PRESENTATIONOSSA, founded in 1952, is a leading company in the underground construction sector specializing in three business
areas: Construction, Energy and Mining.
Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,
OSSA is a solid underground works partner for important industrial and construction groups internationally. At OSSA
we are highly commited to Quality, Health and safety, and Environment, and we invest in Research and Development
Projects at an international level. We promote a culture of respect and teamwork among our team.
OSSA has vast recent experience both in high speed railway tunnels with over 60 km of high speed rail tunneling projects
in the last five years, leading the Spanish market in this specialty, and also in underground power plants, having built
over fifteen underground plants with some of the largest underground caverns in the world. As a recent highlight, we are
participating in the design and construction of the Hong Kong to Shangai High Speed Rail Line.
Internationally OSSA has executed works in Hong Kong, Taiwan, Chile, Peru, Colombia, Panama, Costa Rica, Brasil and
Nicaragua and is recently focusing its tendering activity in North America, Central America, Asia, Canada and Great Britain.
After 65 years of success, our strategy is to continue expanding internationally, and to support large civil engineering and
mining industry clients at all levels, contributing our vast technical expertise and our equipment fleet, while prioritizing
health and safety and innovation in all our projects.
SAFETYSafety is Obras Subterraneas, S.A.’s main asset from the time when its operations begin, demanded by the specialisation
required for the works carried out underground.
The company’s staff have a high degree of professionalism and specialisation, which has been achieved after many years
of training and the transfer of know how. Working in confined spaces with the presence of gas, dust, noise, low visibility
and the use of explosives means that the Obras Subterraneas, S.A.’s security department is the most relevant in the
company.
The use of cutting-edge, innovative techniques in the field of underground works requires the continuous training of the
company’s human resources.
Project photos
Conventional top heading and benching with drilling and blasting or mechanical means support in accordance with natm
STRUCTURE
NayaritPROVINCE
MexicoCOUNTRY
CompostelaPLACE
The work consists of the excavation and support, using top heading and benching, of three road tunnels with a trunk section of 21.1 m x 11.4 m. The total length of the excavation of the 3 tunnels is 595 m (240 m, 235 m, 120 m), with a longitudinal slope of between 0.3 to 3.0% and a maximum and minimum overburden of 40 m and 12 m respectively. The excavation will be done using conventional means. The supports used will be based on: Shotcrete, corrugated grout rock bolts, metallic trusses with IR type profile 203 x 59.6k kg/m. The final reinforced concrete lining will be installed to thickness of 40 cm. During this stage 6 false tunnels will be also be built, one for each tunnel mouth, resulting in a total of 245 m of false tunnels.
Cross section: 21.1 m x 11.4 m 192 m²
Lenght: Mine Tunnels: 595 m, False Tunnels: 245 mGEOMETRY
12-40 mOVERBURDEN
Excavation by drilling and blasting or mechanical means support in accordance with natm
METHODOF TUNNELING
Volcanic rocks: rhyolitic ignimbrites, andesitic ignimbrites, rhyolitic breccias, andesitic breccias and andesitic lavas
GEOLOGY ANDGEOTECHNICAL DATA
Three-arm hydraulic drilling jumboShotcrete robotExcavatorFront bucket loader
TUNNEL EQUIPMENT
8,404,567 USDBUDGET(EXCLUDING VAT)
ROAD & HIGHWAY
Type Project
Owner: AZVI-GIA
CONSTRUCTION DATA SHEET
01
Start: 05/2017STATUS
End: Currently being executed
GUADALAJARA-PUERTO VALLARTA MOTORWAY, COMPOSTELA LAS VARAS;PASO DEL JAGUAR” TUNNEL , “LAS TRUCHAS” TUNNEL, “PASO DEL PUMA” TUNNEL
LOCATIONANDADDITIONALINFORMATION
Project photos
Road TunnelSTRUCTURE
AntioquiaPROVINCE
ColombiaCOUNTRY
VeneciaPLACE
Double-carriageway road tunnel corresponding to functional units 1, 2 and 3 of the project identified as ‘Pacific Connection Highway 1’, which in turn falls within a larger project identified as ‘Highways for Prosperity’, awarded to a public-private association by the Agencia Nacional de Infraestructura Colombiana (ANI, Colombian National Infrastructure Agency).
LOCATIONANDADDITIONALINFORMATION
115 mOVERBURDEN
Progress by stages in accordance with the New Austrian Tunnelling Method (NATM), support with shotcrete reinforced with synthetic fibres and metallic trusses.
METHODOF TUNNELING
Moderately fractured bedrock, with weathering, oxidation and soft fill (lime and clay). Common occurrence of drips and even high water flow pressures through the discontinuities.
GEOLOGY ANDGEOTECHNICAL DATA
JumboRobotTelescopic handler
TUNNEL EQUIPMENT
72,5 billion COPBUDGET(EXCLUDING VAT)
ROAD & HIGHWAY
Type Project
Owner: Consorcio Constructor Pacífico 1
CONSTRUCTION DATA SHEET
02
Start: 04/2018STATUS
End: 11/2019
EXECUTION OF THE EXCAVATION, SUPPORT AND PRE-SUPPORTOF THE SINIFANÁ TUNNEL
Double-carriageway tunnel,1,400 m each, 85 m2 cross-section
GEOMETRY
Project photos
Roadway tunnelsSTRUCTURE
Mexico statePROVINCE
MexicoCOUNTRY
AtizapanPLACE
The project includes 2 road tunnels, Cahuacan and Los Gallos, 113 and 208 meters long respectively. The excavation in top heading and bench. The whole route goes with 14 m long self-drilling bolts as canopy and self-drilling micropiles in portals. Also IR 152x37.2 steel arches each meter.
LOCATIONANDADDITIONALINFORMATION
Cross section: 220 m²
Lenght: Cahuacan: 113 m; Los Gallos: 208 mGEOMETRY
Maximum 55 metersOVERBURDEN
Mechanical meansMETHODOF TUNNELING
Clay and sandstonesGEOLOGY ANDGEOTECHNICAL DATA
Jumbo XL3CRobot PM 500NormetTelehandler
TUNNEL EQUIPMENT
291,532,096.37 MXNBUDGET(EXCLUDING VAT)
ROAD & HIGHWAY
Type Project
ATIZAPÁN-ATLACOMULCO HIGHWAY TUNNELS
Owner: CPVM S.A. DE C.V.
CONSTRUCTION DATA SHEET
03
Start: 02/2018STATUS
End: 03/2019
Project photos
Start: 02/2014
End: 08/2017STATUS
TunnelsSTRUCTURE
São PauloPROVINCE
BrazilCOUNTRY
São PauloPLACE
The work involves the excavation and support of two parallel road tunnels 474 m and 418 m in length, both with a cross-section of approximately 200 m2.
LOCATIONANDADDITIONALINFORMATION
Cross section: 200 m²
Lenght: 892 mGEOMETRY
MediumOVERBURDEN
NATM. Drill and blast and mechanical excavationMETHODOF TUNNELING
Phyllite with possible intercalated schists and quartzitesGEOLOGY ANDGEOTECHNICAL DATA
Shotcrete robotAtlas Copco three-boom jumboBackhoe loaderTelehandler
TUNNEL EQUIPMENT
53,015,618.99 BRL.BUDGET(EXCLUDING VAT)
Type Project
RODOANEL. SÃO PAULO METROPOLITAN RING ROAD. TUNNEL 7. PACKAGE 5
Owner: Construcap - Copasa
CONSTRUCTION DATA SHEET ROAD & HIGHWAY
04
Project photos
Road TunnelSTRUCTURE
Estado NayaritPROVINCE
MexicoCOUNTRY
CompostelaPLACE
Excavation and support of 234 m of bored tunnel. Waterproofing, reinforcement and coating with a formwork carriage in 234 m of bored tunnel and 10 m of cut and cover tunnel (5 m at either entrance).
Maximum 75 mOVERBURDEN
NATM (pre-tunnelling and excavation phases)Drilling and blasting and mechanical means
METHODOF TUNNELING
Gray and greenish andesite, volcano-sedimentarysequence
GEOLOGY ANDGEOTECHNICAL DATA
Jumbo XL3CJumbo L2CRobojet SIKA PM500
TUNNEL EQUIPMENT
73,197,931.41 MXNBUDGET(EXCLUDING VAT)
ROAD & HIGHWAY
Type Project
C-304 COMPOSTELA TUNNEL
Owner: Acciona Infraestructuras México, S.A. de C.V.
