

Road TunnelSTRUCTURE

AntioquiaPROVINCE

ColombiaCOUNTRY

VeneciaPLACE

Double-carriageway road tunnel corresponding to functional units 1, 2 and 3 of the project identified as ‘Pacific Connection Highway 1’, which in turn falls within a larger project identified as ‘Highways for Prosperity’, awarded to a public-private association by the Agencia Nacional de Infraestructura Colombiana (ANI, Colombian National Infrastructure Agency).

LOCATIONANDADDITIONALINFORMATION

115 mOVERBURDEN

Progress by stages in accordance with the New Austrian Tunnelling Method (NATM), support with shotcrete reinforced with synthetic fibres and metallic trusses.

METHODOF TUNNELING

Moderately fractured bedrock, with weathering, oxidation and soft fill (lime and clay). Common occurrence of drips and even high water flow pressures through the discontinuities.

GEOLOGY ANDGEOTECHNICAL DATA

JumboRobotTelescopic handler

TUNNEL EQUIPMENT

72,5 billion COPBUDGET(EXCLUDING VAT)

ROAD & HIGHWAY

Type Project

Owner: Consorcio Constructor Pacífico 1

CONSTRUCTION DATA SHEET

02

Start: 04/2018STATUS

End: 11/2019

EXECUTION OF THE EXCAVATION, SUPPORT AND PRE-SUPPORTOF THE SINIFANÁ TUNNEL

Double-carriageway tunnel,1,400 m each, 85 m2 cross-section

GEOMETRY

Project photos

Roadway tunnelsSTRUCTURE

Mexico statePROVINCE

MexicoCOUNTRY

AtizapanPLACE

The project includes 2 road tunnels, Cahuacan and Los Gallos, 113 and 208 meters long respectively. The excavation in top heading and bench. The whole route goes with 14 m long self-drilling bolts as canopy and self-drilling micropiles in portals. Also IR 152x37.2 steel arches each meter.

LOCATIONANDADDITIONALINFORMATION

Cross section: 220 m²

Lenght: Cahuacan: 113 m; Los Gallos: 208 mGEOMETRY

Maximum 55 metersOVERBURDEN

Mechanical meansMETHODOF TUNNELING

Clay and sandstonesGEOLOGY ANDGEOTECHNICAL DATA

Jumbo XL3CRobot PM 500NormetTelehandler

TUNNEL EQUIPMENT

291,532,096.37 MXNBUDGET(EXCLUDING VAT)

ROAD & HIGHWAY

Type Project

ATIZAPÁN-ATLACOMULCO HIGHWAY TUNNELS

Owner: CPVM S.A. DE C.V.

CONSTRUCTION DATA SHEET

03

Start: 02/2018STATUS

End: 03/2019

Project photos

Start: 02/2014

End: 08/2017STATUS

TunnelsSTRUCTURE

São PauloPROVINCE

BrazilCOUNTRY

São PauloPLACE

The work involves the excavation and support of two parallel road tunnels 474 m and 418 m in length, both with a cross-section of approximately 200 m2.

LOCATIONANDADDITIONALINFORMATION

Cross section: 200 m²

Lenght: 892 mGEOMETRY

MediumOVERBURDEN

NATM. Drill and blast and mechanical excavationMETHODOF TUNNELING

Phyllite with possible intercalated schists and quartzitesGEOLOGY ANDGEOTECHNICAL DATA

Shotcrete robotAtlas Copco three-boom jumboBackhoe loaderTelehandler

TUNNEL EQUIPMENT

53,015,618.99 BRL.BUDGET(EXCLUDING VAT)

Type Project

RODOANEL. SÃO PAULO METROPOLITAN RING ROAD. TUNNEL 7. PACKAGE 5

Owner: Construcap - Copasa

CONSTRUCTION DATA SHEET ROAD & HIGHWAY

04

Project photos

Road TunnelSTRUCTURE

Estado NayaritPROVINCE

MexicoCOUNTRY

CompostelaPLACE

Excavation and support of 234 m of bored tunnel. Waterproofing, reinforcement and coating with a formwork carriage in 234 m of bored tunnel and 10 m of cut and cover tunnel (5 m at either entrance).

Maximum 75 mOVERBURDEN

NATM (pre-tunnelling and excavation phases)Drilling and blasting and mechanical means

METHODOF TUNNELING

Gray and greenish andesite, volcano-sedimentarysequence

GEOLOGY ANDGEOTECHNICAL DATA

Jumbo XL3CJumbo L2CRobojet SIKA PM500

TUNNEL EQUIPMENT

73,197,931.41 MXNBUDGET(EXCLUDING VAT)

ROAD & HIGHWAY

Type Project

C-304 COMPOSTELA TUNNEL

Owner: Acciona Infraestructuras México, S.A. de C.V.

CONSTRUCTION DATA SHEET

05

Start: 03/2016STATUS

End: 02/2017

Cross section: 130 m²GEOMETRY

Lenght: 244 m; 234 m of bored tunnel and 10 m of cut and cover tunnel (5 m at either entrance)

LOCATIONANDADDITIONALINFORMATION

Type Project

TUNNELS FOR ACAPULCO WEST BYPASS

Project photos

Owner: Mota Engil

Start: 01/2015

End: 02/2017STATUS

Road TunnelSTRUCTURE

State of GuerreroPROVINCE

MexicoCOUNTRY

Acapulco de JuárezaPLACE

The work consists of executing three road tunnels. The tunnels to be constructed are: Agustín Lara Tunnel (80 m), Costa Grande Tunnel (90 m) and María Bonita Tunnel (480 m). All three tunnels have an excavation cross-section of 191.3 m2. The excavation will be carried out by drill and blast in the areas of intact rock and by mechanical equipment in the areas where the quality of the ground is poor, following the construction philosophy of the New Austrian Method.

Cross section: 190 m²

Lenght: 650 mGEOMETRY

MediumOVERBURDEN

NATM. Conventional methodsMETHODOF TUNNELING

Muscovite gneissGEOLOGY ANDGEOTECHNICAL DATA

Model L2C and XL3C 2- and 3-boom jumbosModel PM-500 shotcrete robotTelehandler

TUNNEL EQUIPMENT

6,348,000 €BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET ROAD & HIGHWAY

06

LOCATIONANDADDITIONALINFORMATION

Type Project

RODOANEL. SÃO PAULO METROPOLITAN RING ROAD. TUNNEL 6. PACKAGE 4

Owner: Acciona Infraestructuras

CONSTRUCTION DATA SHEET

Project photos

Start: 02/2014

End: 08/2016STATUS

TunnelsSTRUCTURE

São PauloPROVINCE

São PauloCOUNTRY

São PauloPLACE

The work involves the excavation and support of two parallel road tunnels 212 m and 248 m in length, both with a cross-section of approximately 200 m2.

Cross section: 200 m²

Lenght: 212 ml + 248 mlGEOMETRY

MediumOVERBURDEN

NATM. Drill and blast and mechanical excavationMETHODOF TUNNELING

Phyllite with possible intercalated schists and quartzitesGEOLOGY ANDGEOTECHNICAL DATA

Shotcrete robotAtlas Copco three-boom jumboBackhoe loaderTelehandler

TUNNEL EQUIPMENT

33,402,942.77 BRL.BUDGET(EXCLUDING VAT)

ROAD & HIGHWAY

07

LOCATIONANDADDITIONALINFORMATION

Type Project

Project photos

Owner: Arteris

Start: 01/2015

End: 06/2016STATUS

Roadway TunnelsSTRUCTURE

São PauloPROVINCE

BrazilCOUNTRY

JuquitibaPLACE

The project consists of duplicating the carriageway of the current BR-116 highway linking São Paulo with Curitiba between kilometre points 348+900 and 349+300. The works to be carried out consist of:

• Construction of accesses to the tunnel entrances.• Excavation and support of a road tunnel 392 m long with a final cross-section of 170 m2. • Execution of the tunnel’s internal structures:

• Paving• Lining• Drainage

Cross section: 170 m2

Lenght: 392 mGEOMETRY

MediumOVERBURDEN

NATM. Mechanical equipmentMETHODOF TUNNELING

Gneiss and soilsGEOLOGY ANDGEOTECHNICAL DATA

Three-boom jumboShotcrete robot Telehandler

TUNNEL EQUIPMENT

62,000,000 R$BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET REGIS BITTENCOURT MOTORWAY. BR-116 HIGHWAY: SÃO PAULO – CURITIBA. DUPLICATION IN THE SERRA DO CAFEZAL. EXECUTION OF SECTION 3. TUNNEL 4.ROAD & HIGHWAY

08

LOCATIONANDADDITIONALINFORMATION

Project photos

Start: 05/2013

End: 09/2014STATUS

Road TunnelSTRUCTURE

PunoPROVINCE

PeruCOUNTRY

San Gaban, OllacheaPLACE

The work consists of excavating a motorway tunnel. This will be realised using conventional means and by using NATM techniques. Tunnel support will be applied using shotcrete, rectangular girders and bolts with umbrella heads.

