river to sea transportation planning organization …

139
Beverly Beach DeBary Flagler Beach New Smyrna Beach Palm Coast South Daytona Bunnell DeLand Flagler County Oak Hill Pierson Volusia County Daytona Beach Deltona Holly Hill Orange City Ponce Inlet Daytona Beach Shores Edgewater Lake Helen Ormond Beach Port Orange Please be advised that the RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION (TPO) BOARD will be meeting on: DATE: WEDNESDAY, OCTOBER 23, 2019 TIME: 9:00 A.M. PLACE: RIVER TO SEA TPO CONFERENCE ROOM 2570 W. International Speedway Blvd., Suite 100 Daytona Beach, FL 32114 *********************************************************************************** Daytona Beach Commissioner Rob Gilliland, Chairperson Presiding I. CALL TO ORDER / ROLL CALL / DETERMINATION OF QUORUM II. PLEDGE OF ALLEGIANCE III. PUBLIC COMMENT/PARTICIPATION (Public comments may be limited to three (3) minutes at the discretion of the Chairman) IV. CONSENT AGENDA A. SEPTEMBER 25, 2019 RIVER TO SEA TPO BOARD MEETING MINUTES (Contact: Debbie Stewart) (Enclosure, pages 4-15) B. TREASURER’S REPORT (Contact: Julie Adamson) (Enclosure, pages 4, 16) C. EXECUTIVE COMMITTEE REPORT -- Report by Daytona Beach Commissioner Rob Gilliland, Executive Committee Chairperson (Enclosure, pages 4, 17) D. BICYCLE/PEDESTRIAN ADVISORY COMMITTEE REPORT -- Report by Mr. Paul Eik, BPAC Chair (Enclosure, pages 4, 18) E. 2045 LRTP SUBCOMMITTEE REPORT Report by Mr. Bob Storke, 2045 LRTP Subcommittee Chair (Enclosure, pages 4, 19) F. CITIZENS ADVISORY COMMITTEE REPORT--Report by Ms. Nora Jane Gillespie, CAC Chair (Enclosure, pages 4, 20) G. TECHNICAL COORDINATING COMMITTEE REPORT -- Report by Mr. Jose Papa, TCC Chair (Enclosure, pages 4, 21) H. RIVER TO SEA TPO BOARD SUMMARY REPORT -- Report by Daytona Beach Commissioner Rob Gilliland, TPO Board Chairperson (Enclosure, pages 4, 22) I. CENTRAL FLORIDA MPO ALLIANCE (CFMPOA) REPORT (Contact: Lois Bollenback) (Enclosure, pages 4, 23-24) 1

Upload: others

Post on 25-Jun-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Beverly Beach DeBary Flagler Beach New Smyrna Beach Palm Coast South Daytona Bunnell DeLand Flagler County Oak Hill Pierson Volusia County Daytona Beach Deltona Holly Hill Orange City Ponce Inlet Daytona Beach Shores Edgewater Lake Helen Ormond Beach Port Orange

Please be advised that the RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION (TPO) BOARD will be meeting on:

DATE: WEDNESDAY, OCTOBER 23, 2019 TIME: 9:00 A.M. PLACE: RIVER TO SEA TPO CONFERENCE ROOM

2570 W. International Speedway Blvd., Suite 100 Daytona Beach, FL 32114

*********************************************************************************** Daytona Beach Commissioner Rob Gilliland, Chairperson Presiding

I. CALL TO ORDER / ROLL CALL / DETERMINATION OF QUORUM

II. PLEDGE OF ALLEGIANCE

III. PUBLIC COMMENT/PARTICIPATION (Public comments may be limited to three (3) minutes at the discretion of the Chairman)

IV. CONSENT AGENDA

A. SEPTEMBER 25, 2019 RIVER TO SEA TPO BOARD MEETING MINUTES (Contact: Debbie Stewart)(Enclosure, pages 4-15)

B. TREASURER’S REPORT (Contact: Julie Adamson) (Enclosure, pages 4, 16)

C. EXECUTIVE COMMITTEE REPORT -- Report by Daytona Beach Commissioner Rob Gilliland, Executive Committee Chairperson (Enclosure, pages 4, 17)

D. BICYCLE/PEDESTRIAN ADVISORY COMMITTEE REPORT -- Report by Mr. Paul Eik, BPAC Chair (Enclosure, pages 4, 18)

E. 2045 LRTP SUBCOMMITTEE REPORT Report by Mr. Bob Storke, 2045 LRTP Subcommittee Chair (Enclosure, pages 4, 19)

F. CITIZENS ADVISORY COMMITTEE REPORT--Report by Ms. Nora Jane Gillespie, CAC Chair (Enclosure, pages 4, 20)

G. TECHNICAL COORDINATING COMMITTEE REPORT -- Report by Mr. Jose Papa, TCC Chair (Enclosure, pages 4, 21)

H. RIVER TO SEA TPO BOARD SUMMARY REPORT -- Report by Daytona Beach Commissioner Rob Gilliland, TPO Board Chairperson (Enclosure, pages 4, 22)

I. CENTRAL FLORIDA MPO ALLIANCE (CFMPOA) REPORT (Contact: Lois Bollenback) (Enclosure, pages 4, 23-24)

1

Page 2: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Board Agenda October 23, 2019 Page 2

IV. CONSENT AGENDA (Continued)

J. REVIEW AND APPROVAL OF TIMEKEEPING AND TRAVEL REIMBURSEMENT POLICY (Contact: Lois Bollenback) (Enclosure, pages 4, 25-26)

V. ACTION ITEMS

A. REVIEW AND APPROVAL OF RESOLUTION 2019-18 AMENDING THE 2040 LONG RANGE TRANSPORTATION PLAN (LRTP) (Contact: Lois Bollenback) (Enclosure, pages 27-50)

B. REVIEW AND APPROVAL OF RESOLUTION 2019-19 ADOPTING THE WALKABILITY ACTION PLAN AND COMPLETE STREETS POLICY TEMPLATE (Contact: Stephan Harris) (Enclosure, pages 51-57)

C. REVIEW AND APPROVAL OF THE R2CTPO 2020 LEGISLATIVE POSITIONS (Contact: Lois Bollenback)(Enclosure, pages 58-64)

D. REVIEW AND APPROVAL OF EAST CENTRAL FLORIDA REGIONAL RESILIENCE COLLABORATIVE MEMORANDUM OF UNDERSTANDING (Contact: Stephan Harris) (Enclosure, pages 65-77)

VI. PRESENTATIONS, STATUS REPORTS AND DISCUSSION ITEMS

A. PRESENTATION AND DISCUSSION OF DRAFT R2CTPO FY 2018/19 PUBLIC INVOLVEMENT ACTIVITIES SUMMARY (Contact: Pamela Blankenship) (Enclosure, page 78)

B. PRESENTATION AND DISCUSSION OF THE DRAFT COMMUNITY SAFETY ACTION PLAN (CSAP)(Contact: Pamela Blankenship) (Enclosure, pages 79-86)

C. PRESENTATION AND DISCUSSION OF UPDATE OF THE DEVELOPMENT OF THE 2045 LONG RANGE TRANSPORTATION PLAN (LRTP) (Contact: Colleen Nicoulin) (Enclosure, page 87)

D. PRESENTATION AND DISCUSSION OF THE GUIDING RESOLUTIONS AND PROJECT APPLICATIONS FOR THE ANNUAL CALL FOR PROJECTS (Contact: Lois Bollenback) (Enclosure, pages 88-99)

E. PRESENTATION AND DISCUSSION OF CR 415 AND PIONEER TRAIL INTERSECTION IMPROVEMENTS (Contact: Lois Bollenback) (Enclosure, page 100)

F. PRESENTATION AND DISCUSSION OF TENTATIVE FIVE-YEAR WORK PROGRAM FOR FY 2020/21 TO 2024/25 (Contact: Vickie Wyche, FDOT District 5) (Enclosure, pages 101)

G. PRESENTATION AND DISCUSSION OF THE 2045 FLORIDA TRANSPORTATION PLAN (Contact: Lois Bollenback) (Enclosure, page 102)

H. FDOT REPORT (Contact: Vickie Wyche, FDOT District 5) (Enclosure, pages 103-115)

VII. EXECUTIVE DIRECTOR’S REPORT (Enclosure, page 116)

→ Update on SU Funding/Work Program→ Update on FDOT D-5 Proposed Local Agency Program (LAP) Policy

VIII. RIVER TO SEA BOARD MEMBER COMMENTS (Enclosure, page 116)IX. RIVER TO SEA TPO CHAIRPERSON COMMENTS (Enclosure, page 116 )2

Page 3: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Board Agenda October 23, 2019 Page 3

X. INFORMATION ITEMS (Enclosure, pages 116-139)→ Bicycle/Pedestrian Advisory Committee Attendance Record – 2019→ Citizens Advisory Committee Attendance Record – 2019→ Technical Coordinating Committee Attendance Record– 2019→ September 2019 TPO Outreach and Activities→ Volusia and Flagler County Construction Reports→ TRIP Letters→ Acronyms→ 2020 R2CTPO Meeting Schedule

XI. ADJOURNMENT (Enclosure, page 116)

*The next River to Sea TPO Board meeting will be November 27, 2019*

November Meeting Dates Executive Committee, November 6, 2019 @ 9:00 a.m. (Note new meeting time) Transportation Disadvantaged Local Coordinating Board, November 13, 2019 @ 11:00 a.m. Bicycle/Pedestrian Advisory Committee, November 13, 2019 @ 2:00 p.m. Citizens Advisory Committee, November 19, 2019 @ 1:15 p.m. Technical Coordinating Committee, November 19, 2019 @ 3:00 p.m. River to Sea TPO Board, November 27, 2019 @ 9:00 a.m.

****************************************************************************************************

Individuals covered by the Americans with Disabilities Act of 1990 in need of accommodations for this public meeting should contact the River to Sea TPO office, 2570 W. International Speedway Blvd., Suite 100, Daytona Beach, Florida 32114-8145; (386) 226-0422, extension 20416, at least five (5) working days prior to the meeting date.

If any person decides to appeal a decision made by this board with respect to any matter considered at such meeting or hearing, he/she will need a record of the proceedings including all testimony and evidence upon which the appeal is to be based. To that end, such person will want to ensure that a verbatim record of the proceedings is made.

The River to Sea TPO does not discriminate in any of its programs or services. To learn more about our commitment to nondiscrimination and diversity, visit our Title VI page at www.r2ctpo.org or contact our Title VI/Nondiscrimination Coordinator, Pamela Blankenship, at 386-226-0422, extension 20416, or [email protected]. Persons who require translation services, which are provided at no cost, should contact the River to Sea TPO at (386) 226-0422 or by email at [email protected] at least five (5) business days prior to the event.

3

Page 4: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

MEETING SUMMARY

TPO BOARD OCTOBER 23, 2019

IV. CONSENT AGENDA

A. SEPTEMBER 25 2019 RIVER TO SEA TPO BOARD MEETING MINUTES

Minutes are prepared for each board meeting and said minutes must be approved by the River to Sea TPO Board.

B. TREASURER’S REPORT

Monthly treasurer reports are prepared for review and approval by the River to Sea TPO Board. The September 2019 Treasurer’s Report is provided for your information.

C. EXECUTIVE COMMITTEE REPORT

D. BICYCLE/PEDESTRIAN ADVISORY COMMITTEE REPORT

E. 2045 LONG RANGE TRANSPORTATION PLAN (LRTP) SUBCOMMITTEE REPORT

F. CITIZENS ADVISORY COMMITTEE (CAC) REPORT

G. TECHNICAL COORDINATING COMMITTEE (TCC) REPORT

H. RIVER TO SEA TPO BOARD SUMMARY REPORT

I. CENTRAL FLORIDA MPO ALLIANCE (CFMPOA) REPORT

J. REVIEW AND APPROVAL OF TIMEKEEPING AND TRAVEL REIMBURSEMENT POLICY

ACTION REQUESTED:

MOTION TO APPROVE THE CONSENT AGENDA

4

Page 5: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Board Minutes September 25, 2019 Page 1 of 11

SEPTEMBER 25, 2019 MEETING MINUTES OF THE

RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION (TPO) BOARD

2570 W. International Speedway Boulevard, Suite 100 Daytona Beach, FL 32114-8145

TPO Board Members Present: Representing: Vice Mayor John Rogers* Bunnell Commissioner Jeffrey Schuitema** Beverly Beach Commissioner Robert Gilliland, Acting Chairperson Daytona Beach Mayor Karen Chasez DeBary Commissioner Chris Cloudman DeLand Commissioner Chris Nabicht Deltona Councilwoman Christine Power Edgewater Commissioner Marshall Shupe* Flagler Beach Vice Mayor Vernon Burton* Lake Helen Commissioner Roy Johnson Holly Hill Commissioner Jason McGuirk, 2nd Vice Chairperson New Smyrna Beach Commissioner Bill Lindlau* Oak Hill Council Member Jeff Allebach Orange City Commissioner Dwight Selby Ormond Beach Council Member Bob Cuff Palm Coast Council Member Joe Perrone* Ponce Inlet Council Member Scott Stiltner Port Orange Councilman Ralph Schoenherr South Daytona Volusia County Council Chair Ed Kelley Volusia County Council Member Deb Denys Volusia County, District 3 Andy Dance (non-voting) Flagler County School Board Carl Persis (non-voting) Volusia County School Board Vickie Wyche (non-voting advisor) FDOT District 5 Paul Eik (non-voting) BPAC Chairperson Alan Peterson (non-voting) CAC Vice Chairperson Jose Papa (non-voting) TCC Chairperson TPO Board Members Absent: Representing: Mayor Nancy Miller*(excused) Daytona Beach Shores Flagler County Chair Donald O’Brien Flagler County Council Member Barbara Girtman (excused) Volusia County District 1 Council Member Billie Wheeler (excused) Volusia County, District 2 Council Member Ben Johnson (excused) Volusia County, District 5

* Non-voting member in the Small City Alliance ** Voting member for the Small City Alliance Others Present: Representing: Debbie Stewart, Recording Secretary TPO Staff Lois Bollenback TPO Staff Pam Blankenship TPO Staff Colleen Nicoulin TPO Staff Stephan Harris TPO Staff Crystal Mercedes TPO Staff Julie Adamson TPO Staff

5

Page 6: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Board Minutes September 25, 2019 Page 2 of 11

Others Present: Representing: Andrew Holmes Daytona Beach Ron Paradise Deltona Anna Taylor FDOT Ron Meade FDOT Kellie Smith FDOT Jim Wood Kimley-Horn Ann Harrell League of Women Voters Big John Press Brendan Guess VHB, Inc. Jon Cheney Volusia County Traffic Engineering Travis Terpstra Volusia County Traffic Engineering Frank Alvarez Votran

I. Call to Order / Roll Call / Determination of Quorum The meeting of the River to Sea Transportation Planning Organization (TPO) Board was called to order at 9:00 a.m. by TPO Chairperson Rob Gilliland. The roll was called and it was determined that a quorum was present. Ms. Stewart announced that Commissioner Schuitema, Beverly Beach, would be the voting member for the Small City Alliance.

II. Pledge of Allegiance

III. Public Comment/Participation Mr. Big John, press, reminded members of the comments he brought before them last month regarding new bus service to the Tanger Outlet Mall and Tomoka Town Center; the LPGA Sub-Area Study; volunteers for the road tax, and the Russian driveway at East International Speedway Boulevard (ISB) which has been held back for a year. He met with FDOT D-5 Secretary Shannon and was told he was taking care of the Russian driveway so he is taking that off of his agenda. He asked for direction on where to go to start the process for new bus service. Chairperson Gilliland replied the Volusia County Council. Mr. John asked for direction regarding volunteers for the road tax. Chairperson Gilliland suggested the Roundtable of Volusia County Elected Officials. Mr. John asked if the TPO was interested in the road tax as it is a transportation issue. Chairperson Gilliland replied the TPO is not in charge of the proposed half-cent sales tax for road construction; the Roundtable of Elected Officials is the group coordinating that. Mr. John referred to the LPGA Sub-Area Study and asked if he should wait on his comments until it comes before this board. Chairperson Gilliland replied he was welcome to speak on it; they have had several presentations around the county, including to the Daytona Beach City Commission; early information has been received by the TPO. He asked Ms. Bollenback if a presentation will be given to the TPO Board. Ms. Bollenback replied a presentation was given to the Technical Coordinating Committee (TCC) when input from a technical perspective was needed. She believes they are updating the modeling and forecasting information; they may do another presentation but there has not yet been a request to do so. Mr. John commented that the LPGA Sub-Area Study is devastating and asked members to keep an eye out for it.

6

Page 7: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Board Minutes September 25, 2019 Page 3 of 11

IV. Consent Agenda A. August 28, 2019 River to Sea TPO Board Meeting Minutes B. Treasurer’s Report C. Executive Committee Report D. Bicycle and Pedestrian Advisory Committee (BPAC) Report E. Transportation Disadvantaged Local Coordinating Board (TDLCB) Report F. Citizens Advisory Committee (CAC) Report G. Technical Coordinating Committee (TCC) Report H. River to Sea TPO Board (R2CTPO) Summary Report I. Review and Approval of Expenditure for the CAV Study (Not to Exceed $65,000) MOTION: Volusia County Council Chair Kelley moved to approve the Consent Agenda. The motion was

seconded by Commissioner Nabicht which carried unanimously.

V. Action Items A. Review and Approval of the 2045 Long Range Transportation Plan (LRTP) Public Involvement Plan (PIP)

Ms. Bollenback introduced Mr. Jim Wood, Kimley-Horn and Associates, to give the presentation. Mr. Wood stated the PIP is specific to the LRTP that is being developed over the next year and is consistent with the TPO’s Public Participation Plan (PPP) which was adopted in June. The PIP is intended to define the overall process to ensure there is a meaningful effort for input into the LRTP. It is a balanced approach with both targeted and broad input. It includes measures of effectiveness with targets; there has been additional language added for freight coordination and the TPO’s Annual Planning Retreat. There will be a specific website for the LRTP that will launch within the next week and a specific survey will be conducted which will be an extension of the 2018 “Tell the TPO” survey. There will be focus groups, workshops, environmental justice workshops, a needs assessment and cost feasible plan. There will also be continuous social media and stakeholder outreach. Council Member Denys referred to diverse representation and the list of 2045 LRTP Subcommittee members; her definition of diverse is regional and this TPO encompasses two counties and sixteen cities. She would like to see the geographic locations of the subcommittee members to ensure the entire planning area has representation and committee members need to be added if an area is not represented. Ms. Bollenback replied subcommittees are created by volunteers; however, everyone is welcome to attend the meetings and provide input. The geographic information will be added and staff will encourage members to participate. There must be a subcommittee for the purpose of meeting notices and a quorum but ultimately, anyone can participate. Chairperson Gilliland recommended moving forward and approving this item with the understanding it can be amended to add members to the subcommittee if the geographic information provided is found to be weighted toward one side of the county. Council Member Denys stated this subcommittee will be made up of the guiding individuals going forward with this document and the process. It is critical that a broad, geographic diversity is represented. Chairperson Gilliland asked how quickly the geographic information could be distributed to board members. Ms. Bollenback replied staff could put that together now and she can report back by end of the meeting. MOTION: A motion was made by Council Member Denys to approve the 2045 Long Range

Transportation Plan (LRTP) Public Involvement Plan (PIP). The motion was seconded by Volusia County Council Chair Kelley and carried unanimously.

7

Page 8: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Board Minutes September 25, 2019 Page 4 of 11

Chairperson Gilliland stated this item may be reopened at the end of the meeting if it is found the geographic diversity of the 2045 LRTP Subcommittee is not what the board wants it to be.

VI. Presentations and Discussion Items A. Presentation and Discussion of Draft R2CTPO 2020 Legislative Positions

Ms. Bollenback stated the Legislative Issues Subcommittee met this morning and announced the legislative session begins on January 14, 2020; committee meetings began last week. There are two delegation meetings scheduled for November; Volusia County on November 20, 2019 and Flagler County on November 21, 2019. She reviewed the R2CTPO’s legislative positions from last year and the MPOAC’s 2020 legislative positions. The subcommittee agreed to remove the position on MPO structure from last year’s positions as a priority but it will be added to the items the TPO continues to have a position on. Funding is the first priority and there are four items under it; the first is to be clear that we support indexing the local fuel tax; it is consistent with the position approved last year but will be more directly stated. The second item is to maintain stabilization and consistency in the TRIP program. The third item is moving from the back page of Additional Positions to a funding priority which is allowing flexibility of flex funding that is currently for the Strategic Intermodal System (SIS) or the State Transportation Trust Fund (STTF) be used on local roads that relieve those systems including access roads to and from the SIS. This is for situations when the answer is not to widen state roads but to create alternate travel choices. This has been a position taken by the R2CTPO and around the state. The fourth funding priority is to identify resources to maintain the SUN Trail system. Chairperson Gilliland reminded members the subcommittee met at 8:15 am this morning so this information was not available in advance for review. Ms. Bollenback stated the subcommittee was originally scheduled to meet on September 4, 2019 but due to Hurricane Dorian had to be rescheduled. Council Member Denys asked if there was a handout this morning for the subcommittee. TPO staff displayed the R2CTPO 2019 Legislative Positions for use in the review of the subcommittee’s recommendations. Ms. Bollenback replied the MPOAC’s updated positions and the R2CTPO’s positions from last year were included with the subcommittee agenda packet. This was the subcommittee’s initial meeting so there was no draft available. Chairperson Gilliland asked if this item will be back next month for adoption. Ms. Bollenback replied yes. These four items under funding are generally consistent with last year but are more direct in what the TPO is supporting. Council Member Stiltner asked for the dates of the delegation meetings, the locations and what those meetings involve. Ms. Bollenback replied the delegation for Volusia County is scheduled for November 20, 2019; she does not have the locations and times yet. The legislative delegations take requests in advance from agencies that have items that they are promoting. Council Member Denys announced the Volusia County delegation meeting will be held at DeBary City Hall at 9:00 am; Senator Simmons is chairing the delegation. She asked Ms. Bollenback to discuss the indexing of the gas funds; she does not believe the indexing was a priority last year.

8

Page 9: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Board Minutes September 25, 2019 Page 5 of 11

Ms. Bollenback reviewed the positions from last year and stated more detail is provided on the main focus areas. She reviewed the funding positions again and discussed indexing the local option gas tax. She explained TRIP funding and how it is generated. She stated the priorities of preserving the Transportation Disadvantaged Trust Fund, the State Transportation Trust Fund and SUN Trail maintenance will remain the same. The next priority is safety; the first item will add bicycle safety to the pedestrian safety priority. The Texting While Driving priority will be rearranged to be more direct. Commissioner Selby referred to pedestrian and non-motorized transportation safety and asked if scooters, electric bikes, skateboards, etc., were considered to be motorized or non-motorized or how they were categorized. Ms. Bollenback replied a new category was created called micro mobility devices (MMD); there is legislation being passed as they are becoming more prevalent. At the state level, they are saying not to prevent them but to figure out how to manage them. The TPO proposes to address MMDs under a new priority for Transportation Technologies. Commissioner Selby commented he personally knows people that have incurred serious injuries on MMDs. Ms. Bollenback stated people are not wearing helmets and riding on the sidewalks and roads. The position is to come up with a plan for MMDs; how to dock them, where to dock them, etc. If they start to clutter a sidewalk it could become an American with Disabilities Act (ADA) issue. Vice Mayor Burton commented that he just returned from Washington D.C. and MMDs are everywhere; there is no particular place to store them and riders drop them wherever they want. He would like to see some type of regulation since we can look at places that are bad and see how to improve it. Mayor Chasez referred to the wording under the Texting While Driving position; it is asking for a primary offense but it was made a primary offense last year. Ms. Bollenback replied she believes it is not a primary offense in general but in school zones; the point is to elevate the issue. Volusia County Council Chair Kelley commented you cannot touch the phone in a school zone. Mayor Chasez stated you can be pulled over at any time in any situation while driving if caught texting as a primary offense. Ms. Bollenback replied the challenge is the driver is holding a handheld device and the police officer cannot ask to see it; drivers could say they were using the navigation system. The MPOAC is moving toward “no handhelds” as other states have done. Mayor Chasez stated she supports that position but does not think “primary offense” is the right wording because legally it was changed to a primary offense last year. Ms. Bollenback agreed and will update the language to reflect that. Chairperson Gilliland asked if the wording would change from texting while driving to handheld devices while driving. Ms. Bollenback deferred to the Board to be clear on the language. Commissioner Cloudman commented the legislation includes all distracted driving including things such as having a dog in your lap. Discussion continued.

9

Page 10: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Board Minutes September 25, 2019 Page 6 of 11

Chairperson Gilliland requested the draft 2020 Legislative Positions be sent to board members as soon as possible so they can be discussed next week at the Executive Committee meeting.

B. Presentation and Discussion of an Amendment to the 2040 Long Range Transportation Plan (LRTP) Chairperson Gilliland stated this amendment includes three things; the funding of two sections of the SR 40 widening project, incorporating performance measures, and advancing the I-95 and US 1 interchange from the unfunded needs list to the cost feasible list. Mr. John stated there is a plan which will affect the Long Range Transportation Plan (LRTP). On October 17, 2019, they are going before the Planning, Land Development, and Regulation Commission (PLDRC) to take the Hand Avenue extension to Tymber Creek Road off the plan as well as Reed Canal Road. This information came from VCARD and he hopes the Volusia County Council will do something about it. Ms. Bollenback stated this amendment is an opportunity to advance some projects. The materials are out for public review and comment. Chairperson Gilliland stated the US 1 and I-95 interchange project has been needed for decades and it is good to see it finally advancing. Commissioner Selby commented that because it is in the SIS, the SR 40 widening allows the opportunity to incorporate the concepts of multimodal and bike lanes into it. Ms. Bollenback replied that the SR 40 project does include a multi-use trail in its entirety. This will allow it to move forward independently once the right-of-way is acquired.

C. Presentation and Discussion of Updated Transportation Regional Incentive Program (TRIP) List for R2CTPO

(Handout) Ms. Bollenback stated the Transportation Regional Incentive Program (TRIP) is a state funded program to fund projects of regional significance including locally funded projects. It requires a 50% match in most areas of the state; however, as a small, rural county, Flagler County does not have a match requirement. The program varies in the amount of funding available each year. It requires a project be in the Long Range Transportation Plan (LRTP) and a part of an interlocal agreement with neighboring counties. Through participation in the Central Florida MPO Alliance (CFMPOA), this TPO has entered into an agreement that includes all counties in FDOT D-5. A comment was made recently by FDOT staff that the lists were not current and money was being left on the table. In subsequent conversations with FDOT, it was found that this TPO’s list is current and reflects all of the eligible projects in the LRTP. We do not need to update the list but they want to know which projects on the list are actually in play; what projects local governments are willing and able to provide the 50% funding match for. Volusia County responded quickly and DeLand is currently discussing it to see if they are able to provide the match for a project they have on the list. Palm Coast does not have a match but they are being encouraged to provide the projects they would like to see completed if funding comes available. This will be discussed at the CFMPOA meeting on October 11, 2019. From a staff perspective, this process will be rolled into the annual Call for Projects; the required letters of support will also include TRIP projects. There will be a change to the guiding resolution for the process; this will address Council Member Denys’ concern from last month on how the TRIP priority process is supposed to happen. Council Member Stiltner referred to the TRIP list and commented that potential costs and timelines are provided; he asked if the cost for the funding period of 2031 is today’s cost or the projected cost for 2031. Ms. Bollenback replied it was the LRTP cost and those will need to be updated annually along with the letters of support.

10

Page 11: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Board Minutes September 25, 2019 Page 7 of 11

D. Presentation and Discussion of the Draft Community Safety Action Plan

Ms. Bollenback stated the TPO has pursued a number of activities to improve transportation safety; bicycle helmet fittings, public awareness campaigns, safety studies to identify projects, etc. Other agencies such as FDOT have also conducted activities to improve safety. The idea of the Community Safety Action Plan (CSAP) is to identify what the issues are, what projects and programs are already available and determine what the TPO’s role will be. The timing of this is important because the TPO is getting ready to start building the next Unified Planning Work Program (UPWP); the two-year work program that will begin next summer. Ms. Blankenship will give the presentation and come back next month with the recommendations. Ms. Blankenship gave a PowerPoint presentation of the draft Community Safety Action Plan (CSAP) and stated she will be asking for feedback at the end of the presentation. She reviewed the goals and objectives of the CSAP and stated this is to develop a work plan for TPO staff. She reviewed the five “Es” of safety and stated the CSAP will focus on all but engineering. One of the suggestions at an advisory committee was to add “obedience” or “empathy”. She gave an overview of the data for all crashes in Volusia and Flagler Counties from 2014 to 2018 and stated speeding is a factor in 81% of the crashes. She reviewed impaired, aggressive and distracted driving statistics, data for bicycle and pedestrian deaths, and incapacitating injuries for the same time period. She stated the three main roadways for bicycle and pedestrian fatalities are US 1, US 17 and US 92. She reviewed the conclusions reached at the stakeholder meeting and stated they focused on engineering solutions which is not where the this plan is going; we need more education and enforcement ideas. She asked members for suggestions on what the TPO can do to improve safety. Council Member Perrone commented that he has noticed the southbound left turn lane signals on Dunlawton Avenue do not stay green long enough; only a few cars can get through the turn and he has noticed more cars making the left turn on red. He referred to the intersection of Nova Road and Spruce Creek Road and commented that there is a Shell station there with an exit that is not supposed to be a left turn but people do it anyway. On SR A1A to Ponce Inlet there is a pedestrian crossing with a blinking light and he has noticed that cars do not stop for it to allow pedestrians to cross safely. Ms. Blankenship replied that would be enforcement issue. Council Member Perrone stated there used to be police stops where they would issue warnings the first week and tickets the next but there needs to be funding and police availability. Ms. Blankenship replied that is the High Visibility Law Enforcement program and grant money is currently available. Commissioner Nabicht referred to a commissioned document from the federal government entitled “America’s Burning” from the 1980’s; it was noted in that document that most deaths in house fires occurred at night while people were sleeping. This led to widespread residential use of smoke detectors. Then they found people did not change the batteries in smoke detectors or have an exit plan; this is the education component. To have a culture change they started a fire safety program that began in kindergarten and carried through high school with age appropriate curriculum. It was found that the students were hearing the message and it became second nature to them; they were telling the parents to replace the batteries in the smoke detector and to practice an escape plan. We can use all the engineering solutions available but unless we educate to create a culture change it will not be effective. It has to start in the school system and the school system has to allow it to be part of the curriculum. Commissioner Selby referred to enforcement and stated Ormond Beach Police Chief Godfrey informed the City Commission that most crashes happen on Friday nights and were speed-related. They did a joint enforcement with other police departments, mostly motorcycle officers, on Granada Boulevard. It was a high visibility effort and was highly effective. Another benefit was that all the officers liked doing it and working with other departments. He noted the most effective crosswalks are the ones with the rectangular, rapid flashing beacons (RRFBs); they are pedestrian activated, solar powered with flashing lights. There is ample signage to warn drivers the crosswalk is ahead. The diamond crosswalk signs that flash continuously 24 hours

11

Page 12: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Board Minutes September 25, 2019 Page 8 of 11

a day, seven days a week, are not as effective as drivers become immune to them. Engineering does need to be addressed and things need to be simplified. Ms. Bollenback clarified that the intent is not to say engineering does not matter; the TPO has done a SR A1A pedestrian study, a high crash location study and school safety studies. Currently, there are more engineering recommendations than funds to build them so we have to look at other options. Councilwoman Power referred to the Crash Analysis Report and commented that the data is from 2011 to 2015; she asked how relevant that data is since the state is moving toward a vision zero for crashes. She asked if there is trend where one solution works better than another. Ms. Bollenback replied that sometimes there is a year or two before the statistics can be vetted and a report posted but that none of the statistics are going down. Discussion continued. Mayor Chasez stated speeding, rear-end crashes that involve speeding, a cultural change as Commissioner Nabicht mentioned and starting education young attributing negative things to speeding would be helpful. She believes speeding is an area that needs focus. A cultural change would be longer lasting and have greater benefits to safety than enforcement. Commissioner Nabicht commented that with education, there is one educator for thirty students as opposed to twenty officers only reaching a handful of people. Education is cheaper, accomplishes much more and is longer lasting. Discussion continued. Councilwoman Power referred to drivers education and asked what can be done there because the funding for it seems to be drying up; it is grant based and the gas tax was part of the funding. It was cancelled this year at her daughter’s school. Even when they have it, they only have room for 34 students. Ms. Bollenback stated there was much discussion today regarding education; the TPO will see what it can do to help educate the public. The board agreed to direct staff to add encouraging mechanisms for driver’s education programs to the legislative positions.

