Mr. Andy Arkansas Water Div Permits S 5301 Nort North Litt R Dear Andy On behalf with rega applicant applicant operation previous s descriptio proposed not chang Thank you informatio cc: R B M B enclosure 8114 Cantre Nanneman Department vision ections/No D thshore Drive tle Rock, Arka e: Permit Propo Revise Pet So y f of Pet Soluti rds to the Pe planned to e now plans to nal footprint. submission. T on, facility site facility expan ged and are th u for your rev on, please co usty Bowsher obby Bridges Mike Johnson, ryan Posey, P e ell Road, Ste. 3 of Environme Discharge Perm e ansas 721185 t Modificatio sed Permit 3 ed Waste Ma olutions, LLC ions, LLC, plea rmit Modifica xpand the ex o expand the Also, the num The enclosed e map, proces nsion. The an herefore not view of this ap ntact me. r, Pet Solution , Pet Solution Pet Solution Pet Solutions, 350 | Little Ro www.H ental Quality mits 5317 on Application 778WR5 nagement Pl Land Applic ase accept th ation Applicat xisting facility existing facili mbers of coo revised WM ss flow diagra nalytical data being resubm pplication. Sh ns, LLC ns, LLC s, LLC LLC ck, AR 72227 HarborEnv.co Octo n for an cation Facility e attached re tion for the p building with ty building w kers and wet P presents th am, and proce of Appendix mitted. hould you hav Since HAR Andr Senio | P: 501.663.8 om ober 12, 2011 y, Danville, A evised Waste proposed Perm hin the facility within and to t t scrubbers ha he revised tab ess area site D and the soi ve any questi erely, BOR ENVIRO rew Rike, P.E or Project En 8800 | F: 501.5 1 nanneman Arkansas Managemen mit 3778WR y’s operation the east of th ave been cha ble of content map correspo ils report of A ions or need NMENTAL & . gineer P Environ 588.0123 VIA E n@adeq.state nt Plan (WMP 5. Previously al footprint. e facility’s cu nged since th ts, process onding to the Appendix E ha any additiona SAFETY Proactive Solu nmental and EMAIL e.ar.us P) y, the The rrent he e ave al utions for your Safety Needs r s

Upload: others

Post on 09-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

 

 

    Mr. Andy Arkansas Water DivPermits S5301 NortNorth Litt   R

 Dear Andy On behalfwith regaapplicant applicant operationprevious sdescriptioproposednot chang Thank youinformatio   

    cc:   R  B  M  B  enclosure

8114 Cantre

 

Nanneman Department vision ections/No Dthshore Drivetle Rock, Arka

e:  PermitPropoRevisePet So

f of Pet Solutirds to the Peplanned to enow plans tonal footprint. submission.  Ton, facility site facility expanged and are th

u for your revon, please co

usty Bowsherobby Bridges

Mike Johnson,ryan Posey, P

ell Road, Ste. 3

   

of Environme

Discharge Perme  ansas 72118‐5

t Modificatiosed Permit 3ed Waste Maolutions, LLC –

ions, LLC, plearmit Modificaxpand the exo expand the  Also, the numThe enclosede map, procesnsion. The anherefore not 

view of this apntact me. 

r, Pet Solution, Pet Solution Pet SolutionPet Solutions,

350 | Little Rowww.H

ental Quality

mits 

5317  

on Application778‐WR‐5 nagement Pl– Land Applic

ase accept thation Applicatxisting facility existing facilimbers of coo revised WMss flow diagranalytical data being resubm

pplication.  Sh

ns, LLC ns, LLC s, LLC  LLC 

ck, AR 72227 HarborEnv.co

  Octo

n for  

an cation Facility

e attached retion for the pbuilding withty building wkers and wetP presents tham, and proceof Appendix mitted. 

hould you hav

SinceHAR

AndrSenio

| P: 501.663.8om 

ober 12, 2011

y, Danville, A

evised Waste proposed Permhin the facilitywithin and to tt scrubbers hahe revised tabess area site D and the soi

ve any questi

erely, BOR ENVIRO

rew Rike, P.Eor Project En

8800 | F: 501.5

nanneman

Arkansas 

 Managemenmit 3778‐WRy’s operationthe east of thave been chable of contentmap correspoils report of A

ions or need 

NMENTAL & 

 . gineer 

PEnviron

588.0123

VIA [email protected]

nt Plan (WMP‐5. Previouslyal footprint.  e facility’s cunged since thts, process onding to theAppendix E ha

any additiona

SAFETY 

Proactive Solunmental and

EMAIL e.ar.us 

P) y, the The rrent he 

e ave 

al 

utions for your Safety Needs

r s

Page 2: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

WASTE MANAGEMENT PLAN 

REVISED OCTOBER 2011  

 

  