Cross section: 65–93 m²

Lenght: 373 mGEOMETRY

MediumOVERBURDEN

Drill and blast. NAMT System(Segments excavated in advance destructively)

METHODOF TUNNELING

Metaquartzites and fluvioglacial depositsGEOLOGY ANDGEOTECHNICAL DATA

Atlas Copco Boomer L2c (dual booms)ManitouSika PM-500

TUNNEL EQUIPMENT

23,460,818 US$BUDGET(EXCLUDING VAT)

Type Project

WAYRANSECCA TUNNEL

Owner: INTERSUR (Camargo Correa – Andrade – Galvao)

CONSTRUCTION DATA SHEET ROAD & HIGHWAY

09

LOCATIONANDADDITIONALINFORMATION

Type Project

SUHUA IMPROVEMENT C1 TUNNELS

Project photos

Owner: Chieh Hsing

Start: 09/2012

End: 04/2014STATUS

TunnelsSTRUCTURE

Huan LianPROVINCE

TaiwanCOUNTRY

Xiu Lin ShangPLACE

The work involves implementing two parallel highway tunnels of 3,863 m each and with an excavation section of 18 m2. The tunnels are excavated with conventional methods using explosives. Injected concrete, bolts and trusses are used for supporting the tunnels.

Cross section: 118 m²

Length: 2 x 3,863 mGEOMETRY

HighOVERBURDEN

NATM Drill and blastMETHODOF TUNNELING

Marble and gneissGEOLOGY ANDGEOTECHNICAL DATA

XL3C type three-booms jumbosManitou MRT 1650Putzmeister PM500 Robot

TUNNEL EQUIPMENT

39,229,050 €BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET ROAD & HIGHWAY

10

LOCATIONANDADDITIONALINFORMATION

Type Project

T2 E-65 CENTRAL GREECE MOTORWAY

Project photos

STATUSStart: 01/2010

End: 05/2013

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

TUNNEL EQUIPMENT

Owner: Ferrovial Agroman

High

NATM Drill and blast, Reinforced Concrete Lining, Finishes

GEOLOGY ANDGEOTECHNICAL DATA Sandstones, Limestones, Clay

Tunnels

Greece

Fthiotidas

Domokos

37,000,000 €

Construction of twin highway tunnels for the E-65 Motorway in Central Greece. The tunneled length is 3,000 m with 106 m2 in cross section each tube. Excavated alternating rockbreakers and jumbo drill rigs.

Main Quantities: 414,000 m3 of excavation, 57,000 m3 of shotcrete, 345,100 m of rockbolts type 25 mm diameter, 3,500 t of steel rib arches, 105,000 m3 of reinforced concrete, 3,000 t of steel reinforcement, and 306,000 m2 of steel wire mesh.

Two and Three boom jumbos Tamrock Paramatic 316, Putzmeister PM 500 robojets, Manitous

Cross section: 106 m2

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET ROAD & HIGHWAY

11

LOCATIONANDADDITIONALINFORMATION

Type Project

EL CARMEN III TUNNEL – SOIL SECTION

Project photos

Owner: Intersur

Start: 07/2012

End: 02/2013STATUS

TunnelsSTRUCTURE

Puno DistrictPROVINCE

PeruCOUNTRY

San GabánPLACE

The work involves the implementation of a 300 m long highway tunnel sector in soils and with a 65 m2 section belonging to the South Section No. 4 Azangaro Interoceanic Road Corridor - Inambari Bridge.

The main support units to be applied in the tunnel are based on concrete injected in layers of different thicknesses, electro-welded mesh and anchor bolts.

Cross section: 65 m²

Length: 300 mGEOMETRY

LowOVERBURDEN

Excavation with mechanical resourcesMETHODOF TUNNELING

SoilsGEOLOGY ANDGEOTECHNICAL DATA

Jumbo L2CManitou MRT 1650Putzmeister PM500 Robot

TUNNEL EQUIPMENT

4,623,021.66 US$BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET ROAD & HIGHWAY

12

LOCATIONANDADDITIONALINFORMATION

Type Project

EL CARMEN TUNNEL

Project photos

Owner: Intersur

Start: 06/2012

End: 01/2013

Tunnels

Puno District

Peru

San Gabán

Cross section: 65 m²

Length: 600 m

Low

Excavation with mechanical excavationand with perforation and blasting

Schists and Soils

Jumbo L2CManitou MRT 1650Putzmeister PM500 Robot

5,459,550.83 US$

Work consists of building a bypass tunnel on theSouthern Interoceanic Highway (Peru-Brazil).Section 4: Azángaro – Inambaribridge.

32,300 m3 of land will be excavated. Main support units to be applied to the tunnel: 2,000 m3 of shotcrete, 13,500 bolts, 9,000 m2 of netting, 3,500 m of cross-linked trusses, 1,300 ml of 88.9 mmmicropile and 4,060 ml of Marchiavanti bolts.

STATUS

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET ROAD & HIGHWAY

13

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

Project photos

Owner: Govern d’Andorra

Start: 07/2008

End: 01/2012STATUS

TunnelsSTRUCTURE

AndorraPROVINCE

AndorraCOUNTRY

EncampPLACE

The works consisted of building a service gallery parallel to the existing Envalira tunnel.

The 2,932 m gallery is linked to the existing tunnel by 11 cross galleries (9 for pedestrians with a cross section of 18 m2 and 2 for vehicles with a cross section of 24 m2.

The support elements were 150x150x6 mesh, 25 mm f-bolts, shotcrete with and without fibres, TH and HEB trusses, and self-drilling bolts.

Cross section: 18 m²

Length: 2.932 mGEOMETRY

MediumOVERBURDEN

Mechanical means and with drill and blastMETHODOF TUNNELING

Quartzites, schists and phyllitesGEOLOGY ANDGEOTECHNICAL DATA

ITC, shotcrete robotTUNNEL EQUIPMENT

20,804,964 €BUDGET(EXCLUDING VAT)

SERVICE AND EVACUATION GALLERY PARALLEL TO ENVALIRA TUNNEL CONSTRUCTION DATA SHEET

14

LOCATIONANDADDITIONALINFORMATION

Type Project

KALYDONA TUNNEL

Project photos

STATUSStart: 01/2010

End: 05/2011

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

TUNNEL EQUIPMENT

Owner: Ferrovial Agroman

High

NATM Drill and blast, Reinforced Concrete Lining, Finishes

GEOLOGY ANDGEOTECHNICAL DATA Limestones and sandstones

Tunnels

Greece

Etoloakarnanias

Messologi

8,100,000 €

Construction of twin highway tunnels for the Euroionia Motorway in Western Greece. The tunnel length is 1,100 m with 106 m2 in cross section each tube. Excavated alternating rockbreakers and jumbo drill rigs. 80% of the tunnel was done in Full Face Blast.

Main Quantities: 5,287 m3 of shotcrete, 17,990 m of rockbolts type Swellex Mn 12,157 Kgs of steel rib arches type heb-140. 240 t of reinforced concrete and 22,493 m3 of lining concrete, and 200 m2 of Bernold Steel Plates.

