RMDS Business Plan 2011
Retail Market Design Service
ESB Networks
House 39
Merrion Square
Dublin 2.
Version : 1.0
Status : Final version
Date : 28th January 2011
Document Reference : BP11
Approved By : Bob Turley
Approval Date : 1st February 2011
Retail Market Design Service
Document Information
Approvals
This document requires the following approvals:
Name Title Date of Issue Version
Bob Turley Manager, MDS, ESBN 28th January 2011 0.2
Distribution
This document has been distributed to the following:
Name Title Date of Issue Version
History of Changes
Version Number
Status Date of Issue Reason for Change Change Control Reference
0.1 Draft 28.01.11 First draft BP11
0.2 Draft 01.02.11 MB feedback
0.3 Final Draft 01.02.11 BT approval
1.0 Final 29.04.11 Publish on RMDS
website
Version : 0.2
Status : Draft /tt/file_convert/5adcca7c7f8b9ae1408c067e/document.doc
Page 2 of 16
Retail Market Design Service
Table of Contents
1 EXECUTIVE SUMMARY 42 GENERAL DESCRIPTION OF THE SERVICE 6
3.1 OPERATIONAL PLAN................................................................................................8
3.2 MANAGEMENT AND ORGANISATION........................................................................10
3.3 FINANCIAL PLAN...................................................................................................12
3.4 2011 WORK PLAN OVERVIEW................................................................................13
Appendix A. Quality Policy and Service Objectives 14
Table of TablesTable 1 - 2011 Financial Plan (with 2010 outcome)......................................................................12Table 2 - RMDS Service Objectives..............................................................................................15
Version : 0.2
Status : Draft /tt/file_convert/5adcca7c7f8b9ae1408c067e/document.doc
Page 3 of 16
Retail Market Design Service
1 Executive SummaryThe Retail Market Design Service (RMDS) is the "ring-fenced" function within ESB Networks
responsible for all aspects of the Retail Electricity Market design on behalf of the Commission for
Energy Regulation.
The budgeted cost of RMDS operations in 2010 was €1.65M; the actual cost was €1.53M.
For 2011 the budgeted cost is €1.73M. The difference from the 2010 budget arises from a slight
increase in labour costs due to the Harmonisation Project workload and also some application and
test system upgrades which are necessary to ensure the continued quality of our service to the
market. In addition to the normal operational expenditure outlined above there will be a
requirement for a detailed scoping and design phase for the retail market harmonisation changes in
2011. The estimated cost of this work is expected to be of the order of €400k and will be recouped
via the normal DuOS mechanism.
In addition to the planned work programme RMDS will endeavour to support and facilitate any
market driven requirements as they arise during the year based on the assumption that the
budgetary considerations can be recovered as per the normal DuOS mechanism
Highlights of 2010
Successful delivery of two market releases in June and November.
Successful delivery of a Technical upgrade of the MPCC/Hub platform.
Delivery of a new HRDS function to manage and support the Harmonisation change control
process.
Market approval of V1.0 of the Retail Market Harmonised baseline.
Accession of 3 new entrants to the Retail Market:
Ecopower.
NRG Vend.
Castle Dockrell.
Two re-qualifications for existing suppliers into new market segments:
Bord Gais in the unmetered segment.
Electron Energy in QH segment.
Successful upgrade of Sharepoint
Retention of ISO 9001:2008 standard
Development of New Joiner Guide for initiation of new staff members joining RMDSVersion : 0.2
Status : Draft /tt/file_convert/5adcca7c7f8b9ae1408c067e/document.doc
Page 4 of 16
Retail Market Design Service
Key deliverables for 2011
Documentation delivery for V2.0 of the Retail Market Harmonised baseline.
Delivery of the Global Aggregation functionality in the Market design upgrade in June.
Upgrade the ARIS business process modelling application.
Performance enhancements of the Retail market test systems and data.
Continued improvement in the quality of our service to the retail market.