PROPOSED PERMIT NO. 3778‐WR‐5 AFIN: 75‐00051 

  

PREPARED FOR: PET SOLUTIONS, LLC 10511 GAUGE ROAD 

DANVILLE, ARKANSAS 72833 (479) 576‐2050 

   

Prepared by: 

8114 Cantrell, Suite 350 Little Rock, AR 72227 Phone 501.663.8800 www.HarborEnv.com

Page 3: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

Waste Management Plan    Pet Solutions –Danville, Arkansas Proposed Permit No. 3778‐WR‐5    Revised October 2011 

Harbor Environmental & Safety    P a g e  | i 

Table of Contents

Table of Contents ............................................................................................................................................. i

1.  Introduction and Background ................................................................................................................. 1 

2.  Process Description .................................................................................................................................. 2 

3.  Storage Facilities ........................................................................................................................................ 5 

4.  Analysis of Waste Properties ................................................................................................................... 8 

5.  Soil Properties ......................................................................................................................................... 10 

5.1  Identification of Soils ......................................................................................................................... 10 

5.2   Soils Analysis ........................................................................................................................................ 10 

6.  Site Management Plan ............................................................................................................................ 11 

6.1  Solids Land Application Plan ............................................................................................................ 11 

6.2  Application Rate Calculations for Solids ......................................................................................... 11 

6.3  Wastewater Land Application Plan ................................................................................................... 12 

6.4  Application Rate Calculations for Wastewater ................................................................................ 12 

7.  Professional Engineers Certification .................................................................................................... 14 

APPENDICES Appendix A: Facility Vicinity Map and Facility Site Map Appendix B: Simplified Process Flow Diagrams Appendix C: Process Area Site Maps Appendix D: Analytical Data – Pond 3 Wastewater, Pond 1 Sludge, and Soils Data for Application Areas Appendix E: National Cooperative Soil Survey Custom Soil Resource Report for Yell County, Arkansas

Page 4: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers
Page 5: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

Waste Management Plan    Pet Solutions –Danville, Arkansas Proposed Permit No. 3778‐WR‐5    Revised October 2011 

Harbor Environmental & Safety    P a g e  | 1 

1. Introduction and Background Pet Solutions, LLC owns and operates a protein conversion facility in Centerville, Arkansas.

This document constitutes the revised Waste Management Plan (WMP) for the land application of unrecoverable grease solids and process waste water generated at the Pet Solutions facility. Pet Solutions owns approximately 313 acres, of which approximately 170 acres is associated with industrial activity and is located in Sections 11 and 12, Township 5 North, Range 21 West, northeast of Danville, in Yell County, Arkansas. However, due to restrictions such as slopes exceeding 15 percent and maintaining buffer zones around creeks and property boundaries, only about 77 acres in this area is suitable for land application. Appendix A presents the Facility Vicinity Map providing the location of the facility on a Yell County General Highway Map. The plant is surrounded by unmanaged timber and open pasture acreage.

The facility is a protein conversion plant (SIC 2077), located on Gauge Road (County Road #50), west of State Highway 7 between Ola and Centerville, Arkansas. Pet Solutions

processes chicken material to recover protein nutrients and fats. The recovered products are sold in bulk for use as additives in animal feeds. Prior to the recovery of protein nutrients and fat oils, regional chicken producers commonly land-applied these valuable by-products without attempting to recover and recycle the usable portions of their waste stream.

The original Permit (3778-W) was issued to J&B Farms, Inc. on December 30, 1989. The facility was purchased in 1994 by Valley Protein and was operated until it was destroyed by fire in 1996. In 1997, J&B Farms bought back the facility from Valley Protein and operated it until early 2002. The facility was then purchased by Pet Solutions, LLC. The facility operated under Permit No. 3778-WR-1 until March, 2004 when Pet Solutions submitted a minor permit modification application (PMA) and WMP revision for the consolidation of ponds 1 through 4 and the construction of levees and a compacted clay liner system. The PMA was approved, and Permit No. 3778-WR-2 was made effective on September 22, 2004. A permit application was submitted, and the permit was pending issuance in June of 2008. However Permit 3778-WR-3 was not issued. Pet Solutions resubmitted a permit renewal application in December of 2009 which was approved, and Permit No. 3778-WR-4 was made effective on June 1, 2010. The facility currently operates under Permit No. 3778-WR-4.