Two and Three boom jumbos Tamrock Paramatic 216, Tamrock Axera T11, Putzmeister PM 500 robojets, Manitous

Cross section: 106 m2

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET ROAD & HIGHWAY

15

LOCATIONANDADDITIONALINFORMATION

Type Project

AMBELIA TUNNEL

Project photos

STATUSStart: 04/2010

End: 04/2011

STRUCTURE

PROVINCE

COUNTRY

PLACE

BUDGET(EXCLUDING VAT)

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

TUNNEL EQUIPMENT

Owner: Ferrovial Agroman

Medium

Cross section: 106 m2

NATM Drill and blast, Reinforced Concrete Lining, Finishes

GEOLOGY ANDGEOTECHNICAL DATA Weathered limestones with karst

Tunnels

Greece

Bizani

Epirus

17,300,000 €

Construction of twin highway tunnels for the Euroionia Motorway in Northern Greece. The tunneled length is 1,600 m with 106 m2 in cross section each tube. Excavated alternating rockbreakers and jumbo drill rigs.

Main Quantities: 31,638 m3 of shotcrete, 62,080 m of bolts type superswllex and 13,015 m type rockbolts, m 214 of steel rib arches type HEB 180 AND 745 lattice girder, 740 t of reinforced concrete and 30,245 m3 of lining concrete, and 235 m2 of Bernold Steel Plates.

Two and Three boom jumbos Tamrock Paramatic, Tamrock Axera, Putzmeister PM 500 robojets

CONSTRUCTION DATA SHEET ROAD & HIGHWAY

16

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

BILBAO SOUTH BYPASS. SECTION 7: CADAGUA–PEÑASCAL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Vizcaya

Spain

Bilbao

102,979,626 €

Medium

Marls, limestones and sandstones

NATM. Drill and blast

Jumbos Atlas Copco Boomer and Atlas Copco XL3C (Two and three booms and service plataform). Wet - mix Robojet Putzmeister Aliva - PM 500

06/2007

11/2010

95 m²

4.522 m

Owner: Interbiak - Bizkaiko Hegoaldeko Akzesibilitatea S.A.

BUDGET(EXCLUDING VAT)

The work consists of the building of a 2.51 Km section of motorway, formed by two separate 3 lane carriageways.

The overall works include the construction of 2 parallel tunnels, one per carriageway, a 1-lane exit branch, a cave junction between the branch and the tunnels, a reinforced concrete wall, a 126 m viaduct and the road surfaces of the section.

Each tunnel has a cross section of 125 m2 and a length of 2,261 m. The tunnels were excavated with explosives and in two phases, and advance phase and a shattering phase.

The exit branch has a length of 365 m and a cross section of 59 m2,the cave junction has a length of 118 m and a cross section of 383 m2.

CONSTRUCTION DATA SHEET

17

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

SANTULLAN BYPASS

Project photos

Owner: Gestión de Viviendas e Infraestructuras de Cantabria

Start: 07/2008

End: 10/2010STATUS

TunnelsSTRUCTURE

CantabriaPROVINCE

SpainCOUNTRY

SantanderPLACE

The works consisted of building a new 1,000 m section of the CA-251 road, connecting the CA-250 with the A-8 motorway and the CA-522.

The main work implemented was a 293 m tunnel, of which 210 were excavated and the remaining distance was made up by the false entry and exit tunnels. Excavation was carried out following the new Austrian method, with the use of mechanical means. The tunnel was lined with 30 cm of HM-30 type concrete.

Two underpasses with a total length of 42.5 m were also built, as well as several drainage works and the laying of the road surface of the section.

Cross section: 99 m²

Length: 293 mGEOMETRY

25 mOVERBURDEN

Mechanical means. In advance and shatteringMETHODOF TUNNELING

Banks of limestone and brown clayGEOLOGY ANDGEOTECHNICAL DATA

Road header and hydraulic hammers on backhoes, PM-500 type shotcrete robots with η = 8-30 m3/h

TUNNEL EQUIPMENT

7,973,026 €BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

18

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

GI-2620 ARRASATE WEST BYPASS

Project photos

Owner: Diputación Foral de Gipuzkoa

Start: 07/2008

End: 10/2010STATUS

TunnelsSTRUCTURE

GuipúzcoaPROVINCE

SpainCOUNTRY

Arrasate/MondragónPLACE

The works consisted of building a 2 km road, with an open air section of 1,150 m and a tunnel of 850 m. The road is single carriageway with two lanes (one in each direction).The main work implemented was an 850 m tunnel, of which 805 m were excavated and 45 m were false tunnel. An evacuation gallery was also excavated with a length of 469 m and a cross section of 23.5 m2. Excavation was carried out following the new Austrian method, with the use of explosives and in areas where the ground is of poorer quality, mechanical means.The support elements used in the tunnels are shotcrete, 25 mm diameter bolts of up to 8 m in length, 3 mm thick Bernold plate, Dramix type fibre in the shotcrete, and TH-21/TH-29/HEB180 type trusses.The tunnels were waterproofed with PVC and geotextile sheet and are lined with HM-30 type concrete.Two 21 m bridges were also built and a third 44 m bridge in prestressed concrete, as well as the road surface of the whole section.

Cross section: 108 m²

Length: 850 mGEOMETRY

MediumOVERBURDEN

Drill and blast and mechanical meansIn advance and shattering

METHODOF TUNNELING

Interbedded sandstone and limestoneGEOLOGY ANDGEOTECHNICAL DATA

XE3C model three-booms jumboPM-500 type shotcrete robots with η = 8-30 m3/h

TUNNEL EQUIPMENT

34,204,704 €BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

19

LOCATIONANDADDITIONALINFORMATION

Project photos

Start: 09/2008

End: 09/2009STATUS

TunnelsSTRUCTURE

MálagaPROVINCE

SpainCOUNTRY

Alhaurín de la TorrePLACE

The above-mentioned works comprise the excavation of two parallel tunnels each 1,200 m in length and with a cross-section of 180 m2. The construction method employed is the one known as the New Austrian Method (NATM), with the excavation carried out in three phases: top heading, bench and invert. The excavation was done using explosives and mechanical excavation. It was also necessary to excavate 13 connecting galleries 35 m in length and 36 m2 in cross section between the two tunnels.

Cross section: 180 m²

Length: 2 x 1,200 mGEOMETRY

MediumOVERBURDEN

Drill and blast and Mechanical excavationMETHODOF TUNNELING

Clays, glauberites and halitesGEOLOGY ANDGEOTECHNICAL DATA

Model XL3C three-boom jumbosPM500 gunning robotBackhoe loader with hammerTelescopic manipulator with service plataform

TUNNEL EQUIPMENT

21,048,888 €BUDGET(EXCLUDING VAT)

ROAD & HIGHWAY

Type Project

Owner: Ferrovial

MÁLAGA NEW WEST RING ROAD. CHURRIANA TUNNELCONSTRUCTION DATA SHEET

20

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Granada

Spain

Almuñecar

175,258,034 €

Medium

Schist with biotite, chlorite and epidote

NATM. Top-Heading and Bench. Drill and blast

Jumbo Atlas Copco Boomer (Three booms). Tamrock Axera- T11, Axera T - 8, Robot Putzmeister ALIVA, PM - 500

09/2002

06/2009

85 m²

2,855 m

Owner: Mº de Fomento. Dir. Gen. de Carreteras

BUDGET(EXCLUDING VAT)

The works consisted of the building of a 9.12 km road.

Three tunnels: Cantalobos, Calaceite and El Gato, 2.170, 410 and 275 m in length, respectively.

The Cantalobos Tunnel has five galleries with a cross section of 40.87 m² for the transit of vehicles.

The main support units used are 130,621 m³ of shotcrete with or without fibre, 315,520 m of bolts, 1,736,355 kg of THN - 21, THN - 29 or HEB-160 trusses and 49,903 m² of Bernold plate.

The work also included the building of 4 viaducts with a total length of 2,035 m, the road surfaces and the signing and marking.