E. Presentation and Discussion of Walkability Action Plan and Complete Streets Policy Template (Handout) Mr. Harris stated that according to the Smart Growth National Complete Streets Coalition, complete streets are designed and operated to enable safe access for users including pedestrians, bicyclists, motorists and transit riders of all ages and abilities. A Complete Streets Policy directs transportation planners and engineers to integrate a complete streets approach into their transportation practices, policies and decision making processes to improve the entire street network. The Complete Streets Subcommittee met on August 29, 2019 to review the draft policy and they had a few suggestions which are summarized on their meeting summary on page 36 of the agenda; he reviewed those suggestions. He asked for additional feedback and suggestions. TPO staff will continue to refine the draft policy and bring it back for adoption in October. Commissioner Nabicht commented that a contributing factor to bicycle/pedestrian fatalities and injuries continues to be low lighting; to protect them, the TPO should not approve road widening projects that do not include adequate street lighting. On projects that require a sidewalk, embedded lighting crosswalks and pedestrian activated signs should be required.

12

Page 13: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Board Minutes September 25, 2019 Page 9 of 11

Council Member Allebach asked members to review the draft Complete Streets Policy; Orange City is working to implement it and will have a presentation tonight. There are levels of other improvements that are helpful to the health of the residents of Volusia County that walking or moving will improve. If a sidewalk is built next to a school students can walk safely and get needed exercise. The health department has funding to improve health and it is another to fund these projects if a Complete Streets Policy is adopted. Mr. Peterson stated that although the CAC agrees with the concept, it had two concerns regarding this draft policy. The first one is the cities that have a swale drainage system instead of curb and gutters would be at a disadvantage if extra points are given for these projects. The second concern deals with cost; if projects are expanded to include the complete streets concept, it adds to the cost. If additional right-of-way is needed that will significantly increase the cost and funding would not be available for other projects. The concept is good but the CAC feels more thought needs to be given to the implementation. Mayor Chasez referred to the draft policy included in the agenda and the two highlighted performance measures; the health specific measures and to consider equality, demographic patterns and communities. She asked what was in mind for these performance measures. Mr. Harris replied additional reference information and statistics from the Volusia County Health Department were included. Regarding the performance measures, the concept is to utilize the TPO’s adopted performance measures for this policy but to add a health component as well. Ms. Bollenback commented that is to be determined; staff is working with the health department on it. Mayor Chasez asked if it would enhance funding opportunities if this component was added. Ms. Bollenback replied yes, but not through the traditional funding sources that the TPO prioritizes projects for; it may determine which projects get a higher ranking if it is included as part of the ranking process. It will not get more funding there but will allow the TPO to pursue other grants. Chairperson Gilliland referred to the handout of comments provided by Volusia County and asked Mr. Jon Cheney, Volusia County Traffic Engineering Director, if he had any additional comments. Mr. Cheney replied no. Chairperson Gilliland asked if this will be back next month as an action item and if it would go back through the advisory committees. Mr. Harris replied yes to both questions.

F. FDOT Report

Ms. Wyche stated a flyer soliciting requests for Sun Trail funding was emailed. Ms. Bollenback replied it was sent to the TCC members but she would forward it to the board members. Ms. Wyche announced the FDOT D-5 Work Program will have a virtual public hearing from October 21, 2019 through October 25, 2019; it will be available 24 hours per day at www.d5wpph.com. There will be an informational outreach meeting on Thursday, October 24, 2019 from 4:30 pm to 6:30 pm at the D-5 office in DeLand.

VII. Executive Director’s Report (Handout)

13

Page 14: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Board Minutes September 25, 2019 Page 10 of 11

Ms. Bollenback stated the 2045 LRTP Subcommittee members list of geographic locations was handed out. She gave a breakdown; three from East Volusia, three from West Volusia, two from Flagler County and Palm Coast, four from Volusia County and one from the disabled community. Cities and county government are represented as well as citizens and is well balanced in terms of geographic locations. Chairperson Gilliland asked where Mr. Dave Castagnacci, CAC, from Volusia County lives. Commissioner Selby replied Ormond Beach. Chairperson Gilliland commented that Southeast Volusia County was not represented. Ms. Bollenback replied it will be brought up at the advisory committees and staff will ask for volunteers from Southeast Volusia. → Update on SU Funding/Work Program

Ms. Bollenback stated there is just over $1 million in the traffic operations set aside box and $1 million for bicycle/pedestrian in the current year. The money in traffic operations is General Funds SU (GFSU) and that funding does not expire until 2022 so staff has asked that the funding be put into the next fiscal year to advance a Deltona paved shoulders project for Elkcam Boulevard. For the bicycle/pedestrian funding, staff submitted two Daytona Beach projects; the Fremont Avenue and Derbyshire sidewalk projects. There is still $3.6 million in Advanced Construction (AC) funds in current year.

→ Update on Roundtable of Volusia County Elected Officials/Sales Tax Referendum

Ms. Bollenback stated the Roundtable of Volusia County Elected Officials met and discussed issues other than transportation, such as emergency response. They also had a presentation on growth management.

VIII. River to Sea TPO Board Member Comments

Council Member Stiltner referred to the intersection of CR 415 and Pioneer Trail and commented there seems to be new activity and interest there; he asked if an update could be given at the next board meeting. There is a lot of growth coming out of Port Orange and New Smyrna Beach westward and it is catching them off guard. Ms. Bollenback replied yes. Commissioner Selby commented that Volusia County Council Chair Kelley had another appointment and had requested the list of transportation acronyms be provided as a regular attachment in the agenda. Councilwoman Power stated she went through the intersection at CR 415 and Pioneer Trail after both of the recent accidents; there are simple things that could be done that would not require a six month wait for a traffic study. She does not always agree with what traffic studies and engineers come up with. She hopes that this intersection issue gets put to the front burner. Commissioner Nabicht suggested installing rumble strips would help; there are flashing lights and stops signs in place. A roundabout will take a very long time to do. Mr. Jon Cheney, Volusia County Traffic Engineering Director, stated Volusia County is making interim improvements to that intersection including blinking lights, foliage and maintenance. The county also wants to reclaim its land on the Cabbage Patch side to do some gore striping. An engineer is out there this morning to see if rumble strips would be appropriate. The study is done and there are both short and long term recommendations. Chairperson Gilliland commented he appreciates the comments made earlier regarding drivers education; if you are pulled over you are supposed to keep your hands on the steering wheel until told to move them by the police

14

Page 15: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Board Minutes September 25, 2019 Page 11 of 11

officer; dozens of shootings could have been avoided if people had kept their hands on the wheel. This is something he learned in drivers education. Mr. Persis referred to the drivers education program and stated it is funded by the surcharge on traffic tickets statewide which have decreased; this is why the funding for the program has been reduced. He hopes that it will increase since tickets can now be given for texting and driving.

IX. River to Sea TPO Chairperson Comments

X. Information Items → Citizens Advisory Committee Attendance Record – 2019 → Technical Coordinating Committee Attendance Report – 2019 → Bicycle/Pedestrian Advisory Committee Attendance Record – 2019 → August TPO Outreach and Activities → Volusia and Flagler County Construction Reports

XI. Adjournment

There being no further business, the River to Sea TPO Board meeting adjourned at 11:06 a.m.

RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION

_________________________________________ DAYTONA BEACH COMMISSIONER ROB GILLILAND

CHAIRPERSON, RIVER TO SEA TPO CERTIFICATE: The undersigned, duly qualified and acting Recording Secretary of the River to Sea TPO Board certifies that the foregoing is a true and correct copy of the minutes of the September 25, 2019 regular meeting of the River to Sea Transportation Planning Organization (TPO) Board, approved and duly signed this 23rd day of October 2019. _ __________________________________ DEBBIE STEWART, RECORDING SECRETARY RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION

15

Page 16: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

DESCRIPTION 19/20 BUDGET

CURRENT

MONTH FYTD TOTAL

UNDER (OVER)

BUDGET

FYTD %

BUDGET

REVENUES

LOCAL FUNDS $203,437.00 $6,009.71 $56,656.87 $146,780.13 27.85%STATE FUNDS 61,880.00 0.00 0.00 61,880.00 0.00%FEDERAL FUNDS 1,682,371.00 0.00 0.00 1,682,371.00 0.00%

REVENUES $1,947,688.00 $6,009.71 $56,656.87 $1,891,031.13 2.91%

EXPENSES

SALARIES $534,061.00 $41,579.94 $125,562.35 $408,498.65 23.51%FRINGE BENEFITS 200,072.00 13,903.47 40,354.59 159,717.41 20.17%OFFICE SUPPLIES 10,000.00 18.33 303.01 9,696.99 3.03%POSTAGE 5,000.00 22.20 1,168.82 3,831.18 23.38%OFFICE RENT EXPENSE 121,300.00 9,980.96 37,765.71 83,534.29 31.13%ADVERTISING 4,000.00 80.27 160.54 3,839.46 4.01%PRINTING 13,000.00 0.00 27.00 12,973.00 0.21%CONFERENCE, WORKSHOPS & SEMINAR FEES 6,300.00 0.00 800.00 5,500.00 12.70%FEES 35,300.00 923.53 10,567.30 24,732.70 29.94%DUES 3,574.00 0.00 307.00 3,267.00 8.59%PUBLICATIONS 1,050.00 286.00 559.00 491.00 53.24%COPY EXPENSE 22,000.00 1,534.32 4,526.25 17,473.75 20.57%COPY MACHINE COSTS 21,000.00 1,321.05 2,345.66 18,654.34 11.17%TRAVEL EXPENSE 15,575.00 603.20 1,963.33 13,611.67 12.61%AWARDS PROGRAM/PROMO 18,000.00 0.00 0.00 18,000.00 0.00%SPECIAL STUDIES/PROFESSIONAL SERVICES 787,140.00 17,388.17 17,388.17 769,751.83 2.21%MEETING EXPENSE 3,000.00 350.11 665.09 2,334.91 22.17%LIABILITY INSURANCE 13,100.00 3,382.00 6,314.37 6,785.63 48.20%REPAIRS 1,000.00 0.00 0.00 1,000.00 0.00%NETWORK COSTS 36,600.00 1,740.00 12,259.96 24,340.04 33.50%CAPITAL OUTLAY 7,500.00 0.00 0.00 7,500.00 0.00%SOFTWARE 6,434.00 58.25 2,469.40 3,964.60 38.38%TELEPHONE 3,600.00 198.00 594.00 3,006.00 16.50%EDUCATION 1,000.00 235.00 235.00 765.00 23.50%CONTINGENCY 78,083.00 0.00 0.00 78,083.00 0.00%

EXPENSES $1,947,688.00 $93,604.80 $266,336.55 $1,681,352.45 13.67%

BALANCE $0.00 ($87,595.09) ($209,679.68) $209,678.68

25% OF YEAR COMPLETE

RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION

MONTHLY TREASURER REPORT FY 19/20

PERIOD ENDING SEPTEMBER 30, 2019

16

Page 17: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Beverly Beach DeBary Flagler Beach New Smyrna Beach Palm Coast South Daytona Bunnell DeLand Flagler County Oak Hill Pierson Volusia County Daytona Beach Deltona Holly Hill Orange City Ponce Inlet Daytona Beach Shores Edgewater Lake Helen Ormond Beach Port Orange

EXECUTIVE COMMITTEE MEETING SUMMARY OCTOBER 2, 2019

• Discussed updates to R2CTPO Employee Handbook

• Discussed the Consolidated Planning Grant Agreement proposed by FDOT

• Discussed the TPO Executive Director evaluation and directed members to submit completed evaluations by Friday, October 30, 2019

• Rescheduled the Wednesday, January 1, 2020 Executive Committee meeting to Friday, January 3, 2020 at 9:00 am

• Reviewed and recommended approval of the draft Timekeeping and Travel Reimbursement Policy

• Reviewed and approved expenditure for the Williamson Boulevard and Willow Run Sidewalk Feasibility Study ($21,440)

• Reviewed and recommended approval of the draft R2CTPO 2020 Legislative Positions

• Reviewed and approved draft October 23, 2019 TPO Board agenda as amended

• Changed the start time of Executive Committee meetings from 8:30 am to 9:00 am moving forward

THE NEXT EXECUTIVE COMMITTEE MEETING WILL BE ON WEDNESDAY, NOVEMBER 6, 2019 @ 9:00 A.M.

17

Page 18: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Beverly Beach DeBary Flagler Beach New Smyrna Beach Palm Coast South Daytona

Bunnell DeLand Flagler County Oak Hill Pierson Volusia County

Daytona Beach Deltona Holly Hill Orange City Ponce Inlet

Daytona Beach Shores Edgewater Lake Helen Ormond Beach Port Orange

Bicycle/Pedestrian Advisory Committee (BPAC)

Meeting Summary October 9, 2019

• Approved the minutes of the September 11, 2019 BPAC meeting as presented

• Reviewed and recommended approval of Resolution 2019-## adopting a Complete Streets Policy and Implementation Plan as amended

• Reviewed and recommended approval of Resolution 2019-## amending the 2040 Long Range Transportation Plan (LRTP)

• Reviewed and recommended approval of the East Central Florida Regional Resilience Collaborative Memorandum of Understanding (MOU)

• Received a presentation and survey of the Florida Transportation Plan update

• Received a presentation of the Daytona Beach Police Department’s High Visibility Enforcement (HVE) Program

• Received a presentation of the Graham Swamp Trail, Phase 1

• Received a presentation of the draft FY R2CTPO Public Involvement Activities Summary

• Received a presentation of the draft Community Safety Action Plan (CSAP)

• Received a presentation of the guiding resolutions and project applications for the annual Call for Projects and reviewed the changes

• Approved a motion to appoint Mr. Nic Mostert to the 2045 LRTP Subcommittee

• Received staff update on SU funding/Work Program and the FDOT D-5 proposed Local Agency Program (LAP) policy

• Announced Mobility Week is October 25, 2019 to November 1, 2019 and listed the activities the R2CTPO will be participating in

**The next BPAC meeting will be on Wednesday, November 13, 2019 at 2:00 pm**

18

Page 19: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Beverly Beach DeBary Flagler Beach New Smyrna Beach Palm Coast South Daytona Bunnell DeLand Flagler County Oak Hill Pierson Volusia County Daytona Beach Deltona Holly Hill Orange City Ponce Inlet Daytona Beach Shores Edgewater Lake Helen Ormond Beach Port Orange

2045 Long Range Transportation Plan (LRTP) Subcommittee Meeting Summary October 15, 2019

Mr. Jim Wood, Kimley-Horn and Associates, gave a PowerPoint presentation on the update of the development of the 2045 LRTP

Presented Connect 2045, the theme and logo for the 2045 LRTP

Discussed the Draft Data Summary and received comments from the

Subcommittee for incorporation into the document

Discussed and presented the Connect 2045 Draft Website

Discussed the upcoming public involvement activities, including Focus Group Workshops and LRTP Survey

Discussed the Draft Connect 2045 LRTP Goals and Objectives and received

comments from the Subcommittee on clarifications and revisions

Discussed Connect 2045 next steps

Announced the next Connect 2045 LRTP Subcommittee will be on November, 19, 2019 at 11:30 am

**The next 2045 LRTP Subcommittee meeting will be November 19, 2019**

19

Page 20: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Beverly Beach DeBary Flagler Beach New Smyrna Beach Palm Coast South Daytona Bunnell DeLand Flagler County Oak Hill Pierson Volusia County Daytona Beach Deltona Holly Hill Orange City Ponce Inlet Daytona Beach Shores Edgewater Lake Helen Ormond Beach Port Orange

Citizens Advisory Committee (CAC) Meeting Summary October 15, 2019

• Approved the September 17, 2019 CAC meeting minutes

• Reviewed and recommended approval of Resolution 2019-## amending 2040 Long Range Transportation Plan (LRTP)

• Reviewed and recommended approval of Resolution 2019-## adopting the Walkability Action Plan and Complete Streets Policy template as amended

• Reviewed and recommended approval of the East Central Florida Regional Resilience Collaborative Memorandum of Understanding (MOU)

• Received a PowerPoint update of the development of the 2045 Long Range Transportation Plan (LRTP)

• Received a PowerPoint presentation of the 2045 Florida Transportation Plan (FTP)

• Received a PowerPoint presentation of the draft R2CTPO 2018/19 Public Involvement Activities Summary

• Discussed CAC member attendance and vacancies

• Received an update of the draft Community Safety Action Plan (CSAP)

• Discussed the guiding resolutions and project applications for the annual Call for Projects

• Due to time constraints the Tomoka Farms Road (CR 415) and Pioneer Trail (CR 4118) intersection evaluation presentation was not given

• Received the FDOT report and presentation of the FDOT D-5 tentative Work Program for FY 2020/21 to 2024/25. Announced virtual public hearing will be October 21 -25, 2019 available 24 hours a day via the website (www.d5wpph.com) and a public information outreach meeting scheduled for Thursday, October 24, 2019 from 4:30 pm to 6:30 pm in DeLand

• The Volusia County Construction Report and Flagler County Construction Report were provided in the agenda

**The next CAC meeting will be on Tuesday, November 19, 2019**

20

Page 21: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Beverly Beach DeBary Flagler Beach New Smyrna Beach Palm Coast South Daytona Bunnell DeLand Flagler County Oak Hill Pierson Volusia County Daytona Beach Deltona Holly Hill Orange City Ponce Inlet Daytona Beach Shores Edgewater Lake Helen Ormond Beach Port Orange

Technical Coordinating Committee (TCC) Meeting Summary

October 15, 2019 • Approved the September 17, 2019 TCC meeting minutes

• Reviewed and recommended approval of Resolution 2019-## amending 2040 Long Range Transportation Plan (LRTP)

• Reviewed and recommended approval of Resolution 2019-## adopting the Walkability Action Plan and Complete Streets Policy template as amended

• Reviewed and recommended approval of the East Central Florida Regional Resilience Collaborative Memorandum of Understanding (MOU)

• Received a PowerPoint update of the development of the 2045 Long Range Transportation Plan (LRTP)

• Received a PowerPoint presentation of the 2045 Florida Transportation Plan (FTP)

• Received a PowerPoint presentation of the draft R2CTPO 2018/19 Public Involvement Activities Summary

• Received an update of the draft Community Safety Action Plan (CSAP)

• Discussed the guiding resolutions and project applications for the annual Call for Projects

• Received a PowerPoint presentation of Tomoka Farms Road (CR 415) and Pioneer Trail (CR 4118) intersection evaluation

• Received the FDOT report and PowerPoint presentation of the FDOT D-5 tentative Work Program for FY 2020/21 to 2024/25. Announced a virtual public hearing will be October 21 -25, 2019 available 24 hours a day via the website (www.d5wpph.com) and a public information outreach meeting scheduled for Thursday, October 24, 2019 from 4:30 pm to 6:30 pm in DeLand

• Received the Volusia County Construction Report; the Flagler County Construction Report was provided in the agenda

• Received TPO staff update on 2045 LRTP Subcommittee and appointed Ms. Amye King, New Smyrna Beach, to the subcommittee; discussed TCC attendance and vacancies; and update of the FDOT D-5 proposed Local Agency Program (LAP) policy

**The next TCC meeting will be on Tuesday, November 19, 2019**

21

Page 22: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Beverly Beach DeBary Flagler Beach New Smyrna Beach Palm Coast South Daytona Bunnell DeLand Flagler County Oak Hill Pierson Volusia County Daytona Beach Deltona Holly Hill Orange City Ponce Inlet Daytona Beach Shores Edgewater Lake Helen Ormond Beach Port Orange

River to Sea TPO Board Meeting Summary

September 25, 2019

• Approved the Consent Agenda including approval of: June 26, 2019 meeting minutes; and the expenditure for CAV Study (Not to exceed $65,000)

• Approved the 2045 Long Range Transportation Plan (LRTP) Public Involvement Plan (PIP) and requested details of 2045 LRTP Subcommittee representatives

• Received a presentation and discussed the draft R2CTPO 2020 Legislative Positions

• Received a presentation of an amendment to the 2040 Long Range Transportation Plan (LRTP)

• Received a presentation of updated Transportation Regional Incentive Program (TRIP) List for the R2CTPO

• Received a PowerPoint presentation of the draft Community Safety Action Plan (CSAP)

• Received a presentation of the Walkability Action Plan and Complete Streets Policy Template

• Received the FDOT report and announced the FDOT D-5 Work Program will be available for public review from October 21, 2019 through October 24, 2019, 24 hours a day at www.d5wpph.com; and announced an informational outreach meeting on Thursday, October 24, 2019 from 4:30 pm to 6:30 pm at the D-5 office in DeLand

• Received the Executive Director’s report including details of Long Range Transportation Plan (LRTP) Subcommittee representatives and directed staff to reach out to advisory committee members in Southeast Volusia to serve on the 2045 LRTP Subcommittee; update on SU funding/Work Program; and the Roundtable of Volusia County Elected Officials and sales tax referendum

• Directed staff to add to the draft R2CTPO 2020 Legislative Positions for funding of driver’s education

The next River to Sea TPO Board meeting will be on Wednesday, October 23, 2019

22

Page 23: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Beverly Beach DeLand Holly Hill Orange City Port Orange Daytona Beach Deltona Lake Helen Ormond Beach South Daytona Daytona Beach Shores Edgewater New Smyrna Beach Pierson Volusia County DeBary Flagler Beach Oak Hill Ponce Inlet

SUMMARY REPORT TO THE RIVER TO SEA TPO BOARD ON THE MEETING OF THE CENTRAL FLORIDA MPO ALLIANCE (CFMPOA)

OCTOBER 11, 2019

• Call to Order – CFMPOA Vice-Chair Roy Tyler, Polk TPO, called the meeting to order, led in the Pledge of Allegiance, and entertained introductions of the CFMPOA representatives. Chairman Tyler invited public comment (no comments were provided).

• Delegation Reports – Chairman Tyler called attention to the delegation reports from each of the member organizations included in the agenda and as handouts provided to each member.

• FDOT District Reports

o Ms. Nicole Mills, FDOT District 1 reminded the group that Work Program Public Hearings are scheduled in all FDOT Districts.

o Ms. Loreen Bobo, FDOT District 5, stated that the virtual Work Program Public Hearing for District 5 was scheduled for the week of October 21-25, 2019 with an in person public hearing on October 24th at the FDOT District 5 Headquarters in DeLand. She informed the group that the program will reflect revised revenues estimates for the State Transportation Trust Fund (STTF) that were reduced as the result of lower revenues from the rental car surcharge and registration fees. She also informed the Alliance members that a LAP Incubator meeting was held to provide input on the proposed LAP Policy being developed by FDOT District 5.

o Mr. Siansi Fine, Florida’s Turnpike Enterprise (FTE), discussed efforts underway to update the Florida Transportation Plan (FTP). He explained that the plan includes 3 main elements, a Vision Plan, a Policy Plan, and an Implementation Plan. He also stated that the FTP is focusing on emerging and trending topics in transportation such as resiliency and technology.

• Action Items

o The board approved the meeting minutes for the May 31, 2019 CFMPOA meeting.

o The board approved the proposed Meeting Schedule for the 2020 calendar year.

o The board approved unanimously the following officers to serve in the upcoming calendar year: Chair – Roy Tyler, Polk TPO; Vice-Chair - Michelle Stone, Ocala/Marion County TPO; Secretary- Cheryl Grieb MetroPlan Orlando

• Presentations/Discussion

o Transportation Regional Incentives Program (TRIP) Funding – Ms. Virginia Whittington, Metroplan Orlando provided a brief overview of the TRIP program discussion that occurred at the previous

23

Page 24: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

CFMPOA Report October 11, 2019 Page 2 of 2

CFMPOA meeting and asked each MPO staff Director to discuss actions they’ve taken to ensure their TRIP lists are current. Several MPO’s updated their lists to include eligible projects only and an agreement was established between Ocala/Marion and Lake-Sumter to provide support for an additional project (new interchange on I-75 at NW 49th Street). FDOT presented general information regarding the TRIP and how project priorities can effectively be communicated to ensure funding is programmed.

o Coast to Coast Update and SUN Trails Update – Ms. Julie Holtzhausen, FDOT District 5, provided an update on activities associated with the development of the Coast-to-Coast trail segments and informed members that the SUN Trail Tier 3 Call for Projects was issued recently. She also let members know that applications would be collected through the new “GAP” online application program being established by FDOT.

o Central Florida Visitor Study– Ms. Taylor Laurent, HDR Consultant representing, FDOT District 5 presented an overview of the Central Florida Visitor Study that examined the impacts of tourism of the 10 counties represented by MPO’s in the CFMPOA. She reviewed the various data and reports available from the study effort. Ms. Laurent addressed a question regarding the inclusion of tourism related employment as part of the study stating that they collected data on employment and residential areas to start the dialogue, but did not conduct commuting analyses as part of the study effort.

o Update on Four Corners Council Project – Mr. Ronnie Blackshear, Polk TPO provided an update of the study effort being led by Polk County. Mr. Raphael Montalvo of the Florida Consensus Resource Center (FCRC) described the development issues presented in the “Four Corners” area with regard to differences in zoning, future land uses, impact fees, decision-making, etc.

• Information Items

o The CFMPOA Chair called attention to the items included in the agenda including the Legislative Positions developed by various CFMPOA member organizations for the 2019 Legislative Session.

• Member Comments

o Member comments were limited.

• Public Comments

o No additional public comments were provided.

River to Sea TPO representatives in attendance included:

Ms. Lois Bollenback, Executive Director of the R2CTPO; Volusia County Councilmember Deb Denys, Deltona City Commissioner Chris Nabicht and the City of DeLand Commissioner, Chris Cloudman

THE NEXT MEETING OF THE CENTRAL FLORIDA MPO ALLIANCE WILL BE ON JANUARY 10, 2020

24

Page 25: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Policy for: TIMEKEEPING & TRAVEL REIMBURSEMENTS

Background Reason for Policy: To establish effective internal controls for the review and oversight of time

sheet reporting and expense reimbursements for R2CTPO staff. This policy and procedure is intended to supplement information included in the R2CTPO Handbook of Employee Policies and Practices (Employee Handbook).

Additional Action Needed: This policy and procedure should be reviewed periodically and incorporated into the R2CTPO Employee Handbook during the next update.

Approval Required: R2CTPO Board

Effective Date: November 1, 2019

Relevant Documents: R2CTPO Employee Handbook, 2 CFR 200.430, 2 CFR 200.303, Section 112.061 Florida Statutes, Executive Director Employment Agreement

Existing Guidance: The R2CTPO Employee Handbook, Section 4 (I) “Timekeeping” addresses the importance of recording time worked and states: “It is the employee’s responsibility to sign their time records to certify the accuracy of all time recorded. The Executive Director will review and then initial the time record before submitting it for payroll processing.” Additionally, 2 CFR 200.430 “Compensation” requires that “federal awards for salaries and wages must be based on records that accurately reflect work performed.” These records must be supported by a system of internal control which provides reasonable assurance that the charges are accurate, allowable, and properly allocated.” The Employee Handbook also addresses Travel Expenses for R2CTPO employees in Section 7 (V). This section allows R2CTPO employees to be reimbursed “for reasonable business travel expenses incurred while on assignments.”

Policy Direction Timekeeping R2CTPO employees, including the Executive Director, document their work related activities by completing timesheets that document weekly activities and submitting these once every two weeks. Completed timesheets shall accurately reflect the time worked each day by task or the holiday, personal time off (PTO), or other authorized options for recording R2CTPO related activity. Detailed descriptions of work activities are listed on the reverse side of the timesheets to document work progress, training, meeting attendance, travel and other activities. This information is used to develop progress reports that accompany billing invoices. When completed, employees sign their timesheets and submit them to the Chief Financial Officer (CFO) for review of funding availability, allowable charges and availability of PTO. Upon satisfactory review, the CFO initials each timesheet and provides them to the Executive Director to review for accuracy, allowable charges and detailed work activity. Once completed, the Executive Director signs and returns timesheets to the CFO for processing.

Timesheets of the Executive Director will be submitted to the CFO to review for funding availability, allowable charges and availability of PTO. Upon satisfactory review, the CFO will initial the timesheet and provide to a senior staff member to screen for completeness and accuracy. Upon completion of their review, the staff member will sign the timesheet and return to the CFO.

On a monthly basis, the CFO will meet with the R2CTPO Board Chair to review completed timesheets of the Executive Director. The review will involve screening a sample of timesheets for timely submission, accuracy and consistency of work detail. The Board Chair will address any irregularities with the Executive Director and/or the CFO as appropriate. Once completed, the

25

Page 26: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Board Chair will sign the timesheets that were reviewed and will report completion of the review to the Executive Committee and Board. The 1st Vice-Chair may also complete the review if the Board Chair is unavailable.

Travel Expense Reimbursement The R2CTPO reimburses employees for reasonable business travel expenses incurred while on assignment in support of R2CTPO activities. The R2CTPO uses funds provided by the Florida Department of Transportation (FDOT) to cover a portion of the travel costs. Travel costs being reimbursed by FDOT from grant funds must conform to the requirements of Section 112.061, Florida Statutes, Chapter 69I-42, F.A.C., Department of Financial Services Reference Guide for State Expenditures, FDOT Disbursement Handbook, any policies issued by the FDOT and the terms of any contracts the R2CTPO has with the FDOT.

Extended business travel includes work assignments outside the R2CTPO planning area that are longer than a single day involving overnight accommodations, registration fees and, possibly, airfare. All extended business travel for employees must be approved in advance by the Executive Director and the CFO. Requests are to be submitted using the R2CTPO Travel Form. Extended travel requests for the Executive Director must be approved in advance by the R2CTPO CFO and Board Chair or 1st Vice-Chair if the Chair is unavailable.

