RIVER HOUSE MIXED-USE DEVELOPMENT

Retail, Office, and Residential – Highest and Best Use

Significant Economic Impact and Public Benefit

Neighborhood Collaboration and Input

High Quality, Sustainable Development

Broad Ripple Ave.

Canal Towpath

River House

EXISTING SITE CONTEXT

RIVER HOUSE DEVELOPMENT

RIVER HOUSE PROGRAM

Retail - 3,875 sf

Office - 3,195 sf

Apartments - 84,652 sf 86 units | 15% - studios | 66% - 1 bedroom | 19% - 2 Bedroom

Parking Garage - 26,568 sf

Parking CountCode Required Parking - 83

Provided Parking - 98 |85 Garage spaces | 6 Surface | 7 on street spaces

Public Parking – 10 spaces available nights and weekends, 7 Full time on street spaces

RIVER HOUSE DEVELOPMENT

Total Development Budget

$18,099,040

Economic Impact

200 Construction Jobs | 35 Permanent Jobs

Bondable Increment Generated

$4,200,000

TIF Request

$2,463,714 *13.61% of Total Development*

*59% of Increment*

TIF ASSISTANCE

Demolition, Soil Stabilization,

Site Development

Demolition, Soil Stabilization,

Site Development

Utilities and Pole Removal

New Metal Power Pole

TIF ASSISTANCE

Demolition, Soil Stabilization,

Site Development

Utilities and Pole Removal

Rain Garden Storm System Rain Gardens

Permeable Pavers

TIF ASSISTANCE

Demolition, Soil Stabilization,

Site Development

Utilities and Pole Removal

Rain Garden Storm System

10’ Riviera Trail

Lookout Point

10’ Riviera Trail

Future River Walk

TIF ASSISTANCE

Demolition, Soil Stabilization,

Site Development

Utilities and Pole Removal

Rain Garden Storm System

Public Plaza

10’ Riviera Trail

Sidewalks, Plaza, Street Prints Repaving

Repave Riviera Dr.Ladder Crosswalks

TIF ASSISTANCE

Demolition, Soil Stabilization,

Site Development

Utilities and Pole Removal

Rain Garden Storm System

Parking Garage

10’ Riviera Trail

Sidewalks, Plaza, Street Prints Repaving

Parking Garage

TIF ASSISTANCE

Demolition, Soil Stabilization,

Site Development

Utilities and Pole Removal

Rain Garden Storm System

10’ Riviera Trail

Sidewalks, Plaza, Street Prints Repaving

Parking Garage

Monon Trail Improvements

Monon Trail Intersection Improvements:Safety, Lighting, Accessibility, Paving Landscaping

TIF ASSISTANCE

Demolition, Soil Stabilization,

Site Development

Utilities, IPL Pole Removal

Rain Garden Storm System

10’ Riviera Trail

Sidewalks, Plaza, Street Prints Repaving

Parking Garage

Monon Trail Improvements

Pedestrian Trail Lighting – Monon, Canal, Riviera Dr.

22 New Pedestrian Street Lights Along Monon Trail, Canal Towpath, and Riviera Dr.

TIF ASSISTANCE

DEVELOPER COMPONENTS

Acquire Real Estate

Parking Garage

Acquire Real Estate

Construct Parking Garage

DEVELOPER COMPONENTS

Retail

Acquire Real Estate

Construct Parking Garage

Construct Retail Space

DEVELOPER COMPONENTS

Office

Acquire Real Estate

Construct Parking Garage

Construct Retail Space

Construct Office Space

DEVELOPER COMPONENTS

Acquire Real Estate

Construct Parking Garage

Construct Retail Space

Construct Office Space

Construct ApartmentsApartments

DEVELOPER COMPONENTS

RIVER HOUSE DEVELOPMENT

FINANCIAL SUMMARY

Estimate Increment Generated

$300,000 Annually, Bondable - $4,200,000

TIF Requested

$2,463,714

Requested TIF as % of Total Cost

13.61%

Private Investment

$15,635,326

Excess Generated Increment

$1,736,286