MEDITERRANEAN MOTORWAY. ALMUÑECAR-TARAMAY SECTIONCONSTRUCTION DATA SHEET

21

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Guipuzcoa

Spain

Aretxabaleta

158,424,247 €

Medium

Black argillites interbedded with sandstones and limestones

Drill and blast. Top-Heading and Bench. Bernold method

Jumbo Atlas Copco Boomer (Three booms) and Jumbo Tamorock PARA (Two booms). Wet - mix Meyco and Robojet Putzmeister Wetkret η = 30 m³/h

01/2006

05/2009

125 m²

1,320 m

Owner: Bidegi

BUDGET(EXCLUDING VAT)

AP-1 MOTORWAY VITORIA-EIBARNORTH ESKORIATZA–SOUTH ARRASATE SECTION

The work included the building of a 6.3 km section of road with two separate carriageways.

The main works implemented were the double Apotxaga tunnel with a length of 320 m, the double Izurieta tunnel with a length of 280 m and the double GurutzeTxiki tunnel with a length of 710 m.

The main support units in the tunnels were: Shotcrete with fibres, Swelex bolts, mesh, HEB - 160/TH - 29 trusses and Bernold plate.

The work also included the building of two viaducts, with lengths of 391 m and 409 m respectively.

CONSTRUCTION DATA SHEET

22

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

UPGRADING OF TUNNELS AND GALLERIES, LORCA TUNNELS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Roadway

Murcia

Spain

Lorca

6,164,540 €

Medium

Limestones and marls

NATM. Mechanical excavation and drill and blast

Jumbo Tamrock Minimatic (Two booms). Wet - mix Robojet Putzmeister Wetkret η = 30 m³/h

05/2007

03/2009

20 m²

344 m

Owner: Ministerio de Fomento. Dirección General de Carreteras

BUDGET(EXCLUDING VAT)

Works for the upgrading, improvement and operation of the Lorca tunnels. The aim is to provide the tunnel with the safety measures required by Royal Decree 635/2006.

Construction of two communication galleries and improvement of tunnel installations.

194 m and 150 m galleries implemented in full section with explosives and mechanical means.

The galleries are lined with HM-25 concrete.

The supports applied are shotcrete with metal fibres (45 Kg/m3), TH-21 trusses, Ø 25 mm 4 m length bolts and micropile umbrellas of 88.9 mm in diameter.

CONSTRUCTION DATA SHEET

23

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

SUPPLEMENTARY WORKS FOR PIQUERAS TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Roadway

Soria/La Rioja

Spain

Lumbreras/La Poveda

20,133,137 €

200 m

Sandstones and limolites easily to excavate by explosives

Drill and blast. Full section

Jumbo has two booms Atlas Copco Rocket. Wet - mix Robojets Aliva AL - 500 η = 23 m³/h and Putzmeister Wetkret η = 30 m³/h

Emergency roadway parallel to Piqueras tunnel and safety facilities (Real Decreto 635/2006). To pedestrian and emergency vehicles traffic use. Connected to Piqueras tunnel through 11 cross tunnel located every 200 meters. Shotcrete, 4 m long and Ø = 25 mm bolts, steel ribs. Impermeabilization of 4 mm thick PVC sheet.

12/2007

11/2008

25 m²

2,506 m

Owner: Mº de Fomento. Dir. Gen. de Carreteras

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

24

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

PIQUERAS PASS TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

La Rioja, Soria

Spain

Lumbreras, La Poveda de Soria

50,419,986 €

200 m

Sandstones and limolites easily to excavate by explosives

NATM (Top-Heading and Bench). Invert excavation in special stretches. Drill and blast and mechanical excavation

Jumbo: Atlas Copco R Boomer - 353, Atlas Copco H - 175 and Atlas Copco Rocket. Robojet wet - mix: Meyco η = 20 m³/h, Putzmeister Wetkret η = 30 m³/h and Robot Aliva 500 η = 23 m³/h

The work consisted in the building of a 4.68 km road, with a carriageway width of 7 m and 1.5 m hard shoulders.

Two lane road tunnel with four emergency areas, three fire shelter with exit tunnel connection and thirty niches. Affected by the entry into force Real Decreto 635/2006 about safety road tunnels (work stopped for one year). 4 - 6 m long bolts and self drilling rock bolts of 12 m length, steel ribs TH - 29/HEB-140 an steel reinforced shotcrete 40 Kg/m³.

The work included the building of a 210 m viaduct, 1 overpass and several drainage works.

02/2003

11/2008

93 m²

2,444 m

Owner: Mº de Fomento. Dir. Gen. de Carreteras

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

25

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

ELS DOS VALIRES TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Andorra

Andorra

La Massana

73,287,258 €

600 m

Meta - greywacke, quartzite, schists ans fillite (Devonian)

Drill and blast. First 500 m Top-Heading and Bench

Jumbo Atlas Copco Boomer (Three booms) and Jumbo Tamrock Axera (Two booms). Wet - mix Robojet Putzmeister Wetkret η = 30 m³/h

The works included the building of two parallel tunnels, walls to protect the river banks, channelling of two streams, building of approach roads.

The main work is the building of the double road tunnel with two lanes per carriageway. The two tunnels were connected by eleven cross galleries, 8 of which are for pedestrians and with a cross section of 18 m2 and three for vehicles with a cross section of 35 m2. The galleries are situated at a distance of 240 m from each other.

The distance between the tunnel axes is 32 m, and a 17 m2 gallery will be built between the two tunnels, the front of which will be 150 m ahead of the tunnels in order to survey the ground to be excavated; the coverage does not allow for prior reconnaissance. This gallery will later be used for mounting installations. Shotcrete, 4 m long bolts, steel ribs TH - 29/HEB180, Bernold plate and concrete lining. Portals: micropile umbrella and forehole joint beam.

03/2005

09/2008

64 m²

2,950 m

Owner: Gobierno de Andorra

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

26

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

KADAGUA MOTORWAY. ARBUIO–SODUPE SECTION

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Vizcaya

Spain

Arbuio

4,457,902 €

Max. 45 m

Detritic materials and fine grained sandstones

NATM. Drill and blast

Jumbo Atlas Copco Boomer (Three booms) and Jumbo Tamorock Axera (Two booms). Wet - mix Robojet Putzmeister Wetkret η = 30 m³/h

The work consisted of the excavation and support of two parallel tunnels with lengths of 110 m and 152 m. Cut and cover constructions in the tunnel portals of 30 - 40 m long. Shotcrete HP - 30 20cm thickness, steel ribs TH - 29 and micropile umbrella Ø = 150 mm and L = 20 m. Steel fibres reinforced shotcrete HP - 30 5 - 15 cm thickness, Ø = 25 mm L = 5 m bolts and steel ribs TH - 29. Impermeabilization of 2 mm thick PVC sheet and 500 g/cm² geotextil.

11/2006

02/2008

130 m²

262 m

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

27

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

ACCESS TO SOLLER PASS. SA MOLA TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Mallorca

Spain

Sóller

25,645,361 €

4 - 100 m

Calcareous breccias, limestones and dolomite with high tectonic deformation and presence of karst process

NATM. Drill and blast (Top-Heading and Bench)

07/2005

07/2007

95 m²

1,300 m

Owner: Gobierno de las Islas Baleares

BUDGET(EXCLUDING VAT)

AXERA T-11 model three-booms Jumbo Tamrock PARA model two-booms Jumbo Tamrock WKM-103 model wet shotcrete robot TelehandlerCAT-980 Loader Shovels

Two two-lane urban road tunnels, with a false tunnel between the two. Sa Mola and Llampaies tunnels with lengths of 1,100 and 115 m respectively. The Sa Mola tunnel has two emergency exits, one in a 200 m gallery and the other in a false tunnel.

In karst areas there are irregularities or chimneys requiring additional support in specific areas of the tunnel.

Because of the filtrations caused by the four faults crossing the tunnel, the latter is waterproofed with a sheet of reticulated polyethylene.

Pioneer work in compliance with Royal Decree 635/2006 on safety requirements in road tunnels.

The work included the lining of 500 m of a stream, the building of a 45 m skew box and various improvements in the adjacent urban roads.

CONSTRUCTION DATA SHEET

28

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

EVACUATION GALLERY FOR CADI TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Roadway

Gerona, Barcelona

Spain

Urus, Baga

20,807,155 €

Medium

Schists, conglomerates, limestones, calc - schists and calcareous breccias

TBM. Drill and blast

TBM Ø 4.51 and Jumbo has two booms Tamrock Minimatic. Robojet wet - mix Putzmeister Wetkret η = 30 m³/h y Aliva AL - 500 η = 20 m³/h

Refurbishment and extending works. 415.3 m long tunnel and 28 m² cross section excavated by explosives and 3,293.14 m long tunnel of 4.51 m diameter by mechanical excavation. Also 19 cross tunnel with 587 m total long and cross sections between 11.9 to 7.2 m².