When travel is complete, employees should submit a completed travel expense report within 7 calendar days. Completed reports will be submitted using the R2CTPO Travel Form and FDOT Contractor Travel Form (#300-00-06)and must include receipts for all individual expenses submitted for reimbursement as well as relevant information such as conference agendas. Completed travel reports will be submitted to the CFO for review. The CFO will review for completeness and accuracy. Upon satisfactory review, the CFO will sign the report and provide it to the Executive Director for review and approval.

Extended business travel completed by the Executive Director should be reported on the R2CTPO Travel Form and FDOT Contractor Form (#300-00-06). Completed forms will be submitted to the CFO for review within 7 calendar days of completing a trip. The CFO will review for completeness and accuracy. Upon satisfactory review, the CFO will sign the report and provide it to the Board Chair for review and approval. The 1st Vice-Chair may also complete the review if the Board Chair is unavailable.

Single day travel expenses may be incurred within or outside of the R2CTPO planning area. Reimbursement for travel expenses such as personal vehicle mileage, tolls, and commuter rail boarding is provided for R2CTPO employees. Expenses for single day travel are not required to be approved in advance. These expenses are submitted on the FDOT Contractor Travel Form (#300-000-06) which should be submitted at least monthly. Completed travel forms will be submitted to the R2CTPO CFO for review. The CFO will review for completeness and accuracy. Upon satisfactory review, the CFO will sign the report and provide it to the Executive Director for review and approval.

Single day travel expenses incurred by the Executive Director are reimbursed for travel outside the R2CTPO planning area (as established in the Executive Director Employee Agreement). These expenses are submitted on the FDOT Contractor Travel Form (#300-000-06) which must be submitted to the Board Chair or 1st Vice-Chair if the Chair is unavailable for review and approval at least monthly.

Authorized by: Name / Position: Robert Gilliland, River to Sea TPO Chairperson (per Board Action ____________ )

Signature: Date:

26

Page 27: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

MEETING SUMMARY

TPO BOARD OCTOBER 23, 2019

V. ACTION ITEMS

A. REVIEW AND APPROVAL OF RESOLUTION 2019-18 AMENDING THE 2040 LONG RANGE

TRANSPORTATION PLAN (LRTP)

Background Information:

The River to Sea TPO is seeking to amend the 2040 LRTP to reflect updated funding for the following three (3) projects as included in the updated Florida Department of Transportation (FDOT) Strategic Intermodal System (SIS) Long Range Cost Feasible Plan dated June 25, 2018:

• I-95 at US 1 Interchange Modifications: This project includes proposed improvements to the

interchange at I-95 and US 1. This project is being proposed to be moved from the 2040 LRTP Unfunded Needs List to the Strategic Intermodal Systems (SIS) Cost-Feasible Projects List

• SR 40 Widening from Cone Road to SR 11: Advancing funding from years 2031-40 of the 2040 LRTP to years 2026-30 on the SIS Cost Feasible Projects List

• SR 40 Widening from SR 11 to SR 15 (US 17): Advancing funding from years 2031-40 of the 2040 LRTP to years 2026-30 on the SIS Cost Feasible Projects List

Since adoption of the 2040 LRTP in January 2016, the Florida Department of Transportation (FDOT) updated their long range revenue estimates and updated the “cost feasible” SIS plan that extends out to the year 2045. In that updated plan, funding for the three projects was identified. The interchange project was identified as needed, but unfunded, in the TPO plan.

In addition, as a result of new requirements for transportation planning and Transportation Performance Management (TPM), the TPO is also required to develop an amendment that incorporates the new planning requirements and performance measures into the LRTP. Resolution 2019-18 and 2040 LRTP Amendment #2 are provided with this agenda packet for your review and approval.

ACTION REQUESTED:

MOTION TO APPROVE RESOLUTION 2019-18 AMENDING THE 2040 LONG RANGE TRANSPORTATION PLAN (LRTP)

27

Page 28: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION

RESOLUTION 2019-18

RESOLUTION OF THE RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION AMENDING THE 2040 LONG RANGE TRANSPORTATION PLAN (LRTP) TO REFLECT UPDATED FUNDING OF

THE I-95 INTERCHANGE AT US 1 AND WIDENINGS ON SR 40 AND TO INCLUDE NEW REQUIREMENTS FOR TRANSPORTATION PLANNING AND TRANSPORTATION PERFORMANCE

MANAGEMENT (TPM)

WHEREAS Florida Statutes 339.175; 23 U.S.C. 134; and 49 U.S.C. 5303 require that the urbanized area, as a condition to the receipt of federal capital or operating assistance, have a continuing, cooperative, and comprehensive transportation planning process that results in plans and programs consistent with the comprehensively planned development of the urbanized area; and

WHEREAS, the River to Sea Transportation Planning Organization (TPO) is the duly

designated and constituted body responsible for carrying out the urban transportation planning and programming process for Volusia County and portions of Flagler County inclusive of the cities of Flagler Beach, Beverly Beach, and portions of Palm Coast and Bunnell; and

WHEREAS, Florida Statutes 339.175; 23 U.S.C. 134; and 49 U.S.C. 5303; and 23 CFR 450.324(a)

require that each metropolitan planning organization shall prepare and update a transportation plan for its metropolitan planning area that addresses at least a 20-year planning horizon; the River to Sea TPO’s 2040 LRTP has developed a 25-year planning horizon plan; and

WHEREAS, 23 CFR 450.324(g)(11) requires that each long range transportation plan include

a financial plan that demonstrates how the adopted transportation plan can be implemented; and

WHEREAS, 23 C.F.R. 450.306 establishes the planning factors that must be considered by each metropolitan planning organization in the development of a long range plan; and

WHEREAS, the River to Sea TPO Board is seeking to amend the 2040 LRTP to reflect updated

funding for one interchange project on I-95, two road widenings on SR 40 and incorporate new planning rule requirements; and

WHEREAS, the River to Sea TPO has solicited public comment on the proposed amendment

during a public review period meeting the required 30 days as prescribed in Chapter 10 of the adopted plan; and

WHEREAS, after due consideration of the recommendations of its staff and advisory

committees and input from the public, the board has determined that approval of these amendments are necessary and/or appropriate.

NOW, THEREFORE, BE IT RESOLVED, by the River to Sea TPO that:

28

Page 29: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Resolution 2019-18 Page 2

1. The River to Sea TPO’s 2040 LRTP is hereby amended as described below and more particularly shown in "Amendment 2":

a. Moving the I-95 Interchange at US 1 from the Unfunded SIS Needs Projects List (Table 32) to the SIS Cost-Feasible Projects List (Table 28);

b. Advancing funding of the SR 40 Widening from Cone Road to SR 11 from years 2031-40 of the 2040 LRTP to years 2026-30 on the SIS Cost-Feasible Projects List (Table 28);

c. Advancing funding of the SR 40 Widening from SR 11 to SR 15 (US 17) from years 2031-40 of the 2040 LRTP to years 2026-30 on the SIS Cost-Feasible Projects List (Table 28);

d. Incorporating FAST ACT requirements into the 2040 LRTP (Appendix N).

2. The Chairperson of the River to Sea TPO (or his designee) is hereby authorized and directed to submit the 2040 LRTP as amended to the:

a. Florida Department of Transportation; b. Federal Transit Administration (FTA) (through the Florida Department of

Transportation); and the c. Federal Highway Administration (FHWA) (through the Florida Department of

Transportation).

DONE AND RESOLVED at the regular meeting of the River to Sea TPO held on the 23rd day of October 2019.

RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION

Daytona Beach COMMISSIONER ROBERT GILLILAND CHAIRPERSON, RIVER TO SEA TPO

CERTIFICATE:

The undersigned, duly qualified and acting Recording Secretary of the River to Sea TPO, certifies that the foregoing is a true and correct copy of a resolution adopted at a legally convened meeting of the River to Sea TPO held on October 23, 2019.

ATTEST:

DEBBIE STEWART, RECORDING SECRETARY

RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION

29

Page 30: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

1

30

Page 31: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

2

Table 2 – 2040 LRTP SIS Cost Feasible Project List

Map

No.

Funding

Period Facility From To Total1 Cost

1 2026-30 I-4 widen to 10 lanes (I-4

Beyond the Ultimate)2 Seminole County SR 472 $644.38

2 2026-30 SR 472 widen from 4 to 6

lanes2 Graves Ave Kentucky/ MLK Blvd $62.34

3 2026-30 Saxon Blvd Ramp/Roadway2 I-4 Normandy Blvd $54.49

4 2026-30 Rhode Island Extension2 Veterans Memorial Normandy Blvd $53.70

5 2031-40 SR 15 (US 17) widen to 4 lanes Ponce De Leon Blvd SR 40 $77.62

6* 2031-40 SR 40 – widen to 6 lanes Williamson Blvd Breakaway Trails $59.93

7 2031-40

2026-30 SR 40 – widen to 4 lanes Cone Rd SR 11 $83.6686.70

8 2031-40

2026-30 SR 40 – widen to 4 lanes SR 11 SR 15 (US 17) $72.3975.75

9* 2031-40 SR 100 – widen to 6 lanes Old Kings Rd Belle Terre Parkway $66.60

10 2031-40 I-95 Interchange (Farmton)3 @ Maytown Rd

11 2031-40 I-95 Interchange/LPGA Blvd

Modifications Williamson Blvd Tymber Creek Ext. $32.50

12 2031-40 I-95 /Pioneer Trail New

Interchange @ Pioneer Trail $30.06

13 2031-40 I-95/US 1 Interchange

Modifications @ US 1 $59.20

TOTAL BY YEAR OF EXPENDITURE (YOE) $1,237.671,303.27

Abbreviations: PE/PD&E (Preliminary Engineering/Project Development and Environment); ROW (right of way); CST (construction); YOE (year of expenditure) Notes: 1 In millions; inflated from Present Day Costs (PDC) to year of expenditure (YOE) dollars per Revenue Forecast Handbook 2 Part of the I-4 Beyond the Ultimate Project 3 Developer Funded - $12.9 million (provided for informational purposes) * Funded in Other Arterial Category, not in FDOT’s SIS Cost Feasible

Amendment 1: Per Resolution 2019-01, the 2040 LRTP was amended by the River to Sea TPO Board on January 23, 2019, moving two projects, #11 and 12, from the Unfunded Needs List (Table 3) to the SIS Cost-Feasible Projects List (above) Amendment 2: Per Resolution 2019-##, the 2040 LRTP was amended by the River to Sea TPO Board on XX, 2019, advancing funding for two projects, #7 and 8, from years 2031-40 to years 2026-30; and moving project #13 from the Unfunded Needs List (Table 3) to the SIS Cost-Feasible Projects List (above)

31

Page 32: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

3

Table 3 – SIS Needs Projects

Project Limits Est. Present Day Cost

(in millions) Notes

SR 15 (US 17) Preliminary Design and Engineering (PD&E)

SR 40 to Putnam Co. Line

$2.00 Safety Study

I-95/US 1 Interchange Modifications

At I-95 & SR 5 (US 1) $28.00 Interchange Improvements (Safety & Capacity)

I-95/SR 44 Interchange Modifications

At I-95 & SR 44 $15.00 Interchange Improvements (Safety & Capacity)

Amendment 1: Per Resolution 2019-01, the 2040 LRTP was amended by the River to Sea TPO Board on January 23, 2019, moving two projects, I-95 @ LPGA and I-95 @ Pioneer Trail, from the Unfunded Needs List (above) to the SIS Cost-Feasible Projects List (Table 2)

Amendment 2: Per Resolution 2019-##, the 2040 LRTP was amended by the River to Sea TPO Board on XX, 2019, moving the I-95/US 1 Interchange modifications project from the Unfunded Needs List (above) to the SIS Cost-Feasible Projects List (Table 2)

32

Page 33: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

33

Page 34: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

34

Page 35: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Table 28 – 2040 LRTP SIS Cost Feasible Projects List (State/Federal Funding)

Map No.

Facility

From

To

Source ROW Cost1

CST Cost1 Project

Cost1

2019-20202

2021-20252

2026-20302

2031-20402 Y.O.E.

Project Cost Total2 (PDC) (PDC) (PDC) ROW CST ROW CST ROW CST ROW CST

1 I-4 widen to 10 Lanes (I-4

Beyond the Ultimate)3 Seminole County

SR 472

SIS

$46.36

$372.07

$418.43

$71.39

$572.99

$644.38

2 SR 472 widen from 4 to 6 lanes3 Graves Ave Kentucky/MLK Blvd SIS

$40.484 $40.48

$62.34

$62.34

3 Saxon Blvd Ramp/Roadway3 I-4 Normandy Blvd SIS

$35.384 $35.38

$54.49

$54.49

4 Rhode Island Extension3 Veterans Memorial Normandy Blvd SIS

$34.874 $34.87

$53.70

$53.70

5 SR 15 (US 17) widen to 4 lanes

Ponce De Leon Blvd SR 40 SIS

$39.40 $39.40

$77.62 $77.62

6 SR 40 - widen to 6 lanes Williamson Blvd Breakaway Trails SIS $7.43 $22.99 $30.42

$14.64 $45.29 $59.93

7 SR 40 - widen to 4 lanes Cone Rd SR 11 SIS $2.30 $41.50 $43.80

$2.00

$84.70 $4.39 $79.27 $83.66 86.70

8 SR 40 - widen to 4 lanes SR 11 SR 15 (US 17) SIS $7.50 $30.40 $37.90

$2.85

$72.90 $14.33 $58.06 $72.39 75.75

9 SR 100 - widen to 6 lanes Old Kings Rd Belle Terre Parkway SIS $3.17 $31.70 $34.87

$6.05 $60.55 $66.60

10 I-95 Interchange (Farmton Interchange)5 At Maytown Rd

SIS

11 I-95/LPGA Blvd Interchange Modifications Williamson Blvd Tymber Creek Ext. SIS

$20.00 $20.00

$32.50 $32.50

12 I-95/Pioneer Trail New Interchange At Pioneer Trail

SIS

$18.50 $18.50

$30.06 $30.06

13 I-95/US 1 Interchange Modifications At US 1

SIS

$32.20

$59.20 $59.20

Notes: 1 In millions; shown in present day costs (PDC)/”constant” 2013, 2014 or 2015 dollars (Added projects 11 & 12 are in 2017 dollars) 2 In millions; inflated to year of expenditure (YOE) dollars per Revenue Forecast Handbook 3 Part of the I-4 Beyond the Ultimate Project 4 Cost estimates were sourced from the FDOT SR 400 (I-4) PD&E Study, Preliminary Engineering Report for I-4 Beyond the Ultimate, Segment 4 (December 2014) 5 Developer Funded - $12.9 million (informational purposes) Amendment 1: Per Resolution 2019-01, the 2040 LRTP was amended by the River to Sea TPO Board on January 23, 2019, moving two projects, # 11 and 12, from the Unfunded Needs List (Table 32) to the SIS Cost-Feasible Projects

$754.05

$0.00

$0.00

$0.00

$0.00

$71.39

$743.51

$39.41

$383.35

Total By Period

$0.00

$0.00

$814.91

$422.76

$1,237.671,303.27

List (above) Amendment 2: Per Resolution 2019-##, the 2040 LRTP was amended by the River to Sea TPO Board on XX, 2019, for two projects, #7 and 8, advancing ROW funding from years 2031-40 to years 2021-25 and advancing CST funding from years 2031-40 to years 2026-30; and moving project #13 from the Unfunded Needs List (Table 32) to the SIS Cost-Feasible Projects List (above)

Page | 67

35

Page 36: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Table 32 – SIS Needs Projects1

Project Limits Est. Present Day Cost

(in millions) Notes

SR 15 (US 17) Preliminary Design and Engineering (PD&E)

SR 40 to Putnam Co. Line

$2.00

Safety Study

I-95/US 1 Interchange Modifications

At I-95 & SR 5 (US 1)

$28.00

Interchange Improvements/Safety & Capacity

I-95/SR 44 Interchange Modifications

At I-95 & SR 44

$15.00

Interchange Improvements/Safety & Capacity

1 Unfunded Amendment 1: Per Resolution 2019-01, the 2040 LRTP was amended by the River to Sea TPO Board on January 23, 2019, moving two projects, I-95 Interchange at LPGA and I-95 interchange @ Pioneer

Trail, from the Unfunded Needs List (above) to the SIS Cost-Feasible Projects List (Table 28). Amendment 2: Per Resolution 2019-##, the 2040 LRTP was amended by the River to Sea TPO Board on XX, 2019, moving the I-95/US 1 Interchange modifications project from the Unfunded Needs List (above) to the SIS Cost-Feasible Projects List (Table 28)

Page | 74

36

Page 37: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

37

Page 38: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Background of the Transportation Planning Rule

Pursuant to the Moving Ahead for Progress in the 21st Century Act (MAP-21) Act enacted in 2012 and the Fixing America's Surface Transportation (FAST) Act enacted in 2015, state Departments of Transportation (DOTs) and Metropolitan/Transportation Planning Organizations (M/TPOs) must incorporate certain planning activities into the planning processes of the organization and they must apply a transportation performance management approach in carrying out their federally required transportation planning and programming activities.

On May 27, 2016, the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) issued the Statewide and Nonmetropolitan/Metropolitan Transportation Planning Final Rule (The Planning Rule). This rule details how state DOTs and MPOs must implement new MAP-21 and FAST Act transportation planning requirements, including the incorporation of new planning factors, planning activities and transportation performance management provisions. Additional guidance has been provided by the FHWA Florida Division and the Florida DOT Office of Policy Planning.

Long Range Planning Activities

During development of the 2040 LRTP, the River to Sea TPO considered eight planning factors as established by federal requirements. Goals established in the plan were linked to these planning factors (See Chapter 2 – Table 2, Page 13). At that time, the new planning rules had been established, however, guidance had not been provided regarding the implementation of these new requirements. The new planning factors include:

Improve the resiliency and reliability of the transportation system and reduce or mitigate stormwaterimpacts of surface transportation

Enhance travel and tourism

Additional planning activities are also required by the new planning rule. These include:

Incorporating intermodal facilities that support intercity transportation, including intercity buses andintercity bus facilities and commuter vanpool providers.

Including public ports and intercity bus operators, and employer-based commuting programs, such ascarpool or vanpool programs, transit benefit programs, parking cash-out programs, shuttle programs,or telework programs, to the list of interested parties for the MPO’s Public Participation Plan.

Add tourism and natural disaster risk reduction agencies to the list of agencies the MPO should consultwith when developing the LRTP and TIP.

The following few sections of this appendix address the planning factors, as well as the additional planning considerations as they’ve been incorporated into the planning activities of the River to Sea TPO.

Improving Resiliency and Reliability

The River to Sea TPO planning area is shaped by the presence of water; the Atlantic Ocean, Intracoastal Waterway, St. Johns River and numerous canals, springs and lakes weave through our communities. Proximity to these beautiful waterways is what attracts many of us to live here and encourages so many others to visit. In planning for our communities, it’s important that we monitor, predict, plan for, and live with the water that surrounds us.

Page 1 of 1338

Page 39: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

In October 2016, the coastal area was hit by Hurricane Matthew. The resulting storm surge caused significant damage to SR A1A in Flagler County and northern Volusia County, which left the road impassable in many locations. Emergency management organizations responded immediately to secure the area. FDOT also worked quickly to stabilize the shoreline, construct temporary travel lanes and re-open the road in record time. The damage caused by Hurricane Matthew and the subsequent response provide a valuable example of effective cooperation, communication and action.

Severe weather events are predicted to become more commonplace in future years. If these predictions are correct, the strength and success of our community will be defined by our ability to respond effectively to unpredictable and potentially disruptive events. Severe weather events include flooding from rising tides and extreme rainfall, significant fluctuations in temperature, high winds, heatwaves, droughts and windstorms (including tornadoes and tropical storms). The consequences of these events can include damage and deterioration of existing infrastructure, interference with evacuation plans, reduced effectiveness of storm water systems, limited access to property and reduced bridge clearances for vessels. Preparing for future events will require adaptation and resiliency. Adaptation involves changing or modifying our community to suit new conditions in order to reduce potential negative effects. Resiliency is the ability to anticipate, prepare for, and withstand changing conditions and recover rapidly from disruptions.

Creating more adaptive and resilient communities will require a variety of actions involving planning efforts, infrastructure changes, operations and response activities, and proactive governance. The River to Sea TPO has been proactive in addressing issues of transportation resiliency and reliability including the following activities:

Project Ranking Criteria in the 2040 LRTP (January 2016) – Emergency evacuation in response to crisis events has been an emphasis area for the River to Sea TPO for many years. In the assessment of prioritization of projects considered for the 2040 LRTP, the TPO considered additional weighting for improvements to evacuation routes identified by local emergency agencies (see Chapter 6, Table 21 and Appendix I).

2016 Sea Level Rise Vulnerability Assessment (August 2016) – In partnership with the East Central Florida Regional Planning Council, the River to Sea TPO completed an initial and conservative assessment of the potential vulnerabilities of the planning area for issues associated with sea level rise.

River to Sea TPO Fiscal Year 2015/16 Annual Report (December 2016) – In a follow-up to coastal damage resulting from flooding and storm surge, the annual report was used as a mechanism to promote awareness of resiliency and system reliability.

River to Sea TPO Annual Planning Retreat (March 3, 2017) - In partnership with Volusia/Flagler Association for Responsible Development (V/FCARD), the River to Sea TPO held a planning workshop to discuss transportation issues associated with sea level rise.

2017 Resilient Volusia County Assessment (September 2017) - In partnership with the East Central Florida Regional Planning Council, the River to Sea TPO analyzed impact areas resulting from 100-year coastal flooding levels inclusive of storm surge based on sea level rise projections from the Sea Level Scenario Sketch Planning Tool, identified a resiliency stakeholder working group, and identified implementation strategies and educational materials to enhance community resiliency.

2018 Resilient Flagler County Assessment (September 2018) - In partnership with the Northeast Florida Regional Council, the River to Sea TPO analyzed impact areas resulting from 100-year coastal

Page 2 of 1339

Page 40: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

flooding levels inclusive of storm surge based on sea level rise projections from the Sea Level Scenario Sketch Planning Tool, identified a resiliency stakeholder working group, and identified implementation strategies and educational materials to enhance community resiliency.

Interagency Partnering (Ongoing) – The River to Sea TPO continues to partner with local Emergency Management agencies/departments, local governments, regional planning councils, and other agencies that meet periodically to review and assess resiliency efforts.

Incorporation of Resiliency in Project Ranking Criteria (January 2019) – In updates currently being considered by the TPO transportation improvement projects that address resiliency have been added to the project application criteria used to rank projects during the annual call for projects.

Enhancing Travel and Tourism

Tourism represents a significant portion of the local and state economy. The River to Sea TPO has considered tourism as an integral part of the transportation planning efforts of the organization and actively partners with local tourism agencies during the development of the LRTP. The following activities represent the efforts of the River to Sea TPO to ensure transportation matters involving travel and tourism are considered in the transportation planning activities of the TPO:

Considerations in the 2040 LRTP (January 2016)o Project Ranking Criteria for access and connectivity to Activity Centers has been an emphasis

area for the River to Sea TPO for many years. In the assessment of prioritization of projects considered for the 2040 LRTP, the TPO considered additional weighting for multimodal improvements to corridors providing access to designated activity centers.

o Presentations and Stakeholder involvement for agencies directly related to tourism such as the Convention and Visitors Bureau and the Lodging & Hospitality Association.

Partnering with the Lodging & Hospitality Association in the dissemination of the “Tell the TPO Survey” Presentations regarding Tourism in Transportation to the River to Sea TPO Board and the International

Speedway Boulevard Coalition Participation and support in various events such as: the Annual Tourism and Travel Recognition

Celebration and the Annual Bike Florida Tour event. Participation in the Central Florida Regional Visitor Study (estimated completion Spring 2019)

Additional Planning Considerations

The River to Sea TPO recognizes the value of integrating additional planning considerations into the planning activities of the organization. The following information outlines the planning activities pursued by the River to Sea TPO with regards to the planning considerations.

Incorporating Intermodal Facilities

Intercity Bus, Intercity/Commuter Rail and Commuter Vanpools are important elements in supporting a healthy transportation system. These services provide important intercity travel choices for residents and visitors. They also help play a role in reducing congestion, pollution, and energy consumption through automobile vehicle trip reductions, fuel savings and lower emissions. Identifying intermodal facilities that support intercity transportation, including intercity buses, intercity bus facilities and commuter vanpool

Page 3 of 1340

Page 41: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

providers can be important to the long term success of these services. The River to Sea TPO has been engaged in efforts to support these services as follows:

Participation in the Intermodal Transit Station Study (March 2014) – Completed by Florida Department of Transportation (FDOT) in collaboration with Votran, the City of Daytona Beach, Volusia County, International Speedway Boulevard (ISB) Coalition and other stakeholders to support the development of an integrated multimodal transportation system which is economically efficient and safely moves people and goods in an energy-efficient manner.

Considerations were included in the 2040 LRTP (January 2016) - In the assessment of prioritization of projects considered for the 2040 LRTP, the TPO considered additional weighting for projects that improved access and connectivity to the Designated Intermodal Terminal.

Partnering with ReThink Your Commute (Ongoing) – The River to Sea TPO collaborates with reThink Your Commute to promote ridesharing transportation solutions and to incorporate ride sharing into the planning processes of the TPO.

Participation in the Volusia County Transit Connector Study (February 2017) - Completed by FDOT in collaboration with Votran, Volusia County, and other stakeholders to evaluate the potential for developing a premium transit connection between SunRail and Daytona Beach (including a multimodal hub).

Outreach to various providers (Ongoing) – The R2CTPO maintains an open dialogue with existing service providers such as SunRail, Greyhound, and Daytona Beach International Airport as well as potential service providers such as Brightline.

Expanding the Stakeholders in Public Participation

Additional planning considerations include involving intercity bus operators and commuting programs such as carpool or vanpool programs in the planning activities of the TPO and adding them to the list of interested parties as part of the TPO’s Public Participation Plan. Public outreach requirements also include adding tourism and natural disaster risk reduction agencies to the list of agencies the MPO should consult with when developing the LRTP.

As stated previously, the River to Sea TPO has routinely collaborated with reThink Your Commute, with the Lodging & Hospitality Association and with the Convention and Visitors Bureau on planning activities, including the development of the 2040 LRTP. These activities are documented in Chapter 5 of the 2040 LRTP titled “Public Outreach” and in Appendix E. As a key component of the local economy, tourism activities (including the employees who support the industry) are central to many of the transportation considerations in the planning area. The TPO has also worked with emergency management teams from Volusia and Flagler Counties as part of resiliency planning efforts. Members of emergency management are also represented on the Technical Coordinating Committee, an advisory committee of the TPO board. The TPO has had limited communication with intercity bus providers who often communicate with FDOT Central Office staff regarding state-wide planning needs and capital funding opportunities.

Long range transportation planning activities will begin in 2019 as the River to Sea TPO updates the metropolitan transportation plan and extends the planning horizon to the year 2045. The update will continue to build on previous practices of the TPO in considering the added planning factors of resiliency and tourism. In keeping with the spirit and intent of the FAST Act, the public outreach activities will be expanded and more clearly documented to demonstrate the inclusion of interested parties such as intercity bus operators, commuter program managers, tourism agencies and natural disaster risk reduction agencies.

Page 4 of 1341

Page 42: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Transportation Performance Management

Performance Management is a strategic approach to connect investment and policy decisions in order to help achieve performance goals. Performance measures are quantitative criteria used to evaluate progress. Performance measure targets are the benchmarks against which collected data is gauged. The Moving Ahead for Progress in the 21st Century Act (MAP-21) required State DOTs and MPOs to conduct performance-based planning by tracking performance measures and setting data-driven targets to improve those measures. Performance-based planning ensures the most efficient investment of federal transportation funds by increasing accountability, transparency, and providing for better investment decisions that focus on key outcomes related to national goals including:

Improving Safety;

Maintaining Infrastructure Condition;

Reducing Traffic Congestion;

Improving the Efficiency of the System and Freight Movement;

Protecting the Environment; and,

Reducing Delays in Project Delivery.

Fixing America’s Surface Transportation (FAST) Act supplements the MAP-21 legislation by establishing timelines for State DOTs and MPOs to comply with the requirements of MAP-21. State DOTs are required to establish statewide targets and MPOs have the option to support the statewide targets or adopt their own.

There are several milestones related to the required content of the System Performance Report:

In any LRTP adopted on or after May 27, 2018, the System Performance Report must reflect Highway Safety (PM1) measures;

In any LRTP adopted on or after October 1, 2018, the System Performance Report must reflect Transit Asset Management measures

In any LRTP adopted on or after May 20, 2019, the System Performance Report must reflect the Bridge Condition Measures and Pavement Condition Measures (PM-2) and the System Performance Measures (travel time reliability, PM-3)

The River to Sea TPO recognizes the importance of linking goals, objectives, and investment priorities to stated performance objectives, and that establishing this link is critical to the achievement of national transportation goals and statewide and regional performance targets. As such, the LRTP directly reflects the goals, objectives, performance measures, and targets as they are described in other public transportation plans and processes, including:

Project Ranking Criteria in the 2040 LRTP (January 2016) – Improving transportation safety has beenan emphasis area for the River to Sea TPO for many years. In the assessment of prioritization ofprojects considered for the 2040 LRTP, the TPO considered additional weighting for improvementsthat address safety concerns on the transportation network (see Chapter 2 and 6 of the 2040 LRTP).

Incorporation of Measures in Project Ranking Criteria (Ongoing) – The TPO has a long history ofemphasizing safety in the prioritization of transportation projects as a weighted factor in the criteriaused to rank projects during the annual call for projects.

Interagency Partnering (Ongoing) – For many years, the River to Sea TPO has participated in variouspartnerships to promote safety awareness and to identify and address safety concerns throughout thecommunity. This includes involvement in the Community Traffic Safety Teams and Safe Kids Coalition.

Page 5 of 1342

Page 43: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Congestion Management Process and Plan (October 2018) - The congestion management process requires the establishment and use of a coordinated, performance-based approach to transportation decision-making to support national goals for the federal-aid highway and public transportation programs. In addition to congestion resulting from traffic volume, this report incorporated additional transportation measures used in performance management.

Roadway Safety Evaluation & Improvement Study (September 2018) – Building upon a crash analysis performed in 2017, this study developed a process to identify and mitigate the causes of crashes at high crash locations throughout the planning area.

Safety Performance Measures (PM-1)

Safety is the first national goal identified in the FAST Act. In March of 2016, the Highway Safety Improvement Program (HSIP) and Safety Performance Management Measures Rule (Safety PM Rule) was finalized and published in the Federal Register. The rule requires MPOs to set targets for the following safety-related performance measures and report progress to the State DOT:

Fatalities;

Serious Injuries;

Nonmotorized Fatalities and Serious Injuries;

Rate of Fatalities per 100M Vehicle Miles Traveled (VMT); and

Rate of Serious Injuries per 100M VMT.

The 2016 Florida Strategic Highway Safety Plan (SHSP) is the statewide plan focusing on how to accomplish the vision of eliminating fatalities and reducing serious injuries on all public roads. The SHSP was developed in coordination with Florida’s 27 metropolitan planning organizations (MPOs) through Florida’s Metropolitan Planning Organization Advisory Council (MPOAC). The SHSP development process included review of safety- related goals, objectives, and strategies in MPO plans. The SHSP guides FDOT, MPOs, and other safety partners in addressing safety and defines a framework for implementation activities to be carried out throughout the state.

