rn design ltd for constructionpreliminary-not
TRANSCRIPT
L
C
F
S
UP
DN F
S
L
C
UP
DN
L
C
DN
L
C
F
S
UP
DN
DN 4R MAX
L
C
DN
L
C
F
S
UP
DN
DN 4R MAX
L
C
DN
L
C
DN
L
C
L
C
DN
L
C
L
C
DN
UP
DN 4R MAX
F
S
L
C
L
C
DN
L
C
L
C
UP
DN
DN 4R MAX
F
S
L
C
L
C
F
S
UP
DN3R
MIN
DN
DN
L
C
L
C
DN
L
C
L
C
F
S
DN
UP
DN
DN3R
MIN
L
C
L
C
DN
DN 4R MAX
BREAKFAST 7'-8" X 10'-3"
KITCHEN 7'-8" X 11'-0"
GARAGE 9'-10" X 20'-0"
GREAT ROOM 10'-8" X 18'-5"
DN 4R MAX
BREAKFAST 7'-8" X 10'-3"
KITCHEN 7'-8" X 11'-0"
GARAGE 9'-10" X 20'-0"
GREAT ROOM 12'-8" X 18'-5"
BEDROOM 2 9'-6" X 10'-0"
BEDROOM 3 9'-0" X 10'-0"
MASTER BEDROOM 15'-0" X 13'-9"
BREAKFAST 7'-8" X 10'-3"
KITCHEN 7'-8" X 11'-0"
GARAGE 9'-10" X 20'-0"
GREAT ROOM 10'-8" X 18'-5"
BEDROOM 2 9'-6" X 9'-3"
BEDROOM 3 9'-0" (9'-0") X 10'-0"
MASTER BEDROOM 13'-0" X 14'-8"
BREAKFAST 7'-8" X 10'-3"
KITCHEN 7'-8" X 11'-0"
GARAGE 9'-10" X 20'-0"
GREAT ROOM 10'-8" X 18'-5" MASTER BEDROOM
13'-0" X 14'-8"
BEDROOM 2 9'-6" X 10'-0"
BEDROOM 3 9'-0"(8'-4") X 10'-0"
MASTER BEDROOM 13'-0" X 14'-8"
BEDROOM 2 9'-6" X 10'-0"
BEDROOM 3 9'-0" X 10'-0"
MASTER BEDROOM 13'-4" X 14'-8"
BEDROOM 2 9'-6" X 11'-0"
BEDROOM 3 9'-0" X 10'-0"
GARAGE 9'-10" X 20'-0"
BREAKFAST 7'-8" X 10'-3"
KITCHEN 7'-8" X 11'-0"
GREAT ROOM 10'-8" X 18'-5" MASTER BEDROOM
13'-4" X 14'-8"
BEDROOM 2 9'-6" X 11'-0"
BEDROOM 3 9'-0" X 10'-0"
GARAGE 9'-10" X 20'-0"
BREAKFAST 7'-8" X 10'-3"
KITCHEN 7'-8" X 11'-0"
GREAT ROOM 10'-8" X 18'-5"
GARAGE 9'-10" X 20'-0"
KITCHEN 8'-10" X 13'-6"
GREAT ROOM 10'-0" X 21'-10"
MASTER BEDROOM 13'-0" X 13'-6"
BEDROOM 3 8'-10" X 9'-0"
BEDROOM 2 9'-8" X 10'-0"
GARAGE 9'-10" X 20'-0"
KITCHEN 8'-10" X 13'-6"
GREAT ROOM 10'-0" X 21'-10"
MASTER BEDROOM 13'-0" X 13'-6"
BEDROOM 3 8'-10" X 9'-0"
BEDROOM 2 9'-8" X 10'-0"
GAS
MET
ERHY
DRO
MET
ER
D
W
D
W
GAS
MET
ERHY
DRO
MET
ER
D
W
D
W
D
W
HYDRO METER
GAS METER
D
W
GAS METER
HYDRO METER
HYDR
O M
ETER
GAS
MET
ER
DW
HYDR
O M
ETER
GAS
MET
ER
DW
DW DW DWDW
DWDW
DW DW
5'-8"
43'-5
"
20'-2"
5'-8"
22'-2"
43'-5
"
21'-10"
5'-8"
21'-2"
43'-5
"
20'-2"
5'-8"
43'-5
"
20'-2" 20'-2"19'-10"
19'-8"
5'-8"
43'-5
"
19'-8"
5'-8"