Page 6: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

Waste Management Plan    Pet Solutions –Danville, Arkansas Proposed Permit No. 3778‐WR‐5    Revised October 2011 

Harbor Environmental & Safety    P a g e  | 2 

2. Process Description  

Pet Solutions, located in Yell County, Arkansas, provides a service to chicken producers by dehydrating and separating secondary protein nutrients at a protein conversion facility producing grease/oils and protein solids (bone meal) utilized by the Pet Food industry. A simplified process flow diagram for the facility is presented in this section. A more detailed layout of the Process Area is presented in Section 8.0 with the Plot Plan. The planned expansion project will involve expanding and reorganizing the existing plant to incorporate a blood/feather meal and edible chicken parts processing lines in addition to the cooking process (inedible meat processing) currently permitted. Edible materials include chicken materials that are less than three (3) days old, and these materials must be processed within 72 hours to maintain the edible designation. Inedible Processing Lines

The primary feedstock of meat, blood, and feathers is trucked to the plant. Upon arriving at the facility, the blood is to be pumped to a holding tank, then to a coagulator, and then to a centrifuge which will separate the blood solids from the “serum” liquid. The solids from the centrifuge are conveyed to a cyclone where the blood is mixed with hydrolyzed feathers before entering a dryer. Upon arriving at the facility, the feathers are to be dumped into a closed feathers receiving bin. The feathers will then be transferred to the feather hydrolyzer, where they are to be heated, agitated, and reduced to a wet slurry. Hydrolyzed feathers are to be separated from the flash vapors as they depart from the flash chamber and are mixed with blood solids in the cyclone. From the cyclone, mixed blood and hydrolyzed feathers are to be transferred to the dryer. The dryer is an ASME certified steam vessel equipped with steam discs, rather than being direct fired. The dryer is listed as an emission source in the event AP-42 factors change in the future. The dried feather/blood meal is then to be milled, screened, and conveyed to the storage silos. Other inedible materials are to be received and then dumped into a closed receiving bin. The raw material is then transported to a metal detection/removal process. At this point, the raw material is transferred to one (1) of 12 batch cookers. The facility is adding two (2) new cookers to the edible protein processing line as part of this expansion. The inedible cooking process consists of 12 horizontal, cylindrical, non pressurized vessels (batch cookers) equipped with steam jackets and non-steam agitators. The steam is provided by the natural gas boilers and wood-fired boiler located in the boiler area. A new 73.6 MMBTU natural gas boiler will be installed. Materials placed in the cookers are dehydrated. Vapor is vented from these 12 cookers and passes through an RTO. Upon completion of the cooking process, materials are dumped into a drain pan. The drain pan separates the liquid fat from the protein solids. From the drain pan, the protein solids are conveyed to a press. The press completes the separation of fat from solids, and yields protein solids. These solids are then ground and screened to produce protein (bone

Page 7: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

Waste Management Plan    Pet Solutions –Danville, Arkansas Proposed Permit No. 3778‐WR‐5    Revised October 2011 

Harbor Environmental & Safety    P a g e  | 3 

or poultry) meal. The Hammermill room air is vented to the scrubber system which consists of five (5) total scrubbers. The meal is stored in holding bins that are located adjacent to the ship-out area. The fat from both the press and the drain pan is screened and pumped to the grease storage tanks for shipping. Wastewater from the centrifuge is directed to the wastewater ponds. Both grease and bone meal are stored and shipped from the load-out area located on the southeast portion of the facility. To reclaim protein from the solutions, a dissolved air flotation unit may be utilized to process the liquids from the blood and fat centrifuge units, and the separated water would be directed to Pond 1. Other sources of wastewater include blow down from the wet scrubbers, drop out from the cyclones and condensers, and facility wash down water. All wastewater is directed to the wastewater ponds.

Edible Processing Lines  

Edible materials are to be received and directed to the cookers. The open top trucks and totes are to be received at the receiving dock, and then dumped into the closed raw receiving bin. The raw material is then to be transported to a metal detection and removal process. From this point, the material is to be transferred to the cookers in the protein recovery area via a closed pipe pumping system. The protein recovery area includes two (2) new large capacity continuous cookers, two (2) oil separators, two (2) surge bins, two (2) screw presses, two (2) centrifuges, and two (2) coolers with bag house. The continuous cookers consist of two (2) horizontal, cylindrical, non-pressurized vessels (HM2266 batch cookers) equipped with an outer steam jacket and 66 steam discs. The steam is to be provided by two (2) natural gas boilers and the wood fired boiler located in the boiler area. Materials placed in the cookers will be dehydrated thereby facilitating the separation of the fats and proteins. Cooking time will be dependent upon various factors that include the consistency of the raw materials and ambient temperatures inside the plant. Vapor will be vented from each cooker and routed to the RTO to remove odor prior to discharge. Materials from the cookers are to be dumped into one of two (2) pre-heated closed surge bins with mixing capability, thence transferred into one of two (2) screw presses. The press completes the separation of fat from solids. These solids are then ground and screened to produce protein meal. The meal is stored in holding bins that are located adjacent to the ship-out area after passing through the milling/screen room. The fat from both the presses and the drain pans is processed in centrifuges and pumped to the grease storage tanks for shipping. Wastewater from the centrifuges is directed to the wastewater ponds. Both grease and bone/poultry meal are stored and shipped from the load-out area. All plant air is exhausted to the scrubber system which consists of five (5) total scrubbers. Blow-down water from the scrubbers will be directed to Pond 1.