The Florida SHSP and the Florida Transportation Plan (FTP) both highlight the commitment to a vision of zero deaths. The FDOT Florida Highway Safety Improvement Program (HSIP) Annual Report documents the statewide interim performance measures that move the state toward the vision of zero deaths. The River to Sea Transportation Planning Organization has had a longstanding commitment to improving transportation safety, which is demonstrated through planning and programming activities. Activities included in the Unified Planning Work Program (UPWP), such as the completion of school safety studies for all elementary and middle schools within the planning area, pedestrian law enforcement training and exercises, health and safety partnerships with local agencies, participation on the Community Traffic Safety Teams and helmet distribution programs, have led to increased safety awareness and project specific recommendations to reduce injuries and fatalities throughout the planning area.

In January 2018, the River to Sea TPO adopted safety performance targets in support of FDOT’s 2018 safety targets. The TPO targets include a decrease in each of the safety measurements of 2% per year. In order to achieve the reduction established by the safety targets, the TPO has evaluated projects that fall into specific investment categories established by the TPO in the project application, evaluation, and ranking process. The River to Sea TPO recognizes the limitations of their role in affecting transportation safety. At this point, the TPO has not set long range targets for crash reduction, but has signaled support for the FDOT goal of zero.

Page 6 of 1343

Page 44: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

The TPO has long utilized an annual project ranking criteria that identifies and prioritizes projects aimed at improving transportation safety. The ranking criteria are updated annually and are included in the appendices of the TIP. Going forward, the project evaluation and prioritization processes used in the LRTP and the TIP will continue to use a data-driven strategy that considers stakeholder input to evaluate projects that have an anticipated effect of reducing both fatal and injury crashes. The following information reflects the data and goals approved by the River to Sea TPO in January 2018.

Fatalities: This target reflects a two percent (2%) annual reduction in the number of fatalities from the year 2016. This sets a target of reducing the annual fatalities to 136 with a resulting five-year rolling average of 123.3 in 2018.

Number: 136

5-Year Rolling Average: 123.3

Serious Injuries: This target reflects a two percent (2%) annual reduction in the number of serious injuries from the year 2016. This sets a target of reducing the annual serious injuries to 743 with a five-year rolling average of 722.0 in 2018.

Number: 743

5-Year Rolling Average: 722.0

Fatalities Rate*: This target reflects a two percent (2%) annual reduction in the fatalities rate from the year 2016. This sets a target of reducing the fatality rate to 1.929 with a five-year rolling average of 1.783 in 2018.

Number: 1.929

5-Year Rolling Average: 1.783

Serious Injuries Rate*: This target reflects a two percent (2%) annual reduction in the serious injuries rate from the year 2016. This sets a target of reducing the serious injuries rate to 10.343 with a five-year rolling average of 10.256 in 2018.

Number: 10.343

5-Year Rolling Average: 10.256

Non-Motorized Serious Injuries and Fatalities: This target reflects a two percent (2%) annual reduction in the number of non-motorized serious injuries and fatalities from the year 2016. This sets a target of reducing the non-motorized serious injuries and fatalities to 108 with a five-year rolling average of 102.9 in 2018.

Number: 108

5-Year Rolling Average: 102.9

*VMT specific to the planning area is not currently available, which includes all of Volusia County and a portion of Flagler County. As such, the fatalities rate was calculated using the data available for the entirety of Volusia and Flagler County, pending the provision of data at the planning area level.

The TPO’s goal of reducing fatal and serious injury crashes is linked to the LRTP and the TIP and the process used in prioritizing the projects is consistent with federal requirements.

Page 7 of 1344

Page 45: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Transit Asset Performance Measures

On July 26, 2016, FTA published the final Transit Asset Management rule. This rule applies to all recipients and sub-recipients of Federal transit funding that own, operate, or manage public transportation capital assets. The rule defines the term “state of good repair,” requires that public transportation providers develop and implement Transit Asset Management (TAM) plans, and establishes state of good repair standards and performance measures for four asset categories as shown in the following table. The rule became effective on October 1, 2018.

Asset Category Performance Measure

Equipment Percentage of non-revenue, support-service and maintenance vehicles that have met or exceeded their useful life benchmark

Rolling Stock Percentage of revenue vehicles within a particular asset class that have either met or exceeded their useful life benchmark

Infrastructure Percentage of track segments with performance restrictions

Facilities Percentage of facilities within an asset class rated below condition 3 on the TERM scale

To support progress towards TAM performance targets, transit investment and maintenance funding in the River to Sea TPO 2040 LRTP totals $265.9 million, approximately 14 percent of total LRTP funding. In addition, the TPO allocates 30% of the Transportation Management Area (TMA) funding or roughly $31 million to assist local transit agencies in meeting their State of Good Repair (SGR) goals.

TAM Plans and Targets

The Transit Asset Management (TAM) rule requires that every transit provider receiving federal financial assistance under 49 U.S.C. Chapter 53 develop a TAM plan or be a part of a group TAM plan prepared by a sponsor (i.e. FDOT). As part of the TAM plan, public transportation agencies are required to set and report transit targets annually. Transit providers or their sponsors must also share these targets with each M/TPO in which the transit provider’s projects and services are programmed in the M/TPOs TIP. M/TPOs can either agree to support the TAM targets, or set their own separate regional TAM targets for the M/TPOs planning area.

The River to Sea TPO planning area is served by three (3) transit service providers: Flagler County Public Transportation (FCPT), Votran, and SunRail. Votran and SunRail are considered Tier I providers and, as such, each must develop a TAM Plan. FCPT is considered a Tier II provider and thus is included in a group TAM plan developed by the FDOT Public Transit Office in Tallahassee.

The River to Sea TPO will continue to collaborate in transit planning activities and provide support to transit providers including continued inclusion in long range planning activities and transit asset management. The following tables represent the transit data reported by each transit agency for each of the applicable Asset Categories along with the 2019 targets.

Page 8 of 1345

Page 46: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

FDOT - Statewide Tier II Group Report Flagler County Public Transportation – Bus Service

Asset Category Performance Measure

Asset Class Asset Class Condition

2019 Target

2020 Target

Rolling Stock

Age - % of revenue vehicles within a particular asset class that have met or exceeded their Useful Life Benchmark (ULB)

Automobile 55% 55% 45%

Bus 15% 15% 13%

Cutaway Bus 28% 28% 28%

Mini-Bus 31% 31% 28%

Mini-Van 13% 13% 11%

SUV 0% 0% 0%

Van 47% 47% 34%

Equipment

Age - % of non-revenue vehicles within a particular asset class that have met or exceeded their Useful Life Benchmark (ULB)

Non-Revenue/Service Automobile

67% 67% 67%

Trucks and other Rubber Tire Vehicles

50% 50% 40%

Maintenance Equipment 50% 50% 50%

Route & Scheduling Software 100% 100% 100%

Facilities

Condition - % of facilities with a condition rating below 3.0 on the FTA Transit Economic Requirements Model (TERM) Scale

Administration 0% 0% 9%

Maintenance 6% 6% 12%

NOTE: FCPT inventory includes one revenue service vehicle in poor condition (an automobile)

Page 9 of 1346

Page 47: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Votran – Bus Service

Asset Category Performance Measure

Asset Class

Asset Class Condition

2019 Target

2020 Target

Rolling Stock

Age - % of revenue vehicles within a particular asset class that have met or exceeded their Useful Life Benchmark (ULB)

Bus 28% 23% 20%

Cutaway Bus 32% 23% 20%

Mini-Van 0% 1% 1%

Equipment

Age - % of non-revenue vehicles within a particular asset class that have met or exceeded their Useful Life Benchmark (ULB)

Non-Revenue/Service Automobile

100%

10%

10%

Trucks and other Rubber Tire Vehicles

100%

10%

1%

Route & Scheduling Software 86% 15% 15%

Maintenance Equipment/Hardware

92%

20%

20%

Security 100% 20% 20%

Facilities*

Condition - % of facilities with a condition rating below 3.0 on the FTA Transit Economic Requirements Model (TERM) Scale

Administration 4.0 10% 10%

Maintenance 2.1 10% 10%

Parking Structures 3.3 10% 10%

Passenger Facilities 3.6 10% 10%

Administration/Maintenance 3.0 10% 5%

Storage 3.5 10% 2%

*The Votran TAM plan lists the Transit Economic Requirements Model (TERM) rating but not the % at or above the target

Page 10 of 1347

Page 48: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

SunRail - Fixed Guideway

*Equipment is provided through the operations contract and is not reported as a federally funded asset.**DRM is Directional Route Miles***VSMLF is the Vehicle Storage & Light Maintenance Facility

In support of the transit providers, the River to Sea TPO adopted these targets on October 24, 2018. Adoption of the transit asset targets represents an agreement by the TPO to plan and program projects in the LRTP and the TIP that will, once implemented, make progress toward achieving the transit provider targets.

Asset Category Performance Measure

Asset Class Useful Life Benchmark

Asset Class Condition

2019 Target

Rolling Stock

Age - % of revenue vehicles within a particular asset class that have met or exceeded their Useful Life Benchmark (ULB)

Locomotives 43 years 23 years 0%

Coach Cars 39 years 3 years 0%

Cab Cars 39 years 3 years 0%

Equipment*

Age - % of non-revenue vehicles within a particular asset class that have met or exceeded their Useful Life Benchmark (ULB)

Non-Revenue/Service Automobile

n/a n/a n/a

Trucks & Other Rubber Tire Vehicles

n/a n/a n/a

Infrastructure

% of track segments with performance restrictions (as applicable)

Rail fixed guideway track n/a 2% DRM with

speed restriction**

< 3% DRM with

speed restriction

Facilities

Condition - % of facilities with a condition rating below 3.0 on the FTA Transit Economic Requirements Model (TERM) Scale

Administration n/a n/a n/a

Maintenance & Operating Center

> 3 on TERMScale

New 100% ≥ 3

Maintenance (VSLMF)*** > 3 on TERM

ScaleNew 100% ≥ 3

Stations > 3 on TERM

ScaleNew 100% ≥ 3

Park & Ride Lots > 3 on TERM

ScaleNew 100% ≥ 3

Page 11 of 1348

Page 49: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

The TPO’s goal of supporting local transit providers to achieve transit asset condition targets is linked to this investment plan, and the process used to prioritize the projects within the TIP is consistent with federal requirements.

Bridge and Pavement Condition Measures (PM-2) The bridge and pavement condition performance measures rules issued by Federal Highway Administration (FHWA) became effective on May 20, 2017, establishing measures to assess the condition of the pavements and bridges on the National Highway System (NHS). On October 24, 2018 the River to Sea TPO approved measures and targets associated with these facilities utilizing data provided by the FDOT. The data and targets are reflected in the following tables.

Bridge Performance Measures and Targets

Performance Measure # of Bridges

Total Deck Area

% Deck Area

2-yearTarget

4-yearTarget

% of NHS bridges classified as in Good condition by deck area 58 1,199,517 52% ≥ 50% ≥ 50%

% of NHS bridges classified as in Poor condition by deck area 1 1,742.5 0.08% ≤ 10% ≤ 10%

Pavement Performance Measures and Targets

Performance Measure % of Pavement

2-yearTarget

4-yearTarget

% of Interstate pavements in Good condition* 100% Not Required ≥ 60%

% of Interstate pavements in Poor condition* 0% Not Required ≤ 5%

% of non-Interstate NHS pavements in Good condition 100% ≥ 40% ≥ 40%

% of non-Interstate NHS pavements in Poor condition 0% ≤ 5% ≤ 5%

NOTE: 25% of the Interstate system was not measured due to ongoing construction projects.

Ratings categorized as “GOOD” suggest that no major investment is needed. Facilities rated as “POOR” indicate that major investments are needed.

System Performance Management Measures (PM-3) The third category of performance measures rules issued by Federal Highway Administration (FHWA) became effective on May 20, 2017, establishing measures to assess the performance of the National Highway System (NHS), freight movement on the Interstate System, and Congestion Mitigation and Air Quality Improvement Program (CMAQ). Air quality in the River to Sea TPO planning area is above thresholds required for the CMAQ program and therefore monitoring and reporting is not required.

On October 24, 2018 the River to Sea TPO approved measures and targets associated with these facilities utilizing data provided by the FDOT. The data and targets are reflected in the following table.

Page 12 of 1349

Page 50: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

System Performance Management Measures and Targets

Performance Measure Current TTR 2-yearTarget

4-yearTarget

% of person-miles traveled on the Interstate that are reliable 100% ≥ 75% ≥ 70%

% of person-miles traveled on the non-Interstate NHS that are reliable 51% Not

Required ≥ 50%

Truck travel time reliability ratio (TTR) on the Interstate 1.12 ≤ 2.0 ≤ 1.75

Travel time reliability seeks to assess how reliable the highway network is by creating a ratio (called level of travel time reliability, or LOTTR) that compares the worst travel times on a road against the travel time that is typically experienced. Road miles with a LOTTR less than 1.5 are considered reliable. It does not mean that there is not congestion on the road. It means that the amount of time a trip will take is predictable. This calculation is completed for the Interstate system, the National Highway System (NHS) and for Freight traffic utilizing the Interstate system.

Closing Statements The River to Sea TPO recognizes that ongoing efforts must be made to continue incorporating new planning requirements and transportation system performance into the institutional decision-making and documents of the organization. This includes expanding stakeholder involvement, documenting the added planning factors of resiliency and tourism, and further incorporating transportation performance management. The TPO will continue to coordinate with FHWA, FTA, FDOT, and area transit providers to take the actions to further incorporate performance measures as they are established and are more fully understood. As further guidance is provided and transportation data reports are developed, the TPO expects to continue expanding its planning and public outreach activities and strengthening the connection between project programming and improved performance of the transportation system as required.

50

Page 51: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

MEETING SUMMARY

TPO BOARD OCTOBER 23, 2019

V. ACTION ITEMS

B. REVIEW AND APPROVAL OF RESOLUTION 2019-19 ADOPTING THE WALKABILITY ACTION PLAN

AND COMPLETE STREETS POLICY

Background Information:

According to Smart Growth America’s National Complete Streets Coalition, complete streets are designed and operated to enable safe access for all users, including pedestrians, bicyclists, motorists and transit riders of all ages and abilities. A Complete Streets Policy directs transportation planners and engineers to integrate a Complete Streets approach into their transportation practices, policies and decision-making processes to improve the entire street network. Last month, the TPO Board, BPAC, CAC and TCC reviewed and provided feedback on an initial draft Complete Streets Policy. The revised final draft Complete Streets Policy and Resolution 2019-19 are provided for your review and approval.

ACTION REQUESTED:

MOTION TO APPROVE RESOLUTION 2019-19 ADOPTING THE WALKABILITY ACTION PLAN AND COMPLETE STREETS POLICY TEMPLATE

51

Page 52: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION

RESOLUTION 2019-##

RESOLUTION OF THE RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION ADOPTING A COMPLETE STREETS POLICY

______________________________________________________________________________ WHEREAS, the River to Sea Transportation Planning Organization (TPO) is the duly designated and constituted body responsible for carrying out the urban transportation planning and programming process for Volusia County and portions of Flagler County inclusive of the cities of Flagler Beach, Beverly Beach and portions of Palm Coast and Bunnell; and WHEREAS, Florida Statutes 339.175; 23 U.S.C. 134; and 49 U.S.C. 5303 require that the urbanized area, as a condition to the receipt of federal capital or operating assistance, have a continuing, cooperative and comprehensive transportation planning process that results in plans and programs consistent with the comprehensively planned development of the urbanized area; and

WHEREAS, the River to Sea TPO desires to promote, maintain and enhance safety, quality of life, and economic development in the urbanized area; and WHEREAS, Complete Streets are designed and operated to enable safe access for all users, including pedestrians, bicyclists, motorists, freight handlers, and transit riders of all ages and abilities; and WHEREAS, a Complete Streets Policy directs transportation planners and engineers to integrate a Complete Streets approach into their transportation practices, policies and decision-making processes to improve the entire street network; and

WHEREAS, the Florida Department of Transportation is implementing a Complete Streets Policy to routinely plan, design, construct, reconstruct and operate a context-sensitive system of Complete Streets; and

WHEREAS, the River to Sea TPO has developed a Complete Streets Policy that has been

provided for review by the general public, the River to Sea TPO’s Advisory Committees and the River to Sea TPO Board.

NOW, THEREFORE, BE IT RESOLVED, by the River to Sea TPO that the:

1. River to Sea TPO Board and advisory committees have reviewed and endorsed the Complete Streets Policy;

52

Page 53: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Resolution 2019-## Page 2

2. River to Sea TPO’s Complete Streets Policy is hereby endorsed and adopted as shown in Attachment "A" attached hereto and made a part of this resolution; and the

3. Chairperson of the River to Sea TPO (or his/her designee) is hereby authorized

and directed to submit the Complete Streets Policy to the: a. Florida Department of Transportation; b. Federal Transit Administration (FTA) (through the Florida Department of

Transportation); c. Federal Highway Administration (FHWA) (through the Florida

Department of Transportation); d. Department of Economic Opportunity; e. East Central Florida Regional Planning Council; f. Northeast Florida Regional Council (NEFRC); and the g. Central Florida MPO Alliance.

DONE AND RESOLVED at the regularly convened meeting of the River to Sea TPO held on the 23rd day of October 2019.

RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION

______________________________________ DAYTONA BEACH COMMISSIONER ROBERT GILLILAND

CHAIRPERSON, RIVER TO SEA TPO

CERTIFICATE: The undersigned duly qualified and acting Recording Secretary of the River to Sea TPO certified that the foregoing is a true and correct copy of a resolution, adopted at a legally convened meeting of the River to Sea TPO held on October 23, 2019. ATTEST: ________________________________________ DEBBIE STEWART, RECORDING SECRETARY RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION

53

Page 54: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Complete Streets Policy River to Sea TPO Draft: 10/07/2019

Page 1 of 4

River to Sea TPO Complete Streets Policy

Draft: 10/07/2019

1.0 Definition 2.0 Vision and Goals 3.0 Applicability 4.0 Design 5.0 Implementation 6.0 Exceptions 7.0 Performance Measures

1.0 Definition

Complete Streets are planned, designed, operated and maintained to safely accommodate people of all ages and abilities, including pedestrians, cyclists, motorists, transit users, emergency services, freight, plus adjacent businesses and residents. The River to Sea TPO recognizes that, depending on context, streets may serve diverse activities, functions, and intensity of uses, including recreational and destination-based uses.

2.0 Vision and Goals

This Complete Streets Policy outlines a framework for making transportation investment decisions to create a transportation system that provides residents and guests equitable access to resources, supports economic vitality, and promotes healthy communities.

The goals of this Complete Street Policy are:

• Reduce injuries and fatalities • Provide transportation options for people of all ages, physical abilities, and income levels • Improve health by promoting active lifestyles through design to realize long-term health

impacts • Support equitable access to employment opportunities and civic resources • Support economically healthy/vibrant communities • Implement resilient and sustainable solutions

3.0 Applicability

This Complete Street Policy applies to new construction and reconstruction roadway projects including but not limited to intersection projects, roundabouts, capacity projects, safety projects, bridges, and other transportation facilities that will use funds through the River to Sea TPO. All

54

Page 55: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Complete Streets Policy River to Sea TPO Draft: 10/07/2019

Page 2 of 4

phases of project implementation are covered, including planning, design, right-of-way acquisition, and construction. Repair, maintenance, and operations work are not covered.

The River to Sea TPO recognizes the need for interdisciplinary and cross-jurisdictional coordination to effectively develop, operate, and maintain bicycle and pedestrian networks and transit facilities. The River to Sea TPO encourages coordination with nearby jurisdictions, projects, and plans. If projects are linking to or in proximity to each other, the projects should be coordinated to ensure a facility’s consistency and to allow for utmost resource efficiency in project implementation.

4.0 Design

Designs shall consider accommodations for all users and be sensitive to context of the project setting. Complete Streets may look different for every project and road type.

Facilities will be designed and constructed in accordance with current applicable laws and regulations, using best practices and guidance from a variety of organizations, including but not limited to the following:

• FDOT guidelines and manuals, • American Association of State Highway and Transportation Officials (AASHTO) publications, • Manual on Uniform Traffic Control Devices (MUTCD), • Americans with Disabilities Act Accessibility Guidelines (ADAAG), • Public Rights-of-Way Accessibility Guidelines (PROWAG), • Designing Walkable Urban Thoroughfares: A Context Sensitive Approach: An ITE

Recommended Practice, • Urban Bikeway Design Guide and the Urban Streets Design Guide by the National

Association of City Transportation Officials (NACTO).

The agency or government with ownership or maintenance responsibility for the road shall retain the decision authority over its projects.

Context Sensitivity

The River to Sea TPO recognizes that Complete Streets solutions vary according to each street’s land use context. Appropriate design standards and input from community members should be considered within each context that provide for a flexible, innovative, and balanced approach resulting in safety for all users.

5.0 Implementation

Local Complete Streets Polices

The River to Sea TPO encourages all local government partners to adopt Complete Streets policies.

55

Page 56: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Complete Streets Policy River to Sea TPO Draft: 10/07/2019

Page 3 of 4

The River to Sea TPO will assist participating jurisdictions through educational outreach programs as they develop and adopt local Complete Streets policies.

Education and Training

The River to Sea TPO will develop outreach and training materials to assist local agencies in implementing Complete Streets policies, training elected officials, community leaders, and private development partners on the benefits of Complete Streets and distribute current best practice information on Complete Streets design.

Design

Roadway projects shall accommodate people of all ages and abilities, including pedestrians, cyclists, motorists, transit users, emergency services, freight, plus adjacent businesses and residents. Roadway projects shall utilize multimodal performance standards with measurable outcomes.

Funding

The River to Sea TPO will modify and periodically assess its existing prioritization processes to promote high quality Complete Streets projects.

6.0 Exceptions

There are conditions where it may be inappropriate to provide bicycle, pedestrian, or transit facilities. These exceptions may include but not be limited to:

1. Limited access facilities where bicyclists and pedestrians are prohibited by law from using the

road. In this instance, a greater effort may be necessary to accommodate bicyclists and pedestrians elsewhere within the same transportation corridor and to provide safe, comfortable crossings for bicyclists and pedestrians at interchanges and connecting neighborhoods, activity centers, or regional trail network.

2. The Long Range Transportation Plan’s annual average daily traffic (AADT) projection is less than 5,000 vehicles per day.

3. A reasonable and equivalent alternative already exists, or is programmed in the Transportation Improvement Program (TIP) as a separate project, for the specific use being exempted within a reasonable distance and serving the same destinations.

4. Areas outside of the River to Sea TPO’s designated Metropolitan Planning Area (MPA)

For projects funded by the River to Sea TPO, exceptions for not accommodating bicyclists, pedestrians, and transit users in accordance with this policy will require approval of the River to Sea TPO Board. These exceptions will be submitted and proceed through the established TPO transportation planning process.

56

Page 57: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Complete Streets Policy River to Sea TPO Draft: 10/07/2019

Page 4 of 4

7.0 Performance Measures

The River to Sea TPO shall evaluate this policy annually. The River to Sea TPO will report to the Board the performance of the Complete Streets policy based on the measures listed below, compared to the previous review period, in order to evaluate the success of the policy’s success.

• Number of jurisdictions with adopted Complete Streets Policies • Progress in reaching the River to Sea TPO’s adopted transportation safety targets • Volusia and Flagler County Public Health Rankings • Satisfaction levels as expressed in “Tell the TPO” Surveys • Workshops and events to promote Complete Streets and raise awareness of bicycle and

pedestrian safety

57

Page 58: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

MEETING SUMMARY

TPO BOARD OCTOBER 23, 2019

V. ACTION ITEMS

C. REVIEW AND APPROVAL OF THE R2CTPO 2020 LEGISLATIVE POSITIONS

Background Information:

Each year, the TPO develops a set of legislative positions to be used in informing legislators of issues important to the River to Sea TPO. The positions are initially drafted through a subcommittee of the TPO Board. The Legislative Issues Subcommittee met on September 25, 2019 prior to the TPO Board meeting and developed recommendations for developing the draft 2020 Legislative Positions which were discussed subsequently at the September board meeting. A draft update of the 2020 Legislative Positions were presented to the R2CTPO Executive Committee for review and comment. A copy of this draft is presented for your review and approval.

ACTION REQUESTED:

MOTION TO APPROVE THE R2CTPO 2020 LEGISLATIVE POSITIONS 58

Page 59: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Chairperson: Commissioner Robert Gilliland, City of Daytona Beach

2020 Legislative Positions Adopted by River to Sea TPO Board 11-27-2019

Contact: Lois Bollenback, Executive Director Telephone: (386) 226-0422

E-mail: [email protected] Website: www.r2ctpo.org

59

Page 60: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

“On behalf of the River to Sea Transportation Planning Organization, I want to thank you for the work you do for the State of Florida and as a representative of our planning area. As the pace of growth and development continues to increase throughout the state, we recognize the importance of maintaining an efficient and resilient transportation system that supports Florida’s economy and provides safe travel for residents and visitors alike. We look forward to working with you to tackle challenging transportation issues and to provide the support you may need during the 2020 Legislative Session.”

River to Sea TPO Chairperson, Robert Gilliland

Thank you for considering the legislative positions established by the River to Sea TPO. As these positions were developed, consideration was given to the positions established by organizations throughout the state of Florida including the Florida Association of Counties (FAC), the Florida League of Cities (FLC), Florida Public Transit Association (FPTA) and the Metropolitan Planning Organization Advisory Council (MPOAC). We value our relationship with these organizations and appreciate the support and leadership they provide.

River to Sea TPO Legislative Issues Subcommittee

Maintain transportation funding & increase funding flexibility

Improve transportation safety by discouraging the use of handheld devices while driving & improving pedestrian and bicycling safety

Increase the efficiency of existing transportation systems by maximizing the deployment of advanced transportation technologies

2020 Legislative Positions Adopted by River to Sea TPO Board 11-27-2019

60

Page 61: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Transportation Priority -- Funding

The River to Sea TPO supports legislation that preserves transportation funding and provides greater flexibility of funding to support the safety, efficiency and preservation of the transportation system.

Background

Transportation revenue is collected to support the preservation and development of a safe and efficient transportation system that supports economic development, freight mobility, tourism, bicycle and pedestrian safety, accessibility and public transit among others. Actions that protect these programs include:

• Indexing Local Option Fuel Taxes to Keep Pace with Inflation

Revenue studies completed in Florida by the Metropolitan Planning Organization Advisory Council (MPOAC) and the Florida Transportation Commission have shown that transportation revenues are not keeping pace with increased costs over time. The River to Sea TPO supports efforts to index city/county fuel taxes and to further evaluate options that would provide a more sustainable revenue source for transportation.

• Increase and Stabilize Funding Levels for the Transportation Regional Incentive Program (TRIP)

TRIP funding promotes regional transportation planning and project development and has been used to fund important infrastructure improvements. The program is funded primarily through Documentary Stamp proceeds and the allocations have varied significantly in recent years from a low of $11 million in 2016 to approximately $157 million in 2014. The R2CTPO supports stable and consistent funding through TRIP.

• Allow Strategic Intermodal System (SIS) and State Transportation Trust Fund (STTF) Dollars to be Used on Local Road Improvements that are Needed to Support the SIS or State Facility

Current state law limits the allocation of SIS funds and STTF funds to use on those systems. However, there are occasions where the most effective solution to managing congestion on an SIS or state facility is to improve local arterial, collector and distributer roads. The River to Sea TPO supports increasing the flexibility of SIS and STTF funds to be used “off-system” when transportation analysis recommends improvements on supporting roads that enhance freight, safety, emergency management, travel time reliability and congestion.

• Identify Resources for the Maintenance and Preservation the State SUN Trail System

During the 2015 legislative session, the Florida Shared-Use Non-motorized Trail (SUN Trail) network was established. The River to Sea TPO supports this program and is currently developing projects that will help to complete the Coast to Coast Trail as well as the St. Johns River to Sea Loop Trail. We recognize, however, that preservation of transportation infrastructure is a priority for the state and the River to Sea TPO supports efforts to plan for and direct funding to ensure these statewide assets are maintained over time.

Benefit

Efficient transportation systems are necessary to support a strong economy. Inadequate funding to support capital projects as well as operations and maintenance will lead to increased congestion and degradation of vital infrastructure. Increased traffic congestion has negative economic and environmental impacts.

61

Page 62: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Transportation Priority -- Safety

The River to Sea TPO supports legislation that improves transportation safety.

Background These items are intended to support safety initiatives in the State of Florida as well as the national emphasis on transportation safety improvements outlined in the Fixing America’s Surface Transportation (FAST) Act.

Improve Pedestrian and Bicycle Safety

Florida consistently ranks at or near the top of the nation in pedestrian and bicycle injuries and fatalities. Increasing safety and reducing these rates will require education, engineering and law enforcement efforts. The River to Sea TPO supports:

enhanced funding for educational programs that show positive results;

strengthening existing pedestrian and bicycle safety laws; and

increasing performance driven funding for projects that address unsafe conditions.

The 2019 Dangerous by Design report listed the Deltona-Daytona Beach-Ormond Beach Metropolitan Area as the second most dangerous metropolitan area in the nation. Florida DOT is using the Alert Today, Alive Tomorrow program along with changes in design standards to drive down pedestrian fatalities and injuries throughout the state. Though not in the top 10, Flagler County has also recorded bicycle and pedestrian crashes, which may be addressed through proactive efforts involving evaluation, education, engineering and enforcement.

Prohibit the Use of Handheld Electronic Devices While Driving

The River to Sea TPO supports legislation that would improve roadway safety by prohibiting the use of handheld electronic devices while driving. This expands the “Wireless Communications While Driving” law passed by the legislature in 2018 that made texting while driving a primary offense.

Recent crash analyses completed by the River to Sea TPO shows that distracted driving is one of the predominant factors leading to increased crashes. While further research is needed to determine the role of handheld devices in these crashes, other industry research has linked these devices to increases in vehicle crashes.

Benefit

Transportation safety is critical for residents and for the thousands of visitors who choose to vacation here. Changes in Florida law along with other crash reduction efforts improve quality of life and support economic development.

62

Page 63: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Transportation Priority -- Advancing Technology

The River to Sea TPO supports legislation that increases the efficiency of existing transportation systems by maximizing the deployment of advanced transportation technologies.

Background

Transportation technologies are advancing in ways that will transform the industry and, potentially, how people and goods will move in and between our metropolitan areas. Transportation Network Companies (TNC’s) such as Uber and Lyft, automated and connected vehicles, advanced transit systems, advanced traffic signals, and drone delivery as well as technologies not yet developed, provide tremendous opportunities to improve the efficiency and safety of travel.

The River to Sea TPO supports and encourages the Florida legislature to continue establishing state laws and funding mechanisms support the development and implementation of these technological advances. Potential actions include:

Increased infrastructure funding for projects that advance Automated, Connected, Electric and Shared (ACES) technologies.