43'-5
"
19'-8"
35'-1
1"9'-
8"45
'-7"
19'-8" 19'-8"
35'-1
1"9'-
8"
19'-8"
GROUND FLOOR ELEV 'A' SECOND FLOOR ELEV 'A' GROUND FLOOR ELEV 'B' SECOND FLOOR ELEV 'B'
GROUND FLOOR ELEV 'A' SECOND FLOOR ELEV 'A' GROUND FLOOR ELEV 'B' SECOND FLOOR ELEV 'B'
SECOND FLOOR -END COND. ELEV 'A'GROUND FLOOR -END COND. ELEV 'A' GROUND FLOOR -END COND. ELEV 'B' SECOND FLOOR -END COND. ELEV 'B'GROUND FLOOR -UPGRADED END COND. ELEV 'A'
SECOND FLOOR -UPGRADED END COND. ELEV 'A'
GROUND FLOOR -UPGRADED END COND. ELEV 'B'
SECOND FLOOR -UPGRADED END COND. ELEV 'B'
TH-1
TH-2
TH-2 END CONDITION TH-2 UPGRADED END CONDITION
FLUSH BREAKFAST BAR
OPT
GAS
FIR
EPLA
CE
6'0" SLIDING DOOR
FLOOR ABOVE
DOO
R W
HERE
GRA
DE P
ERM
ITS
PWD FOYER(SUNKENIF REQ'D)
(SUNKENIF REQ'D)
OPE
N TO
ABO
VE
COVEREDPORCH
(IF REQ'D)
HALF
WAL
L
FLUSH BREAKFAST BAR
6'0" SLIDING DOOR
FLOOR ABOVEFOYER
PWD
(SUNKENIF REQ'D)
DOO
R W
HERE
GRA
DE P
ERM
ITS(SUNKENIF REQ'D)
OPE
N TO
ABO
VE
COVEREDPORCH
(IF REQ'D)
HALF
WAL
L
BATH
OPT
UPP
ERSLINEN LAUNDRY
WIC
WIC
ENSUITE
62"X32GLASS SHOWER
OPE
N TO
BEL
OW
RAILI
NG
CATHEDRALCEILING
FLUSH BREAKFAST BAR
PORTICO
6'0" SLIDING DOOR
FLOOR ABOVE
O.T.
A.
FOYERPWD
(SUNKENIF REQ'D)
DOO
R W
HERE
GRA
DE P
ERM
ITS(SUNKENIF REQ'D)
OPE
N TO
ABO
VE
LEDG
E
(IF REQ'D)
BATH
OPT
UPP
ERSLINEN LAUNDRY
WIC
WIC
ENSUITE
OPE
N TO
BEL
OW
62"X32GLASS SHOWER
OPE
N TO
BEL
OW
RAILI
NG
CAT
HEDR
ALC
EILIN
G
CATHEDRALCEILING
FLUSH BREAKFAST BAR
OPT
GAS
FIR
EPLA
CE
PORTICO
6'0" SLIDING DOOR
FLOOR ABOVE
DOO
R W
HERE
GRA
DE P
ERM
ITS
PWD FOYER(SUNKENIF REQ'D)
(SUNKENIF REQ'D)
OPE
N TO
ABO
VE
(IF REQ'D)
ENSUITE
WIC
BATH
OPT
UPP
ERSLINEN LAUNDRY
62"X32GLASS SHOWER
OPE
N TO
BEL
OW
RAILI
NG
CATHEDRALCEILING
ENSUITE
WIC
BATH
OPT
UPP
ERSLINEN LAUNDRY
OPE
N TO
BEL
OW
RAILI
NG
62"X32GLASS SHOWER
CATHEDRALCEILING
ENSUITE
BATH
WIC
OPT
UPP
ERSLINEN LAUNDRY
OPE
N TO
BEL
OW
RAILI
NG
CATHEDRAL CEILING
62"X32GLASS SHOWER
PORTICO
FLOOR ABOVE
PWD FOYER(SUNKENIF REQ'D)
(SUNKENIF REQ'D)
OPE
N TO
ABO
VE
DOO
R W
HERE
GRA
DE P
ERM
ITS
(IF REQ'D)
FLUSH BREAKFAST BAR
6'0" SLIDING DOOR
HALF
WAL
L
ENSUITE
BATH
WIC
OPE
N TO
BEL
OW