CONSTRUCTION DATA SHEET
05
Start: 03/2016STATUS
End: 02/2017
Cross section: 130 m²GEOMETRY
Lenght: 244 m; 234 m of bored tunnel and 10 m of cut and cover tunnel (5 m at either entrance)
LOCATIONANDADDITIONALINFORMATION
Type Project
TUNNELS FOR ACAPULCO WEST BYPASS
Project photos
Owner: Mota Engil
Start: 01/2015
End: 02/2017STATUS
Road TunnelSTRUCTURE
State of GuerreroPROVINCE
MexicoCOUNTRY
Acapulco de JuárezaPLACE
The work consists of executing three road tunnels. The tunnels to be constructed are: Agustín Lara Tunnel (80 m), Costa Grande Tunnel (90 m) and María Bonita Tunnel (480 m). All three tunnels have an excavation cross-section of 191.3 m2. The excavation will be carried out by drill and blast in the areas of intact rock and by mechanical equipment in the areas where the quality of the ground is poor, following the construction philosophy of the New Austrian Method.
Cross section: 190 m²
Lenght: 650 mGEOMETRY
MediumOVERBURDEN
NATM. Conventional methodsMETHODOF TUNNELING
Muscovite gneissGEOLOGY ANDGEOTECHNICAL DATA
Model L2C and XL3C 2- and 3-boom jumbosModel PM-500 shotcrete robotTelehandler
TUNNEL EQUIPMENT
6,348,000 €BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET ROAD & HIGHWAY
06
LOCATIONANDADDITIONALINFORMATION
Type Project
RODOANEL. SÃO PAULO METROPOLITAN RING ROAD. TUNNEL 6. PACKAGE 4
Owner: Acciona Infraestructuras
CONSTRUCTION DATA SHEET
Project photos
Start: 02/2014
End: 08/2016STATUS
TunnelsSTRUCTURE
São PauloPROVINCE
São PauloCOUNTRY
São PauloPLACE
The work involves the excavation and support of two parallel road tunnels 212 m and 248 m in length, both with a cross-section of approximately 200 m2.
Cross section: 200 m²
Lenght: 212 ml + 248 mlGEOMETRY
MediumOVERBURDEN
NATM. Drill and blast and mechanical excavationMETHODOF TUNNELING
Phyllite with possible intercalated schists and quartzitesGEOLOGY ANDGEOTECHNICAL DATA
Shotcrete robotAtlas Copco three-boom jumboBackhoe loaderTelehandler
TUNNEL EQUIPMENT
33,402,942.77 BRL.BUDGET(EXCLUDING VAT)
ROAD & HIGHWAY
07
LOCATIONANDADDITIONALINFORMATION
Type Project
Project photos
Owner: Arteris
Start: 01/2015
End: 06/2016STATUS
Roadway TunnelsSTRUCTURE
São PauloPROVINCE
BrazilCOUNTRY
JuquitibaPLACE
The project consists of duplicating the carriageway of the current BR-116 highway linking São Paulo with Curitiba between kilometre points 348+900 and 349+300. The works to be carried out consist of:
• Construction of accesses to the tunnel entrances.• Excavation and support of a road tunnel 392 m long with a final cross-section of 170 m2. • Execution of the tunnel’s internal structures:
• Paving• Lining• Drainage
Cross section: 170 m2
Lenght: 392 mGEOMETRY
MediumOVERBURDEN
NATM. Mechanical equipmentMETHODOF TUNNELING
Gneiss and soilsGEOLOGY ANDGEOTECHNICAL DATA
Three-boom jumboShotcrete robot Telehandler
TUNNEL EQUIPMENT
62,000,000 R$BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET REGIS BITTENCOURT MOTORWAY. BR-116 HIGHWAY: SÃO PAULO – CURITIBA. DUPLICATION IN THE SERRA DO CAFEZAL. EXECUTION OF SECTION 3. TUNNEL 4.ROAD & HIGHWAY
08
LOCATIONANDADDITIONALINFORMATION
Project photos
Start: 05/2013
End: 09/2014STATUS
Road TunnelSTRUCTURE
PunoPROVINCE
PeruCOUNTRY
San Gaban, OllacheaPLACE
The work consists of excavating a motorway tunnel. This will be realised using conventional means and by using NATM techniques. Tunnel support will be applied using shotcrete, rectangular girders and bolts with umbrella heads.
Cross section: 65–93 m²
Lenght: 373 mGEOMETRY
MediumOVERBURDEN
Drill and blast. NAMT System(Segments excavated in advance destructively)
METHODOF TUNNELING
Metaquartzites and fluvioglacial depositsGEOLOGY ANDGEOTECHNICAL DATA
Atlas Copco Boomer L2c (dual booms)ManitouSika PM-500
TUNNEL EQUIPMENT
23,460,818 US$BUDGET(EXCLUDING VAT)
Type Project
WAYRANSECCA TUNNEL
Owner: INTERSUR (Camargo Correa – Andrade – Galvao)
CONSTRUCTION DATA SHEET ROAD & HIGHWAY
09
LOCATIONANDADDITIONALINFORMATION
Type Project
SUHUA IMPROVEMENT C1 TUNNELS
Project photos
Owner: Chieh Hsing
Start: 09/2012
End: 04/2014STATUS
TunnelsSTRUCTURE
Huan LianPROVINCE
TaiwanCOUNTRY
Xiu Lin ShangPLACE
The work involves implementing two parallel highway tunnels of 3,863 m each and with an excavation section of 18 m2. The tunnels are excavated with conventional methods using explosives. Injected concrete, bolts and trusses are used for supporting the tunnels.
Cross section: 118 m²
Length: 2 x 3,863 mGEOMETRY
HighOVERBURDEN
NATM Drill and blastMETHODOF TUNNELING
Marble and gneissGEOLOGY ANDGEOTECHNICAL DATA
XL3C type three-booms jumbosManitou MRT 1650Putzmeister PM500 Robot
TUNNEL EQUIPMENT
39,229,050 €BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET ROAD & HIGHWAY
10
LOCATIONANDADDITIONALINFORMATION
Type Project
T2 E-65 CENTRAL GREECE MOTORWAY
Project photos
STATUSStart: 01/2010
End: 05/2013
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
TUNNEL EQUIPMENT
Owner: Ferrovial Agroman
High
NATM Drill and blast, Reinforced Concrete Lining, Finishes
GEOLOGY ANDGEOTECHNICAL DATA Sandstones, Limestones, Clay
Tunnels
Greece
Fthiotidas
Domokos
37,000,000 €
Construction of twin highway tunnels for the E-65 Motorway in Central Greece. The tunneled length is 3,000 m with 106 m2 in cross section each tube. Excavated alternating rockbreakers and jumbo drill rigs.
Main Quantities: 414,000 m3 of excavation, 57,000 m3 of shotcrete, 345,100 m of rockbolts type 25 mm diameter, 3,500 t of steel rib arches, 105,000 m3 of reinforced concrete, 3,000 t of steel reinforcement, and 306,000 m2 of steel wire mesh.
Two and Three boom jumbos Tamrock Paramatic 316, Putzmeister PM 500 robojets, Manitous
Cross section: 106 m2
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET ROAD & HIGHWAY
11
LOCATIONANDADDITIONALINFORMATION
Type Project
EL CARMEN III TUNNEL – SOIL SECTION
Project photos
Owner: Intersur
Start: 07/2012
End: 02/2013STATUS
TunnelsSTRUCTURE
Puno DistrictPROVINCE
PeruCOUNTRY
San GabánPLACE
The work involves the implementation of a 300 m long highway tunnel sector in soils and with a 65 m2 section belonging to the South Section No. 4 Azangaro Interoceanic Road Corridor - Inambari Bridge.
The main support units to be applied in the tunnel are based on concrete injected in layers of different thicknesses, electro-welded mesh and anchor bolts.
Cross section: 65 m²
Length: 300 mGEOMETRY
LowOVERBURDEN
Excavation with mechanical resourcesMETHODOF TUNNELING
SoilsGEOLOGY ANDGEOTECHNICAL DATA
Jumbo L2CManitou MRT 1650Putzmeister PM500 Robot
TUNNEL EQUIPMENT
4,623,021.66 US$BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET ROAD & HIGHWAY
12
LOCATIONANDADDITIONALINFORMATION
Type Project
EL CARMEN TUNNEL
Project photos
Owner: Intersur
Start: 06/2012
End: 01/2013
Tunnels
Puno District
Peru
San Gabán
Cross section: 65 m²
Length: 600 m
Low
Excavation with mechanical excavationand with perforation and blasting
Schists and Soils
Jumbo L2CManitou MRT 1650Putzmeister PM500 Robot
5,459,550.83 US$
Work consists of building a bypass tunnel on theSouthern Interoceanic Highway (Peru-Brazil).Section 4: Azángaro – Inambaribridge.