Increased funding and technical assistance to support the planning and implementation of Smart Cities, automated vehicle pilot projects and other technology innovations.

Establishing laws that address the malicious and intentional interference of the proper functioning of transportation vehicles and systems.

Continued promotion of interoperable and multi-modal smartcard technology that is compatible, universal and accessible for use by all other smartcard technology systems.

Legislative support and funding for the regulation and infrastructure modifications needed to safely and effectively manage the expansion of micro-mobility devices.

Benefit

Advanced technologies in transportation will transform our communities and our economies. These technologies have the potential to dramatically improve safety and efficiency of our existing transportation infrastructure. They also offer improvements in air quality, mobility for transportation disadvantaged people, and quality of life advantages. Cities and states that are proactive in the deployment of transportation technology will be better positioned for success and economic stability in the future.

63

Page 64: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Additional Positions

The River to Sea TPO also supports legislation that:

• Protects the State Transportation Trust Fund (STTF) and the Transportation Disadvantaged Trust Fund from efforts to reduce or divert funds.

• Offers incentives for employers that reduce peak-hour demand by allowing off-peak commuting and telecommuting options to employees.

• Increases MPO/TPO involvement in growth management, mobility planning and visioning activities to promote a stronger linkage between land-use, transportation and economic development.

• Increases the percentage of the state transportation capacity program allocated to non-SIS highways and transit programs in order to improve mobility on regional and metropolitan area transportation facilities.

• Requires TPO concurrence for public-private partnership agreements related to the lease or sale of transportation facilities that are publicly owned and operated within metropolitan areas and any subsequent modifications to such agreements.

• Maintains gross vehicle weight limitation and restrictions by not raising the maximum weight limit above 80,000 pounds (exceptions should only be granted when authorized by state and local governments and adequate compensation is paid to mitigate the impact to state and local transportation facilities).

• Provides mandatory funding for driver education programs in high schools.

• Changes the Consultants’ Competitive Negotiation Act (CCNA) to allow agencies to introduce a “best-value” option that considers cost as a factor when selecting a firm.

The River to Sea TPO opposes legislation that:

• Imposes restrictions on Metropolitan Planning Organization (MPO) governing board membership, voting, terms of service.

The River to Sea TPO will monitor legislation that: • Authorizes counties to form a regional transportation finance authority for the purpose of financing,

constructing, maintaining and operating transportation projects that are consistent with MPO plans.

• Proposes to establish Tax Increment Financing (TIF) districts associated with expressway or passenger rail corridors for the purposes of financing the debt issued to pay for the project.

• Promotes the continued development and expansion of bus and rail transit as well as efforts to accommodate the growing demand for alternative mobility vehicles (low-speed vehicles, electric vehicles and golf carts).

• Establishes reasonable limits on the amount of business damages awardable in an eminent domain action.

• Considers changes to the transportation analysis required for Developments of Regional Impacts (DRI).

64

Page 65: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

MEETING SUMMARY

TPO BOARD OCTOBER 23, 2019

V. ACTION ITEMS

D. REVIEW AND RECOMMEND APPROVAL OF THE EAST CENTRAL FLORIDA REGIONAL RESILIENCE

COLLABORATIVE MEMORANDUM OF UNDERSTANDING (MOU)

Background Information:

September, 2018: East Central Florida Regional Planning Council passed Resolution #03-2018 reaffirming their commitment to regionalism and requesting the development of a structure and framework for a regional resilience collaborative for the 8 counties and 78 cities in East Central Florida. Two committees were formed:

• Council Subcommittee: drive and provide direction; consider recommendations from a steering committee

• Steering Committee: Develop structure and framework, draft memorandum of understanding; provide recommendations to Council Sub Committee

Council Subcommittee direction: Under the Resilience umbrella, the Collaborative will focus on (people) Health + Equity, (places) Built Infrastructure + Natural Environment, and (prosperity) Economic Resilience; woven throughout each of the pillars will be an emphasis on reducing our carbon footprint, reducing the regions vulnerabilities and risks through emergency management, and increasing our sustainability goals. Steering Committee was identified, comprised of differing disciplines and expertise around the region as well as state, as called for in September, ECFRPC Resolution. The Memorandum of Understanding (MOU) outlines the structure and framework establishing a shared vision for resilience increasing the collective impact potential. ECFRPC formalized the East Central Florida Regional Resilience Collaborative by unanimous vote on May 15. River to Sea TPO Resolution 2019-14 supporting the East Central Florida Regional Resiliency Action Plan (ECF RRAP) is provided with this agenda packet for reference purposes. The draft MOU is provided with this agenda packet for your review.

ACTION REQUESTED: MOTION TO APPROVE OF THE EAST CENTRAL FLORIDA REGIONAL RESILIENCE COLLABORATIVE MEMORANDUM OF UNDERSTANDING (MOU)

65

Page 66: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

66

Page 67: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

67

Page 68: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

68

Page 69: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

69

Page 70: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

70

Page 71: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

The East Central Florida Regional Resilience Collaborative

Memorandum of Understanding

This memorandum of understanding (MOU) is entered into on this 23rd day of October, 2019 among the undersigned members of the East Central Florida Region. All Parties are collectively referred to as the members or collaborative members.

Recalling the East Central Florida Regional Planning Council’s (ECFRPC) resolution 03-2018 of 19 September 2018, in which the unanimous decision was made by the ECFRPC Board to support a program to convene stakeholders across disciplines and the East Central Florida region to develop the framework for a regional resilience collaborative, herein including the undersigned Members that include government agencies and entities that serve the eight counties and municipalities of Brevard, Lake, Marion, Orange, Osceola, Seminole, Sumter, and Volusia:

1. Express profound gratitude to the East Central Florida Regional Planning Council, Council Sub-Committee and Steering Committee, who have articulated the importance of establishing a collaborative framework for action and are committed to implementing resilience measures as a guiding principle to enhance the efforts of our local jurisdictions, individually and collectively, for the future; and 2. Endorse the East Central Florida Regional Resilience Collaborative and the aforementioned resolution, which is contained in Annex I to the present resolution.

WHEREAS, the East Central Florida Region is home to more than 4.1 million residents as of 2018, approximately 20% of the population of the State of Florida, includes two of the four majority-minority counties in the State, hosts over 60 million visitors annually, and comprises one of the fastest growing metropolitan areas in the United States; and WHEREAS, while the East Central Florida Region remains a service-driven economy where 45% of households qualify as asset- limited, income- constrained, employed according to the United Way’s 2018 ALICE report, it is also considered a globally competitive marketplace ranking 38th in the nation according to the Stats America Innovation Index, and is a top ten metropolitan region for various patenting technologies thus indicating a high level of innovation, driving wealth creation in the region; and

71

Page 72: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

WHEREAS, according to the East Central Florida Comprehensive Economic Development Strategy, the region has seven innovation clusters including tourism; aviation and aerospace; boats and other marine vessels; photonics; turbines; modeling, simulation and training; and telecommunications; which positions the region for a diversified and transformative future workforce and economy; and

WHEREAS, water and natural resources are the foundation of communities and eco-tourism in the East Central Florida region and the protection of this biodiversity, its ecosystem services and the economic interdependencies are a critical issue facing the region; and WHEREAS, recent weather, natural and manmade events have resulted in increasing shocks and stressors to our economy, human security, health and equity, natural environment and built infrastructure; and WHEREAS, vulnerable and underserved people in our region are disproportionately impacted from the aforementioned events and from on-going stressors to their human security; and WHEREAS, additional and enhanced regional approaches are needed to build on current efforts and increase adaptive capacities to improve resilience in confronting shocks and stressors; and WHEREAS, this adaptation toward resilience must provide for the region’s people, places, and prosperity in ways that promote mutual progress addressing risk exposure and vulnerability in conjunction with sustainability goals; and WHEREAS, to support further all efforts that continue to mitigate the increasing impacts of hazards and their complexity in the region, we must elevate ways to work cooperatively across disciplines to identify issues, using existing mitigation strategy research with additional technical expertise to identify ways to improve resiliency, while supporting the local mitigation strategy and post disaster recovery planning to include input to measure continual improvement in the process; and WHEREAS, the East Central Florida 2060 Strategic Regional Policy Plan identifies effects from climate change to our water availability, agriculture and food security, public health, infrastructure, natural resources, ecosystems services, and economy, and all are therefore appropriate subjects for this regional resilience effort; and WHEREAS, the resilience of East Central Florida Region’s people, places and prosperity rely on interconnected and multi-modal transportation infrastructure, including the spaceport, space center, seaport, trails, rail and other transit systems, roadways and airports; and WHEREAS, promoting safe, affordable transportation, attainable housing choices, opportunities for safe physical activity, green and open spaces, local food systems, and clean energy use improves health outcomes and contributes to a region that is equitable and prosperous; and WHEREAS, promoting high-performing, energy-efficient and resilience targets and policies for our built infrastructure reduces the region’s risks and vulnerabilities; and

72

Page 73: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

WHEREAS, promoting sustainable development that includes compact urban centers, preservation of agricultural landscapes, interconnected, multi-modal corridors, conservation areas, decreases the carbon footprint, increases our Members’ fiscal sustainability and minimalizes conflicts in ‘wildland and urban interface’ areas, further supporting emergency management efforts; and WHEREAS, the East Central Florida Region provides shelter during the evacuation of surrounding areas in times of disaster, and must plan effectively to accommodate future migration from high hazard areas; and WHEREAS, good health is essential and instrumental to human survival, livelihood and dignity, and addressing health disparities and externalities will foster advances in our health systems, increase access to services, and build a more resilient region; and WHEREAS, collaborating with public and private partners across jurisdictional boundaries will improve human and energy security and increase access to clean and affordable resources and sources of electricity and water; and WHEREAS, several of our jurisdictions and agencies have taken steps to become more sustainable and resilient while continuing to advance economically and socially, all parties recognize that a coordinated and collaborative approach building on current efforts will best serve the region; and WHEREAS, the development and success of a regional resilience collaborative depends on participation and commitment from cooperative networks and partnerships with local governments, federal, state and regional agencies, educational institutions, non-government organizations, philanthropic organizations, businesses, civil society, and other stakeholders to raise the level of our resilience; and WHEREAS, this collaborative approach will position the region, jurisdictions and agencies to plan better for resilience, meet state and federal regulations and guidelines, and enable greater access to long-term financing sources;

NOW, THEREFORE, we call all stakeholders to action, aware that the realization of the new resiliency framework depends especially on our unceasing and tireless collective efforts to make the region and state more resilient in the decades to come for the benefit of our own and future generations, BE IT RESOLVED, BY THE East Central Florida Regional Planning Council and the MEMBERS AS SIGNED BELOW, EACH MEMBER SHALL COMMIT TO THE FOLLOWING WITHIN BUDGET CONSTRAINTS:

• Regional Cooperation – Create Productive Connectivity - Each member shall commit appropriate staff resources and expertise to participate with other members in facilitating and advancing the work of the Regional Resilience Collaborative. A steering committee appointed by the ECFRPC will identify and report on opportunities for providing sustainable solutions for the current and future resilience of our built and natural environment, economy, and health and equity. The steering committee will draw on strategies and processes that address resilience, organize and direct integrated scientific and other

73

Page 74: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

technical research and analysis, and organize and structure its work and procedures toward these ends.

• Regional Resiliency Action Plan -

Each member shall work collaboratively to develop a Regional Resilience Action Plan that will identify specific initiatives with supportive and actionable data.

• Legislative Strategy -

Each member shall work to align individual decisions and policies in service of a shared legislative regional resilience strategy developed by the Regional Resilience Collaborative.

• Community Involvement -

Each member shall work collaboratively to recognize and engage the regional community, involving a diverse stakeholder representation in developing policies and recommendations for implementation of the Regional Resilience Action Plan.

• Annual Summit -

Each member shall participate in an annual regional summit to share knowledge, resources, and progress on the collaboration. In addition, the East Central Florida Regional Resilience Collaborative will coordinate with other coalitions in the State of Florida to identify opportunities and fulfill the specific initiatives of the Regional Resilience Action Plan and collaborative.

Approved for signature by the River to Sea Transportation Planning Organization at a regular meeting, assembled in Daytona Beach, Florida, on the 23rd day of October, 2019.

RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION

______________________________________

COMMISSIONER ROBERT GILLILAND

CHAIRPERSON, RIVER TO SEA TPO

CERTIFICATE:

The undersigned duly qualified and acting Recording Secretary of the River to Sea TPO certified that the foregoing is a true and correct copy of a resolution, adopted at a legally convened meeting of the River to Sea TPO held on October 23, 2019.

Attest:

_____________________________

Debbie Stewart, Recording Secretary River to Sea Transportation Planning Organization

74

Page 75: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

ANNEX I

75

Page 76: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

76

Page 77: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

77

Page 78: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

MEETING SUMMARY TPO BOARD

OCTOBER 23, 2019

VI. PRESENTATIONS AND DISCUSSION ITEMS

A. PRESENTATION AND DISCUSSION OF DRAFT R2CTPO FY 2018/19 PUBLIC INVOLVEMENT ACTIVITIES SUMMARY

Background Information:

A primary responsibility of the River to Sea TPO is public involvement and outreach in the transportation decision-making process. This involves developing various strategies to engage the community, including posting information on the TPO website (www.R2CTPO.org) and Facebook page (www.Facebook.com/RivertoSeaTPO), attending community meetings, building business relationships, joining local organizations and providing presentations to organizations. Another component of the outreach program includes participation in community events, bicycle helmet fittings and the distribution of documents and promotional materials. TPO staff will provide an overview of the public involvement and outreach efforts that occurred during FY 2018/19.

A link to the draft Public Involvement Summary, Matrix and presentation is provided here:

https://www.r2ctpo.org/event/tpo-board-meeting-49/

ACTION REQUESTED:

NO ACTION REQUIRED UNLESS OTHERWISE DIRECTED BY THE TPO BOARD

78

Page 79: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

MEETING SUMMARY

TPO BOARD OCTOBER 23, 2019

VI. PRESENTATIONS AND DISCUSSION ITEMS

B. PRESENTATION AND DISCUSSION OF THE DRAFT COMMUNICTY SAFETY ACTION PLAN (CSAP)

Background Information:

In recent years, the R2CTPO has pursued a variety of activities to improve transportation safety including: bicycle helmet fittings and safety awareness, corridor studies, crash analyses and the prioritized of projects for construction. Other organizations in our planning area have pursued programs as well.

The CSAP involved a review of crash data and trends along with a review of current activities and programs intended to increase awareness among the general public. Recommendations from this effort are intended to identify potential opportunities for the TPO to focus our efforts over the next few years with programs that may improve transportation safety.

Ms. Pam Blankenship will provide an overview of the draft Community Safety Action Plan.

ACTION REQUESTED: NO ACTION REQUIRED UNLESS OTHERWISE DIRECTED BY THE TPO BOARD

79

Page 80: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

October 2019

80

Page 81: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

FIVE “E’S” OF SAFETY

INTRODUCTION & OVERVIEW

A safe community is one where people are able to participate and live their lives in an environment without fear or risk of harm or injury. The River to Sea Transportation Planning Organization (TPO) has developed this Community Safety Action Plan (CSAP) to address and improve transportation safety within our local community. The plan has been developed through a collaborative approach and is based on local data.

Providing a safe transportation system is extremely important to the River to Sea TPO and in the past few years, a number of activities have been pursued, including:

• the development of the Long Range Transportation Plan (LRTP) that addresses safety • the establishment of ranking criteria that assigns points for infrastructure projects

that address unsafe conditions and funds construction projects that improve safety • completion of safety planning studies such as the School Safety Studies, SR/CR A1A

Pedestrian Safety and Mobility Study, Roadway Safety Evaluation and Improvement Study, etc.

• participation in safety awareness events such as White Cane Awareness/Pedestrian Safety Day, summer school helmet fittings, Mobility Week safety events, etc.

The River to Sea TPO, in partnership with community agencies such as the Florida Department of Health in Volusia & Flagler, law enforcement agencies and local cities and counties, has worked to address the five “E’s” of safety; engineering, enforcement, education, encouragement and evaluation.

ENGINEER: Planning, designing and constructing safe places

ENFORCE:Using law enforcement to ensure safe driving,

walking and riding

EDUCATE: Teaching people to drive,

walk and bike safely

ENCOURAGE: Creating a culture to

recognize and welcome safe driving, walking and

riding

EVALUATE: Monitoring and

measuring data to understand factors

contributing to unsafe conditions

81

Page 82: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

BACKGROUND & PROJECT APPROACH

The CSAP was included in the TPO’s FY 2018/19 and 2019/20 Unified Planning Work Program to be completed in 2019. The purpose is to assess existing safety strategies utilized in our planning area and identify community outreach activities that will build upon those efforts to further promote safety. CSAP focus areas will be used to develop a work plan for TPO staff.

Community safety has been consistently identified as a high priority for our residents, tourists and visitors. In the River to Sea TPO’s 2018 Tell the TPO Survey, some of the key findings included:

• Investing in safety and convenience will make travel choices more attractive: Respondents to the survey indicated that they would walk of bicycle more if additional high quality bicycle and pedestrian facilities were constructed. Many felt more should funding should be invested improving walking conditions.

• Improving roadway safety and efficiency are highest priorities: Respondents identified the improvement of safety and transit service as the types of transportation projects that are the highest priorities.

Among the responses to the survey, more than 50% cited safety concerns as reasons they do not walk or bike. It is clear to see that safety is an issue that must be addressed.

This CSAP will review recent safety data and compare it with safety strategies and initiatives that are currently underway in our community. This will help to identify areas that need more attention in order to reduce unsafe activities in our community.

COMMUNITY SAFETY ANALYSIS

STAKEHOLDER/PUBLIC INPUT

The development of this plan began with a review of safety data captured from the past five years through Signal Four Analytics as well as through the TPO’s Crash Analysis Report and Roadway Safety Evaluation & Improvement Study. Current safety campaigns and initiatives in our planning area were identified. A stakeholder group and the TPO’s committees and board convened to discuss the data and strategies and to offer potential ideas that would increase safety. The following agencies and groups provided input into this plan:

• Florida Department of Transportation (FDOT) District 5

• Volusia County Sheriff’s Office • Embry-Riddle Aeronautical University • Safe Kids Coalition • Halifax Heritage Byway

• Daytona Beach Mayors’ Alliance • River to Sea TPO Committees & Board • Volusia County Traffic Engineering • City of Ormond Beach • Halifax Council of the Blind

82

Page 83: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

STATISTICS/DATA

A review of the data determined that there were two things that contribute the most to deaths and injuries: distracted driving and speeding.

DISTRACTED DRIVING

Distracted driving can be defined as driving while not fully paying attention to the road. Many people think of texting and driving or talking on the phone when driving; however, you can also be distracted by:

• Reaching for your phone • Changing the radio station • Daydreaming • Checking your GPS • Taking a photo

• Checking email • Posting to social media sites • Eating and drinking • Putting on makeup/grooming

Even speaking to a passenger in your car can be a distraction. You are distracted ANY TIME your mind and/or your eyes are taken off the road. In 2018, there were 1,383 distracted driving crashes in Volusia and Flagler Counties; accounting for about 14% of all crashes. This number is likely underreported and has been estimated to contribute to at least 25% of all crashes. Driver distraction is reported by the National Safety Council to be responsible for more than 58% of teen crashes. In addition, nine people in the U.S. are killed each day as a result of crashes involving a distracted driver, according to the Department of Motor Vehicles.

Teen Safe (www.teensafe.com)

On July 1, 2019, the Wireless Communications While Driving Law, Section 316.305, Florida Statutes, took effect. The law requires that drivers put their phones down and focus on driving. Law enforcement is now able to stop drivers and issue tickets to motorists who are texting and driving. The law also prohibits any use of wireless handheld devices in school and work (construction) zones.

The two most common crash types are rear end collisions and lane departures. Rear end collisions account for nearly 28% of all crashes; the majority being in daylight hours and dry conditions. It can be inferred from this data that many of these crashes are the result of a distracted driver; the driver not paying attention and being unable to brake in time for a stopped

83

Page 84: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

vehicle in front of them. The second most common, at 25% of all crashes, are lane departures. Lane departures can be due to driver distraction or being drowsy or impaired. Combining the top two crashes accounts for more than 50% of all collisions, most of which are due to distraction.

SPEEDING

Speeding is defined as the act or practice of exceeding the posted speed limit. Speed also affects safety when drivers are travelling too fast for road conditions, such as during bad weather, when a road is under repair, or in an area at night that isn’t well lit. In Volusia and Flagler Counties, speeding is a contributing factor in 81% of all crashes. About 28% of all traffic deaths that occur each year are caused by a speeding driver. A study from the National Transportation Safety Board declares there’s a singular and unequivocal reason for the rise in traffic deaths: speed is what’s killing Americans.

The TPO planning area ranks high for bicycle and pedestrian injuries and fatalities. While some of these can be attributed to the bicycle and pedestrian behavior, many more are attributed to driver behavior. By reducing speeding and distracted driving, bicycle and pedestrian injuries and fatalities will decrease.

The chart below shows the difference speed can make on the survival rate of pedestrians.

The potential consequences for vehicles that speed include:

• Greater potential for losing control of the vehicle; • Reduced effectiveness of protection equipment; • Increased stopping distance after the driver perceives a danger; and • Increased severity of crashes resulting in more severe injuries or fatalities.

This plan focuses on recommendations to reduce speeding and distracted driving.

84

Page 85: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

PREVIOUS WORK EFFORTS

In order to develop recommendations that will have an impact on safety in our area, it is important to look at what is currently being done. Below is a table of many of the initiatives and strategies that are currently occurring:

Initiatives/Strategies Agency Focus Area Alert Today, Alive Tomorrow FDOT Safety Education Initiatives – Advertisements FDOT Safety Put it Down, Focus on Driving FLHSMV/FDOT Distracted Driving Florida Traffic & Bicycle Safety Education Program FDOT/UF Bike/Ped Safety Safe Routes to School Program FDOT Bike/Ped Safety Best Foot Forward Pedestrian Safety Initiative Bike/Walk Central Florida Pedestrian Safety High Visibility Law Enforcement FDOT/Local Governments Pedestrian Safety Arrive Alive, Buckle Up FLHSMV Safety Community Traffic Safety Teams FDOT Safety School Safety Studies River to Sea TPO Safety Bicycle Helmet Fittings River to Sea TPO Bicycle Safety Corridor Assessments River to Sea TPO Safety Bicycle and Pedestrian Master Plan River to Sea TPO Bike/Ped Safety Safety Performance Targets River to Sea TPO Safety Priority Project Process River to Sea TPO Safety Teen Driver Challenge Florida Sheriff’s Association Defensive Driving

It should be noted that the above listing is not an exhaustive list. It is evident upon reviewing the statistics over time that more needs to be done to drive down crashes, fatalities and injuries.

IMPLEMENTATION PLAN

1. Develop an Education and Awareness Campaign for Speeding and Distracted Driving The first recommendation is to decrease distracted driving and speeding through an education and awareness campaign. A theme that was evident from the input that was received at the committee and stakeholder meetings was to teach obedience of the laws and safety throughout the school years, beginning in kindergarten and going all the way through high school. By doing this, following the laws and exhibiting safe behaviors will become instinctive and automatic. The TPO will partner with the Volusia and Flagler County school systems, local law enforcement agencies and the general public to develop a safety education and awareness campaign. This will not be an immediate fix; but one that will need to be monitored for many years to come before we can see its full effects.

2. Create a Targeted Print and Social Media Campaign A second recommendation is to develop safety awareness materials geared toward distracted driving that can be distributed through the Hotel & Motel Lodging Association to be displayed at local hotels and motels as well as colleges and universities. These marketing materials may include posters and QR codes that passerby’s can scan with their phones to get information.

85

Page 86: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

3. Develop a Speakers’ Group A third recommendation is to partner with people who have been involved in life-changing accidents due to distracted drivers or speeders. The TPO will arrange a schedule for these individuals to speak to groups about their experiences. Groups may include college classes, high school classes, safety events and presentations, etc. This will encourage people to see that these are not just numbers we are talking about but real people who have had their lives forever changed.

4. Continue Existing Programs and Activities The TPO will continue the programs and activities that are currently in place such as:

• Bicycle helmet fittings • Participation in safety and health-related events • Partnering with agencies such as the Florida Department of Health in Volusia and

Flagler Counties, Florida Department of Transportation (FDOT) and local governments to promote change in human behavior

• Complete Streets development and implementation • Continued monitoring of transportation safety performance measures for safety • Development of safety studies

86

Page 87: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

MEETING SUMMARY

TPO BOARD OCTOBER 23, 2019

VI. PRESENTATIONS AND DISCUSSION ITEMS

C. PRESENTATION AND DISCUSSION OF UPDATE OF THE DEVELOPMENT OF THE 2045 LONG RANGE TRANSPORTATION PLAN (LRTP)

Background Information:

The TPO’s 2045 LRTP Consultant, Kimley-Horn & Associates, will provide an update to the development of the 2045 Long Range Transportation Plan. A link to the presentation is here:

https://www.r2ctpo.org/wp-content/uploads/2045-LRTP-Update-1.pdf

ACTION REQUESTED: NO ACTION REQUIRED UNLESS OTHERWISE DIRECTED BY THE TPO BOARD

87

Page 88: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

MEETING SUMMARY

TPO BOARD OCTOBER 23, 2019

VI. PRESENTATIONS AND DISCUSSION ITEMS

D. PRESENTATION AND DISCUSSION OF THE GUIDING RESOLUTIONS AND PROJECT APPLICATIONS FOR THE ANNUAL CALL FOR PROJECTS

Background Information: Each year, after completion of the project prioritization process, the TPO staff asks the committees to evaluate the process and recommend improvements for the next cycle. The aim is to achieve the best possible outcomes in terms of identifying and promoting transportation-related priorities consistent with the community’s goals and objectives as prescribed in the adopted long-range transportation plan. There are two recommended changes to Criterion #5 - Enhancements to the Transportation System in the Bicycle/Pedestrian Implementation Application to 1) remove the reference that the project be in an adopted plan since it is a duplicate of Criterion #2 and 2) add conformance to the TPO Complete Streets policy as an attribute to the Criterion. Recommended changes to the guiding resolution to the process are included in the agenda packet in strike-through and underline format. TPO staff will lead a discussion and provide an update of recommended changes.

ACTION REQUESTED: NO ACTION REQUIRED UNLESS OTHERWISE DIRECTED BY THE TPO BOARD

88

Page 89: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

TPO’s Annual Priority Project Process

Project Applications Submitted from Cities and

Counties to TPO

TIP Subcommittee & BPAC Project Review Subcommittee meet separately to score/rank

applications

TPO Issues Call for Projects

Priority Process Workshop held for Cities and Counties

to discuss the Process

CAC, TCC and BPAC Members volunteer

to serve on TIP Subcommittee

BPAC Members volunteer to serve on BPAC Project Review

Subcommittee

BPAC reviews preliminary rankings of

Bicycle & Pedestrian Projects

CAC and TCC recommend approval of rankings for

Traffic Ops/Safety projects and Planning Studies

TPO Board reviews preliminary rankings of

Bicycle & Pedestrian and Traffic Ops/Safety Projects

and Planning Studies

CAC/TCC review preliminary rankings of

Traffic Ops/Safety Projects and Planning Studies

BPAC recommends approval of rankings for

Bicycle/Pedestrian projects

TPO Board approves List of Priority Projects (LOPP) and

submits to FDOT

TPO Board approves Priority Process applications and resolutions Fa

ll Ap

ril

Janu

ary

Mar

ch

Febr

uary

Ju

ne

May

89

Page 90: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

DRAFT 10-8-2019

RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION

RESOLUTION 2019-02XX

RESOLUTION OF THE RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION REAFFIRMING THE POLICY FOR ESTABLISHING AND MAINTAINING TRANSPORTATION

PRIORITY PROJECTS _____________________________________________________________________________________________

WHEREAS, Florida Statutes 339.175; 23 U.S.C. 134; and 49 U.S.C. 5303 require that every urbanized area with a population of 50,000 or more, as a condition to the receipt of federal capital or operating assistance, shall have a continuing, cooperative, and comprehensive transportation planning process that results in plans and programs consistent with the comprehensively planned development of the urbanized area; and

WHEREAS, the River to Sea Transportation Planning Organization (TPO) is the duly designated and constituted body responsible for carrying out the urban transportation planning and programming process for the designated Metropolitan Planning Area (MPA) comprised of Volusia County and the urbanized areas of Flagler County including the cities of Flagler Beach, Beverly Beach, and portions of Palm Coast and Bunnell; and

WHEREAS, 23 C.F.R. 450.104 provides that the River to Sea TPO shall annually endorse, and amend as appropriate, the plans and programs required, among which is the Surface Transportation Block Grant Program (STBG) projects list of the annual Transportation Improvement Program (TIP) submission; and

WHEREAS, each year the appropriate River to Sea TPO committees made up of a cross-section of interested citizens and technical staff are charged with the responsibility of drafting a list of prioritized projects; and

WHEREAS, it is the responsibility of the River to Sea TPO to establish project priorities for all areas of the TPO's MPA; and

WHEREAS, the River to Sea TPO reaffirms its commitment to the priority process and related policies;

NOW, THEREFORE, BE IT RESOLVED by the River to Sea TPO that the following policies are established to prioritize transportation projects throughout the TPO's MPA:

1. The project application and evaluation criteria approved by the River to Sea TPOBoard shall be used to solicit and evaluate projects for priority ranking in thetransportation program categories listed below:

a. Florida Strategic Intermodal System (SIS) Projects;

b. Regionally Significant, Non-SIS Roadway Projects and Major Bridge Projects;

DRAFT

90

Page 91: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Resolution 2019-02XX Page 2

DRAFT 10-8-2019

c. Traffic Operations, Safety, and Local Initiatives Projects;

d. Bicycle/Pedestrian, Transportation Alternatives, Regional Trails, and LocalInitiatives Projects;

e. Public Transit Projects; and

f. Transportation Planning Studies.

2. River to Sea TPO projects that were previously ranked and have a FinancialManagement (FM) number and are in the Florida Department of TransportationWork Program will automatically be prioritized above projects that are notcurrently in the FDOT Five-Year Work Program;

3. Projects which are ranked one through five on the Prioritized List of FloridaStrategic Intermodal System (SIS) Projects are deemed to be protected, and willremain in their current spot or move to the next available higher spot until theyare completed and drop out of the Work Program;

4. Projects which are ranked one through five on the Prioritized List of RegionallySignificant, Non-SIS Roadway Projects and Major Bridge Projects are deemed tobe protected, and will remain in their current spot or move to the next availablehigher spot until they are completed and drop out of the Work Program;

5. Projects which are ranked one through eight on Tier “B” of the Prioritized List ofTraffic Operations, Safety, and Local Initiatives Projects are deemed to beprotected, and will be ranked in their current spot or move to the next availablehigher spot until they are completed and drop out of the Work Program;

6. Projects which are ranked one through three on Tier “B” of the Prioritized List ofBicycle/Pedestrian, Transportation Alternatives, Regional Trails, and LocalInitiatives Projects are deemed to be protected, and will be ranked in theircurrent spot or move to the next available higher spot until they are completedand drop out of the Work Program;

7. If, at any time, two or more lists of prioritized projects are merged into a newlist, every project that was protected prior to the merger shall retain itsprotected status, and no new or previously unprotected project shall be deemedto be protected unless and until it advances to the protected rank prescribed forthe new, merged list.