RAILI
NG
OPT
UPP
ERSLINEN LAUNDRY
62"X32GLASS SHOWER
CATHEDRAL CEILING
PWD FOYER
COVEREDPORCH
DOO
R W
HERE
GRA
DE P
ERM
ITS
6'0" SLIDING DOOR
FLOOR ABOVE
(IF REQ'D)
(SUNKENIF REQ'D)
(SUNKENIF REQ'D)
OPE
N TO
ABO
VE
FLUSH BREAKFAST BAR
HALF
WAL
L
FOYER
PWD
DOOR WHEREGRADE PERMITS
COVEREDPORCH FLOOR ABOVE
FLUS
H BR
EAKF
AST B
AR
GARDENDOOR
COFFERED CEILING
(IF REQ'D)
(SUNKENIF REQ'D)
ADDI
TIONA
LST
EPS
AS R
EQ'D
(SUNKENIF REQ'D)
HALF
WAL
L
WIC
BATH
ENSUITE
LINEN
LAUNDRY
OPT UPPERS
RAILI
NG
DOOR WHEREGRADE PERMITS
PORTICOFLOOR ABOVE
FLUS
H BR
EAKF
AST B
AR
GARDENDOOR
(IF REQ'D)
ADDI
TIONA
LST
EPS
AS R
EQ'D
COFFERED CEILING
FOYER
PWD
(SUNKENIF REQ'D)
(SUNKENIF REQ'D)
HALF
WAL
L
WIC
LINEN
LAUNDRY
OPT UPPERS
RAILI
NGBATH
ENSUITE
OPT
GAS
FIR
EPLA
CE
A1scale
project #
project
page
revisions date dwn chk#
client
model
File:
C:\
_RN_
Stan
dard
s\te
mp\
AcPu
blish
_426
4\17
047-
TH-B
LOC
K-HL
.dw
g Pl
otte
d: O
ct 1
8, 2
017
By:p
aula
h
1/8" = 1'-0"
17047
Grand Valley,Town of
Hollenbeck
Cachet EstateHomes Inc.
TH-BLOCK
SIGNATURE:
I, DECLARE THAT I HAVE REVIEWED AND TAKENDESIGN RESPONSIBILITY FOR THE DESIGN WORK ON BEHALFOF RN DESIGN LTD,UNDER DIVISION C,PART-3 SUBSECTION-3.2.4OF THE BUILDING CODE. I AM QUALIFIED AND THE FIRM ISREGISTERED IN THE APPROPRIATE CLASSES / CATEGORIES.
QUALIFIED DESIGNER BCIN:FIRM BCIN:DATE:
PRELIMINARY-NOT
FOR CONSTRUCTION
ISSUED FOR SPA 19-OCT-17 PH MSA1
A B C D E
FG. FG. FG.FG.
PEAK HEIGHT OF ROOF
MID POINT OF ROOF 24'-4"
30'-7"
8'-1"
10'-0
"8'-
8"1'-
8"6'-
10"
6'-10
"7'-
4"
8'-1"
10'-0
"8'-
8"1'-
8"6'-
10"
6'-10
"7'-
4"
6:12
6:12
12:12
6:12
12:12
UPGRADED END CONDITIONTH-2 - ELEV. 'B' (STD)1
12:12
6:126:12
12:12 12:12
TH-2 - ELEV. 'B' (REV)2
FRONT ELEVATION - BLOCK 1TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF WINDOW
TOP OF TRANSOM
TOP OF DOOR/WIN
SUNKEN FOYERFINISHED GRADE
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF WINDOW
TOP OF TRANSOM
TOP OF DOOR/WIN
SUNKEN FOYER
FINISHED GRADE
TH-1 - ELEV. 'B' (STD)3 TH-2 - ELEV. 'B' (STD)5TH-1 - ELEV. 'B' (REV)4 INTERIOR END CONDITIONTH-2 - ELEV. 'B' (REV)6
ABCDE
FG.