32,300 m3 of land will be excavated. Main support units to be applied to the tunnel: 2,000 m3 of shotcrete, 13,500 bolts, 9,000 m2 of netting, 3,500 m of cross-linked trusses, 1,300 ml of 88.9 mmmicropile and 4,060 ml of Marchiavanti bolts.
STATUS
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET ROAD & HIGHWAY
13
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
Project photos
Owner: Govern d’Andorra
Start: 07/2008
End: 01/2012STATUS
TunnelsSTRUCTURE
AndorraPROVINCE
AndorraCOUNTRY
EncampPLACE
The works consisted of building a service gallery parallel to the existing Envalira tunnel.
The 2,932 m gallery is linked to the existing tunnel by 11 cross galleries (9 for pedestrians with a cross section of 18 m2 and 2 for vehicles with a cross section of 24 m2.
The support elements were 150x150x6 mesh, 25 mm f-bolts, shotcrete with and without fibres, TH and HEB trusses, and self-drilling bolts.
Cross section: 18 m²
Length: 2.932 mGEOMETRY
MediumOVERBURDEN
Mechanical means and with drill and blastMETHODOF TUNNELING
Quartzites, schists and phyllitesGEOLOGY ANDGEOTECHNICAL DATA
ITC, shotcrete robotTUNNEL EQUIPMENT
20,804,964 €BUDGET(EXCLUDING VAT)
SERVICE AND EVACUATION GALLERY PARALLEL TO ENVALIRA TUNNEL CONSTRUCTION DATA SHEET
14
LOCATIONANDADDITIONALINFORMATION
Type Project
KALYDONA TUNNEL
Project photos
STATUSStart: 01/2010
End: 05/2011
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
TUNNEL EQUIPMENT
Owner: Ferrovial Agroman
High
NATM Drill and blast, Reinforced Concrete Lining, Finishes
GEOLOGY ANDGEOTECHNICAL DATA Limestones and sandstones
Tunnels
Greece
Etoloakarnanias
Messologi
8,100,000 €
Construction of twin highway tunnels for the Euroionia Motorway in Western Greece. The tunnel length is 1,100 m with 106 m2 in cross section each tube. Excavated alternating rockbreakers and jumbo drill rigs. 80% of the tunnel was done in Full Face Blast.
Main Quantities: 5,287 m3 of shotcrete, 17,990 m of rockbolts type Swellex Mn 12,157 Kgs of steel rib arches type heb-140. 240 t of reinforced concrete and 22,493 m3 of lining concrete, and 200 m2 of Bernold Steel Plates.
Two and Three boom jumbos Tamrock Paramatic 216, Tamrock Axera T11, Putzmeister PM 500 robojets, Manitous
Cross section: 106 m2
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET ROAD & HIGHWAY
15
LOCATIONANDADDITIONALINFORMATION
Type Project
AMBELIA TUNNEL
Project photos
STATUSStart: 04/2010
End: 04/2011
STRUCTURE
PROVINCE
COUNTRY
PLACE
BUDGET(EXCLUDING VAT)
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
TUNNEL EQUIPMENT
Owner: Ferrovial Agroman
Medium
Cross section: 106 m2
NATM Drill and blast, Reinforced Concrete Lining, Finishes
GEOLOGY ANDGEOTECHNICAL DATA Weathered limestones with karst
Tunnels
Greece
Bizani
Epirus
17,300,000 €
Construction of twin highway tunnels for the Euroionia Motorway in Northern Greece. The tunneled length is 1,600 m with 106 m2 in cross section each tube. Excavated alternating rockbreakers and jumbo drill rigs.
Main Quantities: 31,638 m3 of shotcrete, 62,080 m of bolts type superswllex and 13,015 m type rockbolts, m 214 of steel rib arches type HEB 180 AND 745 lattice girder, 740 t of reinforced concrete and 30,245 m3 of lining concrete, and 235 m2 of Bernold Steel Plates.
Two and Three boom jumbos Tamrock Paramatic, Tamrock Axera, Putzmeister PM 500 robojets
CONSTRUCTION DATA SHEET ROAD & HIGHWAY
16
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
BILBAO SOUTH BYPASS. SECTION 7: CADAGUA–PEÑASCAL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Vizcaya
Spain
Bilbao
102,979,626 €
Medium
Marls, limestones and sandstones
NATM. Drill and blast
Jumbos Atlas Copco Boomer and Atlas Copco XL3C (Two and three booms and service plataform). Wet - mix Robojet Putzmeister Aliva - PM 500
06/2007
11/2010
95 m²
4.522 m
Owner: Interbiak - Bizkaiko Hegoaldeko Akzesibilitatea S.A.
BUDGET(EXCLUDING VAT)
The work consists of the building of a 2.51 Km section of motorway, formed by two separate 3 lane carriageways.
The overall works include the construction of 2 parallel tunnels, one per carriageway, a 1-lane exit branch, a cave junction between the branch and the tunnels, a reinforced concrete wall, a 126 m viaduct and the road surfaces of the section.
Each tunnel has a cross section of 125 m2 and a length of 2,261 m. The tunnels were excavated with explosives and in two phases, and advance phase and a shattering phase.
The exit branch has a length of 365 m and a cross section of 59 m2,the cave junction has a length of 118 m and a cross section of 383 m2.
CONSTRUCTION DATA SHEET
17
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
SANTULLAN BYPASS
Project photos
Owner: Gestión de Viviendas e Infraestructuras de Cantabria
Start: 07/2008
End: 10/2010STATUS
TunnelsSTRUCTURE
CantabriaPROVINCE
SpainCOUNTRY
SantanderPLACE
The works consisted of building a new 1,000 m section of the CA-251 road, connecting the CA-250 with the A-8 motorway and the CA-522.
The main work implemented was a 293 m tunnel, of which 210 were excavated and the remaining distance was made up by the false entry and exit tunnels. Excavation was carried out following the new Austrian method, with the use of mechanical means. The tunnel was lined with 30 cm of HM-30 type concrete.
Two underpasses with a total length of 42.5 m were also built, as well as several drainage works and the laying of the road surface of the section.
Cross section: 99 m²
Length: 293 mGEOMETRY
25 mOVERBURDEN
Mechanical means. In advance and shatteringMETHODOF TUNNELING
Banks of limestone and brown clayGEOLOGY ANDGEOTECHNICAL DATA
Road header and hydraulic hammers on backhoes, PM-500 type shotcrete robots with η = 8-30 m3/h
TUNNEL EQUIPMENT
7,973,026 €BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
18
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
GI-2620 ARRASATE WEST BYPASS
Project photos
Owner: Diputación Foral de Gipuzkoa
Start: 07/2008
End: 10/2010STATUS
TunnelsSTRUCTURE
GuipúzcoaPROVINCE
SpainCOUNTRY
Arrasate/MondragónPLACE
The works consisted of building a 2 km road, with an open air section of 1,150 m and a tunnel of 850 m. The road is single carriageway with two lanes (one in each direction).The main work implemented was an 850 m tunnel, of which 805 m were excavated and 45 m were false tunnel. An evacuation gallery was also excavated with a length of 469 m and a cross section of 23.5 m2. Excavation was carried out following the new Austrian method, with the use of explosives and in areas where the ground is of poorer quality, mechanical means.The support elements used in the tunnels are shotcrete, 25 mm diameter bolts of up to 8 m in length, 3 mm thick Bernold plate, Dramix type fibre in the shotcrete, and TH-21/TH-29/HEB180 type trusses.The tunnels were waterproofed with PVC and geotextile sheet and are lined with HM-30 type concrete.Two 21 m bridges were also built and a third 44 m bridge in prestressed concrete, as well as the road surface of the whole section.
Cross section: 108 m²
Length: 850 mGEOMETRY
MediumOVERBURDEN
Drill and blast and mechanical meansIn advance and shattering
METHODOF TUNNELING
Interbedded sandstone and limestoneGEOLOGY ANDGEOTECHNICAL DATA
XE3C model three-booms jumboPM-500 type shotcrete robots with η = 8-30 m3/h
TUNNEL EQUIPMENT
34,204,704 €BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
19
LOCATIONANDADDITIONALINFORMATION
Project photos
Start: 09/2008
End: 09/2009STATUS
TunnelsSTRUCTURE
MálagaPROVINCE
SpainCOUNTRY
Alhaurín de la TorrePLACE
The above-mentioned works comprise the excavation of two parallel tunnels each 1,200 m in length and with a cross-section of 180 m2. The construction method employed is the one known as the New Austrian Method (NATM), with the excavation carried out in three phases: top heading, bench and invert. The excavation was done using explosives and mechanical excavation. It was also necessary to excavate 13 connecting galleries 35 m in length and 36 m2 in cross section between the two tunnels.