Apart from the excavation works, drainage had to be constructed and systems installed inside the tunnel, and the concrete floor had to be laid along the whole length of the gallery.

The building and conditioning of the approaches to the mouths of the galleries was also carried out.

04/2004

03/2007

Variable

4,348 m

Owner: Túnel de Cadí S.A.C.

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

29

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Málaga, Granada

Spain

Nerja, Almuñecar

105,428,608 €

Max. 150 m

Schist with high tectonic deformation.

NATM. Top-Heading and Bench. Drill and blast.

Jumbo Atlas Copco R Boomer (Three booms and service plataform). Wet - mix Meyco and Robojet Putzmeister Wetkret η = 30 m³/h. ALIVA - 500.23 m3/h.

11/2002

02/2007

90 m²

1,920 m

Owner: Ministerio de Fomento

BUDGET(EXCLUDING VAT)

The works consisted of building 9.5 km of road.

Basically three double two-carriageway tunnels were built: the Marchante Tunnel has a length of 1,400 m, the Cerrosol Tunnel 200 m and the Pino Tunnel 400 m.

Major geotechnical problems in the Marchante Tunnel. The work also included the building of 5 double viaducts with a total length of 1,256 m, an overpass, the road surfaces and the signing and marking.

CONSTRUCTION DATA SHEET MEDITERRANEAN MOTORWAY. NERJA-ALMUÑECAR SECTION

30

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

ADEGA TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Lugo

Spain

Paradela

502,970 €

8 m

Schist and gneiss with high tectonic deformation and deep weathering

Drill and blast

Jumbo has two booms and service plataform (Atlas Copco Boomer). Ripper hammer

Two lane road tunnel. Historic buildings close to the tunnel needs specific supporting system and a considerable monitoring tunnel excavation. Steel fibres reinforced shotcrete + steel ribs HEB - 180. Micropile umbrellas overlap in the middle of the excavation.

07/2006

08/2006

62 m²

30 m

Owner: Diputación de Lugo

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

31

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

THIRD GUADARRAMA TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Madrid, Segovia

Spain

San Lorenzo de El Escorial, San Rafael

14,322,731 €

High

Biotite granite rich in cordierite with thick and medium grain and leucogranite with medium and fine grain, showing different weathering process

NATM (Top-Heading and Bench). Drill and blast

Jumbo Atlas Copco Rocket and Atlas Copco XL3C. Robojets wet - mix Aliva AL - 500 η = 23 m³/h and Putzmeister Sika η = 30 m³/h

The work consisted of the excavation and support of a three-lane road tunnel on the AP-6 in the section between the Valle de los Caídos and San Rafael.

The length of tunnel excavated was 3,002.5 m. In addition, 11 galleries for vehicles with a cross section of 20 m² and 1,037 m of pedestrian galleries with a cross section of 12 m² were built.

The main support units used are: 12,038 m³ steel reinforced concrete, 318,860 Kg steel ribs TH - 29/HEB - 160, 1,402 m² Bernold plate, 105,207 m bolts 120 KN y 1,526 ud. bolts of 32 mm diameter.

02/2005

05/2006

105 m²

3,002 m

Owner: Castellana de Autopistas S.A.

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

32

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

ARBUIO TUNNELS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Vizcaya

Spain

Alonsótegui

2,441,985 €

High

Sandstones, marls and calcareous sandstones

NATM (Top-Heading and Bench). Drill and blast

Jumbo: Atlas Copco Boomer y Tamrock PARA (Two and three booms). Wet - mix Robojets Aliva AL - 500 η = 20 m³/h and Putzmeister Wetkret η = 30 m³/h

Twin tunnels of Cadaga Highway Design. The distance between the tunnel sides is 10 m and the longitudinal slope is 1%. Steel fibres reinforced shotcrete, 25 mm bolts and steel ribs. Impermeabilization with 2.5 mm PVC sheet and 4 m thickness in the tunnel sides with 1.5 mm aluminum panels.

02/2005

10/2005

90 m²

272 m

Owner: Interbiak - Bizkaiko Hegoaldeko Akzesibilitatea S.A.

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

33

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

EL PERDÓN TUNNELS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Navarra

Spain

Zizur

19,733,305 €

Medium

Red and grey marls with gypsum

Drill and blast, Top-Heading and Bench. Invert mechanical excavation

Jumbo Atlas Copco Boomer has two booms. Wet - mix Robojets Aliva AL - 500 η = 20 m³/h and Putzmeister Wetkret η = 30 m³/h

Twin tunnels of Pamplona - Estella Highway Design. Emergency cross tunnel are required by future use. Shotcrete, 25 mm and 36 mm bolts, Bernold plate and steel ribs. Impermeabilization with 2 mm thick PVC sheets and 500 g/m² geotextiles.

10/2003

10/2005

120 m²

2,010 m

Owner: Gobierno de Navarra

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

34

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

LANTUENO TUNNELS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Cantabria

Spain

Santiurde de Reinosa, Reinosa

5,892,286 €

Medium

Marls, limestones and clays

NATM (Top-Heading and Bench). Drill and blast

Jumbo: Copco Boomer and Tamrock PARA (Two and three booms and service plataform). Wet - mix Robojet Putzmeister Wetkret η = 30 m³/h

The works consisted of the excavation and support of one double two-lane tunnel belonging to the “Cantabria – Meseta Motorway Construction Project” with lengths of 675 m and 655 m respectively.

The main support units used in the tunnels are: 8,620 m³ of thick steel fibre reinforced shotcrete , 39,332 m. Super Swellex bolts, 1,854 m² wire mesh 150 x 150 x 6 mm and 1,769 m² Bernold plate e = 2 mm. 14,744 steel ribs TH - 29/HEB - 140. HM - 45 concrete lining unforced 40 cm thickness.

01/2004

08/2005

105 m²

1,330 m

Owner: Mº de Fomento. Dir. Gen. de Carreteras

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

35

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

EVACUATION GALLERY FOR SOMPORT TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Roadway

Huesca

Spain

Canfranc

949,436 €

High

Limestones, lutites and sandstones

Drill and blast

Jumbo Atlas Copco Boomer (Two booms and service plataform), and Jumbo Tamrock Minimatic. Wet - mix Meyco, Robojet Putzmeister Wetkret and Aliva AL - 500

Emergency tunnel exit, cross tunnel and tunnel facilities to the Tunnel of Somport Cross tunnel between road tunnel to railway tunnel Spain - French. 10,256 Kg of bolts 25 mm diameter and 2 m length, 516 m³ shotcrete and 114 Kg wire mesh 150 x 150 x 6 mm B500T.

03/2003

06/2003

18 m²

285 m

Owner: Ministerio de Fomento

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

36

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

TUNNELS FOR SANT QUIRZE BYPASS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Barcelona

Spain

Sant Quirze de Besora

2,761,372 €

Medium

Sandstones, marls and clays (Tertiary)

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

Jumbo has three booms Tamrock PARA. Wet - mix Robojets Meyco and Putzmeister Wetkret η = 30 m³/h

Two road tunnel of “Sant Quirze de Besora y Montesquiu bypass”. The length of the tunnels are 342.75 and 213.15 m 25,425 m³ heading and 25,232 m³ bench. 2,156 m³ shotcrete 5 - 10 cm thickness, 18,768 m of bolts Ø = 25 mm and 1,126 m steel ribs THN - 29.