8. The River to Sea TPO will only re-prioritize or add projects when the TPO Boarddetermines: a) unusual circumstances support such action, b) the circumstancesare not of a recurring nature, c) the circumstances do not result from the actionsof the project sponsor, and d) the proposed reprioritization or addition will notbe contrary to the public interest;

9. Requests to change the priority or to add a project must include a statement ofhardship by the requestor along with supporting documentation that includes

DRAFT

91

Page 92: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Resolution 2019-02XX Page 3

DRAFT 10-8-2019

detailed justification of need and an assessment of the impacts to the programming of prioritized projects;

10. It is the responsibility of the River to Sea TPO and FDOT staffs to provide theRiver to Sea TPO members with current information and data on project statusand to assist the members in their efforts to make informed decisions regardingthe prioritized projects lists;

11. The River to Sea TPO shall, in its discretion, make all decisions regarding the finalprioritized project lists that are annually submitted to FDOT;

12. Once a project has attained protected status, it should be programmed within 3years. If it has not been programmed during that time due to inactivity on thepart of the project sponsor, then the project will be removed from the list ofpriority projects. The project sponsor may resubmit the project for open rankingon any subsequent call for projects.

13. Per the approved the Annual Call for Projects schedule, the project sponsor shallannually submit a letter to the River to Sea TPO affirming their continuedsupport to retain each project on the priority list and provide updated costestimates. The letter shall also provide support from the project sponsor for anyTransportation Regional Incentive Program (TRIP) eligible project(s) which theyare ready to advance into the Work Program and TIP and provide a commitmentof local matching funds, if required.

14. The River to Sea TPO shall use this project prioritization process to support thedevelopment of Regional Priority Lists in the areas of Trails, Transit,Transportation Systems Management and Operations (TSM&O), and PlanningStudies

15. The policies set forth in this resolution shall remain in effect unless and until theyare repealed by the TPO; and

16. the Chairperson of the River to Sea TPO, (or their designee) is hereby authorizedand directed to provide a copy of this resolution to the:

a. Florida Department of Transportation (FDOT);

b. Federal Transit Administration (FTA) (through the FloridaDepartment of Transportation); and

c. Federal Highway Administration (FHWA) (through the FloridaDepartment of Transportation)

DRAFT

92

Page 93: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Resolution 2019-02XX Page 4

DRAFT 10-8-2019

DONE AND RESOLVED at the regular meeting of the River to Sea TPO held on the 23rd27th day of January November 2019.

RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION

_____________ __________________________ CITY OF DAYTONA BEACH COMMISSIONER ROBERT GILLILAND

ACTING CHAIRPERSON, RIVER TO SEA TPO

CERTIFICATE:

The undersigned duly qualified and acting Recording Secretary of the River to Sea TPO certified that the foregoing is a true and correct copy of a resolution, adopted at a legally convened meeting of the River to Sea TPO held on January 23November 27, 2019.

ATTEST:

_____________________________________ DEBBIE STEWART, RECORDING SECRETARY RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION

DRAFT

93

Page 94: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

DRAFT 10-8-2019

RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION

RESOLUTION 2019-03XX

RESOLUTION OF THE RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION (TPO)DEFINING THE LOCAL MATCH REQUIREMENTS PLACED ON MEMBER LOCAL GOVERNMENTS FOR

PROJECTS PRIORITIZED FOR FUNDING BY THE TPO ______________________________________________________________________________

WHEREAS, Florida Statutes 339.175; 23 U.S.C. 134; and 49 U.S.C. 5303 require that the urbanized area, as a condition to the receipt of federal capital or operating assistance, have a continuing, cooperative, and comprehensive transportation planning process that results in plans and programs consistent with the comprehensively planned development of the urbanized area; and

WHEREAS, the River to Sea Transportation Planning Organization (TPO) is the duly designated and constituted body responsible for carrying out the urban transportation planning and programming process for the designated Metropolitan Planning Area (MPA) comprised of Volusia County and the urbanized areas of Flagler County including the cities of Flagler Beach, Beverly Beach, and portions of Palm Coast and Bunnell; and

WHEREAS, the FDOT funds projects in the Work Program based on the plans and priorities set by the TPO; and

WHEREAS, the River to Sea TPO desires to provide, whenever possible, financial assistance to governmental entities to allow them to pursue transportation projects and programs which are consistent with the TPO's plans and priorities and benefit residents of and visitors to our planning area; and

WHEREAS, the River to Sea TPO wants to leverage the state and federal transportation funds programmed on transportation projects in TPO's MPA and ensure a measure of local financial commitment to transportation projects and programs utilizing these funds;

NOW, THEREFORE, BE IT RESOLVED by the River to Sea TPO that:

1. Every governmental entity receiving state and/or federal transportation funds for a projecton any of the following Priority Project Lists shall provide a local match at the ratio of 10%local funds to 90% state and/or federal funds:

a. Traffic Operations, Safety, and Local Initiatives Projects;

b. Bicycle/Pedestrian, Transportation Alternatives, Regional Trails, and Local InitiativesProjects.

This match requirement shall not apply to projects on the State Highway System; and

2. Every governmental entity receiving state and/or federal transportation funds for a projecton the TPO's Priority List of Transportation Planning Studies shall provide a local match atthe a minimum ratio of 10% local funds to 90% state and/or federal funds; and

DRAFT

94

Page 95: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Resolution 2019-03XX Page 2

DRAFT 10-8-2019

3. A local match shall not be required for any project on the TPO's Priority Lists of StrategicIntermodal System (SIS) Projects, Regionally-Significant, Non-SIS Roadway Projects, orTransit Projects, subject to the any other funding program requirements that may apply(e.g., Transportation Regional Incentive Program); and

4. the River to Sea TPO determines that “local match” shall be defined as non-state/non-federal cash match and/or in-kind services of eligible costs that advance the project inquestion; and

5. notwithstanding the terms prescribed in subparagraph 2, above, the required local matchshall not exceed the ratio required in the current policy of the TPO Board at the time thegovernmental entity requesting the funds commits to its amount of local match for theproject; and

6. the River to Sea TPO reserves the right to waive or adjust the local match requirements ifthe TPO Board deems there exists sufficient reason or circumstance; and

7. the River to Sea TPO defines a cost overrun as an increase in the amount of the cost of anyprogrammed project phase due to a change in scope, project limits or project approach thatcould have reasonably been foreseen or is the result of an incomplete, insufficient or out ofdate cost estimate; and

8. the River to Sea TPO reaffirms its policy that any cost overruns encountered on a projectfunded with state and/or federal transportation funds will be the responsibility of thegovernmental entity identified as the project originator with the following exception: if theproject is on the state highway system and the State DOT is the project manager of recordthen the state shall be responsible for any cost overruns utilizing state dollars; and

9. the River to Sea TPO defines a cost increase as an increase in the cost of any programmedproject phase due to unforeseen market changes or a change in requirements and/orstandards for projects that have current and complete cost estimates; and

10. Requests for additional state and/or federal funds must be submitted to the TPO andinclude a statement of hardship or justification by the governmental entity identified as theproject sponsor along with supporting documentation that includes detailed justification ofthe change in cost; and

11. the River to Sea TPO Executive Director may authorize the use of state and/or federal fundsto cover some or all of a cost increase on any project phase up to and including 10% of theproject cost estimate for that phase; and

12. the use of state and/or federal funds to cover cost increases exceeding 10% of the projectcost estimate for any phase may be authorized only by the River to Sea TPO Board; and

13. the Chairperson of the River to Sea TPO (or their designee) is hereby authorized anddirected to submit this resolution to the:

a. Florida Department of Transportation;b. Federal Transit Administration (through the Florida Department of Transportation);c. Federal Highway Administration (through the Florida Department of

Transportation); and

DRAFT

95

Page 96: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Resolution 2019-03XX Page 3

DRAFT 10-8-2019

d. Councils, Commissions, and Managers of the TPO Member Local Governments.

DONE AND RESOLVED at the regularly convened meeting of the River to Sea TPO held on the 23rd 27th day of January November 2019.

RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION

__________________________________________ CITY OF DAYTONA BEACH COMMISSIONER ROBERT GILLILAND

ACTING CHAIRPERSON, RIVER TO SEA TPO

CERTIFICATE:

The undersigned duly qualified and acting Recording Secretary of the River to Sea TPO certified that the foregoing is a true and correct copy of a resolution, adopted at a legally convened meeting of the River to Sea TPO held on January 23November 27, 2019.

ATTEST:

___________________________________ DEBBIE STEWART, RECORDING SECRETARY RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION

DRAFT

96

Page 97: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

97

Page 98: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

98

Page 99: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

99

Page 100: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

MEETING SUMMARY

TPO BOARD OCTOBER 23, 2019

VI. PRESENTATIONS AND DISCUSSION ITEMS

E. PRESENTATION AND DISCUSSION OF CR 415 AND PIONEER TRAIL INTERSECTION IMPROVEMENTS

Background Information: Volusia County has recently completed an evaluation of the Intersection of Tomoka Farms Road (CR 415) and Pioneer Trail (CR 4118). County staff will present the findings of this evaluation. A link to the presentation is here:

https://www.r2ctpo.org/wp-content/uploads/Tomoka-Farms-Rd-at-Pioneer-Trail.pdf

ACTION REQUESTED: NO ACTION REQUIRED UNLESS OTHERWISE DIRECTED BY THE TPO BOARD

100

Page 101: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

MEETING SUMMARY

TPO BOARD OCTOBER 23, 2019

VI. PRESENTATIONS AND DISCUSSION ITEMS

F. PRESENTATION AND DISCUSSION OF TENTATIVE FIVE-YEAR WORK PROGRAM FOR FY 2020/21 TO 2024/25

Background Information:

Each year, FDOT develops the Five-Year Work Program in accordance with Section 339.135, Florida Statutes. The Five-Year Work Program is an ongoing process that is used to forecast the funds available and allocate those to transportation system improvements over a five year period.

The development of this Work Program involves coordination with local governments, including Metropolitan Planning Organizations and other city and county officials. In urbanized areas, Metropolitan Planning Organizations (MPOs) have the responsibility to develop transportation plans and prioritize transportation needs. In non-metropolitan areas, county commissions establish priorities. FDOT implements the transportation improvements identified by the TPOs and local governments. During the process, new projects are added and existing projects may be advanced or deferred based on the updated financial forecast. As a new fifth year is added to the cycle, the current year drops out of the plan and a new Five-Year Work Program is introduced.

Public hearings are held in each of the seven transportation districts, including a week-long online public hearing, and a statewide public hearing is held by the Florida Transportation Commission. The Florida Transportation Commission then performs an in-depth review of the Work Program and presents the results to the Executive Office of the Governor.

A link to the presentation of the FDOT District 5 Work Program Public Hearing can be found here:

https://www.r2ctpo.org/wp-content/uploads/WPPH-Presentation.pdf

ACTION REQUESTED: NO ACTION REQUIRED UNLESS OTHERWISE DIRECTED BY THE TPO BOARD

101

Page 102: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

MEETING SUMMARY

TPO BOARD OCTOBER 23, 2019

VI. PRESENTATIONS AND DISCUSSION ITEMS

G. PRESENTATION AND DISCUSSION OF THE 2045 FLORIDA TRANSPORTATION PLAN

Background Information: The Florida Transportation Plan (FTP) is the single overarching statewide plan guiding Florida's transportation future. It is a plan for all of Florida created by, and providing direction to, the Florida Department of Transportation (FDOT) and all organizations that are involved in planning and managing Florida's transportation system, including statewide, regional, and local partners. The FTP includes seven goals to guide transportation planning decisions:

1. Safety and security 2. Agile, resilient, and quality transportation infrastructure 3. Efficient and reliable mobility 4. More transportation choices 5. Economic competitiveness 6. Quality places to live, learn, work, and play 7. Florida’s environment and energy conservation

Ms. Judy Pizzo, FDOT, District 5, is scheduled to deliver a presentation on the FTP update. A link to the presentation is here:

https://www.r2ctpo.org/wp-content/uploads/R-Update-FTP-2045-River2Sea-TPO-Board-102319-5-min.pdf

ACTION REQUESTED: NO ACTION REQUIRED UNLESS OTHERWISE DIRECTED BY THE TPO BOARD

102

Page 103: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

MEETING SUMMARY

TPO BOARD OCTOBER 23, 2019

VI. PRESENTATIONS AND DISCUSSION ITEMS

H. FDOT REPORT Background Information: Ms. Vickie Wyche, Florida Department of Transportation (FDOT) will be present to answer questions regarding projects on the FDOT Construction Status Report and Push Button Report.

The Construction Status and Push Button Reports are provided for your information.

ACTION REQUESTED:

NO ACTION REQUIRED UNLESS OTHERWISE DIRECTED BY THE TPO BOARD

103

Page 104: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Florida Department of Transportation

RON DESANTIS GOVERNOR

719 S. Woodland Boulevard DeLand, Florida 32720-6834

KEVIN J. THIBAULT, P.E. SECRETARY

www.fdot.gov

Volusia/Flagler County Project Status Update as of September 25, 2019

The following is a brief status update on major FDOT road construction projects in Volusia and Flagler counties as of the August cutoff. The next cutoff date is October 20, 2019. Information is also available on www.cflroads.com.

Upcoming projects: 439121-1-51 and 439144-1-52 S.R. 472 Resurfacing from U.S. 197/92 to the I-4 Interchange

o Contract: E5Z77 o Contractor: P&S Paving Inc o Estimated Start: Late September 2019 o Estimated Completion: Spring 2020 o Project Cost 3.2 Million

Current projects: 437595-1 – U.S. 1 at Matanzas Woods Parkway Roundabout

o Contract: T5648 o Contractor: P&S Paving Inc. o Contractor received 30 days lead time extension o Estimated Start: Late September 2019 o Estimated Completion: Summer 2020 o Utility work is being done o Project Cost: 2.6 Million

440966-1 – I-4 over Dirksen Drive bridge bearing pad replacement and epoxy overlay

o Contract: E5Z73 o Estimated Start: August 2019 o Estimated Completion: Late 2019 o Contractor is working to prepare bridge for bearing pad replacement.

441694-1 – Asphalt repairs on S.R. 44 from west of I-4 to east of Prevatt Avenue near Deland, and on Canal Street from Myrtle Avenue to Dimmick Street in New Smyrna Beach

o Contract: E5U86

104

Page 105: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

o Estimated Start: August 2019 o Complete - Final accepted 9/17/2019

• 242715-2-52-01 -- I-95 Widening, I-4, U.S. 92 System to System Interchange

o Contract: E5W26 o Estimated Completion: Late 2019

• 438038-1 and 441070-1 – I-4 Resurfacing and Saxon Boulevard Interchange

o Contract T5606 o Project Start: August 2018 o Project is substantially complete o Estimated Completion: September 2019

• 441210-1 – U.S. 1 at Old Dixie Highway Roundabout

o Contract: E5Z64 o Project Start: January 2019 o Traffic is in Phase 3 configuration (north bound traffic is in final configuration)

and is expected to move to final traffic configuration in October. o Contractor is on schedule

• 440557-5,6,7 – SR A1A Permanent Repairs in Flagler County

o Contract: T5641 o Project Start: February 2019 o Estimated completion: Early 2020 o Southbound S.R. A1A detour in place o Segment 2 (French drain system) drainage installation is continuing and is nearly

90% complete. o Segment 3 (buried seawall) substantially complete o Segment 1 (South 25-South 23) substantially complete o Contractor is on schedule

• 240992-5 – U.S. 1 at Canal Street intersection improvements

o Contract: T5660 o Project Start: March 2019 o Estimated Completion: Summer 2020 o Expect additional lane closures and detours this month o Contractor working on new water main on the west side of U.S. 1

• 438003-1-52-01 and 438003-2-52-01 – I-95 Resurfacing Flagler County

o Contract: T5636

105

Page 106: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

o Work began March 2019 o Estimated Completion: Late 2020 o Contractor is now using two crews to work on both segments o Daytime and nighttime lane closures can be expected Sunday - Friday

• 441682-1-72-01 – Concrete Rehabilitation on U.S. 1 in South Daytona & Port

Orange o Contract: E5U82 o Project Start: April 29, 2019 o Estimated Completion: Early 2020 o Contractor is working towards intersection of U.S. 1 and Dunlawton Avenue,

work will begin there in the next week. o Daytime lane closures to be expected Monday – Friday in both directions

106

Page 107: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

FDOT District 5 - DeLand Operations Office 1650 N. Kepler Road , DeLand, FL 32724

Phone (386) 740-3548 Fax (386) 736-5469 DeLand Operations Engineer Ron Meade, P.E

Outside Consultant

In-House Construction

Maintenance

Project Status Report as of September 25, 2019

FIN #

CONTRACT #

TIME COST

CONTRACTOR: Archer Western Contractors LLC LET DATE: 9/05/2014 ORIGINAL: 1,100 $204,975,000.00

CCEI: Jacobs Engineering Group NTP: 11/25/2014 CURRENT: 1,580 $206,228,829.56

FED. AID #: 0954-140-1 TIME BEGAN: 11/25/2014 ELAPSED: 1,760 $196,623,558.67

FUND TYPE Federal WORK BEGAN: 11/25/2014 % ORIGINAL: 160.00% 95.93%

Current CPPR: 99 EST. COMPLETION: Late 2019 % TO DATE: 111.39% 95.34%

Robert Parker

Lynda Parker

Jose Medina

Jeremy Haines

Jaime Venegas

Ryan Gwaltney

Glenn Raney

Amy Scales, P.E.

Mike Meadows

Jim Read

Jeremy Haines

Jason Roberts

FIN #

CONTRACT #

TIME COST

CONTRACTOR: P&S Paving Inc. LET DATE: 1/31/2018 ORIGINAL: 390 $8,022,650.00

CCEI: CDM Smith NTP: 4/5/2018 CURRENT: 488 $8,349,047.55

FED. AID #: D517062B TIME BEGAN: 6/4/2018 ELAPSED: 471 $8,120,648.14

FUND TYPE Construction Lump Sum WORK BEGAN: 6/4/2018 % ORIGINAL: 120.77% 101.22%

Current CPPR 100 EST. COMPLETION: Fall 2019 % TO DATE: 96.52% 97.26%

Greg Shelton

Seth Simpson

Brian Davidson

John Dunlap

Glenn Raney

Michael Ruland P.E.

Charles Spaeth

Jim Read

John Dunlap

Brian Davidson

CEI PROJECT ADMINISTRATOR O: 386.333.9537 C: 904.449.0923 [email protected]

CONTRACTOR'S PROJECT MANAGER: O: 386.333.9575 C: 770-990-7508 [email protected]

O: 386.333.9537 C: 386.281.2238 [email protected]

CONTACT PHONE EMAIL

CEI ASST. PROJECT ADMINISTRATOR: O: 386.333.9537 C: 386.804.2403 [email protected]

Volusia County

MAINTENANCE CONTACT: O: 386.740.3406 C: 386.801.5584 [email protected]

24 HR CONTRACTOR EMERGENCY CONTACT: O: 386.333.9575 C: 770-990-7508 [email protected]

SENIOR INSPECTOR: O: 386.333.9537 C: 352.547.7145 [email protected]

ALT. 24 HR CONTRACTOR EMERGENCY CONTACT: O: 386.333.9575 C: 386.916.4439

CONTRACTOR'S ASST PROJECT MANAGER O: 386.333.9577 C: 863.245.1814 [email protected]

I-95 Widening and I-4, US 92 System to System Interchange Reconstruction

242715-2-52-01

E5W26

DESIGN BUILD

CONTRACT SUPPORT SPECIALIST (CSS)

PROJECT DESCRIPTION: Widening of I-95 from four to six lanes, complete reconstruction of the I-4/SR 400 and US 92 interchanges, reconstruction of Bellevue Bridge, improvements to

SR 400, US 92, Bellevue Road and Tomoka Farms Road.

CONTRACTOR'S ASST PROJECT MANAGER O: 386.333.9576 C: 817.721.5071 [email protected]

FDOT PROJECT MANAGER: O: 386.740.3524 C:386.846.4862 [email protected]

SENIOR PROJECT ENGINEER: O: 386.333.9537 C: 386.481.3758 [email protected]

[email protected]

Volusia County

I-4 Resurfacing from West of Saxon Boulevard to East of S.R. 472, Saxon Interchange Improvements

438038-1-52-01 and 441070-1-52-01

T5606

Lump Sum

PROJECT DESCRIPTION: Mill and resurface mainline and ramps along I-4 from west of Saxon Boulevard to east of S.R. 472. The project also consists of interchange improvements at

Saxon Boulevard including realignment of the I-4 eastbound off ramp to Saxon Boulevard and widening along Saxon Boulevard.

CONTACT PHONE EMAIL

CEI SENIOR PROJECT ADMINISTRATOR C: 407.948.9021 [email protected]

CONTRACT SUPPORT SPECIALIST (CSS) O: 407.488.7984 [email protected]

CONTRACTOR'S PROJECT MANAGER: C: 386.566.0551 [email protected]

CONTRACTOR'S SUPERINTENDENT: C: 386.214.8896 [email protected]

FDOT PROJECT MANAGER: O: 386.740.3524 C:386.846.4862 [email protected]

SENIOR PROJECT ENGINEER: C: 407.280.5435 [email protected]

SENIOR INSPECTOR: C: 386.453.9131 [email protected]

MAINTENANCE CONTACT: O: 386.740.3406 C: 386.801.5584 [email protected]

24 HR CONTRACTOR EMERGENCY CONTACT: C: 386.214.8896 [email protected]

ALT. 24 HR CONTRACTOR EMERGENCY CONTACT: C: 386.566.0551 [email protected]

107

Page 108: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Outside Consultant

In-House Construction

Maintenance

Project Status Report as of September 25, 2019

FIN #

CONTRACT #

TIME COST

CONTRACTOR: Superior Construction Co Southeast LLC LET DATE: 9/26/2018 ORIGINAL: 300 $22,429,705.30

CCEI: Atkins Global NTP: 1/4/2019 CURRENT: 320 $22,429,705.30

FED. AID #: E171039E TIME BEGAN: 2/4/2019 ELAPSED: 226 $21,279,595.40

FUND TYPE Conventional Construction WORK BEGAN: 2/4/2019 % ORIGINAL: 75.33% 94.87%

Current CPPR 100 EST. COMPLETION: Late 2019 % TO DATE: 70.63% 94.87%

Javier Castro

Harry Raysin P.E.

David Blair

Bruce Gibson

Glenn Raney

Eric Rosenstein P.E.

Alan Floyd

Jim Read

David Blair

Bruce Gibson

FIN #

CONTRACT #

TIME COST

CONTRACTOR: Masci General Contractors Inc. LET DATE: 10/31/2018 ORIGINAL: 550 $28,838,467.02

CCEI: Jacobs NTP: 1/7/2019 CURRENT: 591 $28,838,467.02

FED. AID #: D517085B TIME BEGAN: 2/18/2019 ELAPSED: 214 $5,987,980.71

FUND TYPE Conventional Construction WORK BEGAN: 2/18/2019 % ORIGINAL: 38.91% 20.76%

Current CPPR 96 EST. COMPLETION: Late 2020 % TO DATE: 36.21% 20.76%

Tony Phillips

Lynda Parker

David Jewett

Ignacio Masci

Rick Coe

Amy Scales, P.E.

Roy Blankenship

Jim Read

Ignacio Masci

David Jewett

MAINTENANCE CONTACT: O: 386.740.3406 C: 386.801.5584 [email protected]

24 HR CONTRACTOR EMERGENCY CONTACT: C: 407.948.3046 [email protected]

ALT. 24 HR CONTRACTOR EMERGENCY CONTACT: C: 386.281.9042 [email protected]

FDOT PROJECT MANAGER: O: 386.740.3490 C: 386.527.3831 [email protected]

SENIOR PROJECT ENGINEER: O: 386.333.9537 C: 386.481.3758 [email protected]

SENIOR INSPECTOR: O: 386.333.9537 C: 386.801.4097 [email protected]

CONTRACT SUPPORT SPECIALIST (CSS) O: 386.333.9537 C: 386.281.2238 [email protected]

CONTRACTOR'S PROJECT MANAGER: C: 386.281.9042 [email protected]

CONTRACTOR'S SUPERINTENDENT: C: 407.948.3046 [email protected]

PROJECT DESCRIPTION: I-95 resurfacing in Flagler County from the Volusia County line to the St. Johns County line.

CONTACT PHONE EMAIL

CEI SENIOR PROJECT ADMINISTRATOR C: 904.415.8024 [email protected]

ALT. 24 HR CONTRACTOR EMERGENCY CONTACT: O: 904.292.4240 C: 904.759.2701 [email protected]

FLAGLER COUNTY

I-95 Resurfacing from the Volusia County Line to St. Johns County Line

438003-1-52-01, 438003-2-52-01

T5636

Conventional Pay Item

SENIOR INSPECTOR: C: 386.320.2206 [email protected]

MAINTENANCE CONTACT: O: 386.740.3406 C: 386.801.5584 [email protected]

24 HR CONTRACTOR EMERGENCY CONTACT: O: 904.292.4240 C: 904.874.4677 [email protected]

CONTRACTOR'S SUPERINTENDENT: O: 904.292.4240 C: 904.759.2701 [email protected]

FDOT PROJECT MANAGER: O: 386.740.3524 C:386.846.4862 [email protected]

SENIOR PROJECT ENGINEER: C: 850.596.8081 [email protected]

CEI SENIOR PROJECT ADMINISTRATOR C: 904-392-3082 [email protected]

CONTRACT SUPPORT SPECIALIST (CSS) C: 850.339.1590 [email protected]

CONTRACTOR'S PROJECT MANAGER: O: 904.292.4240 C: 352-208-3762 [email protected]

FLAGLER COUNTY

SR A1A Permanent Repairs

440557-5-52-01, 440557-6-52-01, 440557-7-52-02, 440557-6-52-02

T5641

Conventional Pay Item

PROJECT DESCRIPTION: Construct permanent repairs along SR A1A in Flagler County in three sections from South 25th Street to South 22nd Street, from South 22nd Street to South

9th Street, and from North 18th Street to Osprey Drive.

CONTACT PHONE EMAIL

108

Page 109: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Outside Consultant

In-House Construction

Maintenance

Project Status Report as of September 25, 2019

FIN #

CONTRACT #

TIME COST

CONTRACTOR: Masci General Contractors Inc. LET DATE: 10/31/2018 ORIGINAL: 430 $4,991,772.04

CCEI: CDM Smith NTP: 1/7/2019 CURRENT: 443 $4,991,772.04

FED. AID #: D518041B TIME BEGAN: 3/8/2019 ELAPSED: 187 $1,414,005.88

FUND TYPE Conventional Construction WORK BEGAN: 3/18/2019 % ORIGINAL: 43.49% 28.33%

Current CPPR 100 EST. COMPLETION: Summer 2020 % TO DATE: 42.21% 28.33%

Greg Shelton

Seth Simpson

Chris Wright

Don Chapmen

Glenn Raney

Michael Ruland P.E.

Mike Brown

Jim Read

Don Chapmen

Chris Wright

FIN #

CONTRACT #

TIME COST

CONTRACTOR: P&S Paving Inc. LET DATE: 5/22/2019 ORIGINAL: 250 $2,614,877.70

CCEI: Atkins Global NTP: 7/26/2019 CURRENT: 250 $2,614,877.70

FED. AID #: D518111B TIME BEGAN: 9/25/2019 ELAPSED: 0 $0.00

FUND TYPE Construction WORK BEGAN: TBD % ORIGINAL: 0.00% 0.00%

Current CPPR 100 EST. COMPLETION: Summer 2020 % TO DATE: 0.00% 0.00%

Eric Rosenstein P.E.

Harry Raysin P.E.

Kirsten Berg

John Dunlap

Glenn Raney

Eric Rosenstein P.E.

Alan Floyd

Jim Read

John Dunlap

Brian DavidsonALT. 24 HR CONTRACTOR EMERGENCY CONTACT: C: 386.566.0551 [email protected]

SENIOR INSPECTOR: C: 386.320.2206 [email protected]

MAINTENANCE CONTACT: O: 386.740.3406 C: 386.801.5584 [email protected]

24 HR CONTRACTOR EMERGENCY CONTACT: C: 386.214.8896 [email protected]

CONTRACTOR'S SUPERINTENDENT: C: 386.214.8896 [email protected]

FDOT PROJECT MANAGER: O: 386.740.3524 C:386.846.4862 [email protected]

SENIOR PROJECT ENGINEER: C: 850.596.8081 [email protected]

CEI SENIOR PROJECT ADMINISTRATOR C: 850.596.8081 [email protected]

CONTRACT SUPPORT SPECIALIST (CSS) C: 850.339.1590 [email protected]

CONTRACTOR'S PROJECT MANAGER: C: 386.566.0551 [email protected]

FLAGLER COUNTY

US 1 at Matanzas Woods Parkway Roundabout

437595-1-52-01

T5648

Conventional Pay Item

PROJECT DESCRIPTION: Construct a new roundabout at the intersection of U.S. 1 and Matanzas Woods Parkway in Palm Coast.

CONTACT PHONE EMAIL

VOLUSIA COUNTY

US 1 at Canal Street Intersection Improvements

240992-5-52-01

T5660

Conventional Pay Item

PROJECT DESCRIPTION: Intersection improvements at SR 5 (US 1) including milling and resurfacing, widening, curb and gutter, drainage improvements, sidewalk, signalization, lighting,

and utility work (water and sewer).

CONTACT PHONE EMAIL

[email protected]

CEI SENIOR PROJECT ADMINISTRATOR C: 407.948.9021 [email protected]

CONTRACT SUPPORT SPECIALIST (CSS) O: 407.488.7984 [email protected]

CONTRACTOR'S PROJECT MANAGER: C: 386.561.8057 [email protected]

CONTRACTOR'S SUPERINTENDENT: C: 386.281.9645 [email protected]

FDOT PROJECT MANAGER: O: 386.740.3524 C:386.846.4862 [email protected]

SENIOR PROJECT ENGINEER: C: 407.280.5435

ALT. 24 HR CONTRACTOR EMERGENCY CONTACT: C: 386.561.8057 [email protected]

SENIOR INSPECTOR: C: 407.419.1248 [email protected]

MAINTENANCE CONTACT: O: 386.740.3406 C: 386.801.5584 [email protected]

24 HR CONTRACTOR EMERGENCY CONTACT: C: 386.281.9645 [email protected]

109

Page 110: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Outside Consultant

In-House Construction

Maintenance

Project Status Report as of September 25, 2019

FIN #

CONTRACT #

TIME COST

CONTRACTOR: Penn. National Mutual Casualty Insurance LET DATE: 4/03/2018 ORIGINAL: 130 $149,935.00

FED. AID #: N/A NTP: 6/7/2018 CURRENT: 145 $149,935.00

FUND TYPE Construction TIME BEGAN: 7/7/2018 ELAPSED: 386 $57,793.63

Current CPPR: 64 WORK BEGAN: Nov. 2018 % ORIGINAL: 296.92% 38.55%

EST. COMPLETION: Summer 2019 % TO DATE: 266.21% 38.55%

Rick Coe

Ben Griffiths

Robert Wittenberg

Vincent Marsh

Rafael Rodriguez, P.E.