Cross section: 180 m²
Length: 2 x 1,200 mGEOMETRY
MediumOVERBURDEN
Drill and blast and Mechanical excavationMETHODOF TUNNELING
Clays, glauberites and halitesGEOLOGY ANDGEOTECHNICAL DATA
Model XL3C three-boom jumbosPM500 gunning robotBackhoe loader with hammerTelescopic manipulator with service plataform
TUNNEL EQUIPMENT
21,048,888 €BUDGET(EXCLUDING VAT)
ROAD & HIGHWAY
Type Project
Owner: Ferrovial
MÁLAGA NEW WEST RING ROAD. CHURRIANA TUNNELCONSTRUCTION DATA SHEET
20
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Granada
Spain
Almuñecar
175,258,034 €
Medium
Schist with biotite, chlorite and epidote
NATM. Top-Heading and Bench. Drill and blast
Jumbo Atlas Copco Boomer (Three booms). Tamrock Axera- T11, Axera T - 8, Robot Putzmeister ALIVA, PM - 500
09/2002
06/2009
85 m²
2,855 m
Owner: Mº de Fomento. Dir. Gen. de Carreteras
BUDGET(EXCLUDING VAT)
The works consisted of the building of a 9.12 km road.
Three tunnels: Cantalobos, Calaceite and El Gato, 2.170, 410 and 275 m in length, respectively.
The Cantalobos Tunnel has five galleries with a cross section of 40.87 m² for the transit of vehicles.
The main support units used are 130,621 m³ of shotcrete with or without fibre, 315,520 m of bolts, 1,736,355 kg of THN - 21, THN - 29 or HEB-160 trusses and 49,903 m² of Bernold plate.
The work also included the building of 4 viaducts with a total length of 2,035 m, the road surfaces and the signing and marking.
MEDITERRANEAN MOTORWAY. ALMUÑECAR-TARAMAY SECTIONCONSTRUCTION DATA SHEET
21
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Guipuzcoa
Spain
Aretxabaleta
158,424,247 €
Medium
Black argillites interbedded with sandstones and limestones
Drill and blast. Top-Heading and Bench. Bernold method
Jumbo Atlas Copco Boomer (Three booms) and Jumbo Tamorock PARA (Two booms). Wet - mix Meyco and Robojet Putzmeister Wetkret η = 30 m³/h
01/2006
05/2009
125 m²
1,320 m
Owner: Bidegi
BUDGET(EXCLUDING VAT)
AP-1 MOTORWAY VITORIA-EIBARNORTH ESKORIATZA–SOUTH ARRASATE SECTION
The work included the building of a 6.3 km section of road with two separate carriageways.
The main works implemented were the double Apotxaga tunnel with a length of 320 m, the double Izurieta tunnel with a length of 280 m and the double GurutzeTxiki tunnel with a length of 710 m.
The main support units in the tunnels were: Shotcrete with fibres, Swelex bolts, mesh, HEB - 160/TH - 29 trusses and Bernold plate.
The work also included the building of two viaducts, with lengths of 391 m and 409 m respectively.
CONSTRUCTION DATA SHEET
22
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
UPGRADING OF TUNNELS AND GALLERIES, LORCA TUNNELS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Roadway
Murcia
Spain
Lorca
6,164,540 €
Medium
Limestones and marls
NATM. Mechanical excavation and drill and blast
Jumbo Tamrock Minimatic (Two booms). Wet - mix Robojet Putzmeister Wetkret η = 30 m³/h
05/2007
03/2009
20 m²
344 m
Owner: Ministerio de Fomento. Dirección General de Carreteras
BUDGET(EXCLUDING VAT)
Works for the upgrading, improvement and operation of the Lorca tunnels. The aim is to provide the tunnel with the safety measures required by Royal Decree 635/2006.
Construction of two communication galleries and improvement of tunnel installations.
194 m and 150 m galleries implemented in full section with explosives and mechanical means.
The galleries are lined with HM-25 concrete.
The supports applied are shotcrete with metal fibres (45 Kg/m3), TH-21 trusses, Ø 25 mm 4 m length bolts and micropile umbrellas of 88.9 mm in diameter.
CONSTRUCTION DATA SHEET
23
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
SUPPLEMENTARY WORKS FOR PIQUERAS TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Roadway
Soria/La Rioja
Spain
Lumbreras/La Poveda
20,133,137 €
200 m
Sandstones and limolites easily to excavate by explosives
Drill and blast. Full section
Jumbo has two booms Atlas Copco Rocket. Wet - mix Robojets Aliva AL - 500 η = 23 m³/h and Putzmeister Wetkret η = 30 m³/h
Emergency roadway parallel to Piqueras tunnel and safety facilities (Real Decreto 635/2006). To pedestrian and emergency vehicles traffic use. Connected to Piqueras tunnel through 11 cross tunnel located every 200 meters. Shotcrete, 4 m long and Ø = 25 mm bolts, steel ribs. Impermeabilization of 4 mm thick PVC sheet.
12/2007
11/2008
25 m²
2,506 m
Owner: Mº de Fomento. Dir. Gen. de Carreteras
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
24
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
PIQUERAS PASS TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
La Rioja, Soria
Spain
Lumbreras, La Poveda de Soria
50,419,986 €
200 m
Sandstones and limolites easily to excavate by explosives
NATM (Top-Heading and Bench). Invert excavation in special stretches. Drill and blast and mechanical excavation
Jumbo: Atlas Copco R Boomer - 353, Atlas Copco H - 175 and Atlas Copco Rocket. Robojet wet - mix: Meyco η = 20 m³/h, Putzmeister Wetkret η = 30 m³/h and Robot Aliva 500 η = 23 m³/h
The work consisted in the building of a 4.68 km road, with a carriageway width of 7 m and 1.5 m hard shoulders.
Two lane road tunnel with four emergency areas, three fire shelter with exit tunnel connection and thirty niches. Affected by the entry into force Real Decreto 635/2006 about safety road tunnels (work stopped for one year). 4 - 6 m long bolts and self drilling rock bolts of 12 m length, steel ribs TH - 29/HEB-140 an steel reinforced shotcrete 40 Kg/m³.
The work included the building of a 210 m viaduct, 1 overpass and several drainage works.
02/2003
11/2008
93 m²
2,444 m
Owner: Mº de Fomento. Dir. Gen. de Carreteras
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
25
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
ELS DOS VALIRES TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Andorra
Andorra
La Massana
73,287,258 €
600 m
Meta - greywacke, quartzite, schists ans fillite (Devonian)
Drill and blast. First 500 m Top-Heading and Bench
Jumbo Atlas Copco Boomer (Three booms) and Jumbo Tamrock Axera (Two booms). Wet - mix Robojet Putzmeister Wetkret η = 30 m³/h
The works included the building of two parallel tunnels, walls to protect the river banks, channelling of two streams, building of approach roads.
The main work is the building of the double road tunnel with two lanes per carriageway. The two tunnels were connected by eleven cross galleries, 8 of which are for pedestrians and with a cross section of 18 m2 and three for vehicles with a cross section of 35 m2. The galleries are situated at a distance of 240 m from each other.
The distance between the tunnel axes is 32 m, and a 17 m2 gallery will be built between the two tunnels, the front of which will be 150 m ahead of the tunnels in order to survey the ground to be excavated; the coverage does not allow for prior reconnaissance. This gallery will later be used for mounting installations. Shotcrete, 4 m long bolts, steel ribs TH - 29/HEB180, Bernold plate and concrete lining. Portals: micropile umbrella and forehole joint beam.
03/2005
09/2008
64 m²
2,950 m
Owner: Gobierno de Andorra
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
26
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
KADAGUA MOTORWAY. ARBUIO–SODUPE SECTION
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Vizcaya
Spain
Arbuio
4,457,902 €
Max. 45 m
Detritic materials and fine grained sandstones
NATM. Drill and blast
Jumbo Atlas Copco Boomer (Three booms) and Jumbo Tamorock Axera (Two booms). Wet - mix Robojet Putzmeister Wetkret η = 30 m³/h
The work consisted of the excavation and support of two parallel tunnels with lengths of 110 m and 152 m. Cut and cover constructions in the tunnel portals of 30 - 40 m long. Shotcrete HP - 30 20cm thickness, steel ribs TH - 29 and micropile umbrella Ø = 150 mm and L = 20 m. Steel fibres reinforced shotcrete HP - 30 5 - 15 cm thickness, Ø = 25 mm L = 5 m bolts and steel ribs TH - 29. Impermeabilization of 2 mm thick PVC sheet and 500 g/cm² geotextil.