06/2002

11/2002

102 m²

556 m

Owner: GISA

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

37

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

CANTABRIA–MESETA AUTOVÍA (MOTORWAY) (LOS CORRALES TUNNELS)

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Cantabria

Spain

Torrelavega, Los Corrales de Buelna

5,076,794 €

Medium

Sandstones interbedded with lutite

NATM: Top-Heading and Bench in two phases. Drill and blast

Jumbo Tamrock PARA (Two and three booms with service plataform). Ripper hammer. Wet - mix Robojet Putzmeister Wetkret η = 30 m³/hTelehandler

The work consisted of building two tunnels for the “Construction of the Cantabria - La Meseta motorway” with lengths of 660 m and 626 m respectively. 31,345 m³ steel reinforced concrete, 8,728 ud. 4 m long bolts Ø = 25 mm and 55,024 Kg steel ribs TH - 29. Impermeabilization with PVC sheet and geotextil and 30 cm thick concrete lining.

05/2001

09/2002

114 m²

1,286 m

Owner: Ministerio de Fomento

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

38

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

TARDAJOS TUNNELS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Burgos

Spain

Tardajos

2,180,800 €

30 m

Soil, sands and clays

Top-Heading and Bench in two phases. Mechanical excavation. Bernold method

Jumbo Atlas Copco Boomer (two booms). Wet - mix Robojet Putzmeister Wetkret η = 20 m³/h

Double two lane tunnel of 135 m long. Two cut and cover constructions in tunnel portals, 12.54 m long Leon side and 38.92 m long Burgos side. Objective: historical preservation of the “Castro” of Tardajos. Shotcrete, steel ribs, Bernold plate and concreting in extrados.

03/2001

04/2002

100 m²

2 x 130 m

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

39

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

LA MADERA AND LA CALABAZA TUNNELS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Asturias

Spain

Gijón

5,939,932 €

Medium

Limestone, clays and marls

Drill and blast

Jumbo Atlas Copco R Boomer (Three booms and service plataform) and Jumbo Atlas Copco Rocket. Wet - mix Meyco and Robojet Putzmeister Wetkret and Aliva AL - 500

Two double tunnels of Mieres - Gijon Highway. Madera and Calabaza tunnel are 480 and 499 m long respectively. Bolts, steel ribs, 18 cm thick shotcrete, 7 cm thick second concrete lining and wire mesh.

08/2000

11/2001

86 m²

979 m

Owner: Principado de Asturias

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

40

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

SEPÚLVEDA TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Segovia

Spain

Sepúlveda

3,383,203 €

Max. 45 m

Marls and limestones (Cretaceous). Limestones and dolomites with high tectonic deformation in the south portal tunnel

Mechanical excavation

Atlas Copco 2,050 Kg ripper hammer. Robojet Putzmeister Wetkret WKM - 102

Two lane road tunnel. HM - 250 steel fibres reinforced shotcrete, HEB - 140 steel ribs and 2 mm thick Bernold plate. Two cut and cover tunnels supporting by HEB steel ribs, shotcrete, Bernold plate and wire mesh. Long extended micropile umbrella in the south portal is required to solve the stabilization problems.

04/2000

10/2001

70 m²

330 m

Owner: Junta de Castilla y León

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

41

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

ZORERA TUNNELS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Asturias

Spain

Langreo, Siero

5,050,300 €

Max. 100 m

Conglomerates, sandstones, marls and slates

Drill and blast. Top-Heading and Bench

Jumbo: Atlas Copco R Boomer y Atlas Copco Rocket (Two and three booms and service plataform). Wet - mix Robojet Aliva AL - 500 η = 20 m³/h

Twin tunnels of “Mieres - Gijón Highway”. The design includes 7,290 m of Mieres - Riaño Highway and the connection to A - 8. (Not included in the budget). Cut and cover construction is required due to estability problems in tunnel portals. Bolts, steel ribs, 20 cm thick steel fibre reinforced shotcrete and 15 cm thick shotcrete with wire mesh.

02/2000

05/2001

90 m²

1,317 m

Owner: Principado de Asturias

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

42

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

PIEDRAFITA TUNNELS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

León, Lugo

Spain

Piedrafita

10,000,827 €

Máx 90 m

Slates, sandstones and carbonates (Lower Cambrian)

NATM (Top-Heading and Bench). Drill and blast

Jumbo Atlas Copco Boomer y Atlas Copco H - 175 (Two and three booms with service plataform). Robojets wet - mix Meyco η = 18 m³/h and Putzmeister Wetkret η = 20 m³/h

Twin tunnels of “Northwest Highway, stretch Castro Lamas - Noceda”. The lengths of the tunnels are 8,005 m per carriageway. 12,986 m³ shotcrete H - 250, 120,872 m botls AEH - 500 25 mm diameter, 27,527 m steel ribs TH - 29, 393,482 Kg steel ribs HEB - 160 and 3,933 m² Bernold plate. 19,122 m of micropile umbrella of 32 mm diameter and 4,565 m³ concrete invert H - 250.

02/2000

03/2001

120 m²

1,610 m

Owner: Ministerio de Fomento

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

43

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

LIMPIAS BYPASS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Cantabria

Spain

Colindres, Limpias, Ampuero

3,928,409 €

Medium

Limestone, limolites, sandstones and claystones

Drill and blast and mechanical excavation

Jumbo has three booms and service plataform H - 175. Ripper hammer

Road tunnel N - 629 Burgos-Santoña. Top-Heading and Bench in two phases. In specific stretches is necessary invert excavation. 2,399 m³ steel reinforced shotcrete, 1,393 ud. bolts of 25 mm diameter and 4 m length and 281,867 Kg of steel ribs TH - 29. 2,200 m² of 2 mm thick Bernold plate, 5,532 m³ of concrete lining 25 cm thickness and 11,790 m² of two layer sheet impermeabilization.

05/1998

01/2001

96 m²

515 m

Owner: Ministerio de Fomento

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

44

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Lugo

Spain

Doncos

7,038,811 €

Max. 100 m

Slates, sandstones and carbonates, with calcareous levels

NATM (Top-Heading and Bench). Mechanical excavation. Drill and blast

Jumbo Atlas Copco Boomer (Two booms and service plataform). Wet - mix Robojets Meyco η = 18 m³/h and Putzmeister Wetkret η = 20 m³/hTelehandler

The works consisted of building the Espariz and Doncos tunnels, belonging to the Autovía del Noroeste project.

Each tunnel has a length of 680 m and average cross section of 120 m2, excavated with explosives and mechanical means.

The main support units are: 9,797 m³ of reinforced or nonreinforced shotcrete, 61,308 m of bolts and 516,750 Kg of steel ribs. 161,088 m³ tunnel excavation. Bernold plates are required in some stretches.

06/1999

04/2000

120 m²

1,360 m

Owner: Ministerio de Fomento

BUDGET(EXCLUDING VAT)

AUTOVÍA DEL NOROESTE (NORTHWEST MOTORWAY)NOCEDA–AGÜEIRA SECTIONCONSTRUCTION DATA SHEET

45

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

REPAIRS TO BELATE TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Navarra

Spain

Almandoz

349,297 €

Medium

Marls and clays, sandy marls and limestones

Drill and blast. Top-Heading and Bench

Jumbo has two booms and service plataform Atlas Copco Boomer

Road tunnel of N - 121. Works to reinforce support system along 850 m of the tunnel.

10 - 15 cm thick shotcrete, 9 m long bolts, drained pipes and PVC sheet in wet areas.

07/1999

08/1999

92 m²

850 m

Owner: Gobierno de Navarra

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

46

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Málaga

Spain

Frigiliana, Nerja

3,173,807 €

Medium

Conglomerates and biotite schists with andalucite and granate

Drill and blast. Top-Heading and Bench

Jumbo has three booms and service plataform Atlas Copco R Boomer. Aliva AL - 285 η = 9 - 21 m³/hTelehandler

11/1998

06/1999

113 m²

778 m

Owner: Ministerio de Fomento

BUDGET(EXCLUDING VAT)

The work consisted of the excavation and support of the Capistrano parallel tunnels, one per carriageway, belonging to the Autovía del Mediterráneo project.

The tunnels have a length of 317 m in axis 1 and 461 m in axis 2. In addition, a connecting gallery with a length of 30 m and a cross section of 45 m² was excavated.

Provisional support with metal frames, bolts and shotcrete.