Page 8: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

Waste Management Plan    Pet Solutions –Danville, Arkansas Proposed Permit No. 3778‐WR‐5    Revised October 2011 

Harbor Environmental & Safety    P a g e  | 4 

To reclaim protein from the solutions, a dissolved air flotation unit may be utilized to process the liquids from the fat centrifuge units, and the separated water would be directed to Pond 1. Other sources of wastewater include drop out from the cyclones and condensers, and facility wash down water. All wastewater is directed to the wastewater ponds.

Page 9: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

Waste Management Plan    Pet Solutions –Danville, Arkansas Proposed Permit No. 3778‐WR‐5    Revised October 2011 

Harbor Environmental & Safety    P a g e  | 5 

3. Storage Facilities

Process wastewater effluent from various sources associated with the operations of the protein recovery facility will flow into a series of ponds for treatment. Dehydration of the feedstock condenses and becomes a process wastewater stream. Other wastewater streams are generated from the two boilers (blow-down and by-pass condensate), the wash down of equipment and maintenance cleanup, spent scrubber liquids, and preprocess feedstock drainage. Bound fat in these wastewater streams separates and floats to the water’s surface as they enter Pond 1 of the treatment system. Since complete separation of the bound fat is not a pure separation that could be accomplished by screening, a series of settling ponds are utilized to accomplish this process. However, the separation of fat from water is a simple process and does occur naturally. Based on land application volumes from previous years, it is estimated that approximately 18,000 gallons of wastewater per production day will be generated. Upon completion of treatment, the waste will be stored and then land applied as needed. An overall layout of the site and treatment system is presented in Appendix A. The average annual rainfall for this area, Dardanelle Weather Station Gauge, is 46.89 inches Average annual lake evaporation (U.S. Weather Bureau Technical Paper #37, 1959) is 44inches. The 46.89 inches of annual rainfall less 44 inches of annual evaporation is 2.89 inches of annual accumulated rainfall in the ponds. Pond 1 is the primary anaerobic lagoon used as a receiving, settling and separation pond. The dimensions of Pond 1 are approximately 125 feet, by 335 feet (rainfall watershed area), by 11 feet deep, with 1 foot of freeboard. The sides of the pond were constructed with 2:1 (H:V) slopes. Fat separates from the wastewater stream and floats to the surface, and settled water from mid depth of the pond drains through a pipe structure to Pond 2. Chemical adjustment may be done as needed. The maximum holding capacity for Pond 1 is approximately 2,430,745 gallons. This is approximately 134 days of throughput for process and rainfall loading accounting for evaporation. A 25-year, 24-hour rain event at 7.3 inches is approximately 189,408 gallons of loading that must pass through Pond 1 to maintain the required freeboard. TABLE 1 provides a design summary of the ponds. Pond 2 is the aerated pond. This top of the pond’s berm is approximately five feet lower than the top of the berm of Pond 1. Aerobic biological treatment and chemical adjustment are accomplished in Pond 2. The dimensions of Pond 2 are approximately 130 feet, by 150 feet (rainfall watershed area), by 21 feet deep with 1 foot freeboard. The sides of the pond were constructed with 2:1 (H:V) slopes. Settled water from this pond flows through a pipe structure to the next and final holding lagoon (Pond 3). The maximum holding capacity of Pond 2 is approximately 1,443,641 gallons. This is approximately 80 days of throughput for process and rainfall loading accounting for evaporation. At this point some evaporation could be considered, but for simplicity have been avoided in this calculation.

Page 10: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

Waste Management Plan    Pet Solutions –Danville, Arkansas Proposed Permit No. 3778‐WR‐5    Revised October 2011 