8'-1"
10'-0
"8'-
8"6'-
10"
6'-10
"6'-
10"
8'-1"
10'-0
"8'-
8"6'-
10"
6'-10
"
6:12 6:126:12
12:12
12:12
6:126:126:12 6:12
12:12
UPGRADED END CONDITIONTH-2 - ELEV. 'B' (STD)1TH-2 - ELEV. 'B' (REV)2TH-1 - ELEV. 'B' (STD)3TH-2 - ELEV. 'B' (STD)5 TH-1 - ELEV. 'B' (REV)4INTERIOR END CONDITION
TH-2 - ELEV. 'B' (REV)6
REAR ELEVATION - BLOCK 1
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF WINDOW
FINISHED GRADE
TOP OF WINDOW
TOP OF WINDOW
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF WINDOW
FINISHED GRADE
TOP OF WINDOW
TOP OF WINDOW
FG.
FG. FG.
8'-1"
10'-0
"8'-
8"1'-
0"6'-
10"
7'-4"
8'-1"
10'-0
"8'-
8"1'-
0"6'-
10"
6:12
12:12
12:12
INTERIOR END CONDITIONTH-2 - ELEV. 'B' (REV)6
RIGHT SIDE ELEVATION - BLOCK 1
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF TRANSOMTOP OF WINDOW
SUNKEN FOYERFINISHED GRADE
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF TRANSOM
FINISHED GRADE
TOP OF WINDOWFG.
FG.FG.
FG.
8'-1"
10'-0
"8'-
8"1'-
0"6'-
10"
6'-7"
7'-4"
8'-1"
10'-0
"8'-
8"1'-
0"6'-
10"
6'-10
"
1'-0"
12:12
6:1212:12
UPGRADED END CONDITIONTH-2 - ELEV. 'B' (STD)1
LEFT SIDE ELEVATION - BLOCK 1
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF WINDOW
TOP OF TRANSOMTOP OF WINDOW
SUNKEN FOYERFINISHED GRADE
12:12
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF WINDOW
TOP OF TRANSOM
FINISHED GRADE
TOP OF WINDOW
TOP OF TRANSOM
A2scale
project #
project
page
revisions date dwn chk#
client
model
File:
C:\
_RN_
Stan
dard
s\te
mp\
AcPu
blish
_426
4\17
047-
TH-B
LOC
K-HL
.dw
g Pl
otte
d: O
ct 1
8, 2
017
By:p
aula
h
1/8" = 1'-0"
17047
Grand Valley,Town of
Hollenbeck
Cachet EstateHomes Inc.
TH-BLOCK
SIGNATURE:
I, MARTHA SANDOVAL DECLARE THAT I HAVE REVIEWED ANDTAKEN DESIGN RESPONSIBILITY FOR THE DESIGN WORK ONBEHALF OF RN DESIGN LTD,UNDER DIVISION C,PART-3SUBSECTION-3.2.4 OF THE BUILDING CODE. I AM QUALIFIEDAND THE FIRM IS REGISTERED IN THE APPROPRIATE CLASSES /CATEGORIES.QUALIFIED DESIGNER BCIN: 103017FIRM BCIN: 26995DATE:
ISSUED FOR SPA 19-OCT-17 PH MSA1
A B C D EPEAK HEIGHT OF ROOF
MID POINT OF ROOF 25'-2"
32'-2"
FRONT ELEVATION - BLOCK 2INTERIOR END CONDITIONTH-2 - ELEV. 'A' (STD)7 TH-2 - ELEV. 'A' (REV)8 TH-1 - ELEV. 'A' (STD)9 TH-2 - ELEV. 'A' (STD)11TH-1 - ELEV. 'A' (REV)10 UPGRADED END CONDITION
TH-2 - ELEV. 'A' (REV)12
8'-1"
10'-0
"8'-
8"1'-
8"6'-
10"
6'-10
"6'-
8"
8'-1"
10'-0
"8'-
8"1'-
8"6'-
10"
6'-10
"6'-
1"
4:12
6:12
14:12
6:12
6:126:12
6:12
4:12 4:12 4:12
6:12
14:12
14:12
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF WINDOW
TOP OF TRANSOM
TOP OF DOOR/WIN
SUNKEN FOYERFINISHED GRADE
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF WINDOW
TOP OF TRANSOM
TOP OF DOOR/WIN
SUNKEN FOYERFINISHED GRADE
ABCDE
FG.