Dominic Fiandra

Debra Sjoberg

Vincent Marsh

FIN #

CONTRACT #

TIME COST

CONTRACTOR: P&S Paving Inc. LET DATE: 8/07/2018 ORIGINAL: 420 $4,022,401.58

FED. AID #: N/A NTP: 10/6/2018 CURRENT: 455 $4,072,401.58

FUND TYPE Construction TIME BEGAN: 1/3/2019 ELAPSED: 256 $2,448,875.14

Current CPPR: 100 WORK BEGAN: 1/3/2019 % ORIGINAL: 60.95% 60.88%

EST. COMPLETION: Spring 2020 % TO DATE: 56.26% 60.13%

Rick Coe

Ernie Saltar

Brian Davidson

John Dunlap

Rafael Rodriguez, P.E.

Chuck Crossman

Prince Dorvilus

Jim Read

John Dunlap

Brian DavidsonALT. 24 HR CONTRACTOR EMERGENCY CONTACT: C: 386.566.0551 [email protected]

ADD'L SENIOR INSPECTOR C: 407.276.5810 [email protected]

MAINTENANCE CONTACT: O: 386.740.3406 C: 386.801.5584 [email protected]

24 HR CONTRACTOR EMERGENCY CONTACT: C: 386.214.8896 [email protected]

CONTRACTOR'S SUPERINTENDENT: C: 386.214.8896 [email protected]

CONSTRUCTION ENGINEER O: 386.740.3594 C: 386.801.5571 [email protected]

SENIOR INSPECTOR: C: 407.907.4300 [email protected]

PROJECT ADMINISTRATOR O: 386.740.3490 C: 386.527.3831 [email protected]

CONTRACT SUPPORT SPECIALIST (CSS) O: 386.740.3416 [email protected]

CONTRACTOR'S PROJECT MANAGER: C: 386.566.0551 [email protected]

FLAGLER

US 1 at Old Dixie Highway Roundabout

441210-1-52-01

E5Z64

Conventional Pay Item

PROJECT DESCRIPTION: Construct new roundabout along U.S. 1 at Old Dixie Highway. Project also includes drainage improvements, lighting and landscaping.

CONTACT PHONE EMAIL

ALT. 24 HR CONTRACTOR EMERGENCY CONTACT:

ADD'L SENIOR INSPECTOR

STRUCTURES CONTACT: O: 386.740.3405 [email protected]

24 HR CONTRACTOR EMERGENCY CONTACT: C: 727.421.4332

CONTRACTOR'S SUPERINTENDENT: C: 727.421.4332 [email protected]

CONSTRUCTION ENGINEER O: 386.740.3594 C: 386.801.5571 [email protected]

SENIOR INSPECTOR: C: 904.760.7496 [email protected]

PROJECT ADMINISTRATOR O: 386.740.3490 C: 386.527.3831 [email protected]

CONTRACT SUPPORT SPECIALIST (CSS) O: 386.740.3564 [email protected]

CONTRACTOR'S PROJECT MANAGER: O: 215.595.6669 [email protected]

VOLUSIA

SR 46 Bridge Rehabilitation

439273-1-52-01

E5Z19

Conventional Pay Item

PROJECT DESCRIPTION: Apply an epoxy overlay to the concrete bridge deck, and clean and install non-structural pile jackets to bridge piers.

No new estimate

CONTACT PHONE EMAIL

110

Page 111: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Outside Consultant

In-House Construction

Maintenance

Project Status Report as of September 25, 2019

FIN #

CONTRACT #

TIME COST

CONTRACTOR: Viktor Construction Corp. LET DATE: 6/05/2018 ORIGINAL: 110 $257,400.00

FED. AID #: N/A NTP: 8/10/2018 CURRENT: 149 $257,400.00

FUND TYPE Construction TIME BEGAN: 11/8/2018 ELAPSED: 278 $112,207.40

Current CFPR 87 WORK BEGAN: 11/13/2018 % ORIGINAL: 252.73% 43.59%

EST. COMPLETION: Summer 2019 % TO DATE: 186.58% 43.59%

Charles Long

Ben Griffiths

Nikitas Kavouklis

Rafael Rodriguez, P.E.

Jimmy Gregory

Jonathan Jastremsky

Nikitas Kavouklis

Stylianos Fragkos

FIN #

CONTRACT #

TIME COST

CONTRACTOR: Intron Technologies Inc. LET DATE: 12/04/2018 ORIGINAL: 140 $471,365.65

FED. AID #: N/A NTP: 2/12/2019 CURRENT: 165 $471,365.65

FUND TYPE Construction TIME BEGAN: 3/14/2019 ELAPSED: 170 $372,718.44

Current CPPR: 98 WORK BEGAN: 4/1/2019 % ORIGINAL: 121.43% 79.07%

EST. COMPLETION: Summer 2019 % TO DATE: 103.03% 79.07%

Glenn Raney

Ernie Saltar

Jody Windsor

Henry Balcer

Rafael Rodriguez, P.E.

P.J. Langello

Jonathan Jastremsky

Henry Balcer

Jody Windsor

STRUCTURES CONTACT: O: 386.740.3418 [email protected]

24 HR CONTRACTOR EMERGENCY CONTACT: C: 904.349.1987 [email protected]

ALT. 24 HR CONTRACTOR EMERGENCY CONTACT: C: 904.545.2993 [email protected]

CONTRACTOR'S SUPERINTENDENT: C: 904.349.1987 [email protected]

CONSTRUCTION ENGINEER O: 386.740.3594 C: 386.801.5571 [email protected]

SENIOR INSPECTOR: C: 386.931.8617 [email protected]

PROJECT ADMINISTRATOR O: 386.740.3524 C:386.846.4862 [email protected]

CONTRACT SUPPORT SPECIALIST (CSS) O: 386.740.3416 [email protected]

CONTRACTOR'S PROJECT MANAGER: C: 904.545.2993 [email protected]

VOLUSIA

Westbound SR 40 over Tomoka River Bridge Repair (Bridge 790027)

440968-1-52-01

E5Z60

Conventinal Pay Item

PROJECT DESCRIPTION: Project consists of bridge deck repairs, deck sealing and non-structural pile jackets.

Final Acceptance 9/12/2019

CONTACT PHONE EMAIL

24 HR CONTRACTOR EMERGENCY CONTACT: C:727.741.7200 [email protected]

ALT. 24 HR CONTRACTOR EMERGENCY CONTACT: C: 727.437.9302

CONSTRUCTION ENGINEER O: 386.740.3594 C: 386.801.5571 [email protected]

SENIOR INSPECTOR: C: 757.509.2252 [email protected]

STRUCTURES CONTACT: O: 386.740.3418 [email protected]

PROJECT ADMINISTRATOR O: 386.740.3505 C: 407.415.0764 [email protected]

CONTRACT SUPPORT SPECIALIST (CSS) O: 386.740.3564 [email protected]

CONTRACTOR'S PROJECT MANAGER: C:727.741.7200 [email protected]

VOLUSIA

Kepler Road Pedestrian Bridge Rehabilitation

439521-1-52-01

E5Z30

Lump Sum

PROJECT DESCRIPTION: Cleaning and painting of the FDOT pedestrian bridge over Kepler Road, and installation of overhead canopy.

Project is complete

CONTACT PHONE EMAIL

111

Page 112: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Outside Consultant

In-House Construction

Maintenance

Project Status Report as of September 25, 2019

FIN #

CONTRACT #

TIME COST

CONTRACTOR: Seacoast Inc. LET DATE: 12/04/2018 ORIGINAL: 120 $1,193,299.40

FED. AID #: N/A NTP: 2/5/2019 CURRENT: 159 $1,193,299.40

FUND TYPE Construction TIME BEGAN: 3/22/2019 ELAPSED: 170 $1,083,955.40

Current CPPR: 98 WORK BEGAN: 3/25/2019 % ORIGINAL: 141.67% 90.84%

EST. COMPLETION: Summer 2019 % TO DATE: 106.92% 90.84%

Glenn Raney

Ben Griffiths

Eddie Beard

BJ Johnson

Rafael Rodriguez, P.E.

Nick Peters

Jonathan Jastremsky

Eddie Beard

BJ Johnson

FIN #

CONTRACT #

TIME COST

CONTRACTOR: Oceaneer Consulting LLC LET DATE: 4/02/2019 ORIGINAL: 80 $648,932.00

FED. AID #: N/A NTP: 6/11/2019 CURRENT: 80 $648,932.00

FUND TYPE Construction TIME BEGAN: 8/10/2019 ELAPSED: 37 $64,450.00

Current CPPR: WORK BEGAN: TBD % ORIGINAL: 46.25% 9.93%

EST. COMPLETION: Late 2019 % TO DATE: 46.25% 9.93%

Charles Long

Ben Griffiths

Christian Villegas

Onel Beltran

Rafael Rodriguez, P.E.

Robert Bitting

Jonathan Jastremsky

Christian Villegas

Onel Beltran

STRUCTURES CONTACT: O: 386.740.3418 [email protected]

24 HR CONTRACTOR EMERGENCY CONTACT: C: 321.604.1371 [email protected]

ALT. 24 HR CONTRACTOR EMERGENCY CONTACT: C: 561.334.7416 [email protected]

CONTRACTOR'S SUPERINTENDENT: C: 561.334.7416 [email protected] ENGINEER O: 386.740.3594 C: 386.801.5571 [email protected]

SENIOR INSPECTOR: C: 407.915.5545 [email protected]

PROJECT ADMINISTRATOR O: 386.740.3505 C: 407.415.0764 [email protected]

CONTRACT SUPPORT SPECIALIST (CSS) O: 386.740.3564 [email protected]

CONTRACTOR'S PROJECT MANAGER: C: 321.604.1371 [email protected]

VOLUSIA

I-4 Over Dirksen Drive Bridge Bearing Replacement

440966-1-52-01

E5Z73

Conventional Pay Item

PROJECT DESCRIPTION: Project consists of replacing the bearing pads on the eastbound and westbound I-4 bridges over Dirksen Drive, and an epoxy overlay on westbound I-4.

CONTACT PHONE EMAIL

ALT. 24 HR CONTRACTOR EMERGENCY CONTACT: C: 727.643.0133

SENIOR INSPECTOR: C: 386.453.5222 [email protected]

STRUCTURES CONTACT: O: 386.740.3418 [email protected]

24 HR CONTRACTOR EMERGENCY CONTACT: C: 813.943.8681 [email protected]

CONTRACTOR'S PROJECT MANAGER: C: 813.943.8681 [email protected]

CONTRACTOR'S SUPERINTENDENT: C: 727.643.0133

CONSTRUCTION ENGINEER O: 386.740.3594 C: 386.801.5571 [email protected]

CONTACT PHONE EMAIL

PROJECT ADMINISTRATOR O: 386.740.3524 C:386.846.4862 [email protected]

CONTRACT SUPPORT SPECIALIST (CSS) O: 386.740.3564 [email protected]

VOLUSIA

SR 44 (South Causway) Bridge Bulkhead and Fender Repairs

442555-1-52-01

E5Z49

Conventional Pay Item

PROJECT DESCRIPTION: Project consists of repairing and replacing bridge fender and bulkhead components.

Final Acceptance 9/14/2019

112

Page 113: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Outside Consultant

In-House Construction

Maintenance

Project Status Report as of September 25, 2019

FIN #

CONTRACT #

TIME COST

CONTRACTOR: Sieg & Ambachtsheer Inc. LET DATE: 6/04/2019 ORIGINAL: 110 $176,487.00

FED. AID #: N/A NTP: 8/7/2019 CURRENT: 110 $176,487.00

FUND TYPE Construction TIME BEGAN: ELAPSED: 0 $0.00

Current CPPR: 98 WORK BEGAN: % ORIGINAL: 0.00% 0.00%

EST. COMPLETION: % TO DATE: 0.00% 0.00%

Charles Long

Ben Griffiths

Rafael Rodriguez, P.E.

Jonathan Jastremsky

FIN #

CONTRACT #

TIME COST

CONTRACTOR: P&S Paving, Inc. LET DATE: 7/02/2019 ORIGINAL: 200 $3,278,490.18

FED. AID #: NA NTP: 8/28/2019 CURRENT: 200 $3,278,490.18

FUND TYPE TIME BEGAN: 9/27/2019 ELAPSED: 0

Current CPPR: 98 WORK BEGAN: % ORIGINAL: 0.00% 0.00%

EST. COMPLETION: % TO DATE: 0.00% 0.00%

Charles Long

Ernie Saltar

Kirsten Berg

John Dunlap

Rafael Rodriguez, P.E.

P.J. Langello

Jonathan Jastremsky

ALT. 24 HR CONTRACTOR EMERGENCY CONTACT:

SENIOR INSPECTOR: C: 386.931.8617 [email protected]

STRUCTURES CONTACT: O: 386.740.3418 [email protected]

24 HR CONTRACTOR EMERGENCY CONTACT:

CONTRACTOR'S PROJECT MANAGER: O: 386.258.7911 C:574.335.9398 [email protected]'S SUPERINTENDENT: C: 386.214.8896 [email protected]

CONSTRUCTION ENGINEER O: 386.740.3594 C: 386.801.5571 [email protected]

CONTACT PHONE EMAIL

PROJECT ADMINISTRATOR O: 386.740.3505 C: 407.415.0764 [email protected]

CONTRACT SUPPORT SPECIALIST (CSS) O: 386.740.3416 [email protected]

VOLUSIA

S.R. 472 Resurfacing from U.S. 197/92 to the I-4 Interchange

439121-1-52-01 & 439144-1-52-01

E5Z77

Conventional Pay Item

PROJECT DESCRIPTION: Mill and resurface S.R. 472, turn lane widening, and add turn lane from eastbound S.R. 472 to northbound Minnesota Avenue

STRUCTURES CONTACT: O: 386.740.3418 [email protected]

24 HR CONTRACTOR EMERGENCY CONTACT:

ALT. 24 HR CONTRACTOR EMERGENCY CONTACT:

CONTRACTOR'S SUPERINTENDENT:

CONSTRUCTION ENGINEER O: 386.740.3594 C: 386.801.5571 [email protected]

SENIOR INSPECTOR:

PROJECT ADMINISTRATOR O: 386.740.3505 C: 407.415.0764 [email protected]

CONTRACT SUPPORT SPECIALIST (CSS) O: 386.740.3564 [email protected]

CONTRACTOR'S PROJECT MANAGER:

VOLUSIA

SR 430 Eastbound Bridge Joint Repair

443266-1-52-01

E5Z83

Conventional Pay Item

PROJECT DESCRIPTION: Replace the bridge joint on the east end of the eastbound S.R. 430 Bridge over the Halifax River

CONTACT PHONE EMAIL

113

Page 114: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Outside Consultant

In-House Construction

Maintenance

Project Status Report as of September 25, 2019

FIN #

CONTRACT #

TIME COST

CONTRACTOR: Southern States Pavement Markings LET DATE: 10/02/2018 ORIGINAL: 180 $2,100,179.18

FED. AID #: N/A NTP: 12/06/2018 CURRENT: 250 $2,100,179.18

FUND TYPE Maintenance TIME BEGAN: 12/14/2018 ELAPSED: 266 $2,046,929.15

Current CFPR NA WORK BEGAN: 12/14/2018 % ORIGINAL: 147.78% 97.46%

EST. COMPLETION: Summer 2019 % TO DATE: 106.40% 97.46%

Rick Coe

Ben Griffiths

Buck Adams

Rafael Rodriguez, P.E.

Walter Moore

Jim Read

Buck Adams

Chris Robbins

FIN #

CONTRACT #

TIME COST

CONTRACTOR: Shen-Line LLC LET DATE: 10/02/2018 ORIGINAL: 179 $1,960,178.51

FED. AID #: N/A NTP: 12/12/2018 CURRENT: 217 $1,960,178.51

FUND TYPE Maintenance TIME BEGAN: 12/26/2018 ELAPSED: 258 $1,760,144.75

Current CFPR WORK BEGAN: 3/4/2019 % ORIGINAL: 144.13% 89.80%

EST. COMPLETION: Summer 2019 % TO DATE: 118.89% 89.80%

Rick Coe

Ernie Saltar

Louis Woska

Rafael Rodriguez, P.E.

Craig Sonner

Jim Read

Garrett Kulp

Louis Woska

SENIOR INSPECTOR: C: 407.216.9848 [email protected]

MAINTENANCE CONTACT: O: 386.740.3406 C: 386.801.5584 [email protected]

VOLUSIA

Pipe Cleaning and Lining, Various Locations in Volusia County

427986-1-72-15

E5U77

Maintenance

PROJECT DESCRIPTION: Pipe desilting and lining on: SR 400 from Woodcrest Drive to U.S. 1; U.S. 1 at Palmetto Avenue, White Avenue, Bayshore Drive, Fox Place and at SR 442;

Ora Street and S. Peninsula Drive.

No new estimate

CONTACT PHONE EMAIL

PROJECT ADMINISTRATOR O: 386.740.3490 C: 386.527.3831

CONTRACTOR'S PROJECT MANAGER: C: 904.814.8410 [email protected]

CONSTRUCTION ENGINEER O: 386.740.3594 C: 386.801.5571 [email protected]

24 HR CONTRACTOR EMERGENCY CONTACT: C: 904.814.8410 [email protected]

ALT. 24 HR CONTRACTOR EMERGENCY CONTACT: C: 407.738.8308 [email protected]

VOLUSIA

Pavement Markings, Various Roads

427833-1-72-05

E5U70

Maintenance

CONTRACT SUPPORT SPECIALIST (CSS) O: 386.740.3416 [email protected]

CONTRACTOR'S PROJECT MANAGER: C: 386.479.8318 [email protected]

[email protected]

PROJECT ADMINISTRATOR O: 386.740.3490 C: 386.527.3831 [email protected]

CONTRACT SUPPORT SPECIALIST (CSS) O: 386.740.3564 [email protected]

PROJECT DESCRIPTION: Install new thermoplastic pavement markings and reflective pavement markings on various roads.

CONTACT PHONE EMAIL

CONSTRUCTION ENGINEER O: 386.740.3594 C: 386.801.5571 [email protected]

SENIOR INSPECTOR: C: 407.310.9658 [email protected]

MAINTENANCE CONTACT: O: 386.740.3406 C: 386.801.5584 [email protected]

24 HR CONTRACTOR EMERGENCY CONTACT: C: 772.834.1455 [email protected]

ALT. 24 HR CONTRACTOR EMERGENCY CONTACT: C: 386.479.8318 [email protected]

114

Page 115: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Outside Consultant

In-House Construction

Maintenance

Project Status Report as of September 25, 2019

FIN #

CONTRACT #

TIME COST

CONTRACTOR: GPS Civil Construction Inc. LET DATE: 2/05/2019 ORIGINAL: 270 $2,090,679.00

FED. AID #: N/A NTP: 4/16/2019 CURRENT: 288 $2,090,679.00

FUND TYPE Conventional TIME BEGAN: 4/16/2019 ELAPSED: 144 $1,060,965.70

Current CFPR: WORK BEGAN: 4/16/2019 % ORIGINAL: 53.33% 50.75%

EST. COMPLETION: Early 2020 % TO DATE: 50.00% 50.75%

Ernie Saltar

Ben Griffiths

Greg Schlaffer

Dallas Moore

Rafael Rodriguez, P.E.

Paul Stacks

Chris Engels

Dallas Moore

Greg Schlaffer

FIN # 435469-2-52-01 Contract Days: 1041

CONTRACT # E5Y26

FIN #

CONTRACT #

TIME COST

CONTRACTOR: Halifax Paving Inc. LET DATE: 4/02/2019 ORIGINAL: 90 $438,198.34

FED. AID #: N/A NTP: 6/12/2019 CURRENT: 92 $438,198.34

FUND TYPE Maintenance TIME BEGAN: 6/26/2019 ELAPSED: 98 $483,478.32

Current CFPR: 100 WORK BEGAN: TBD % ORIGINAL: 108.89% 110.33%

EST. COMPLETION: Fal 2019 % TO DATE: 106.52% 110.33%

Charles Long

Ernie Saltar

Joe Durrance

Josh Lloyd

Rafael Rodriguez, P.E.

Chris Engels

Joe Durrance

Josh Lloyd

PROJECT DESCRIPTION: Repair and replace concrete slabs along U.S. 1 from south of Reed Canal Road to Fleming Avenue in Port Orange.

CONTACT PHONE EMAIL

VOLUSIA

U.S. 1 Concrete Rehabilitation

441682-1-72-01

E5U82

Maintenance

SENIOR INSPECTOR: C: 352.217.1773 [email protected]

PROJECT ADMINISTRATOR O: 386.740.3416 [email protected]

CONTRACT SUPPORT SPECIALIST (CSS) O: 386.740.3564 [email protected]

CONTRACTOR'S PROJECT MANAGER: O: 386.872.5811 C: 386.316.9314 [email protected]

CONTRACTOR'S SUPERINTENDENT: O: 386.872.5811 C: 386.566.4800 [email protected]

CONSTRUCTION ENGINEER O: 386.740.3594 C: 386.801.5571 [email protected]

ALT. 24 HR CONTRACTOR EMERGENCY CONTACT: O: 386.872.5811 C: 386.316.9314 [email protected]

ADD'L SENIOR INSPECTOR

MAINTENANCE CONTACT: O: 386.740.3420 C: 386.279.5444 [email protected]

24 HR CONTRACTOR EMERGENCY CONTACT: O: 386.872.5811 C: 386.566.4800 [email protected]

VOLUSIA

I-4 / Saxon Boulevard Interchange Landscaping

Days Elapsed: 880

Present Amount: $837,910 Paid to Date: $827,910

VOLUSIA

SR 44 Resurfacing in Volusia County

441694-1-72-01

E5U86

PROJECT DESCRIPTION: Mill and resurface SR 44 from just east of the I-4 ramps to east of Prevatt Avenue near DeLand, and on SR 44/Canal Street from west of Myrtle Avenue to

Dimmick Street in New Smyrna Beach.

Final Acceptance 9/17/2019

CONTACT PHONE EMAIL

PROJECT ADMINISTRATOR O: 386.740.3505 C: 407.415.0764 [email protected]

CONTRACT SUPPORT SPECIALIST (CSS) O: 386.740.3416 [email protected]

CONTRACTOR'S PROJECT MANAGER: O: 386.676.0200 C: 386.547.4852 [email protected]

ALT. 24 HR CONTRACTOR EMERGENCY CONTACT: C: 386.937.7850

ADD'L SENIOR INSPECTOR

MAINTENANCE CONTACT: O: 386.740.3420 C: 386.279.5444 [email protected]

24 HR CONTRACTOR EMERGENCY CONTACT: O: 386.676.0200 C: 386.547.4852 [email protected]

CONTRACTOR'S SUPERINTENDENT: C: 386.937.7850

CONSTRUCTION ENGINEER O: 386.740.3594 C: 386.801.5571 [email protected]

SENIOR INSPECTOR:

115

Page 116: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

MEETING SUMMARY

TPO BOARD OCTOBER 23, 2019

VII. EXECUTIVE DIRECTOR’S REPORT

→ Update on SU Funding/Work Program → Update on FDOT D-5 Proposed Local Agency Program (LAP) Policy

VIII. RIVER TO SEA TPO BOARD MEMBER COMMENTS

IX. RIVER TO SEA TPO CHAIRPERSON COMMENTS

X. INFORMATION ITEMS

→ Bicycle/Pedestrian Advisory Committee Attendance Record – 2019 → Citizens Advisory Committee Attendance Record – 2019 → Technical Coordinating Committee Attendance Record – 2019 → September 2019 TPO Outreach and Activities → Volusia and Flagler Counties Construction Reports → TRIP Letters → Acronyms → 2020 R2CTPO Meeting Schedule

XI. ADJOURNMENT

*The next River to Sea TPO Board meeting will be November 27, 2019*

116

Page 117: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

BPAC Attendance Record 2019

Name Jan Feb

Mar

Apr

May

Jun

July

Aug

Sept

Oct Nov

Dec NotesHolly Ryan/Doug Hall x x x exc exc exc x x exc Daytona Beach (appt. 3/12) (alt. appt. 02/14)Joan Sandler x x x x exc x DeBary (appt 4/19)Ted Wendler x x x x exc x x x x DeLand (appt. 05/11)Scott Leisen exc abs exc exc abs abs abs abs abs Deltona (appt. 12/12)Paul Eik (19/20 Chairman) x x x x x x x x x Flagler Beach (appt. 7/14) (alt appt 9/18)Larry Coletti (19/20 Vice Chairman) x xx xx x x xx xx x x Flagler County (appt 2/16)Ned Wolfarth x x Holly Hill (appt 9/19)Nic Mostert x x x x x x x x x New Smyrna Beach (appt. 03/15)Bob Storke x x x x x x x x x Orange City (appt. 12/07)Gayle Belin exc x exc x x x exc x x Ormond Beach (appt. 01/15 - 07/16)Danielle Anderson/Andrew Dodzik abs exc abs abs abs abs abs x x Palm Coast (Appt. 02/16) (Alt appt 9/19)Jeff Martindale x exc x exc x abs abs abs Port Orange (Appt 2/19)Christy Gillis abs x x exc x x exc exc x South Daytona (appt. 01/16)Roy Walters/Jason Aufdenberg x x x x x exc x x xx Volusia County At-Large (appt. 03/05) (alt. appt 07/12)Patrick McCallister x x exc exc x exc x x exc Volusia County D-1 (appt. 10/16)Nancy Burgess-Hall/Chris Daun x xx xx x x exc xx xx x Volusia County D-2 (app 2/14) (alt. appt 3/18)Wendy Hickey (non-voting) x x exc x x exc exc x exc Flagler County (appt. 12/15)Gwen Perney (non-voting) x x x exc x x x x x Large City - Port OrangeJohn Cotton/Edie Biro (non-voting) x x x x x x x x x Votran (appt. 07/13)(alt. appt. 02/16)Melissa Winsett/Terri Bergeron (non-voting) x x x x x x x x x Volusia County (02/14) (alt. Appt. 09/16)Rob Brinson/Eric Kozielski (non-voting) x abs abs abs abs abs abs abs exc Volusia County School Board (appt. 01/16)VACANT(non-voting) x x x exc x x vacant x vacant FDOT QUORUM Y Y Y Y Y Y Y Y Y

Vacancies CODESBeverly Beach X = PresentBunnell exc = ExcusedDaytona Beach Shores abs = Absent (Unexcused)DeBaryEdgewaterFlagler County School BoardFlagler County TransitLake HelenOak HillPiersonPonce InletVolusia County ChairVolusia County D-3

January - December 2019117

Page 118: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

CAC Attendance Record 2019

Name Jan Feb

Mar

Apr

May

Jun

July

Aug

Sept

Oct Nov

Dec NotesSue Habel exc x x x x x x exc x Daytona Beach (appt. 3/18)Janet Deyette (18/19 Chairperson) x x x x x x exc exc exc Deltona (appt. 11/10)Ralph Bove abs abs abs abs abs abs abs abs abs DeBary (appt. 11/16)Daniel Klasel x exc abs exc x exc exc exc Edgewater (appt 1/19)Rob Plympton/Mary Dioguardi x x x x exc x exc abs x Flagler Beach (appt 5/18)Marcia Stevens Foltz x x x exc x x x x x Flagler County (appt 2/18)Heidi Petito abs abs abs abs abs abs abs abs abs Flagler County Transit (appt 9/14)Gilles Blais (18/19 Vice Chairperson) x x x exc x x x x x Holly Hill (appt. 11/07) (Reap. 02/13)Rick Basso/Linda Provost x abs EXC abs Lake Helen (appt 6/19) (alt 0Nora Jane Gillespie abs x x x x x x x x New Smyrna Beach (appt 12/14) Bob Storke x x x x x x x x x Orange City (appt. 1/08)Roger Strcula x x x x x exc x x x Ormond Beach (appt 7/18)Alan Peterson x x x x x x x x x Palm Coast (appt. 03/15)Susan Elliott x x x x exc x x x xx Pierson (appt. 3/06)Joe Villanella exc exc exc abs exc exc x x abs Ponce Inlet (apptJack Delaney x x exc x x x x abs x South Daytona (appt. 04/16)Bobby Ball x x exc x x x x x x Port Orange (appt. 12/02) Dave Castagnacci x x x x x Volusia County Chair (appt 05/19)Elizabeth Alicia Lendian exc x x exc x x x x x Volusia County At-Large (appt. 05/13)Ann Christian exc exc abs abs abs abs abs Volusia County D-1 (appt 3/19)Patricia Lipovsky abs x abs abs exc x exc x x Volusia County D-2 (appt 4/17)Edie Biro/John Cotton x x x exc exc x x x x Votran (appt. 02/16) (alt. appt. 07/13)Faith Alkhatib (non-voting) abs abs abs abs abs abs abs abs abs Flagler County Traffic Engineering (appt 9/14)Melissa Winsett/J.Cheney (non-voting) x x x exc x x x x x Volusia County Traffic Engineering (appt 10/11)Vickie Wyche (non-voting) x x x x x x x x x FDOT District 5 (appt 1/18)QUORUM Y Y Y Y Y Y Y Y Y

VacanciesBunnell Beverly BeachDaytona Beach Shores Deland Flagler County School BoardOak HillVolusia County School BoardVolusia County D-3

January - December 2019

118

Page 119: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

TCC Attendance Record 2019

Name Jan Feb

Mar

Apr

May

Jun

July

Aug

Sept

Oct Nov

Dec NotesRodney Lucas x x abs abs abs abs x s abs Bunnell (appt 12/18)Andrew Holmes/Dennis Mrozek x x x x x x x x x Daytona Beach (11/18) (alt 6/18)Arlene Smith x x abs x x x x x x Daytona Beach Airport (appt. 03/16)Stewart Cruz abs x abs abs abs abs abs abs abs Daytona Beach Shores (appt. 10/04)Mike Holmes/Anna Cava Grosso x x x x xx xx x x abs DeLand (appt. 09/98)Ron Paradise x x x x x x x x x Deltona (appt. 11/09)Matt Boerger/Andrew Landis abs x x x x x abs DeBary (appt 3/19)Darren Lear exc x x x exc x x x x Edgewater (appt. 10/99)Larry Newsom abs abs abs abs abs abs abs abs abs Flagler Beach (Appt. 02/16)Faith Alkhatib/Adam Mengel abs abs abs abs abs abs abs abs abs Flagler County Traffic Engineering (appt 9/14)Brian Walker x x x x x x x x x Holly Hill (appt 10/17)Amye King/Kyle Fegley x x x x x x exc exc x New Smyrna Beach (appt. 10/16)Rebecca Witte/Katie Holmes abs x x x x x x x abs Lake Helen (appt 12/18)(alt appt 8/19)Shawn Finley x x x x x x x x x Ormond Beach (appt. 12/17)Becky Mendez (18/19 Vice Chairperson) x x x x x x x x x Orange City (appt. 08/15)Jose Papa (18/19 Chairperson) x x x x x exc x x x Palm Coast (appt 7/14)Mark Karet x x x x x x abs x x Pierson (appt. 09/16)Aref Joulani/Mike Disher x x x x x abs x x x Ponce Inlet (appt. 09/16) (alt. appt. 04/19)Tim Burman/Margaret Tomlinson x x x x x x exc x x Port Orange (appt. 10/13 )(alt appt 4/19)Brian Peek/Patty Rippey x x x x x x x abs abs South Daytona (appt. 6-19)Jon Cheney/Melissa Winsett x x x exc x x x x x Volusia County Traffic Engineering (appt. 04/99)Eric Kozielski x exc abs abs abs x exc x abs Volusia County Schools (appt. 1/15)Frank Alvarez/Edie Biro x x x x x x x x x Votran (appt. 01/019) (alt. appt. 02/16)Larry LaHue/Pat White abs abs x abs x x exc x exc Volusia County Emergency Management (appt. 01/04)Vickie Wyche (non-voting) x x x x x x x x x FDOT (appt 1/18)QUORUM Y Y Y Y Y Y Y Y Y

VacanciesBeverly BeachFlagler County TransitFlagler County AviationFlagler County Emergency ManagementFlagler County School BoardOak Hill

January - December 2019

119

Page 120: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

September 2019 TPO Outreach & Activities

2040 Long Range Transportation Plan (LRTP) Amendment Public Notice/Legal Ad Date: Tuesday, September 24, 2019 Description: The TPO issued a legal ad and public notice to solicit input on a proposed amendment to the 2040 LRTP: www.r2ctpo.org

Port Orange Family Days Helmet FittingDate: Saturday, September 28, 2019 Location: Port Orange Description: TPO staffed a booth with safety promotional items and flyers and fit and donated 203 bicycle helmets to adults and children

Palm Coast/FCARD Development Meeting Date: Thursday, September 12, 2019 Location: Palm Coast Description: TPO staff attended this meeting regarding development, permitting and customer service

Florida Public Transit Association (FPTA) & Commission for the Trans. Disadvantaged (CTD) Annual Conference Date: Monday, September 16, 2019 Location: Orlando Description: TPO staff attended the FPTA and CTD Annual Conference in Orlando

DeBary Wellness and Safety Fair Date: Friday, September 20, 2019 Location: DeBary Description: TPO staff participated in this event staffing a booth to distribute safety information and inform the public about the role of the TPO

2: Int’l Walk to School Day, multiple locations 3: Florida Transportation Plan (FTP) Resiliency

Discussion– TPO Panel Participation, Webinar 21-25: FDOT Work Program Virtual Public Hearing,

www.D5WPPH.com, Open House (24th) District 5 Office, DeLand

23: VCARD Icebreaker, Daytona Beach 25- Nov 1: Central Florida Mobility Week 29: MPO Advisory Council Meeting, Orlando 31: Central Florida Commuter Rail Commission

Meeting, Orlando 31: Trail Walk Helmet Fitting, Palm Coast

Nov 2: Halifax Art Fest Helmet Fitting, Daytona Beach Nov 4-5: MPO-FDOT Leadership Meeting, Tallahassee Nov 20: Volusia County Legislative Delegation Mtg. Nov 21: Flagler County Legislative Delegation Mtg.