Harbor Environmental & Safety    P a g e  | 6 

A 25-year, 24-hour rain event at 7.3 inches is approximately 88,732 gallons of loading that must pass through Pond 2 to maintain required freeboard. Pond 3 is the final holding pond of the treatment system. Two surface aerators are utilized to maintain aerobic conditions in Pond 3. This pond is the lowest pond in the treatment system. The top of the berm of Pond 3 is approximately four feet lower than the top of the berm of the Pond 2. Pond 3 is the holding lagoon on which the “No Discharge” permit is determined. All process wastewater is treated and held in this pond. Water sampling analysis for this pond is provided in Appendix D. The dimensions of Pond 3 are approximately 140 feet, by 560 feet (rainfall watershed area), by 13 feet deep with two feet of freeboard. The sides of the pond were constructed with 2:1 (H:V) slopes. Retained water in this pond will be reused as equipment wash water in the plant and also land applied by an irrigation sprinkler system. The maximum holding capacity for Pond 3 is approximately 4,810,534 gallons. This is approximately 262 days of throughput for process and rainfall loading accounting for evaporation. A 25-year, 24-hour rain event at 7.3 inches is approximately 356,746 gallons of required freeboard volume for Pond 3. With the additional pass through loading received from Ponds No. 1 through No. 3, the total storm event that must be contained by Pond 3 is approximately 634,885 gallons or a minimum maintained freeboard requirement of 13.0 inches, worst case scenario. A minimum freeboard of 2’ is to be maintained at all times in Pond 3. The process wastewater annual throughput and average annual rainfall, based on double the highest discharge volumes of the past three years for the existing facility is 6,821,345 gallons. The system’s throughput design is calculated to be 476 days with a total working volume of approximately 8,684,920 gallons.

Page 11: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

Waste Management Plan    Pet Solutions –Danville, Arkansas Proposed Permit No. 3778‐WR‐5    Revised October 2011 

Harbor Environmental & Safety    P a g e  | 7 

TABLE 1. TREATMENT SYSTEM SUMMARY

RAIN EVENT IDENTIFICATION POND CAPACITY 1 LOADING THROUGHPUT

(ft2) DIMENSIONS (Gallons) (Gallons) (Days) Pond 1 (41,625) 185' x 225' x 11', 1’ FB 2,430,745 189,408

134

Pond 2 (19,500) 130' x 150' x 21', 1’ FB 1,443,641 88,732

80

Pond 3 (78,400) 140' x 560' x 13', 2’ FB 4,810,534 356,746

262

TOTAL 8,684,920 634,885

476

Notes:

1. Capacities were calculated with 2:1 (H:V) side slopes. The AREA indicated in the table is

the surface area (rainfall watershed area). 2. Throughput is calculated by the Capacity of the Pond divided by the sum of the Annual

Production Rate and Annual Accumulated Rainfall in the pond. Annual Production Rate = 18,000 gallons/day x 365 days = 6,570,000 gallons/year Annual Accumulated Rainfall = 46.89 in – 44 in = 2.89 Annual Rainfall Pond 1 = (2.89 in/yr / 12 in/ft) x (41,625 sf) x (7.48 gal/sf) = 74,985 gallons/yr Annual Rainfall Pond 2 = (2.89 in/yr / 12 in/ft) x (19,500 sf) x (7.48 gal/sf) = 35,128 gallons/yr Annual Rainfall Pond 3 = (2.89 in/yr / 12 in/ft) x (78,400 sf) x (7.48 gal/sf) = 141,232 gallons/yr

Page 12: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

Waste Management Plan    Pet Solutions –Danville, Arkansas Proposed Permit No. 3778‐WR‐5    Revised October 2011 

Harbor Environmental & Safety    P a g e  | 8 

4. Analysis of Waste Properties

Analyses of the physical and nutrient properties of the waste were performed by analytical laboratories and the results were supplied to Pet Solutions, LLC. The results have been used in the calculations to determine application rates (See Section 6.0). A summary of the wastewater and sludge analyses are included in TABLE 2 and TABLE 3 respectively. The values presented in TABLE 2 are the average values of 10 water samples collected from Pond 3 between April 27, 2010 and March 8, 2011, except for the Chromium value which is from a single analysis of the March 8, 2011 sample. The values presented in TABLE 3 are the values of 3 sludge samples collected from Pond 1 on March 8, 2011. The laboratory test results are located in Appendix D.

TABLE 2: SUMMARY OF WASTEWATER ANALYSIS

PARAMETERS RESULTS PARAMETERS RESULTS

% Volatile Solids1

0.28% Total Kjeldahl Nitrogen 138.9 mg/l

% Total Solids!

0.66% Oil & Grease 9.3 mg/l

BOD-5

78.6 mg/l Total Phosphorus 64.8 mg/l

Nitrate - Nitrogen

83.0 mg/l Total Potassium 145 mg/l

Nitrite - Nitrogen

32.4 mg/l Ammonia - Nitrogen 157 mg/l

Arsenic

0.014 mg/l Cadmium 0.0019 mg/l

Copper

0.022 mg/l Molybdenum 0.023 mg/l

Lead

0.012 mg/l mg/l Mercury 0.0002 mg/l

Nickel

0.018 mg/l Selenium 0.041 mg/l

Zinc

0.043 mg/l pH (standard units) 6.7 SU

Chromium

0.010 mg/l

1. Average Total Solids (TS) are presented as 0.66% and Volatile Solids (VS) as 0.28%,

however analytical results from September 2010 until February 2010 had a reporting limit of 1% by weight for TS. As presented in the attached data, all samples were <1% by weight for TS. After February 2010, the reporting limit for TS has been changed to 0.05% by weight for TS. An average TS of the four (4) samples presented with lower reporting limits (4/27/10, 6/15/10, 8/17/10, 3/8/11) is calculated to be 0.14% by weight, and VS is calculated to be 0.06%.