11/2006
02/2008
130 m²
262 m
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
27
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
ACCESS TO SOLLER PASS. SA MOLA TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Mallorca
Spain
Sóller
25,645,361 €
4 - 100 m
Calcareous breccias, limestones and dolomite with high tectonic deformation and presence of karst process
NATM. Drill and blast (Top-Heading and Bench)
07/2005
07/2007
95 m²
1,300 m
Owner: Gobierno de las Islas Baleares
BUDGET(EXCLUDING VAT)
AXERA T-11 model three-booms Jumbo Tamrock PARA model two-booms Jumbo Tamrock WKM-103 model wet shotcrete robot TelehandlerCAT-980 Loader Shovels
Two two-lane urban road tunnels, with a false tunnel between the two. Sa Mola and Llampaies tunnels with lengths of 1,100 and 115 m respectively. The Sa Mola tunnel has two emergency exits, one in a 200 m gallery and the other in a false tunnel.
In karst areas there are irregularities or chimneys requiring additional support in specific areas of the tunnel.
Because of the filtrations caused by the four faults crossing the tunnel, the latter is waterproofed with a sheet of reticulated polyethylene.
Pioneer work in compliance with Royal Decree 635/2006 on safety requirements in road tunnels.
The work included the lining of 500 m of a stream, the building of a 45 m skew box and various improvements in the adjacent urban roads.
CONSTRUCTION DATA SHEET
28
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
EVACUATION GALLERY FOR CADI TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Roadway
Gerona, Barcelona
Spain
Urus, Baga
20,807,155 €
Medium
Schists, conglomerates, limestones, calc - schists and calcareous breccias
TBM. Drill and blast
TBM Ø 4.51 and Jumbo has two booms Tamrock Minimatic. Robojet wet - mix Putzmeister Wetkret η = 30 m³/h y Aliva AL - 500 η = 20 m³/h
Refurbishment and extending works. 415.3 m long tunnel and 28 m² cross section excavated by explosives and 3,293.14 m long tunnel of 4.51 m diameter by mechanical excavation. Also 19 cross tunnel with 587 m total long and cross sections between 11.9 to 7.2 m².
Apart from the excavation works, drainage had to be constructed and systems installed inside the tunnel, and the concrete floor had to be laid along the whole length of the gallery.
The building and conditioning of the approaches to the mouths of the galleries was also carried out.
04/2004
03/2007
Variable
4,348 m
Owner: Túnel de Cadí S.A.C.
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
29
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Málaga, Granada
Spain
Nerja, Almuñecar
105,428,608 €
Max. 150 m
Schist with high tectonic deformation.
NATM. Top-Heading and Bench. Drill and blast.
Jumbo Atlas Copco R Boomer (Three booms and service plataform). Wet - mix Meyco and Robojet Putzmeister Wetkret η = 30 m³/h. ALIVA - 500.23 m3/h.
11/2002
02/2007
90 m²
1,920 m
Owner: Ministerio de Fomento
BUDGET(EXCLUDING VAT)
The works consisted of building 9.5 km of road.
Basically three double two-carriageway tunnels were built: the Marchante Tunnel has a length of 1,400 m, the Cerrosol Tunnel 200 m and the Pino Tunnel 400 m.
Major geotechnical problems in the Marchante Tunnel. The work also included the building of 5 double viaducts with a total length of 1,256 m, an overpass, the road surfaces and the signing and marking.
CONSTRUCTION DATA SHEET MEDITERRANEAN MOTORWAY. NERJA-ALMUÑECAR SECTION
30
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
ADEGA TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Lugo
Spain
Paradela
502,970 €
8 m
Schist and gneiss with high tectonic deformation and deep weathering
Drill and blast
Jumbo has two booms and service plataform (Atlas Copco Boomer). Ripper hammer
Two lane road tunnel. Historic buildings close to the tunnel needs specific supporting system and a considerable monitoring tunnel excavation. Steel fibres reinforced shotcrete + steel ribs HEB - 180. Micropile umbrellas overlap in the middle of the excavation.
07/2006
08/2006
62 m²
30 m
Owner: Diputación de Lugo
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
31
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
THIRD GUADARRAMA TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Madrid, Segovia
Spain
San Lorenzo de El Escorial, San Rafael
14,322,731 €
High
Biotite granite rich in cordierite with thick and medium grain and leucogranite with medium and fine grain, showing different weathering process
NATM (Top-Heading and Bench). Drill and blast
Jumbo Atlas Copco Rocket and Atlas Copco XL3C. Robojets wet - mix Aliva AL - 500 η = 23 m³/h and Putzmeister Sika η = 30 m³/h
The work consisted of the excavation and support of a three-lane road tunnel on the AP-6 in the section between the Valle de los Caídos and San Rafael.
The length of tunnel excavated was 3,002.5 m. In addition, 11 galleries for vehicles with a cross section of 20 m² and 1,037 m of pedestrian galleries with a cross section of 12 m² were built.
The main support units used are: 12,038 m³ steel reinforced concrete, 318,860 Kg steel ribs TH - 29/HEB - 160, 1,402 m² Bernold plate, 105,207 m bolts 120 KN y 1,526 ud. bolts of 32 mm diameter.
02/2005
05/2006
105 m²
3,002 m
Owner: Castellana de Autopistas S.A.
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
32
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
ARBUIO TUNNELS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Vizcaya
Spain
Alonsótegui
2,441,985 €
High
Sandstones, marls and calcareous sandstones
NATM (Top-Heading and Bench). Drill and blast
Jumbo: Atlas Copco Boomer y Tamrock PARA (Two and three booms). Wet - mix Robojets Aliva AL - 500 η = 20 m³/h and Putzmeister Wetkret η = 30 m³/h
Twin tunnels of Cadaga Highway Design. The distance between the tunnel sides is 10 m and the longitudinal slope is 1%. Steel fibres reinforced shotcrete, 25 mm bolts and steel ribs. Impermeabilization with 2.5 mm PVC sheet and 4 m thickness in the tunnel sides with 1.5 mm aluminum panels.
02/2005
10/2005
90 m²
272 m
Owner: Interbiak - Bizkaiko Hegoaldeko Akzesibilitatea S.A.
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
33
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
EL PERDÓN TUNNELS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Navarra
Spain
Zizur
19,733,305 €
Medium
Red and grey marls with gypsum
Drill and blast, Top-Heading and Bench. Invert mechanical excavation
Jumbo Atlas Copco Boomer has two booms. Wet - mix Robojets Aliva AL - 500 η = 20 m³/h and Putzmeister Wetkret η = 30 m³/h
Twin tunnels of Pamplona - Estella Highway Design. Emergency cross tunnel are required by future use. Shotcrete, 25 mm and 36 mm bolts, Bernold plate and steel ribs. Impermeabilization with 2 mm thick PVC sheets and 500 g/m² geotextiles.
10/2003
10/2005
120 m²
2,010 m
Owner: Gobierno de Navarra
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
34
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
LANTUENO TUNNELS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Cantabria
Spain
Santiurde de Reinosa, Reinosa
5,892,286 €
Medium
Marls, limestones and clays
NATM (Top-Heading and Bench). Drill and blast
Jumbo: Copco Boomer and Tamrock PARA (Two and three booms and service plataform). Wet - mix Robojet Putzmeister Wetkret η = 30 m³/h
The works consisted of the excavation and support of one double two-lane tunnel belonging to the “Cantabria – Meseta Motorway Construction Project” with lengths of 675 m and 655 m respectively.
The main support units used in the tunnels are: 8,620 m³ of thick steel fibre reinforced shotcrete , 39,332 m. Super Swellex bolts, 1,854 m² wire mesh 150 x 150 x 6 mm and 1,769 m² Bernold plate e = 2 mm. 14,744 steel ribs TH - 29/HEB - 140. HM - 45 concrete lining unforced 40 cm thickness.
01/2004
08/2005
105 m²
1,330 m
Owner: Mº de Fomento. Dir. Gen. de Carreteras
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
35
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
EVACUATION GALLERY FOR SOMPORT TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Roadway
Huesca
Spain
Canfranc
949,436 €
High
Limestones, lutites and sandstones
Drill and blast
Jumbo Atlas Copco Boomer (Two booms and service plataform), and Jumbo Tamrock Minimatic. Wet - mix Meyco, Robojet Putzmeister Wetkret and Aliva AL - 500
Emergency tunnel exit, cross tunnel and tunnel facilities to the Tunnel of Somport Cross tunnel between road tunnel to railway tunnel Spain - French. 10,256 Kg of bolts 25 mm diameter and 2 m length, 516 m³ shotcrete and 114 Kg wire mesh 150 x 150 x 6 mm B500T.