• Walkability Action Institute Grant Project & Complete Streets Policy & Implementation Plan

• Central Florida Regional Planning Model Update • Development of FY 2018/19 Public Outreach

Summary and Evaluation Matrix • Development of FY 2018/19 Annual Report • Development of 2045 LRTP (Public Involvement

Plan, Data Collection, Established Subcommittee) • Amendment to the 2040 LRTP • Development of Community Safety Action Plan • FY 2018/19 TPO Audit • Update of the Congestion Management Process • Regional Resiliency Action Plan Implementation • Connected and Automated Vehicle Readiness

Study 120

Page 121: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Volusia County Construction Report – September 2019* Completed within the last 6 months: 1) LPGA Blvd 4-lane widening (Jimmy Ann Dr. to Derbyshire) 2) ECRRT – Segment 5 (Brevard County Line to Cow Creek Rd.) 3) ECRRT – Segment 4B (Gobblers Lodge to Maytown Spur) 4) Spring to Spring Trail – Segment 3A (Detroit Terrace to Don Smith Blvd.) 5) Turnbull Bay Bridge Replacement 6) New York Ave sidewalk (Hamilton to US-17/92) 7) Doyle Road paved shoulders (Lush Lane to Courtland Blvd)

Under Construction or Advertised for Construction: 1) Veterans Memorial Bridge (Orange Ave.) – Under construction 2) W. Park Avenue 3-lane widening (Dale Street to Old Mission Rd) – Under Construction 3) Mast Arm Replacement at Catalina and Midway – Under Construction 4) Coast to Coast Trail Wayfinding Signage, and Emergency Location Markers – Contract Awarded 5) Williamson Blvd. (LPGA to Strickland Range) – Construction Bids Opened 6) Turtlemound Road Repair – Construction Advertised

Design Projects: 1) ECRRT – Segment 4A (Guise Rd. to Gobblers Lodge) – Design / Build Contract Executed 2) Howland Blvd 4-lane widening (Providence Blvd to Elkcam Blvd) – Design Ongoing 3) Orange Camp Rd. 4-lane widening (MLK Blvd. to I-4) – Design Ongoing 4) Tenth St 4-lane widening (Myrtle to US 1) – Design nearing completion - Waiting for Railroad and

interlocal agreements. 5) Spring to Spring (DeLeon Springs Trail) – Design Ongoing 6) DeLeon Spring Connection to Spring to Spring Trail – Design Ongoing 7) Spring to Spring Trail – Segment 3B (Rob Sullivan Park to Dirksen Dr) – Design Ongoing 8) Spring to Spring Trail- Segment 3C (Trail along Don Smith Blvd) – Design FY 20, Construction FY

23 9) Turnbull Bay Road paved shoulders – Topographic survey complete, waiting on ROW Survey 10) Beresford Ave Extension (Blue Lake to MLK) – Waiting for ROW from City to start Design 11) Spring to Spring Trail (Lake Beresford to Grand Avenue) – PD&E study administered by FDOT is

nearing completion 12) Amelia Ave (Voorhis to Ohio) – In Negotiations for Design Contract 13) Williamson Blvd. (Strickland Range to Hand Ave) – Design funded 2019 14) Graves Ave Turn lanes (Veterans Memorial Parkway to Kentucky) – In Negotiations for Design

Contract 15) Old New York paved shoulders (Shell to S-44) – Topographic survey complete, waiting on ROW

Survey 16) Intersection Improvements at SR-44 and Kepler – Design by FDOT underway 17) Doyle Road paved shoulders (Twisted Oak to Lush Lane) – Not funded 18) Trail Connetion from Marine Discovery Center to River to Sea Loop – Design Ongoing 19) Jacobs Road Sidewalk – Survey underway 20) Sugar Mill Road curve reconstruction and turn lanes – Design underway 21) Study of LPGA Widening from Tymber Creek to I-95 – Feasibility Study near completion 22) Blue Lake Extension from Victoria Park to SR-472 – Negotiating survey and preliminary design with

constultant *Changes/Updates since last report are underlined. Note: Dates are subject to change due to normal project development issues.

121

Page 122: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

FLAGLER COUNTY CONSRUCTION REPORTAs of September 2019

Construction and Near Construction Phase Status1 Emergency Dune Restoration Completed2 County Road 2006 Resurfacing Construction ongoing3 County Road 305 Widening and Resurfacing from bridge # 734006 to SR 100 Completed4 Old Dixie Highway Widening and Resurfacing Completed

5 North Mala Compra Drainage Basin Improvements (Not FDOT)Completed, Project closeout in

progress6 Plantation Bay Wastewater Treatment Facility Improvements (Not FDOT) Construction near completion7 Plantation Bay Water (Not FDOT) Construction ongoing8 Bay Drive Park (not FDOT) Construction ongoing9 Mahogany Blvd. Resurfacing Near Construction

10 Briarwood Drive Near Construction

Design Phase Status1 Design of 3.7 miles A1A Shore Protection (FDOT) Design ongoing2 Dune Restoration - City of Flagler Beach (ACOE) Design ongoing3 County Road 304 Resurfacing from County Road 305 to SR5 (US1) Design completed4 CR 304 Replacement of 4 Bridges Design ongoing5 Marineland Acres Road Improvement Design ongoing6 Old Haw Creek from County Road 304 to SR 11 Design ongoing7 Water Oak Road from County Road 2006 to Mahogany Blvd. Design ongoing8 Graham Swamp Multi-Use Trail & Pedestrian Bridge from Lehigh Trail to SR 100 Design ongoing9 Apache Dr from Osceola Ave to 1st Ave

10 Hammock Roadway Stabilization - Various Roadways11 Malacompra Road Resurfacing - from A1A to Roadway end at Atlantic Coast Beach12 Hargrove CR 1421 from Otis Stone Hunter CR 1422 to US 113 Otis Stone from County Road 13 to US 1

122

Page 123: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

123

Page 124: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

TRIP - ELIGIBLE PROJECTS LIST (6/15/16)VOLUSIA COUNTY: Revisions & Project Priorities (9/18/19)

PRIORITY PROJECT FROM TO Location AGENCY SPONSOR NOTESRemove SR 44 – Miscellaneous upgrades to improve access to DeLand SunRail SR 15A DeLand SunRail Station Volusia County Volusia County - Zone 4 DuplicateRemove Old New York Ave - safety & paved shoulders SR 44 DeLand SunRail Station Volusia County Volusia County - Zone 4 Already Funded FN 4389801 (FY 20/Remove Howland Blvd - widening to 4 lanes Providence Blvd Elkcam Blvd Volusia County - Zone 3 DuplicateRemove Park Ave - adding bi-directional turn lanes & paved shoulder Old Mission Rd Massey Ranch Rd Volusia County/Edgewater Volusia County - Zone 2 Currently, under construction

Williamson Blvd - widening to 4 lanes LPGA Blvd Strickland Range Hand Ave Volusia County/Daytona Bch Volusia County - Zone 1 100% Plans completed, Funded - LPGA to Strickland Range. State has provided $4M for project (Strickland Range to Hand Ave)

2 Hand Ave - widen to 4 lanes Williamson Blvd SR 5A/Nova Rd Volusia County/Ormond Bch Volusia County - Zone 1 NO ROW needed

Tymber Creek Rd - extend as 2 lane road South of SR 40 LPGA Blvd Volusia County/Daytona Bch Volusia County - Zone 1Being partially constructed by developments

Tymber Creek Rd - widening to 4 lanes Peruvian Ln Airport Rd Volusia County/Ormond Bch Volusia County - Zone 1 100% Plans completedWilliamson Blvd - widening to 4 lanes SR 400/Beville Rd Summertree Rd Volusia County/Daytona Bch Volusia County - Zone 1Dunn Ave - widening to 4 lanes Williamson Blvd Clyde Morris Blvd Volusia County/Daytona Bch Volusia County - Zone 1

I-95 & Pioneer Trail Interchange Williamson Blvd Turnbull Bay Rd Volusia County/Port Orange Volusia County - Zone 2 PD&E Underway, Design funded3 Josephine St - widening to 4 lanes Old Mission Rd Tatum St Volusia County/NSB Volusia County - Zone 2

Pioneer Trail - widening to 4 lanes Airport Rd I-95 Volusia County/NSB Volusia County - Zone 2Old Mission Road - widen to 3 lanes Park Ave Josephine St Volusia County Volusia County - Zone 2

1 Howland Blvd – widen to 4 lanes Providence Blvd Elkcam Blvd Volusia County/Deltona Volusia County - Zone 3 Under DesignWestside Pkwy - extend road French Ave Rhode Island Ave Volusia County/Orange City Volusia County - Zone 3W. Volusia Beltway (Veteran Memorial Parkway) - widening to 4 lanes and reSR 472 Harley Strickland Volusia County/Orange City Volusia County - Zone 3

4 - Veteran Memorial Parkway Graves South of Rhode Island (Parc Volusia County/Orange City Volusia County - Zone 3 Parc Hill development is designing 4-LN widening fm Harley Strickland to Rhode Island. Will construct 4-LNs from termini of 4 LNs to their north property line (ie., south of Rhode Island)

Doyle Rd - widening to 4 lanes Providence Blvd Saxon Blvd Volusia County/Deltona Volusia County - Zone 3Saxon Blvd - widen to 4 lanes Tivoli Dr Providence Blvd Volusia County/Deltona Volusia County - Zone 3Providence Blvd widen to 4 lanes Debary/Doyle Rd Elkcam Rd Volusia County/Deltona Volusia County - Zone 3

W. Volusia Beltway (Dr. MLK Jr) - widening to 4 lanes Taylor Rd Orange Camp Rd Volusia County Volusia County - Zone 4W. Volusia Beltway (Kepler Rd) - widening to 4 lanes US 92 Beresford Ave Extension Volusia County Volusia County - Zone 4

124

Page 125: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

125

Page 126: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

126

Page 127: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

city of

Office of the City Manager

>AST 160 Lake Avenue Palm Coast, FL 32164 386-986-3710

September 24, 2019

Lois Bollenbaci<, Executive Director

River to Sea Transportation Planning Organization (R2CTP0) 2570 W. International Speedway Blvd., Suite 100 Daytona Beach, FL 32114-8145

RE: Confirmation of City support for Transportation Regional Incentive Program (TRIP) funding Eligible Projects

Ms. Bollenback:

In response to your enquiry regarding the use of TRIP funds. City staff has reviewed the list of TRIP

eligible projects and finds the following to be of continued importance to the City and requests their continued consideration for funding with TRIP funds.

1. Old Kings Rd. - widen from 2 to 4-lanes (Palm Harbor Way to Forest Grove Dr.) 2. Old Kings Rd. Extension Phase II (Matanzas Woods Pkwy. to Old Kings Rd.)

3. Matanzas Woods Pkwy. (west) - widen to 4 lanes (US-1 to Southbound 1-95 ramps) 4. Matanzas Woods Pkwy. (east) - widen to 4 lanes (1-95 ramps to Old Kings Rd. extension) 5. Old Kings Rd. - widen to 4 lanes (Town Center Blvd. to Palm Coast Pkwy.) 6. Old Kings Rd. South - widen to 4 lanes (SR 100 to Old Dixie Hwy.) 7. SR 100 - widen to 6 lanes (Old Kings Rd. to Belle Terre Pkwy.) 8. Palm Coast Pkwy. - widen to 6 lanes (US-1 to Belle Terre Pkwy.)

If you require additional information, please do not hesitate to contact me or the following staff person:

Jose Papa, AlCP, Senior Planner 160 Lake Ave. Suite 136 Palm Coast, FL 32164 Tel.: (386) 986-2469 ipapa(a)palmcoastgov.com

Sincerely,

Matthew Morton City Manager

c. Carl Cote, Director, Stormwater and Engineering Dept.

please recycle palmcoastgov.com 127

Page 128: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

128

Page 129: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

129

Page 130: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Updated 03/05/19

TRANSPORTATION ACRONYMS & ABBREVIATIONS Acronym Description

3-C Process

Continuing, Cooperative, Comprehensive – Generally used to defining qualities of the metropolitan planning organization (MPO) planning process.

3-R Restoration, Rehabilitation, and Resurfacing

4-R 3R plus Reconstruction

A

AA Alternative Analysis – A process for evaluating alternative methods to address transportation needs in a region.

AADT Average Annual Daily Traffic – The total traffic for a year divided by 365.

AADTT Average Annual Daily Truck Traffic

AASHTO American Association of State Highway and Transportation Officials

ACCM Advanced Construction Congestion Mitigation

ADA Americans with Disabilities Act

ADT Average Daily Traffic

AMPO Association of Metropolitan Planning Organizations

APA American Planning Association – National organization of professional planners; focus includes planning policy, lobbying and public information.

APS Accessible Pedestrian Signal

APWA American Public Works Association

ASCE American Society of Civil Engineers

ATM Advanced Traffic Management Systems

B

B/C Ratio

Benefit/Cost Ratio – Benefit/Cost Ratio is used to compare the benefit versus the cost of proposed alternatives. For highway projects, benefits may include reduced fuel consumption, travel time, and air pollution; cost may include construction, right-of-way, and maintenance.

BEBR Bureau of Economic and Business Research (University of Florida)

BLS Bureau of Labor Statistics

BPAC Bicycle/Pedestrian Advisory Committee

BRP Bridge Rehab Funds (state)

BRT Bus Rapid Transit

BTS Bureau of Transportation Statistics

C

CAC Citizens’ Advisory Committee – Advisory committee utilized by most metropolitan planning

130

Page 131: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Updated 03/05/19

organizations (MPOs) for citizen input into the transportation planning process.

CDD Community Development District

CEI Construction, Engineering and Inspection

CFMPOA Central Florida Metropolitan Planning Organization Alliance

CFR Code of Federal Regulations – Compilation of the rules of the executive department and agencies of the federal government.

CFRPM Central Florida Regional Planning Model

CIE Capital Improvements Element

CIP Corridor Improvement Program

CMA Critical Movement Analysis – For signalized intersections, CMA focuses on lane groups or movements which control signal requirements. CMA focuses on the identification and provision of capacity for such flows called critical movements. CMA is also used in capacity analysis.

CMAQ Congestion Mitigation and Air Quality – A special provision of the Intermodal Surface Transportation Efficiency Act (ISTEA) that directs funds towards projects in Clean Air Act Non-Attainment areas for ozone and carbon monoxide.

CMP Congestion Management Process

CMPWG Congestion Management Process Working Group

CMS Congestion Management System – A systematic process which provides information on transportation system performance and alternative strategies to alleviate congestion and enhance the mobility of persons and goods. A CMS includes methods to monitor and evaluate performance, identify alternative actions, access and implement cost-effective actions, and evaluate the effectiveness of implemented actions.

COOP Continuity of Operations Plan

CRA Community Redevelopment Agency

CSAP Community Safety Action Plan

CST Construction Project Phase

CTC Community Transportation Coordinator – People contracted by the Transportation Disadvantaged Commission to provide complete, cost-effective and efficient transportation services to transportation disadvantaged (TD) persons.

CTE City/County Traffic Engineer

CTST Community Traffic Safety Teams

CUTR Center for Urban Transportation and Research

CY Calendar Year

D

DBE Disadvantaged Business Enterprise

DCA Department of Community Affairs – Now called the Department of Economic Opportunity

DDR District Dedicated Revenue

DEIS Draft Environmental Impact Statement

DEO Department of Economic Opportunity

DEP Department of Environmental Protection

131

Page 132: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Updated 03/05/19

DHSMV Department of Highway Safety and Motor Vehicles

DIH Designated In-House funds

DOT Department of Transportation – Agency responsible for transportation at the local, state or federal level.

DRI Developments of Regional Impact

E

EA Environmental Assessment – A document that assesses an action that is not a categorical exclusion and does not clearly require the preparation of an environmental impact statement (EIS), or where the Federal Highway Administration believes an environmental assessment would assist in determining the need for an EIS.

EB Equity Bonus funds

ECFRPC East Central Florida Regional Planning Council

ECRRT East Central Regional Rail Trail

EIS Environmental Impact Statement

ENV Environmental Phase

EPA Environmental Protection Agency – A federal agency charged with protecting the natural resources in the nation.

ERAU Embry-Riddle Aeronautical University

ETDM Efficient Transportation Decision Making

F

FAA Federal Aviation Association – A federal entity responsible for overseeing air commerce, air traffic control, noise abatement, and other related issues.

FAHP Federal Aid Highway Program

FAST Act Fixing America’s Surface Transportation Act

FCARD Flagler County Association for Responsible Development – A non-profit association of Central Florida professionals who work in all aspects of land development.

FCTD Florida Commission for the Transportation Disadvantaged

FDEP Federal Department of Environmental Protection

FDHSMV Florida Department of Highway Safety and Motor Vehicles

International Speedway Boulevard (ISB)

Florida Department of Transportation

FEC Florida East Coast Railroad

FEMA Federal Emergency Management Administration – Administers of the Federal Emergency Management Act.

FGTF Florida Greenways and Trails Foundation

FHP Florida Highway Patrol

FHWA Federal Highway Administration

132

Page 133: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Updated 03/05/19

FPTA Florida Public Transit Association

FR Federal Register

FS Florida Statutes

FSUTMS Florida Standard Urban Transportation Modeling Structure

FTA Federal Transit Administration – The FTA operates under the authority of the Federal Transit Act. The FTA was established as a component of the US Department of Transportation.

FTC Florida Transportation Commission

FTE Florida’s Turnpike Enterprise

FTP Florida Transportation Plan

FTP File Transfer Protocol

FY Fiscal Year

G

GIS Geographic Information System

GPC General Planning Consultant

GPS Global Positioning System

GPS General Planning Studies

GMSC Growth Management Subcommittee

H

HOV High Occupancy Vehicle – Vehicles having more than one occupant. Examples include carpools, vanpools, buses, and mini-buses. Transportation systems may encourage HOV use by having designated HOV lanes.

SP Highway Safety Improvement Program

HSR High Speed Rail – A railway system which can transport people or goods at speeds in excess of 125 miles per hour.

HSRC Highway Safety Research Center

HTF National Highway Trust Fund

HVE High Visibility Enforcement

I

I/C Interchange

ICAR Intergovernmental Coordination and Review

IF Impact Fees

International Speedway Boulevard (ISB)

Interstate Highway System

IJR Interchange Justification Report

IMS Intermodal Management System – Systematic process to improve the coordination in planning and implementation of air, water, and land-based transportation facilities

133

Page 134: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Updated 03/05/19

and services; required for transportation facilities connected to the National Highway System (NHS) as a part of ISTEA; must be in use by October 1, 1997; for non-NHS transportation facilities, the extent of an IMS is left to the discretion of state and local officials.

International Speedway Boulevard (International Speedway Boulevard (ISB))

International Speedway Boulevard

ISTEA Intermodal Surface Transportation Efficiency Act of 1991

ITE Institute of Transportation Engineers – An international society of professionals in transportation and traffic engineering; published Trip Generation (a manual of trip generation rates by land use type).

ITS Intelligent Transportation Systems – program that endeavors to provide a safe transportation system that ensures the mobility of people and goods, enhances economic prosperity, and preserves the quality of our environment and communities.

J

JPA Joint Participation Agreement – Legal instrument describing intergovernmental tasks to be accomplished and/or funds to be paid between government agencies. (Contract)

L

LAP Local Agency Program

LEP Limited English Proficiency

LI Local Initiatives

LIDAR Light Detection and Ranging

LOGT Local Option Gas Tax

LOPP List of Priority Projects

LOS Level of Service – A qualitative assessment of a road’s operating condition; generally described using a scale of A (little congestion) to E/F (severe congestion).

Long Range Transportation Plan (LRTP)

Long Range Transportation Plan – A 20-year forecast plan required of state planning agencies and MPOs; must consider a wide range of social, environmental, energy, and economic factors in determining overall regional goals and consider how transportation can best meet these goals.

LRT Light Rail Transit

M

MAP-21 Moving Ahead for Progress in the 21st Century – Current Federal Transportation Bill adopted July 2012.

MOT Maintenance of Traffic

MOU Memorandum of Understanding

MPA Metropolitan Planning Area – The geographic area within which the metropolitan transportation planning process is carried out.

MPOAC Metropolitan Planning Organization Advisory Council – An advisory council (consisting of one member

134

Page 135: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Updated 03/05/19

from each MPO) that serves as the principal forum for collective policy discussion in urban areas; created by law to assist the MPOs in carrying out the urbanized area transportation planning process.

MSA Metropolitan Statistical Area

MUTCD Manual on Uniform Traffic Control Devices

N

NEPA National Environmental Policy Act - Federal law passed in 1969 which requires an analysis of environmental impacts of federal actions (including the funding of projects).

NAAQS National Ambient Air Quality Standards

NHS National Highway System – The NHS is one of the three major components of the 1991 Intermodal Surface Transportation Efficiency Act. A major new Federal-Aid system was established in the NHS. It includes the Interstate System, other routes identified as having strategic defense characteristics, routes providing access to major ports, airports, public transportation and intermodal transportation facilities, and many principal urban and rural arterials which provide regional service.

NHTSA National Highway Traffic Safety Administration

NOAA National Oceanic and Atmospheric Administration

NTS National Transportation System – An intermodal system consisting of all forms of transportation in a unified, interconnected manner to reduce energy consumptions and air pollution while promoting economic development and supporting the Nation's preeminent position in international commerce. The NTS includes the National Highway System, public transportation and access to ports and airports.

NTSB National Transportation Safety Board

O

OA Obligational Authority

OGT Office of Greenways & Trails

OPP Office of Policy & Planning

OTTED Office of Tourism, Trade & Economic Development

P

P&R Park and Ride

PAS Principal Arterial System

PD&E Project Development and Environmental Study

PE Preliminary Engineering

PIP/PPP Public Involvement/Participation Plan

PL Planning Funds

PRSC Project Review Subcommittee

PSA Public Service Announcement

PSAP Pedestrian Safety Action Plan

Q

135

Page 136: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Updated 03/05/19

QAC Quality Assurance Committee

R

RFP Request for Proposal

RFQ Request for Qualifications

RITSA Regional Intelligent Transportation System Architecture

RMLO Records Management Liaison Office

ROW Right of Way - The land (usually a strip) acquired for or devoted to transportation purposes.

RPC Regional Planning Council - A multipurpose organization composed of representatives of local governments and appointed representatives from the geographic area covered by the council, and designated as the primary organization to address problems and plan solutions that are of greater than local concern or scope.

RRFB Rectangular Rapid Flashing Beacon

RTCA Regional Trails Corridor Assessment

S

SAFETEA-LU The “Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users” –

Federal Transportation Bill that was adopted in August 2005; Replaced in July 2012 by MAP-21.

SE Surface Enhancement funds

SCE Socio-cultural Effects

SHS State Highway System

SIS Strategic Intermodal System

SJRWMD St. Johns River Water Management District

SOV Single Occupancy Vehicle

SRTS Safe Routes To School

STBGP Surface Transportation Block Grant Program - A new block grant type program established as one of the three major components of the Intermodal Surface Transportation Efficiency Act to supplement the National Highway System (NHS). The STP may be used by states and localities for any roads, including NHS, that are not functionally classified as local or rural minor collectors. These roads are now collectively referred to as Federal-aid roads.

STIP Statewide Transportation Improvement Program

The official statewide, intermodal transportation plan that is developed through the statewide planning process.

STTF State Transportation Trust Fund

SU Urban Attributable Funding

SUN Trails Shared-use, nonmotorized Trails

136

Page 137: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Updated 03/05/19

T

TAC Transportation Advisory Committee/Technical Advisory Committee

TAM Transit Asset Management

TAP Transportation Alternative Program

TAZ Traffic or Travel Analysis Zone

TPO Technical Coordinating Committee

TCEA Transportation Concurrency Exception Area – A specific geographic area where transportation concurrency requirements do not apply; area must be designated in a local comprehensive plan.

TD Transportation Disadvantaged – People who are unable to transport themselves or to purchase transportation due to disability, income status or age.

TDDG Transit Development Design Guidelines

TDLCB Transportation Disadvantaged Local Coordinating Board

TDM Transportation Demand Management – Strategies to reduce peak period congestion which focus on managing travel demand; includes shifting solo drives to carpools or transit, staggered work hours, telecommuting and other similar concepts.

TDP Transit Development Plan – A short term (5 years) plan that identifies the intended development of transit, including equipment purchase, system management and operation.

TDSP Transit Disadvantaged Service Plan

TDTF Transportation Disadvantaged Trust Fund

TTF Transportation Trust Fund

TEA-21 Transportation Equity Act for the 21st Century – Federal Transportation Law in effect from 1997-2005

TF Transportation Fund

TIA Transportation Impact Analysis

TIP Transportation Improvement Program – The TIP is a staged, three-to-five-year prioritized program of transportation projects covering a metropolitan planning area which is consistent with the metropolitan transportation plan.

TMA Transportation Management Area – An urbanized area with a population over 200,000 (as determined by the latest decennial census) or other area when TMA designation is requested by the Governor and the Metropolitan Planning Organization (MPO), and officially designated by the metropolitan planning area served by an MPO within which the TMA is located.

TOD Transit-Oriented Development – A mixed use community or neighborhood designed to encourage transit use and pedestrian activity.

TPM Transportation Performance Measures

TPO Transportation Planning Organization – An association of local agencies established for mutual benefit to help coordinate planning and development activities within a metropolitan region. Establishment of the TPO is required by law in urban areas with populations over 50,000 if federal funds are to be used. The TPO is not a level of government. However, the TPO has “effective control” over transportation improvements within the area since a project must be a part of the TPO’s adopted plan in order to receive federal funding.

TPS Transportation Planning Studies

TRIP Transportation Regional Incentive Program

TSMO Transportation Systems Management & Operations

137

Page 138: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

Updated 03/05/19

U

UA Urban Area

USACE United States Army Corps of Engineers

US DOT United States Department of Transportation

UPWP Unified Planning Work Program – Official two-year budget of an MPO/TPO.

UZA Census Urbanized Area

V

VCARD Volusia County Association for Responsible Development – A non-profit association of Central Florida professionals who work in all aspects of land development.

VMT Vehicle Miles Travelled

X

XU Extra Urban: Funds attributable to urbanized areas over 200,000 population

138

Page 139: RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION …

River to Sea TPO Board Executive Committee

Technical Coordinating

Committee (TCC)Citizens Advisory Committee (CAC)

Bicycle/Pedestrian Advisory Committee

(BPAC)

Trans. Disadvantaged Local Coordinating Board

(TDLCB)

2020 4th Wed. @9:00 a.m. 1st Wed. @ 9:00 a.m. 3rd Tues. @ 3:00 p.m. 3rd Tues. @ 1:15 p.m. 2nd Wed. @ 2:00 p.m.2nd Wed. the first month of every

quarter @ 11:00 a.m. **

January January 22, 2020 Friday January 3, 2019*** January 21, 2020 January 21, 2020 January 8, 2020 January 8, 2020

February February 26, 2020 February 5, 2020 February 18, 2020 February 18, 2020 February 12, 2020

March March 25, 2020 March 4, 2020 March 17, 2020 March 17, 2020 March 11, 2020

April April 22, 2020 April 1, 2020 April 21, 2020 April 21, 2020 April 8, 2020 April 8, 2020

May May 27, 2020 May 6, 2020 May 19, 2020 May 19, 2020 May 13, 2020

June June 24, 2020 June 3, 2020 June 16, 2020 June 16, 2020 June 10, 2020

July July 22, 2020* July 1, 2020* July 21, 2020* July 21, 2020* July 8, 2020* July 8, 2020

August August 26, 2020 August 5, 2020 August 18, 2020 August 18, 2020 August 12, 2020

September September 23, 2020 September 2, 2020 September 15, 2020 September 15, 2020 September 9, 2020

October October 28, 2020 October 7, 2020 October 20, 2020 October 20, 2020 October 14, 2020 October 14, 2020

November November 25, 2020 November 4, 2020 November 17, 2020 November 17, 2020 November 11, 2020

December December 23, 2020* December 2, 2020* December 15, 2020* December 15, 2020* December 9, 2020** These meetings are typically cancelled ** TDLCB Meetings are at Votran ***Rescheduled due to Holiday

2020 Meeting Schedule of the River to Sea TPO Board and Committees

139