Page 13: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

Waste Management Plan    Pet Solutions –Danville, Arkansas Proposed Permit No. 3778‐WR‐5    Revised October 2011 

Harbor Environmental & Safety    P a g e  | 9 

TABLE 3: SUMMARY OF SLUDGE ANALYSIS

PARAMETERS RESULTS PARAMETERS RESULTS % Volatile Solids

59.6% Total Kjeldahl Nitrogen 5,337 mg/kg

% Total Solids

62.3% Oil & Grease 1,6333,333 mg/kg

BOD-5

71,200 mg/kg Total Phosphorus 1,447 mg/kg

Nitrate - Nitrogen

<5.00 mg/kg Total Potassium 228 mg/kg

Nitrite - Nitrogen

<5.00 mg/kg Ammonia - Nitrogen 1,222 mg/kg

Arsenic

3.60 mg/kg Cadmium 0.3603 mg/kg

Copper

4.50 mg/kg Molybdenum 2.88 mg/kg

Lead

7.20 mg/kg Mercury 0.0287 mg/kg

Nickel

1.64 mg/kg Selenium 7.20 mg/kg

Zinc

38.0 mg/kg pH (standard units) 5.2 SU

Chromium

3.11 mg/kg

Page 14: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

Waste Management Plan    Pet Solutions –Danville, Arkansas Proposed Permit No. 3778‐WR‐5    Revised October 2011 

Harbor Environmental & Safety    P a g e  | 10 

5. Soil Properties

5.1 Identification of Soils

The National Cooperative Soil Survey custom soil resource report of the site classifies the soil located at Pet Solutions’ property associated with land application as Leadvale silt loam and Nella gravelly fine sandy loam. The custom soil resource report is presented in Appendix E.

5.2 Soils Analysis As required by ADEQ’s Technical Requirements for a No Discharge Permit, the facility collected and tested six soil samples. A summary of the analyses performed is shown in TABLE 4. A copy of the laboratory test results is included in Appendix D.

TABLE 4. SUMMARY OF SOILS ANALYSIS

PARAMETERS RESULTS PARAMETERS RESULTS

Nitrate-Nitrogen 5.49 mg/Kg Specific Conductance 53.2 μS/cm

Phosphorus 1,043 mg/Kg Potassium 1,270 mg/Kg

Arsenic 7.7 mg/Kg Magnesium 930 mg/Kg

Copper 10.1 mg/Kg Cadmium 0.561 mg/Kg

Lead 17.6 mg/Kg Molybdenum 2.34 mg/Kg

Nickel 14.1 mg/Kg Mercury 0.024 mg/Kg

Zinc 39.2 mg/Kg Selenium 5.84 mg/Kg Cation Exchange Capacity (meq/100g)

3.47 meq/100g

pH (SU)

5.0 SU

Page 15: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

Waste Management Plan    Pet Solutions –Danville, Arkansas Proposed Permit No. 3778‐WR‐5    Revised October 2011 

Harbor Environmental & Safety    P a g e  | 11 

6. Site Management Plan

A total of 76.2 acres is available for land application of solids and wastewater. Two (2) center pivots and a travelling reel sprinkler irrigation system are to be used to land apply wastewater. Solids are rarely land applied, but when they are applied, a manure spreader and disc are utilized. The center pivots are to cover an area of approximately 39.8 acres and are to be used for wastewater application. This will leave a remaining 36.4 acres to be utilized for wastewater and solids application by means of travelling reel sprinkler or manure spreader respectively. Use of the center pivots will be the land application method of choice, and may be used exclusively depending on wastewater volumes, wastewater characteristics, and field conditions.

6.1 Solids Land Application Plan

Excess, unrecoverable waste solids are collected in the storage ponds, adjacent to the plant. The unrecoverable waste solids are from naturally occurring separation of the fat from saturated carriers that were part of the process wastewater discharge stream (organic material). The proposed application areas are illustrated on the Facility Site Map presented in Appendix A. Land application of these solids has been approved in the past under permit 3778-WR-4. The current proposed land application is the same in nature The limiting agent that determines the safe rate per acre for applying the unrecoverable waste (sludge) is “plant available nitrogen” (PAN). Of the total nitrogen in the waste, 15% will be lost to leaching and 20% will be lost to denitrification during the application process. Therefore, only 65% of the total nitrogen in the waste would be considered “plant available nitrogen”. The safe application rate for Bermuda grass is 150 lbs of nitrogen per acre per year. This is even higher for Bahia and other more growth aggressive grasses. Consideration is given only for the ability of plants to use certain nutrients (nitrogen). Other properties of the waste material (biological and chemical) are not addressed in this plan. The test results do not indicate excess heavy metals, toxicity levels, or volatile solids (VS) outside the range of soil background level concentrations for concern at this time. The VS (95%) will create a temporary odor problem, as this is mainly the decomposition of organic substrates. The unrecoverable waste solids will be applied to existing vegetated areas with a manure spreader as needed and incorporated immediately by disking.