REAR ELEVATION - BLOCK 2INTERIOR END CONDITIONTH-2 - ELEV. 'A' (STD)7TH-2 - ELEV. 'A' (REV)8TH-1 - ELEV. 'A' (STD)9TH-2 - ELEV. 'A' (STD)11 TH-1 - ELEV. 'A' (REV)10UPGRADED END CONDITION
TH-2 - ELEV. 'A' (REV)12
8'-1"
10'-0
"8'-
8"6'-
10"
6'-10
"6'-
10"
8'-1"
10'-0
"8'-
8"6'-
10"
6'-10
"
6:126:128:12
6:12
14:12 14:12
14:12
6:12 6:12
14:126:126:12
6:126:12
14:12
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF WINDOW
FINISHED GRADE
TOP OF WINDOW
TOP OF WINDOW
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF WINDOW
FINISHED GRADE
TOP OF WINDOW
TOP OF WINDOW
FG.
FG.FG.
INTERIOR END CONDITIONTH-2 - ELEV. 'A' (STD)7
LEFT SIDE ELEVATION - BLOCK 2
8'-1"
10'-0
"8'-
8"1'-
0"6'-
10"
6'-1"
8'-1"
10'-0
"8'-
8"1'-
0"6'-
10"
6:12
14:12
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF TRANSOMTOP OF WINDOW
SUNKEN FOYER
FINISHED GRADE
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF TRANSOM
FINISHED GRADE
TOP OF WINDOW
6:12
4:12
FG. FG.
FG.
UPGRADED END CONDITIONTH-2 - ELEV. 'A' (REV)12
RIGHT SIDE ELEVATION - BLOCK 2
8'-1"
10'-0
"8'-
8"1'-
0"6'-
10"
6'-10
"
8'-1"
10'-0
"8'-
8"
1'-0"
6'-10
"6'-
7"6'-
8"1'-
0"
6:12
14:12
14:12
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF WINDOW
TOP OF TRANSOM
FINISHED GRADE
TOP OF WINDOW
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF WINDOW
TOP OF TRANSOMTOP OF WINDOW
SUNKEN FOYERFINISHED GRADE
TOP OF TRANSOM
A3scale
project #
project
page
revisions date dwn chk#
client
model
File:
C:\
_RN_
Stan
dard
s\te
mp\
AcPu
blish
_426
4\17
047-
TH-B
LOC
K-HL
.dw
g Pl
otte
d: O
ct 1
8, 2
017
By:p
aula
h
1/8" = 1'-0"
17047
Grand Valley,Town of
Hollenbeck
Cachet EstateHomes Inc.
TH-BLOCK
SIGNATURE:
I, DECLARE THAT I HAVE REVIEWED AND TAKENDESIGN RESPONSIBILITY FOR THE DESIGN WORK ON BEHALFOF RN DESIGN LTD,UNDER DIVISION C,PART-3 SUBSECTION-3.2.4OF THE BUILDING CODE. I AM QUALIFIED AND THE FIRM ISREGISTERED IN THE APPROPRIATE CLASSES / CATEGORIES.
QUALIFIED DESIGNER BCIN:FIRM BCIN:DATE:
PRELIMINARY-NOT
FOR CONSTRUCTION
ISSUED FOR SPA 19-OCT-17 PH MSA1
A B C D E
FG.FG.FG. FG.