CONSTRUCTION DATA SHEET AUTOVÍA DEL MEDITERRANEO (MEDITERRANEAN MOTORWAY)FRIGILIANA–NERJA SECTION

47

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Lugo

Spain

Pedrafita do Cebreiro

3,182,878 €

Max 40 m

Slates, sandstones and carbonates

Drill and blast. Top-Heading and Bench

The works consisted of the excavation and support of the San Pedro parallel tunnels, one per carriageway, belonging to the Autovía de Noroeste A-6 project.

Each tunnel has a length of 255 m and an average cross section of 120 m2. The tunnels were excavated with explosives and in the areas where the ground is of a lower quality, mechanical means were used. 6,403 m³ of shotcrete H - 250, 15,323 m of bolts AEH - 500 Ø = 25 mm and 2,292 m steel ribs TH - 29. 1,122 m² of wire mesh 5 x 15 cm and Ø = 6 mm is requiered in some stretches.

06/1998

05/1999

120 m²

550 m

Owner: Ministerio de Fomento

BUDGET(EXCLUDING VAT)

Atlas Copco Boomer three-booms jumbos with service plataform.Putzmeister Wetkret wet Robojet shotcrete = 20 m³/h.Telehandler

CONSTRUCTION DATA SHEET AUTOVÍA DEL NOROESTE (NORTHWEST MOTORWAY)CASTROLAMAS–NOCEDA SECTION

48

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

CINTAS II TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Asturias

Spain

Gijón

1,010,525 €

Max. 120 m

White quartzites

Drill and blast. Mechanical excavation

Jumbos has two and three booms Atlas Copco Boomer. Wet - mix Meyco GM - 090 η = 6 - 7 m³/h and Aliva AL - 285 η = 9 - 21 m³/h

Exclusively to bulk carrier use that are landed at El Musel harbour. The tunnel connects El Musel harbour to Aboño’s Explanada through Torres cape.

The main support units used are: 1,382 m3 H-200 e =15 cm shotcrete with fibre (35 kg/m3), 47 pc. bolts Ø = 25 mm and L=4 m, 41,350 kg TH-21 trusses and 1,804 m2 Bernold plate.

09/1998

04/1999

37 m²

400 m

Owner: Autoridad Portuaria de Gijón

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

49

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Málaga

Spain

Marbella, Estepona

8,616,330 €

Medium

Marls and sandstones (Tertiary) and limestones and marls (Jurasic)

Drill and blast. Top-Heading and Bench

Jumbo: Atlas Copco Boomer (Three booms and service plataform). Wet - mix Robojet Meyco. Meyco GM - 090 η = 6 - 7 m³/h and Aliva AL - 285 η = 9 - 21 m³/h

The work consisted of the excavation and support of two double tunnels on the Sol motorway. Tunnels of Río Verde and Montemayor have 540 (2 x 270) and 1,074 (2 x 537) m respectively.

5 - 20 cm thick steel fibres reinforced shotcrete, steel ribs TH - 29/HEB - 140, wire mesh and 4 m long bolts.

06/1997

09/1998

110 m²

1,614 m

Owner: Autopista Costa del Sol

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET AUTOPISTA DEL SOL (MOTORWAY OF THE SUN)MÁLAGA–ESTEPONA SECTION

50

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

ALONGOS TUNNELS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Orense

Spain

Alongos

2,749,611 €

40 m

Medium - coarse grained granodiorite with biotite

Drill and blast. Top-Heading and Bench

Jumbo Atlas Copco Boomer (Two and three booms and service plataform). Wet - mix Robojet Meyco

Twin tunnels of Highway Rias Baixas A - 52. 4,647 m³ of shotcrete, 28,890 m of bolts and 136,458 Kg steel ribs.

2,121 m² of Bernold plate and 10,216 m² of wire mesh.

05/1997

06/1998

110 m²

400 m

Owner: Ministerio de Fomento

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

51

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

CASTELL DE FERRO

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Granada

Spain

Castell de Ferro

12,234,511 €

Medium

Schists with granate and staurolite. Cuarcites and biotite schists

NATM (Top-Heading and Bench). Drill and blast, mechanical excavation

Jumbo has two booms and ripper hammer. Raise borer. Wet - mix Aliva AL- 285 η = 9 - 21 m³/h

Two road tunnel of 505 and 525 m CN - 340 Cádiz - Barcelona, stretch: Castell de Ferro - Castillo de Baños. Poly - circular cross section with three centers and 6.45 m of clearance. Primary support: 5,735 m³ shotcrete, 36,264 m bolts y 410 uds. steel ribs.

11/1994

05/1998

85 m²

1,030 m

Owner: Mº de Fomento. Dirección General de Carreteras

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

52

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Huesca

Spain

Ainsa, Boltaña

6,171,860 €

Medium

Limestones

NATM. Drill and blast. Top-Heading and Bench

Jumbo has three booms ATLAS COPCO BOOMER 353E

10/1993

11/1997

80 m²

620 m

Owner: Mº de Obras Públicas, Transportes y Medio Ambiente

BUDGET(EXCLUDING VAT)

N-260 ROAD FROM SABAÑANGO TO FRANCEAINSA-BOLTAÑA SECTION

The works consisted of widening the platform and improving the surface of 12.7 km of road. The main works implemented were the construction of two tunnels, several retaining walls, engineering works and drainage.

The tunnels have a length of 340 and 280 m and a cross section of 80 m2. The main supporting units used in the tunnel are: 692 m³ shotcrete, 180 m³ shotcrete with fibres, 113 pc. TH – 21 trusses, 11,042 m Ø = 25 mm bolts and 1,984 m³ H – 250 concrete.

CONSTRUCTION DATA SHEET

53

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

DUPLICATION OF EL NEGRÓN TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

León, Asturias

Spain

Sena de Luna, Lena

48,275,464 €

Medium

Quartzite, dolomite and sandstone interbedded with slate

NATM (Top-Heading and Bench). Drill and blast

Jumbo machine has three booms ATLAS COPCO H.175

08/1993

05/1997

89 m²

4,106 m

Owner: Aucalsa

BUDGET(EXCLUDING VAT)

The work consisted of widening the road to form a dual-carriageway. The main work was the implementation of the access and the building of the El Negron Tunnel.

Excavation in semi-competent materials with low compressive strength, making the tunnel extremely difficult to excavate. 1920 ml. Injected cement and bentonite to achieve stabilization of the southern exit portal.

L = 4 m bolts, HEB160 trusses and shotcrete over welded wire mesh. 30 cm thick mass concrete lining.

In addition, several engineering works were carried out as well as road surfacing.

CONSTRUCTION DATA SHEET

54

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

CANDEÁN TUNNELS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Pontevedra

Spain

Redondela, Vigo, Mos

12,625,152 €

40 m

Mainly gneiss showing different weathering process (I - III). Also sands and silts

Mechanical excavation, Top-Heading and Bench

Jumbo, ripper hammer. Wet - mix Robojets Putmeister η = 20 m³/h

Two lane road tunnel. Highway A - 9, strecht Rande - Puxeiros. Diaphram walls displacement present problems in the cut and cover construction extended. Problems in portals due to the low overburden. Micropile umbrella (150 mm, 40 m) reinforced with steel pipes (4”,10 mm) and 0.5 m cement grout.

10/1995

04/1997

90 m²

855 m

Owner: Autopistas del Atlántico (Audasa)

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

55

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

CONSTRUCTION OF BELATE PASS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Navarra

Spain

Almandoz

13,441,917 €

Medium

Marls and clays, sandy marls and limestones

NATM (Top-Heading and Bench). Drill and blast

Jumbo Atlas Copco Boomer (Two booms and service plataform). Wet - mix Robojet Putzmeister Wetkret η = 20 m³/h

08/1994

07/1996

92 m²

1,160 m

Owner: Gobierno de Navarra

BUDGET(EXCLUDING VAT)

The works comprise all the work carried out on the whole section pertaining to the variant, with a total length of 2,840 m.

The main work done was the construction of the Belate Tunnel, with a length of 1,160 m.

The supporting elements used in the tunnel are: shotcrete with and without fibre, bolts, TH - 21/HEB - 160 trusses and 2 mm. Bernold plate in specific sections.

The tunnel has 182.5 m of linear concreting in the exit portals and the rest with waterproof coating.

In addition to the tunnel, a bridge and viaducts were built and the road surface of the section was laid.