6.2 Application Rate Calculations for Solids The following presents a summary of the nitrogen analytical data of the Pond 1 sludge followed by the nitrogen loading calculations.

Page 16: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

Waste Management Plan    Pet Solutions –Danville, Arkansas Proposed Permit No. 3778‐WR‐5    Revised October 2011 

Harbor Environmental & Safety    P a g e  | 12 

DESCRIPTION YEAR SAMPLE TAKEN RESULTS

Total Kjeldahl Nitrogen 2011 5,337 mg/kg Nitrate Nitrogen 2011 <5.0 mg/kg

Nitrite Nitrogen 2011 <5.0 mg/kg

Ammonia Nitrogen 2011 1,222 mg/kg

PAN = 0.25(Organic Nitrogen) + 0.5(Ammonia Nitrogen) + Nitrate Nitrogen Organic Nitrogen = Total Kjeldahl Nitrogen – Ammonia Nitrogen PAN = 0.25(5,337 mg/Kg – 1,222 mg/Kg) + 0.5(1,222 mg/Kg) + 5.0 mg/Kg = 1,645 mg/Kg Convert: mg/Kg to (lb PAN/lb matl.) = 1,645 mg/Kg /10,000 = 0.00164 lb PAN/lb matl. Application Rate = (150 lb/acre - yr) / ((0.00164 lb/lb)(0.65)) = 140,4321 lb/acre-year = 70.2 tons/acre-year

6.3 Wastewater Land Application Plan

The area to receive wastewater irrigation will be rotated over the entire pasture area surrounding the plant. The pump house for the sprinkler irrigation system is located on the south side of Pond 3, midway of the pond. The pasture area consists of Bermuda grass and Bahia grass. The pastures will be mowed as needed to maintain good agricultural practices. The Facility Site Map of Appendix A illustrates the proposed application areas. Sprinkler irrigation application from Pond 3 has been used in the past under conditions of Permit 3778-WR-4. The current proposed irrigation application will utilize two (2) center pivots and a travelling reel sprinkler system in areas not covered by the center pivots.

The use of center pivots or a travelling reel sprinkler during periods of intense sunshine and dryness causes an increase in the evaporation rate. For the purpose of calculating an application rate, this system will allow for up to a 30% increase in the application rate due to evaporation.

6.4 Application Rate Calculations for Wastewater The following presents a summary of the nitrogen analytical data of Pond 3 wastewater followed by the nitrogen loading calculations.

Page 17: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

Waste Management Plan    Pet Solutions –Danville, Arkansas Proposed Permit No. 3778‐WR‐5    Revised October 2011 

Harbor Environmental & Safety    P a g e  | 13 

DESCRIPTION YEAR SAMPLES TAKEN AVERAGE RESULTS

Total Kjeldahl Nitrogen 2010 – 2011 139 mg/l Nitrate Nitrogen 2010 – 2011 83.0 mg/l

Nitrite Nitrogen 2010 – 2011 32.4 mg/l

Ammonia Nitrogen 2010 – 2011 157 mg/l

PAN = 0.25(Organic Nitrogen) + 0.5(Ammonia Nitrogen) + Nitrate Nitrogen Organic Nitrogen = Total Kjeldahl Nitrogen – Ammonia Nitrogen Assume Organic Nitrogen to be 0 mg/l because TKN is less than Ammonia Nitrogen. The lab was consulted regarding this contradictory result, and the lab attributed it to the difficulty of testing this particular wastewater. PAN = 0.25(0 mg/l) + 0.5(157 mg/l) + 83.0 mg/l = 165 mg/l Convert: mg/Kg to (lb PAN/lb matl.) = 165 mg/Kg /10,000 = 0.000165 lb PAN/lb matl. Application Rate = (150 lb/acre - yr) / ((0.000165 lb/lb)(0.65)) = 1,400,044 lb/acre-year = 700.0 tons/acre-year Weight of Wastewater = 8.34 lb/gal Volume of Wastewater for Safe Application = (1,400,044 lb/ac-yr)/(8.34 lb/gal) = 167,871 gal/ac-yr Volume of Wastewater Produced + Rain Accumulated = 6,821,345 gallons per year Acres Required = (Vol of WW Produced + Rain) / (Vol of WW for Safe Application) = (6,821,345 gal/yr)/(167,871 gal/ac-yr) = 40.6 acres required for Nitrogen Application Center pivots and the travelling reel sprinkler system will be used for the land application of wastewater. The maximum application depth will not exceed 1” per day. Use of the center pivots will be the application method of choice based on effectiveness and ease of operation. The center pivots will cover a 40 acre area, so the use of the irrigation reel may not be required depending on wastewater volumes and field conditions.