03/2003
06/2003
18 m²
285 m
Owner: Ministerio de Fomento
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
36
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
TUNNELS FOR SANT QUIRZE BYPASS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Barcelona
Spain
Sant Quirze de Besora
2,761,372 €
Medium
Sandstones, marls and clays (Tertiary)
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
Jumbo has three booms Tamrock PARA. Wet - mix Robojets Meyco and Putzmeister Wetkret η = 30 m³/h
Two road tunnel of “Sant Quirze de Besora y Montesquiu bypass”. The length of the tunnels are 342.75 and 213.15 m 25,425 m³ heading and 25,232 m³ bench. 2,156 m³ shotcrete 5 - 10 cm thickness, 18,768 m of bolts Ø = 25 mm and 1,126 m steel ribs THN - 29.
06/2002
11/2002
102 m²
556 m
Owner: GISA
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
37
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
CANTABRIA–MESETA AUTOVÍA (MOTORWAY) (LOS CORRALES TUNNELS)
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Cantabria
Spain
Torrelavega, Los Corrales de Buelna
5,076,794 €
Medium
Sandstones interbedded with lutite
NATM: Top-Heading and Bench in two phases. Drill and blast
Jumbo Tamrock PARA (Two and three booms with service plataform). Ripper hammer. Wet - mix Robojet Putzmeister Wetkret η = 30 m³/hTelehandler
The work consisted of building two tunnels for the “Construction of the Cantabria - La Meseta motorway” with lengths of 660 m and 626 m respectively. 31,345 m³ steel reinforced concrete, 8,728 ud. 4 m long bolts Ø = 25 mm and 55,024 Kg steel ribs TH - 29. Impermeabilization with PVC sheet and geotextil and 30 cm thick concrete lining.
05/2001
09/2002
114 m²
1,286 m
Owner: Ministerio de Fomento
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
38
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
TARDAJOS TUNNELS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Burgos
Spain
Tardajos
2,180,800 €
30 m
Soil, sands and clays
Top-Heading and Bench in two phases. Mechanical excavation. Bernold method
Jumbo Atlas Copco Boomer (two booms). Wet - mix Robojet Putzmeister Wetkret η = 20 m³/h
Double two lane tunnel of 135 m long. Two cut and cover constructions in tunnel portals, 12.54 m long Leon side and 38.92 m long Burgos side. Objective: historical preservation of the “Castro” of Tardajos. Shotcrete, steel ribs, Bernold plate and concreting in extrados.
03/2001
04/2002
100 m²
2 x 130 m
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
39
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
LA MADERA AND LA CALABAZA TUNNELS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Asturias
Spain
Gijón
5,939,932 €
Medium
Limestone, clays and marls
Drill and blast
Jumbo Atlas Copco R Boomer (Three booms and service plataform) and Jumbo Atlas Copco Rocket. Wet - mix Meyco and Robojet Putzmeister Wetkret and Aliva AL - 500
Two double tunnels of Mieres - Gijon Highway. Madera and Calabaza tunnel are 480 and 499 m long respectively. Bolts, steel ribs, 18 cm thick shotcrete, 7 cm thick second concrete lining and wire mesh.
08/2000
11/2001
86 m²
979 m
Owner: Principado de Asturias
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
40
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
SEPÚLVEDA TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Segovia
Spain
Sepúlveda
3,383,203 €
Max. 45 m
Marls and limestones (Cretaceous). Limestones and dolomites with high tectonic deformation in the south portal tunnel
Mechanical excavation
Atlas Copco 2,050 Kg ripper hammer. Robojet Putzmeister Wetkret WKM - 102
Two lane road tunnel. HM - 250 steel fibres reinforced shotcrete, HEB - 140 steel ribs and 2 mm thick Bernold plate. Two cut and cover tunnels supporting by HEB steel ribs, shotcrete, Bernold plate and wire mesh. Long extended micropile umbrella in the south portal is required to solve the stabilization problems.
04/2000
10/2001
70 m²
330 m
Owner: Junta de Castilla y León
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
41
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
ZORERA TUNNELS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Asturias
Spain
Langreo, Siero
5,050,300 €
Max. 100 m
Conglomerates, sandstones, marls and slates
Drill and blast. Top-Heading and Bench
Jumbo: Atlas Copco R Boomer y Atlas Copco Rocket (Two and three booms and service plataform). Wet - mix Robojet Aliva AL - 500 η = 20 m³/h
Twin tunnels of “Mieres - Gijón Highway”. The design includes 7,290 m of Mieres - Riaño Highway and the connection to A - 8. (Not included in the budget). Cut and cover construction is required due to estability problems in tunnel portals. Bolts, steel ribs, 20 cm thick steel fibre reinforced shotcrete and 15 cm thick shotcrete with wire mesh.
02/2000
05/2001
90 m²
1,317 m
Owner: Principado de Asturias
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
42
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
PIEDRAFITA TUNNELS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
León, Lugo
Spain
Piedrafita
10,000,827 €
Máx 90 m
Slates, sandstones and carbonates (Lower Cambrian)
NATM (Top-Heading and Bench). Drill and blast
Jumbo Atlas Copco Boomer y Atlas Copco H - 175 (Two and three booms with service plataform). Robojets wet - mix Meyco η = 18 m³/h and Putzmeister Wetkret η = 20 m³/h
Twin tunnels of “Northwest Highway, stretch Castro Lamas - Noceda”. The lengths of the tunnels are 8,005 m per carriageway. 12,986 m³ shotcrete H - 250, 120,872 m botls AEH - 500 25 mm diameter, 27,527 m steel ribs TH - 29, 393,482 Kg steel ribs HEB - 160 and 3,933 m² Bernold plate. 19,122 m of micropile umbrella of 32 mm diameter and 4,565 m³ concrete invert H - 250.
02/2000
03/2001
120 m²
1,610 m
Owner: Ministerio de Fomento
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
43
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
LIMPIAS BYPASS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Cantabria
Spain
Colindres, Limpias, Ampuero
3,928,409 €
Medium
Limestone, limolites, sandstones and claystones
Drill and blast and mechanical excavation
Jumbo has three booms and service plataform H - 175. Ripper hammer
Road tunnel N - 629 Burgos-Santoña. Top-Heading and Bench in two phases. In specific stretches is necessary invert excavation. 2,399 m³ steel reinforced shotcrete, 1,393 ud. bolts of 25 mm diameter and 4 m length and 281,867 Kg of steel ribs TH - 29. 2,200 m² of 2 mm thick Bernold plate, 5,532 m³ of concrete lining 25 cm thickness and 11,790 m² of two layer sheet impermeabilization.
05/1998
01/2001
96 m²
515 m
Owner: Ministerio de Fomento
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
44
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Lugo
Spain
Doncos
7,038,811 €
Max. 100 m
Slates, sandstones and carbonates, with calcareous levels
NATM (Top-Heading and Bench). Mechanical excavation. Drill and blast
Jumbo Atlas Copco Boomer (Two booms and service plataform). Wet - mix Robojets Meyco η = 18 m³/h and Putzmeister Wetkret η = 20 m³/hTelehandler
The works consisted of building the Espariz and Doncos tunnels, belonging to the Autovía del Noroeste project.
Each tunnel has a length of 680 m and average cross section of 120 m2, excavated with explosives and mechanical means.
The main support units are: 9,797 m³ of reinforced or nonreinforced shotcrete, 61,308 m of bolts and 516,750 Kg of steel ribs. 161,088 m³ tunnel excavation. Bernold plates are required in some stretches.
06/1999
04/2000
120 m²
1,360 m
Owner: Ministerio de Fomento
BUDGET(EXCLUDING VAT)
AUTOVÍA DEL NOROESTE (NORTHWEST MOTORWAY)NOCEDA–AGÜEIRA SECTIONCONSTRUCTION DATA SHEET
45
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
REPAIRS TO BELATE TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Navarra
Spain
Almandoz
349,297 €
Medium
Marls and clays, sandy marls and limestones
Drill and blast. Top-Heading and Bench
Jumbo has two booms and service plataform Atlas Copco Boomer
Road tunnel of N - 121. Works to reinforce support system along 850 m of the tunnel.
10 - 15 cm thick shotcrete, 9 m long bolts, drained pipes and PVC sheet in wet areas.