CONSTRUCTION DATA SHEET

56

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

UPGRADING OF C-3313. EL SALT TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Alicante

Spain

Alcoi

5,227,326 €

Medium

Calcareous conglomerate and marls (Oligocene and Lower Miocene). The last 30 - 40 m appear Quaternary deposits

Belgian Method. Top-Heading and Bench. Drill and blast

Jumbo machine has two booms and service plataform. Dry - mix shotcrete

05/1994

02/1996

52 m²

300 m

Owner: Generalitat Valenciana

BUDGET(EXCLUDING VAT)

The project consisted in laying 4.2 km of road. Part of this new road will be laid over the old road and the rest on a new path.

One of the main jobs was the construction of the Salt Tunnel, with a length of 297 m and a cross section of 52 m2. The tunnel was excavated with explosives and mechanical means. Excavation of the main section. Excavation, by trenches, of the gables. Immediate concreting of the gables.

A 43 m false tunnel was also implemented, and several drainage works, both transverse and longitudinal. Also worth mentioning is the building of a skew bridge with 17 m prefabricated girders and a 45 m continuous slab bridge, as well as the additional works of reinstatement of services and laying of the road surface.

CONSTRUCTION DATA SHEET

57

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

CARDONA TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Barcelona

Spain

Cardona

604,967 €

35 m

Marls, red limolites, interbedded with sandstones

Drill and blast. Top-Heading and Bench

Jumbo machine has two booms and service plataform. Dry - mix shotcrete

Two lane road tunnel. Difficult access to the tunnel portals. The Barcelona side excavation was from inside.

11,603 m³ tunnel excavation, 264 m micropiles, 1,228 ud. of 4 m long bolts and 25 mm diameter.

29,700 Kg of steel ribs TH, 2,579 m² of wiremesh 150 x 150 x 6 mm and 679 m³ of shotcrete.

08/1995

12/1995

117 m²

98 m

Owner: SATO

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

58

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

PUERTO DE PEÑA ANGULO TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Burgos

Spain

Valle de Losa, Valle de Mena

1,283,229 €

15 m

Marls and clayly limestones

Drill and blast. Full face

Jumbo Atlas Copco Boomer (Two booms). Wet - mix Robojet Putzmeister Wetkret η = 30 m³/h

Road Tunnel includes in the stabilization design of slopes in Puerto de Peña Angulo, Road BU - 550.

The high geotechnical characteristics of the ground made the works easier.

6 cm thicness shotcrete all around the excavation.

04/1995

10/1995

67 m²

540 m

Owner: Junta de Castilla y León

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

59

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

GALLEGOS TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

La Palma, Tenerife

Spain

Barlovento

1,582,584 €

25 m

Pyroclastic rocks and lavas

Mechanical excavation, full face

Ripper hammer

Two lane road tunnel of C - 830 stretch Barlovento - Llano Negro.

The route is developed an average slope with high technical problems.

34,687 m³ tunnel excavation, 3,123 m³ shotcrete, 81,976 Kg steel ribs and 1,025 m² bernold plate.

01/1994

03/1995

72 m²

573 m

Owner: Gobierno de Canarias

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

60

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

HOZ TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Cantabria

Spain

Islares

6,639,300 €

Max. 100 m

Limestones, sandstones and clayly silts

Drill and blast

Jumbo Atlas Copco Boomer (Two booms). Wet - mix Robojet Putzmeister Wetkret η = 30 m³/h

Two lane twin tunnels of “Cantabria Highway A - 8. Stretch Castro Urdiales - Colindres”.

Twin tunnels in curve. The route is developed an average slope and different levels.

Primary support: shotcrete, bolt and steel ribs.

07/1993

10/1994

110 m²

1,685 m

Owner: Ministerio de Obras Públicas y Urbanismo

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

61

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

NORTH AND SOUTH AGUADULCE TUNNELS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Almería

Spain

Almería, Roquetas de Mar

4,942,109 €

100 m

Calc - schist and dolomite showing different rock alteration process

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

Jumbo has two booms. Dry - mix shotcrete

Two double - lane tunnel tubes. North, south and Pescadería tunnel is 985, 534 and 97 m length respectively.

The design contains the constuction of twin tunnel but the problems of stability around the Aguadulce portal force to change the length of both.

The main units are: 163,288 m³ tunnel excavation, 63,000 m bolts, 247 ud. steel ribs TH - 21 y 40,109 m² shotcrete.

04/1993

07/1994

100 m²

1,616 m

Owner: Ministerio de Obras Públicas y Transportes

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

62

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

DUPLICATION OF BARRIOS TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

León

Spain

Barrios de Luna

5,695,307 €

High

Quartzites and slates

NATM. Top-Heading and Bench. Drill and blast

Jumbo has three booms ATLAS COPCO H175WKM shotcrete robot and telehandler

12/1991

05/1993

114 m²

1,641 m

Owner: AUCALSA

BUDGET(EXCLUDING VAT)

The work consisted of the implementation of the road tunnel called “Barrios” and its approaches.

In the more complex sections inverted vault is added on the base of the tunnel using a total of 3,712 m³ of concrete in its lining.

The main supporting units of the tunnel are: 28,701 m³ of shotcrete, 14,058 pcs. of bolts L = 4 - 6 m Ø = 25 mm. and TH/HEB180 trusses.

The road surface of the Barrios Tunnel and its approaches was also laid.

CONSTRUCTION DATA SHEET

63

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

SUMBILLA TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Navarra

Spain

Sumbilla

4,181,906 €

Max. 120 m

Slates, greywacke and conglomerates

NATM (Top-Heading and Bench). Drill and blast

Jumbo Atlas Copco Boomer (Two booms and service plataform). Wet - mix Robojet Putzmeister Wetkret η = 20 m³/h

Two lane road tunnel of “Naciona N - 124 Pamplona - Francia”.

10,638 m³ shotcrete, Ø = 25 mm and 25,377 m long bolts , 164,476 Kg steel ribs y micropiles of 12 m long and Ø = 150 mm in tunnel portals.

Impermeabilization with 2,968 m² PVC sheet 3 mm thicknes and 2,563 m² reinforced concrete lining.

08/1991

05/1993

78 m²

530 m

Owner: Gobierno de Navarra

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

64

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

COLLEGATS TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Lérida

Spain

Pobla de Segur

3,095,059 €

Medium

Conglomerates. Marls in the north side

NATM. Drill and blast

Jumbo has two booms. GM - 090 6, 7 m³/h

Road tunnel of N - 260 Pobla se Segur - Sort. Five emergency areas every 200 m.

81,532 m³ tunnel excavation, 120 m² of Bernold plate, 20,717 m² wiremesh 150 x 150 x 4 mm 5,316 ud. of bolts of 3.5 m legth and 25 mm diameter, 5,180 Kg steel ribs TH - 21 and 6,992 m³ shotcrete.

02/1991

02/1992

72 m²

1,134 m

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

65

LOCATIONANDADDITIONALINFORMATION

ROAD & HIGHWAY

Type Project

PANDO AND VEGAVIESA TUNNELS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Asturias

Spain

Pando

4,977,863 €

High

Slates, sandstones, limestones and quartzites

NATM. Top-Heading and Bench. Drill and blast. Mechanical excavation

Jumbo has three booms Atlas Copco H - 175. Wet- mix Aliva 262 n = 7 - 10 m²/h

Twin tunnels of Toll Highway Astur - Leonesa. The tunnel of Pando has 1,499 m lond and Tunnel of Vegaviesesa has 284 m long.

185,888 m³ tunnel excavation, 21,056 m³ shotcrete, 10,200 ud. of bolts, 41,664 m² wiremesh.

1,439 m micropiles of 8” diameter, 595,822 Kg steel ribs, 8,320 m of steel in umbrellas and 39,689 m³ of concrete lining.

08/1990

08/1991

104 m²

1,783 m

Owner: AUCALSA

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

66

LOCATIONANDADDITIONALINFORMATION

OSSA, Obras Subterráneas

Calle Isla Graciosa 1, 2ª Planta - Puerta 428703 San Sebastián de los Reyes (Madrid)Spain

T. +34 91 782 34 00F. +34 91 562 42 98

www.ossaint.com