Peak gallons per acre may be increased by 1.3 the application rate per day conditionally based on hot arid days to reduce the number of applications required. Also the application area may be increased to reduce the applications required.

Page 18: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers
Page 19: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

Waste Management Plan    Pet Solutions –Danville, Arkansas Proposed Permit No. 3778‐WR‐5    Revised October 2011 

Harbor Environmental & Safety     

APPENDIX A

Facility Vicinity Map and Facility Site Maps

Page 20: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers
Page 21: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers
Page 22: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

Waste Management Plan    Pet Solutions –Danville, Arkansas Proposed Permit No. 3778‐WR‐5    Revised October 2011 

Harbor Environmental & Safety     

APPENDIX B

Simplified Process Flow Diagrams

Page 23: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers
Page 24: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

Waste Management Plan    Pet Solutions –Danville, Arkansas Proposed Permit No. 3778‐WR‐5    Revised October 2011 

Harbor Environmental & Safety     

APPENDIX C

Process Area Site Maps

Page 25: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers
Page 26: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

Waste Management Plan    Pet Solutions –Danville, Arkansas Proposed Permit No. 3778‐WR‐5    Revised October 2011 

Harbor Environmental & Safety     

APPENDIX D

Analytical Data Pond 3 Wastewater and Pond 1 Sludge

Page 27: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

Waste Management Plan    Pet Solutions –Danville, Arkansas Proposed Permit No. 3778‐WR‐5    Revised October 2011 

Harbor Environmental & Safety     

APPENDIX E

National Cooperative Soil Survey Custom Soil Resource Report for Yell County, Arkansas

Page 28: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

1

Hanson, Kim

From: Andrew Rike <[email protected]>Sent: Thursday, October 13, 2011 8:59 AMTo: Nanneman, AndrewSubject: RE: Pet Solutions - Land Application Permit Application - Revised WMPAttachments: Pet WMP Cert Page - 10-13-11.pdf

Andy,  Attached is stamped and signed certification for the Pet Solutions October 2011 Revised WMP.  Please let me know if you require a hardcopy.  Thank you for your assistance.  Sincerely,  Andrew Rike, P.E. Harbor Environmental and Safety 8114 Cantrell Road, Suite 350 Little Rock, AR 72227 501.663.8800 (tel) 501.765.0440 (cell) 501.588.0123 (fax) www.harborenv.com  From: Nanneman, Andrew [mailto:[email protected]] Sent: Thursday, October 13, 2011 8:17 AM To: Andrew Rike Subject: RE: Pet Solutions - Land Application Permit Application - Revised WMP  Andrew, Thanks for the revised WMP. However, we required a PE stamp on WMPs for them to be Department approved and to be incorporated into a land application permit. Please send me a PE certification, with a stamp and signature, for the October 2011 Revised WMP. Thanks for your cooperation in this matter and if you have any questions do not hesitate to get in contact with me. Andy Nanneman, E.I. No-Discharge Permits Branch, Water Division, ADEQ 5301 Northshore Drive North Little Rock, AR 72118-5317 P: (501) 682-0647 F: (501) 682-0910 From: Andrew Rike [mailto:[email protected]] Sent: Wednesday, October 12, 2011 4:36 PM To: Nanneman, Andrew Cc: Rusty Bowsher ([email protected]); [email protected]; Mike Johnson ([email protected]); Bryan Posey ([email protected]) Subject: Pet Solutions - Land Application Permit Application - Revised WMP  

Page 29: roactive Solu tions for your Environ · 2011. 10. 13. · HAR Andr Senio | P: 501.663.8 m ber 12, 2011, Danville, A vised Waste roposed Perm in the facility ithin and to t t scrubbers

2

Andy,  Pet Solutions (AFIN 75‐00051) has modified the plans for the expansion of the facility associated with the modification of the Land Application Permit 3778‐WR‐4. The attached cover letter and revised WMP details the new plans for the expansion.  Please note that none of the values of the land application areas, wastewater volumes, or analytical data have changed from the previous revision submittal.  Please let me know if you have any questions regarding the revised WMP and facility expansion. Thank you for your work on this permit!   Sincerely,  Andrew Rike, P.E. Harbor Environmental and Safety 8114 Cantrell Road, Suite 350 Little Rock, AR 72227 501.663.8800 (tel) 501.765.0440 (cell) 501.588.0123 (fax) www.harborenv.com