07/1999
08/1999
92 m²
850 m
Owner: Gobierno de Navarra
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
46
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Málaga
Spain
Frigiliana, Nerja
3,173,807 €
Medium
Conglomerates and biotite schists with andalucite and granate
Drill and blast. Top-Heading and Bench
Jumbo has three booms and service plataform Atlas Copco R Boomer. Aliva AL - 285 η = 9 - 21 m³/hTelehandler
11/1998
06/1999
113 m²
778 m
Owner: Ministerio de Fomento
BUDGET(EXCLUDING VAT)
The work consisted of the excavation and support of the Capistrano parallel tunnels, one per carriageway, belonging to the Autovía del Mediterráneo project.
The tunnels have a length of 317 m in axis 1 and 461 m in axis 2. In addition, a connecting gallery with a length of 30 m and a cross section of 45 m² was excavated.
Provisional support with metal frames, bolts and shotcrete.
CONSTRUCTION DATA SHEET AUTOVÍA DEL MEDITERRANEO (MEDITERRANEAN MOTORWAY)FRIGILIANA–NERJA SECTION
47
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Lugo
Spain
Pedrafita do Cebreiro
3,182,878 €
Max 40 m
Slates, sandstones and carbonates
Drill and blast. Top-Heading and Bench
The works consisted of the excavation and support of the San Pedro parallel tunnels, one per carriageway, belonging to the Autovía de Noroeste A-6 project.
Each tunnel has a length of 255 m and an average cross section of 120 m2. The tunnels were excavated with explosives and in the areas where the ground is of a lower quality, mechanical means were used. 6,403 m³ of shotcrete H - 250, 15,323 m of bolts AEH - 500 Ø = 25 mm and 2,292 m steel ribs TH - 29. 1,122 m² of wire mesh 5 x 15 cm and Ø = 6 mm is requiered in some stretches.
06/1998
05/1999
120 m²
550 m
Owner: Ministerio de Fomento
BUDGET(EXCLUDING VAT)
Atlas Copco Boomer three-booms jumbos with service plataform.Putzmeister Wetkret wet Robojet shotcrete = 20 m³/h.Telehandler
CONSTRUCTION DATA SHEET AUTOVÍA DEL NOROESTE (NORTHWEST MOTORWAY)CASTROLAMAS–NOCEDA SECTION
48
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
CINTAS II TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Asturias
Spain
Gijón
1,010,525 €
Max. 120 m
White quartzites
Drill and blast. Mechanical excavation
Jumbos has two and three booms Atlas Copco Boomer. Wet - mix Meyco GM - 090 η = 6 - 7 m³/h and Aliva AL - 285 η = 9 - 21 m³/h
Exclusively to bulk carrier use that are landed at El Musel harbour. The tunnel connects El Musel harbour to Aboño’s Explanada through Torres cape.
The main support units used are: 1,382 m3 H-200 e =15 cm shotcrete with fibre (35 kg/m3), 47 pc. bolts Ø = 25 mm and L=4 m, 41,350 kg TH-21 trusses and 1,804 m2 Bernold plate.
09/1998
04/1999
37 m²
400 m
Owner: Autoridad Portuaria de Gijón
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
49
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Málaga
Spain
Marbella, Estepona
8,616,330 €
Medium
Marls and sandstones (Tertiary) and limestones and marls (Jurasic)
Drill and blast. Top-Heading and Bench
Jumbo: Atlas Copco Boomer (Three booms and service plataform). Wet - mix Robojet Meyco. Meyco GM - 090 η = 6 - 7 m³/h and Aliva AL - 285 η = 9 - 21 m³/h
The work consisted of the excavation and support of two double tunnels on the Sol motorway. Tunnels of Río Verde and Montemayor have 540 (2 x 270) and 1,074 (2 x 537) m respectively.
5 - 20 cm thick steel fibres reinforced shotcrete, steel ribs TH - 29/HEB - 140, wire mesh and 4 m long bolts.
06/1997
09/1998
110 m²
1,614 m
Owner: Autopista Costa del Sol
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET AUTOPISTA DEL SOL (MOTORWAY OF THE SUN)MÁLAGA–ESTEPONA SECTION
50
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
ALONGOS TUNNELS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Orense
Spain
Alongos
2,749,611 €
40 m
Medium - coarse grained granodiorite with biotite
Drill and blast. Top-Heading and Bench
Jumbo Atlas Copco Boomer (Two and three booms and service plataform). Wet - mix Robojet Meyco
Twin tunnels of Highway Rias Baixas A - 52. 4,647 m³ of shotcrete, 28,890 m of bolts and 136,458 Kg steel ribs.
2,121 m² of Bernold plate and 10,216 m² of wire mesh.
05/1997
06/1998
110 m²
400 m
Owner: Ministerio de Fomento
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
51
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
CASTELL DE FERRO
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Granada
Spain
Castell de Ferro
12,234,511 €
Medium
Schists with granate and staurolite. Cuarcites and biotite schists
NATM (Top-Heading and Bench). Drill and blast, mechanical excavation
Jumbo has two booms and ripper hammer. Raise borer. Wet - mix Aliva AL- 285 η = 9 - 21 m³/h
Two road tunnel of 505 and 525 m CN - 340 Cádiz - Barcelona, stretch: Castell de Ferro - Castillo de Baños. Poly - circular cross section with three centers and 6.45 m of clearance. Primary support: 5,735 m³ shotcrete, 36,264 m bolts y 410 uds. steel ribs.
11/1994
05/1998
85 m²
1,030 m
Owner: Mº de Fomento. Dirección General de Carreteras
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
52
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Huesca
Spain
Ainsa, Boltaña
6,171,860 €
Medium
Limestones
NATM. Drill and blast. Top-Heading and Bench
Jumbo has three booms ATLAS COPCO BOOMER 353E
10/1993
11/1997
80 m²
620 m
Owner: Mº de Obras Públicas, Transportes y Medio Ambiente
BUDGET(EXCLUDING VAT)
N-260 ROAD FROM SABAÑANGO TO FRANCEAINSA-BOLTAÑA SECTION
The works consisted of widening the platform and improving the surface of 12.7 km of road. The main works implemented were the construction of two tunnels, several retaining walls, engineering works and drainage.
The tunnels have a length of 340 and 280 m and a cross section of 80 m2. The main supporting units used in the tunnel are: 692 m³ shotcrete, 180 m³ shotcrete with fibres, 113 pc. TH – 21 trusses, 11,042 m Ø = 25 mm bolts and 1,984 m³ H – 250 concrete.
CONSTRUCTION DATA SHEET
53
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
DUPLICATION OF EL NEGRÓN TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
León, Asturias
Spain
Sena de Luna, Lena
48,275,464 €
Medium
Quartzite, dolomite and sandstone interbedded with slate
NATM (Top-Heading and Bench). Drill and blast
Jumbo machine has three booms ATLAS COPCO H.175
08/1993
05/1997
89 m²
4,106 m
Owner: Aucalsa
BUDGET(EXCLUDING VAT)
The work consisted of widening the road to form a dual-carriageway. The main work was the implementation of the access and the building of the El Negron Tunnel.
Excavation in semi-competent materials with low compressive strength, making the tunnel extremely difficult to excavate. 1920 ml. Injected cement and bentonite to achieve stabilization of the southern exit portal.
L = 4 m bolts, HEB160 trusses and shotcrete over welded wire mesh. 30 cm thick mass concrete lining.
In addition, several engineering works were carried out as well as road surfacing.
CONSTRUCTION DATA SHEET
54
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
CANDEÁN TUNNELS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Pontevedra
Spain
Redondela, Vigo, Mos
12,625,152 €
40 m
Mainly gneiss showing different weathering process (I - III). Also sands and silts
Mechanical excavation, Top-Heading and Bench
Jumbo, ripper hammer. Wet - mix Robojets Putmeister η = 20 m³/h
Two lane road tunnel. Highway A - 9, strecht Rande - Puxeiros. Diaphram walls displacement present problems in the cut and cover construction extended. Problems in portals due to the low overburden. Micropile umbrella (150 mm, 40 m) reinforced with steel pipes (4”,10 mm) and 0.5 m cement grout.
10/1995
04/1997
90 m²
855 m
Owner: Autopistas del Atlántico (Audasa)
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
55
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
CONSTRUCTION OF BELATE PASS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Navarra
Spain
Almandoz
13,441,917 €
Medium
Marls and clays, sandy marls and limestones
NATM (Top-Heading and Bench). Drill and blast
Jumbo Atlas Copco Boomer (Two booms and service plataform). Wet - mix Robojet Putzmeister Wetkret η = 20 m³/h
08/1994
07/1996
92 m²
1,160 m
Owner: Gobierno de Navarra
BUDGET(EXCLUDING VAT)
The works comprise all the work carried out on the whole section pertaining to the variant, with a total length of 2,840 m.