PEAK HEIGHT OF ROOF
MID POINT OF ROOF 24'-4"
30'-7"
8'-1"
10'-0
"8'-
8"
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
6'-10
"
TOP OF WINDOW
FRONT ELEVATION -BLOCK 3UPGRADED END CONDITIONTH-2 - ELEV. 'B' (STD)6TH-2 - ELEV. 'B' (REV)2 TH-1 - ELEV. 'B' (STD)3
TH-2 - ELEV. 'B' (STD)5TH-1 - ELEV. 'B' (REV)4INTERIOR END CONDITIONTH-2 - ELEV. 'B' (REV)1
1'-6"
6'-10
"5'-
5"
8'-1"
10'-0
"8'-
8"1'-
8"6'-
10"
6'-10
"5'-
5"
6:12
6:12
12:12
6:12
12:12
12:12
6:12 6:12
12:12
12:12
SUNKEN FOYERFINISHED GRADE
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF WINDOW
TOP OF TRANSOM
TOP OF DOOR/WIN
SUNKEN FOYER
TOP OF TRANSOM
TOP OF DOOR/WIN
ABCDEPEAK HEIGHT OF ROOF
MID POINT OF ROOF 24'-2"
30'-3"
8'-1"
10'-0
"8'-
8"
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
1'6'-
10"
TOP OF TRANSOMTOP OF DOOR/WIN
6'-10
"
TOP OF WINDOW
REAR ELEVATION -BLOCK 3
UPGRADED END CONDITIONTH-2 - ELEV. 'B' (STD)6 TH-2 - ELEV. 'B' (STD)5 TH-1 - ELEV. 'B' (REV)4 TH-1 - ELEV. 'B' (STD)3 TH-2 - ELEV. 'B' (REV)2 INTERIOR END CONDITION
TH-2 - ELEV. 'B' (REV)1
8'-1"
10'-0
"8'-
8"6'-
10"
6'-10
"
6:126:12 6:12
6:12
12:12
12:1212:12
6:12
12:12
6:12
TOP OF WINDOW
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF WINDOW
TOP OF WINDOW
TOP OF WINDOWFINISHED GRADE
FG.
FG.FG.
8'-1"
10'-0
"8'-
8"
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
6'-10
"
TOP OF WINDOW
LEFT SIDE ELEVATION - BLOCK 3INTERIOR END CONDITIONTH-2 - ELEV. 'B' (REV)1
1'6'-
10"
5'-5"
8'-1"
10'-0
"8'-
8"6'-
10"
1'-0"
6:12
12:12
12:12
SUNKEN FOYERFINISHED GRADE
TOP OF TRANSOMTOP OF WINDOW
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF WINDOWTOP OF TRANSOMS
FINISHED GRADE
FG.
FG. FG.
FG.
8'-1"
10'-0
"8'-
8"
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
1'6'-
10"
TOP OF TRANSOMTOP OF DOOR/WIN
6'-10
"
TOP OF WINDOW
RIGHT SIDE ELEVATION -BLOCK 3UPGRADED END CONDITIONTH-2 - ELEV. 'B' (STD)6
8'-1"
10'-0
"8'-
8"
6'-10
"5'-
5"6'-
7"1'-
0"1'-
0"
12:12
6:12
12:12
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
SUNKEN FOYER
TOP OF TRANSOMTOP OF WINDOW
FINISHED GRADE
TOP OF WINDOWTOP OF TRANSOM
A4scale
project #
project
page
revisions date dwn chk#
client
model
File:
C:\
_RN_
Stan
dard
s\te
mp\
AcPu
blish
_426
4\17
047-
TH-B
LOC
K-HL
.dw
g Pl
otte
d: O
ct 1
8, 2
017
By:p
aula
h
1/8" = 1'-0"
17047
Grand Valley,Town of
Hollenbeck
Cachet EstateHomes Inc.
TH-BLOCK
SIGNATURE:
I, DECLARE THAT I HAVE REVIEWED AND TAKENDESIGN RESPONSIBILITY FOR THE DESIGN WORK ON BEHALFOF RN DESIGN LTD,UNDER DIVISION C,PART-3 SUBSECTION-3.2.4OF THE BUILDING CODE. I AM QUALIFIED AND THE FIRM ISREGISTERED IN THE APPROPRIATE CLASSES / CATEGORIES.