Continued high quality service to the Electricity Retail market
Version : 0.2
Status : Draft /tt/file_convert/5adcca7c7f8b9ae1408c067e/document.doc
Page 5 of 16
Retail Market Design Service
2 General description of the service
Mission Statement: ‘Our mission is to provide cost effective, quality delivery of the Market design
approved by CER to all Market Participants’
Work culture:
We promote a culture of continuous improvement and are fully committed to supporting growth and
development in the Market. Our business strategy revolves around the need to provide quality
products and services to our customers. This has been undertaken through the establishment of a
professional team to cater for all our customer and stakeholder needs.
History: Retail Market Design Service (RMDS) is the "ring-fenced" function within ESB Networks
responsible for all aspects of the Retail Electricity Market design on behalf of the Commission for
Energy Regulation. It was established on an interim basis in February 2005 and formally ratified in
June 2005.
Strengths and core competencies:
Facilitation skills.
Clear communication of technical information.
Appreciation of business impact of process quality.
Analysis and documentation skills.
Stakeholder management.
Planning and Co-ordination.
Professional, customer focussed and responsive service
Flexible approach
Confidential, reliable, trustworthy expertise and impartiality
Version : 0.2
Status : Draft /tt/file_convert/5adcca7c7f8b9ae1408c067e/document.doc
Page 6 of 16
Retail Market Design Service
3 ServicesServices: RMDS provide a range of services all touching on the Retail Market design. The key
services are:
Retail Market Design Information Service
Operational Updates
Change Control
MDU Release and Cutover Co-ordination
Process Improvement
New Entrant Service
Secretariat for Retail Market forums
Market Assurance Co-ordination
Issue Resolution
Obligations: In addition, RMDS is charged with a number of other tasks:
Supporting the retail market Harmonisation project between ESB and NI
Interaction of Retail Market group with other relevant groups
Version : 0.2
Status : Draft /tt/file_convert/5adcca7c7f8b9ae1408c067e/document.doc
Page 7 of 16
Retail Market Design Service
3.1 Operational Plan
Themes: The concern for RMDS in 2011 is to continue to facilitate the changes planned – including
those to further enhance the Retail Market processes as an efficient, cost-effective means of
conducting business.
RMDS endeavours to continually increase the quality and responsiveness of the service provided to
Market participants through all media.
Key Objectives:
Release and Cutover:
Successful Cutover of the Retail Market and all MP systems and businesses to version 9.0
of the Retail Market design.
Design Information Service:
Upgrade of RMDS customer website with particular focus on the New Entrant process.
Facilitation of Retail Market Harmonisation across market participants in ROI and NI
Support of existing Participants as they move to new Market segments.
Upgrade the ARIS business process modelling tool.
Operational updates:
Run Market teleconference calls as required by the Market Participants.
New Entrant Service:
Formalise and enhance the service to make it easier for new entrants to understand the
processes required to become active in the retail market.
Augment the e-enabled aspects via the website www.rmdservice.com
Retail Market Forums:
Successfully facilitate IGG and HWG meetings as required and manage associated actions.
Market Assurance:
Co-ordinate assurance for requalification and new entrants as required.
In conjunction with Gemserv refresh the suite of assurance documents to approval stage
and published to the market.
Version : 0.2
Status : Draft /tt/file_convert/5adcca7c7f8b9ae1408c067e/document.doc
Page 8 of 16
Retail Market Design Service
Process improvement:
Retention of ISO 9001:2008. We have two audits each year to ensure our compliance one
internal and an external audit carried out by NSAI.
Refresh of our quality manual and management system to reflect our activities.
Regular reporting on Retail Market process quality indicators.
Issue resolution:
Facilitate in a timely manner the IGG’s capability to progress the key issues within the
Retail Market.
Version : 0.2
Status : Draft /tt/file_convert/5adcca7c7f8b9ae1408c067e/document.doc
Page 9 of 16
Retail Market Design Service
3.2 Management and Organisation
Organisation: The service is provided by personnel drawn from ESB’s CIO organisation, ESB
Networks and externally. The team lead reports to the Manager RMDS, a manager within the
Metering and Data Services division of ESB Networks.
Ring-fencing: Impartiality and transparency are vital in the role of Design Administrator. The
Commission decision required personnel, reporting and financial separation of RMDS from other
parts of ESB and ESB Networks. These measures and others have been implemented:
RMDS is a distinct, readily identifiable team.