The main work done was the construction of the Belate Tunnel, with a length of 1,160 m.
The supporting elements used in the tunnel are: shotcrete with and without fibre, bolts, TH - 21/HEB - 160 trusses and 2 mm. Bernold plate in specific sections.
The tunnel has 182.5 m of linear concreting in the exit portals and the rest with waterproof coating.
In addition to the tunnel, a bridge and viaducts were built and the road surface of the section was laid.
CONSTRUCTION DATA SHEET
56
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
UPGRADING OF C-3313. EL SALT TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Alicante
Spain
Alcoi
5,227,326 €
Medium
Calcareous conglomerate and marls (Oligocene and Lower Miocene). The last 30 - 40 m appear Quaternary deposits
Belgian Method. Top-Heading and Bench. Drill and blast
Jumbo machine has two booms and service plataform. Dry - mix shotcrete
05/1994
02/1996
52 m²
300 m
Owner: Generalitat Valenciana
BUDGET(EXCLUDING VAT)
The project consisted in laying 4.2 km of road. Part of this new road will be laid over the old road and the rest on a new path.
One of the main jobs was the construction of the Salt Tunnel, with a length of 297 m and a cross section of 52 m2. The tunnel was excavated with explosives and mechanical means. Excavation of the main section. Excavation, by trenches, of the gables. Immediate concreting of the gables.
A 43 m false tunnel was also implemented, and several drainage works, both transverse and longitudinal. Also worth mentioning is the building of a skew bridge with 17 m prefabricated girders and a 45 m continuous slab bridge, as well as the additional works of reinstatement of services and laying of the road surface.
CONSTRUCTION DATA SHEET
57
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
CARDONA TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Barcelona
Spain
Cardona
604,967 €
35 m
Marls, red limolites, interbedded with sandstones
Drill and blast. Top-Heading and Bench
Jumbo machine has two booms and service plataform. Dry - mix shotcrete
Two lane road tunnel. Difficult access to the tunnel portals. The Barcelona side excavation was from inside.
11,603 m³ tunnel excavation, 264 m micropiles, 1,228 ud. of 4 m long bolts and 25 mm diameter.
29,700 Kg of steel ribs TH, 2,579 m² of wiremesh 150 x 150 x 6 mm and 679 m³ of shotcrete.
08/1995
12/1995
117 m²
98 m
Owner: SATO
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
58
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
PUERTO DE PEÑA ANGULO TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Burgos
Spain
Valle de Losa, Valle de Mena
1,283,229 €
15 m
Marls and clayly limestones
Drill and blast. Full face
Jumbo Atlas Copco Boomer (Two booms). Wet - mix Robojet Putzmeister Wetkret η = 30 m³/h
Road Tunnel includes in the stabilization design of slopes in Puerto de Peña Angulo, Road BU - 550.
The high geotechnical characteristics of the ground made the works easier.
6 cm thicness shotcrete all around the excavation.
04/1995
10/1995
67 m²
540 m
Owner: Junta de Castilla y León
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
59
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
GALLEGOS TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
La Palma, Tenerife
Spain
Barlovento
1,582,584 €
25 m
Pyroclastic rocks and lavas
Mechanical excavation, full face
Ripper hammer
Two lane road tunnel of C - 830 stretch Barlovento - Llano Negro.
The route is developed an average slope with high technical problems.
34,687 m³ tunnel excavation, 3,123 m³ shotcrete, 81,976 Kg steel ribs and 1,025 m² bernold plate.
01/1994
03/1995
72 m²
573 m
Owner: Gobierno de Canarias
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
60
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
HOZ TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Cantabria
Spain
Islares
6,639,300 €
Max. 100 m
Limestones, sandstones and clayly silts
Drill and blast
Jumbo Atlas Copco Boomer (Two booms). Wet - mix Robojet Putzmeister Wetkret η = 30 m³/h
Two lane twin tunnels of “Cantabria Highway A - 8. Stretch Castro Urdiales - Colindres”.
Twin tunnels in curve. The route is developed an average slope and different levels.
Primary support: shotcrete, bolt and steel ribs.
07/1993
10/1994
110 m²
1,685 m
Owner: Ministerio de Obras Públicas y Urbanismo
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
61
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
NORTH AND SOUTH AGUADULCE TUNNELS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Almería
Spain
Almería, Roquetas de Mar
4,942,109 €
100 m
Calc - schist and dolomite showing different rock alteration process
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
Jumbo has two booms. Dry - mix shotcrete
Two double - lane tunnel tubes. North, south and Pescadería tunnel is 985, 534 and 97 m length respectively.
The design contains the constuction of twin tunnel but the problems of stability around the Aguadulce portal force to change the length of both.
The main units are: 163,288 m³ tunnel excavation, 63,000 m bolts, 247 ud. steel ribs TH - 21 y 40,109 m² shotcrete.
04/1993
07/1994
100 m²
1,616 m
Owner: Ministerio de Obras Públicas y Transportes
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
62
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
DUPLICATION OF BARRIOS TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
León
Spain
Barrios de Luna
5,695,307 €
High
Quartzites and slates
NATM. Top-Heading and Bench. Drill and blast
Jumbo has three booms ATLAS COPCO H175WKM shotcrete robot and telehandler
12/1991
05/1993
114 m²
1,641 m
Owner: AUCALSA
BUDGET(EXCLUDING VAT)
The work consisted of the implementation of the road tunnel called “Barrios” and its approaches.
In the more complex sections inverted vault is added on the base of the tunnel using a total of 3,712 m³ of concrete in its lining.
The main supporting units of the tunnel are: 28,701 m³ of shotcrete, 14,058 pcs. of bolts L = 4 - 6 m Ø = 25 mm. and TH/HEB180 trusses.
The road surface of the Barrios Tunnel and its approaches was also laid.
CONSTRUCTION DATA SHEET
63
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
SUMBILLA TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Navarra
Spain
Sumbilla
4,181,906 €
Max. 120 m
Slates, greywacke and conglomerates
NATM (Top-Heading and Bench). Drill and blast
Jumbo Atlas Copco Boomer (Two booms and service plataform). Wet - mix Robojet Putzmeister Wetkret η = 20 m³/h
Two lane road tunnel of “Naciona N - 124 Pamplona - Francia”.
10,638 m³ shotcrete, Ø = 25 mm and 25,377 m long bolts , 164,476 Kg steel ribs y micropiles of 12 m long and Ø = 150 mm in tunnel portals.
Impermeabilization with 2,968 m² PVC sheet 3 mm thicknes and 2,563 m² reinforced concrete lining.
08/1991
05/1993
78 m²
530 m
Owner: Gobierno de Navarra
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
64
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
COLLEGATS TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Lérida
Spain
Pobla de Segur
3,095,059 €
Medium
Conglomerates. Marls in the north side
NATM. Drill and blast
Jumbo has two booms. GM - 090 6, 7 m³/h
Road tunnel of N - 260 Pobla se Segur - Sort. Five emergency areas every 200 m.
81,532 m³ tunnel excavation, 120 m² of Bernold plate, 20,717 m² wiremesh 150 x 150 x 4 mm 5,316 ud. of bolts of 3.5 m legth and 25 mm diameter, 5,180 Kg steel ribs TH - 21 and 6,992 m³ shotcrete.
02/1991
02/1992
72 m²
1,134 m
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
65
LOCATIONANDADDITIONALINFORMATION
ROAD & HIGHWAY
Type Project
PANDO AND VEGAVIESA TUNNELS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Asturias
Spain
Pando
4,977,863 €
High
Slates, sandstones, limestones and quartzites
NATM. Top-Heading and Bench. Drill and blast. Mechanical excavation
Jumbo has three booms Atlas Copco H - 175. Wet- mix Aliva 262 n = 7 - 10 m²/h
Twin tunnels of Toll Highway Astur - Leonesa. The tunnel of Pando has 1,499 m lond and Tunnel of Vegaviesesa has 284 m long.
185,888 m³ tunnel excavation, 21,056 m³ shotcrete, 10,200 ud. of bolts, 41,664 m² wiremesh.
1,439 m micropiles of 8” diameter, 595,822 Kg steel ribs, 8,320 m of steel in umbrellas and 39,689 m³ of concrete lining.
08/1990
08/1991
104 m²
1,783 m
Owner: AUCALSA
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
66
LOCATIONANDADDITIONALINFORMATION