Road Asset Management System (RAMS) Lite
A simplified approach to Road Asset Management
Objective of RAMS
• Initial exposure
• Setup organisational policy
• Accessible / Cost effective RAMS
• Conform to asset management guidelines (TMH 22)
Components
• Road asset register
• Asset condition assessment
• Life cycle analysis
• Reporting
• Visualisation
• Gap analysis
Assets
Asset Register
• Roads links – uniform sections
• RISFSA classification
• Geo-location
• Asset components – Surfacing, base, abutments etc.
Field Assessment
• MOBICAP
– Geo-reference roads
– Assess pavement visual condition (TMH9)
Road Condition
• TMH 9 visual assessment
– Defects• Cracking
• Failures
• Functional condition
– Degree / extent rating
RAMS Analysis – MS Excel / VBA
• MS Excel environment
• Basis of analysis – asset visual condition
• Life cycle cost analysis
– Condition analysis
– Prioritisation
– Deterioration / Amelioration
– User and agency costs
Life Cycle AnalysisAsset
ConditionPrioritise
Budget Constraint
M+R(Agency Costs)
Budget Constraint
Deteriorate Next Year
Road User Costs
X
Co
nd
itio
n
Time
Measure Actual
X
Co
nd
itio
n
Time
Predict the future
LCA - Modelling of Road Condition
• M+R effects
– Adjust degree / extent
• Deterioration
– Sygmoidal model
– HDM 4 deterioration model
0
20
40
60
80
100
0 5 10 15 20 25 30 35
CO
ND
ITIO
N IN
DEX
YEARS
ACCB
ACGB
SLGB
Co
nd
itio
n
Time
Limit
Maintain or Rehabilitate
LCA – Maintenance and Rehabilitation
• M+R triggers– Defect / degree / extent
• Opex– Crack seal
– Patch
• Capex– Overlay
– In-situ recycle
– New construction
Co
nd
itio
n
Time
Deteriorate
Increased User Costs
LCA - Prioritisation
• Road condition (TMH 9)
• RISFSA classification
– Strategic importance
– Socio-economic benefit
– Corridor development
• Traffic type and volume
LCA Output
• Road network condition
– Distribution based on available budgets
– Target / Current / Model
0%
20%
40%
60%
80%
100%
Very Poor(VCI < 30)
Poor(30 < VCI < 50)
Fair(50 < VCI < 70)
Good(70 < VCI < 85)
Very Good(85 < VCI < 100)
% o
f N
etw
ork
Target
Current
Model
LCA Output
• Agency costs
– Maintenance and rehabilitation
– Upgrade / new construction
• Road user costs
– Vehicle operating (Roughness/VCI)
– Time (Capacity)
Life Cycle Cost Analysis
Agency Costs
(M&R)User Costs
(time, vehicle)
LCA Output
• Asset valuation
– Sum of component values
– Depreciate based on condition
0
50
100
150
200
250
300
350
400
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
As
se
t V
alu
ati
on
Mill
ions
Year
Visualisation
• Google Earth
• LCA data exported to .kml
X
Co
nd
itio
n
Time
X
X
Gap Analysis
• Organisation knowledge/ structure
• Model calibration
Conclusion
• Simplified approach to RAMS
• Foundation in basics of roads asset management
• First step to:
– Asset Register
– Level III / IV RAMS
– Integrated Asset Management