Each team member receives Market and service training.
Team members sign Confidentiality Agreements.
The RMDS team occupies separate offices within the Merrion Sq. building complex.
RMDS maintains separate financial records.
RMDS records its activities separately.
RMDS operates to a separate Quality Manual and Quality Procedures.
The annual budget and business plan for RMDS will be presented to the Industry
Governance Group and approved by CER.
The RMDS manager and team leader meet every six weeks with CER.
The RMDS website is separate from that of ESB.
The RMDS team aspire to the highest levels of transparency throughout all our activities and those
in the Market in general. RMDS prides itself on its responsiveness and proactive assistance to
Market Participants to ensure that all processes work as smoothly as possible and with minimum
cost of participation.
Professional Support: RMDS, at the request of the Commission, maintains a contract for
professional services for the role of Assurance Body. Following a competitive tender process in
September 2010 Gemserv were awarded the contract the term of which is 2 years.
Version : 0.2
Status : Draft /tt/file_convert/5adcca7c7f8b9ae1408c067e/document.doc
Page 10 of 16
Retail Market Design Service
People and Expertise
A key element of the services provided to Market Participants is the knowledge and expertise of its
team members. Market Participants depend on this resource when they have a query on the
operation of the Market design and to ensure that the optimal design is obtained in response to
requests for change. RMDS can also utilise the considerable technical and business experience
within the ESB group where specialist needs are demanded.
A major objective for RMDS is to maintain and develop the expertise of the team and to ensure that
new joiners are quickly brought up to the necessary level.
The areas of expertise required to meet this standard include:
Knowledge of the Retail Electricity Market Design.
Knowledge of the central market systems.
Knowledge of other Market designs, especially the NI Retail design.
Knowledge of the electricity industry structure in Ireland.
Knowledge of the electricity Distribution businesses.
Knowledge of change management methodologies.
Expertise in project management.
Knowledge of the ARIS process modelling tool.
Knowledge of the messaging infrastructure.
Among the skills required are:
Good interpersonal skills.
Ability to Problem solves.
Meeting facilitation.
Excellent communication skills.
The following measures are in place in order to achieve this objective:
Skills/competencies for the Design Administrator roles.
Individual training needs assessment.
Individual training and development plans.
New joiners guide for new staff members.Version : 0.2
Status : Draft /tt/file_convert/5adcca7c7f8b9ae1408c067e/document.doc
Page 11 of 16
Retail Market Design Service
3.3 Financial Plan
RMDS costs are recouped via Distribution Use of System (DUoS) Charges and form part of the
Distribution price review. Since 2007, RMDS costs are reviewed annually.
The 2010 outcome and financial plan for 2011 are shown below (Table 1). It is proposed that the
recovery of costs associated with the Retail Market Design Service will be on the basis of actual
costs incurred. The Manager RMDS will furnish regularly reports for CER on progress against plan.
Budget2010
Actual 2010
Budget 2011
Labour 809,966 726,297 851,870
Accommodation 48,735 50,019 48,735
IT/Telecoms 38,988 27,063 38,988
Server and Storage 332,000 136,224 136,000
Professional Fees 120,000 156,916 120,000
Others 0 1,970 0
Market Releases 300,000 436,093 400,000
€1,649,689 €1,534,581 €1,595,593
ARIS Upgrade 50,000
NRI Upgrade 90,000
Sub Total €1,735,593
Harmonisation Design phase * 400,000
Grand Total €2,135,593.00
Table 1 - 2011 Financial Plans (with 2010 outcome)
* Notes to Retail Market Cost above
Harmonisation: Considerable work has been carried by a multi functional ESB team in conjunction with NIE to deliver the design for the harmonised retail market baseline. There will be costs incurred for the detailed design impaction work in 2011. It is expected that these costs will be of the order of €400k. The implementation will drive further costs in 2012. Exact costs will be furnished once the detailed design phase has been completed.Version : 0.2
Status : Draft /tt/file_convert/5adcca7c7f8b9ae1408c067e/document.doc
Page 12 of 16
Retail Market Design Service
3.4 2011 Work Plan overview
Market Releases
2010 Actual
There were two successful releases in 2010. The June release was a significant piece of work in
that it also delivered a technical upgrade to the hub and MPCC infrastructure. The cost of this
project was €316k. The November release was not as substantial but delivered the new DG4 tariff
group and a number of non schema related changes for the market. The cost of this release was of
the order of €120k.