QUALIFIED DESIGNER BCIN:FIRM BCIN:DATE:
PRELIMINARY-NOT
FOR CONSTRUCTION
ISSUED FOR SPA 19-OCT-17 PH MSA1
A B C D E
PEAK HEIGHT OF ROOF
MID POINT OF ROOF 25'-2"
32'-2"
6'-10
"
TOP OF WINDOW
8'-1"
10'-0
"8'-
8"
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
FRONT ELEVATION- BLOCK 4
TH-2 - ELEV. 'A' (REV)8 TH-1 - ELEV. 'A' (STD)9 TH-2 - ELEV. 'A' (STD)11TH-1 - ELEV. 'A' (REV)10 UPGRADED END CONDITIONTH-2 - ELEV. 'A' (REV)12UPGRADED END CONDITION
TH-2 - ELEV. 'A' (REV)7
1'-8"
6'-10
"5'-
5"
8'-1"
10'-0
"8'-
8"1'-
8"6'-
10"
6'-10
"6'-
1"
6:12
6:126:12
6:12
4:12 4:12 4:12
6:12
18:12
14:12
14:12
4:12
6:12
TOP OF TRANSOM
TOP OF DOOR/WIN
SUNKEN FOYERFINISHED GRADE
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF WINDOW
TOP OF TRANSOM
TOP OF DOOR/WIN
SUNKEN FOYERFINISHED GRADE
ABCDEPEAK HEIGHT OF ROOF
MID POINT OF ROOF 25'-2"
32'-2"
6'-10
"
TOP OF DOOR/WIN
6'-10
"
TOP OF WINDOW
8'-1"
10'-0
"8'-
8"
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
REAR ELEVATION - BLOCK 4UPGRADED END CONDITIONTH-2 - ELEV. 'A' (REV)7TH-2 - ELEV. 'A' (REV)8TH-1 - ELEV. 'A' (STD)9TH-1 - ELEV. 'A' (REV)10TH-2 - ELEV. 'A' (STD)11UPGRADED END CONDITION
TH-2 - ELEV. 'A' (REV)12
8'-1"
10'-0
"8'-
8"6'-
10"
6'-10
"
6:128:12
6:12
14:12 14:12
6:126:126:12
FINISHED GRADETOP OF WINDOW
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF WINDOW
FINISHED GRADE
TOP OF WINDOW
TOP OF WINDOW
TOP OF SLAB
FG.FG.
FG. 1'6'-
10"
TOP OF TRANSOMTOP OF WINDOW
6'-10
"
TOP OF WINDOW
8'-1"
10'-0
"8'-
8"
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
LEFT SIDE ELEVATION - BLOCK 4UPGRADED END CONDITIONTH-2 - ELEV. 'A' (REV)7
6'-1"
8'-1"
10'-0
"8'-
8"6'-
10"
6'-10
"1'-
0"
6:12
14:12
14:12
SUNKEN FOYERFINISHED GRADE
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF WINDOW
TOP OF SLAB
TOP OF WINDOWTOP OF TRANSOM
FINISHED GRADE
FG. FG.
FG.
1'6'-
10"
TOP OF TRANSOMTOP OF DOOR/WIN
6'-10
"
TOP OF WINDOW
8'-1"
10'-0
"8'-
8"
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
RIGHT SIDE ELEVATION - BLOCK 4UPGRADED END CONDITIONTH-2 - ELEV. 'A' (REV)12
8'-1"
10'-0
"8'-
8"1'-
0"6'-
10"
6'-10
"5'-
5"
6:12
14:12
14:12
TOP OF SLAB
TOP OF PLATE
SECOND FLOOR
GROUND FLOOR
TOP OF WINDOW
TOP OF TRANSOMTOP OF WINDOW
SUNKEN FOYER
FINISHED GRADE
A5scale
project #
project
page
revisions date dwn chk#
client
model
File:
C:\
_RN_
Stan
dard
s\te
mp\
AcPu
blish
_426
4\17
047-
TH-B
LOC
K-HL
.dw
g Pl
otte
d: O
ct 1
8, 2
017
By:p
aula
h
1/8" = 1'-0"
17047
Grand Valley,Town of
Hollenbeck
Cachet EstateHomes Inc.
TH-BLOCK
SIGNATURE:
I, DECLARE THAT I HAVE REVIEWED AND TAKENDESIGN RESPONSIBILITY FOR THE DESIGN WORK ON BEHALFOF RN DESIGN LTD,UNDER DIVISION C,PART-3 SUBSECTION-3.2.4OF THE BUILDING CODE. I AM QUALIFIED AND THE FIRM ISREGISTERED IN THE APPROPRIATE CLASSES / CATEGORIES.
QUALIFIED DESIGNER BCIN:FIRM BCIN:DATE:
PRELIMINARY-NOT
FOR CONSTRUCTION
ISSUED FOR SPA 19-OCT-17 PH MSA1