2011 Budget
As part of the ongoing system developments plan we aim to carry out a retail market upgrade in Q2
of 2011. This is in line with the agreed Retail Market System Development Plan and has been
communicated to the market participants and the CER. The content of the release will be as follows
MCR1024: Global aggregation.
MCR0179: Downloadable meter point details file.
MCR0178: Treatment of supplier unit excess of generation over demand.
MCR0180: Sending of 342 MM to Eirgrid.
MCR1040: Additional information on the 591MM.
The estimated cost of this work is €400k, although final figures will only be available once the
project has been delivered.
In addition to the above there are specific system upgrades needed in 2011 namely to the ARIS
business modelling tool and to the test market system (NRI). The costs of this work will be approx
€140k.These upgrades are necessary to ensure the continuity of service can be maintained and we
can deliver the required service to meet the expectations of the market.
Version : 0.2
Status : Draft /tt/file_convert/5adcca7c7f8b9ae1408c067e/document.doc
Page 13 of 16
Retail Market Design Service
Appendix A. Quality Policy and Service Objectives
Quality Policy:
1. Our Customers
CER.
NIAEUR.
Electricity Suppliers.
Eirgrid/TSO.
Generators.
ESB Networks.
New Entrants.
NIE.
DCENR.
2. We consult extensively with our customers to develop a Business Plan that meets their needs.
3. We deliver a timely, accurate and friendly service.
4. We actively seek customer feedback to review and continually improve our service.
Our Processes
1. We comply fully with all regulatory and legal requirements.
2. We benchmark our performance against international best practice.
3. We set measurable targets for the quality of our service and the effectiveness of our processes.
4. We actively pursue a policy of continual improvement through ongoing management review.
Our People
1. We ensure that our people are competent and empowered to carry out their roles through recruitment, training, performance management and professional development.
2. We combine our ideas and skills to improve the quality of our service.
Our Mandate
1. We operate within the budget presented to the Industry Governance Group and approved by the Commission.
2. We work to the annual Business Plan presented to the Industry Governance Group and approved by the Commission.
Version : 0.2
Status : Draft /tt/file_convert/5adcca7c7f8b9ae1408c067e/document.doc
Page 14 of 16
Retail Market Design Service
3. We regularly report to the Commission on progress.
We utilise the RMDS Quality Management System to support our processes as a framework for
continual improvement. This is a documented Management System designed to meet the
requirements of ISO9001 standard.
RMDS is committed to delivering the highest quality of service. We have attained certification to
the IS EN ISO 9001 standard and will continue to improve on this over the coming year.
Service Objectives:
As part of the development of the Quality Management System, the following core objectives have
been identified. We will measure and track these and report on progress:
Area Activity Measure Objective
Customer Surveys No. per year 1
Process IGG Meetings M1 IGG Change Control Documents (days before meeting) 5
M2 IGG Agendas (days before meeting) 5
M3 IGG Working Documents (days before meeting) 2
M4 Draft Presentations (days before meeting) 2
M5 Open/Carried Forward Action Items list (days before
meeting)1
M6 Circulation of Final IGG Presentations (days after
meeting 2
M7 New Action Items List (days after meeting) 2
M8 Circulation of IGG Minutes (days after meeting) 10
Conference Call C1 Agenda (days before meeting) 5
C2 Circulation of Conference Call Minutes (days after
meeting)5
Financial Financial Plan Expenditure within overall budget 100%
Version : 0.2
Status : Draft /tt/file_convert/5adcca7c7f8b9ae1408c067e/document.doc
Page 15 of 16
Retail Market Design Service
Table 2 - RMDS Service Objectives
Version : 0.2
Status : Draft /tt/file_convert/5adcca7c7f8b9ae1408c067e/document.doc
Page 16 of 16