riskview ® tutorial: selling assurance “ quad-play”
DESCRIPTION
RiskView ® Tutorial: Selling Assurance “ Quad-Play” . July 2012. Robert Cruickshank CEO [email protected] +1-703-568-8379. Evan Birkhead VP Marketing & Sales e [email protected] +1-908-910-6988. Assurance Quad-Play Sales Goal. MSOs without ARRIS Assurance - PowerPoint PPT PresentationTRANSCRIPT
RiskView® Tutorial:Selling Assurance “Quad-Play”
July 2012
Robert [email protected]+1-703-568-8379
Evan BirkheadVP Marketing & [email protected]+1-908-910-6988
Assurance Quad-Play Sales Goal
MSOs without ARRIS Assurance Sell all-four Quad-Play solutions
MSOs with some ARRIS Assurance Sell missing Quad-Play solutions
Sell best fit solution(s) to meet MSO needs Set stage for additional sales of missing Quad-Play solutions
Confidential 2
Selling the Message
Get Familiar with Assurance Quad-Play & RiskView’s role www.rev2.com/arris-resources/ : Videos, Info Sheets, Case
Studies
Assess MSO Assurance Need Does MSO have Assurance Products: SAA, EA, WA, Others?
Have Enrollment Conversation to Gauge MSO Interest Goal: Selling opportunity via:
1) Webinar, 2) in-house Demo, or 3) other next steps
Follow-up with Sales Package based on MSO Assurance Needs
Confidential 3
Get Ready for Customer Facing: About RiskView
How Assurance Quad-Play works together – Next Slide
Description of each Assurance Solution – ARRIS & Rev2
RiskView Service Outage Analytics Video https://dl.dropbox.com/u/42856417/Rev%202%20Video%201%20Edit%204.wmv
RiskView Service Outage Analytics Demo https://dl.dropbox.com/u/42856417/Rev%202%20Short%202%20Hi%20Def.wmv
Savings Model
Deployment Steps
Feedback – What you didn’t get, what else you need…?
Confidential 4
From Automated Outage Notification to Repair
WorkAssure powered Field Tech
Performance Management
Proactive Outage Management
Common Data Collection
CMTSs and CPEs
Network outage suspected at
Node 0
EventAssure determines all devices offline behind Node 0
Workforce Management
WorkAssure creates the work order and
acknowledges with the assigned job ID
WorkAssure determines the best resource to fix
the issue (skillset, distance, equipment etc.)
Automated Outage Interface
EventAssure declares an Event with an
automated notification for a Work Order
The tech is dispatched and notified via his handheld of the outage details The tech fixed the outage and closes
the job on his handheld.
Common Periodic Data Collection for Performance and Outage Information
5
Financial Impact Analysis
Rev2 RiskView® provides service outage analytics that enable prioritization of infrastructure issues based on their
financial impact.
• In real-time analysis, small and intermittent issues/outages may not exceed thresholds
• Issues may be missed for extended periods
• Some issues are precursors of larger outages
GOOD NEWS: Clues clearly point operations teams to issues and concentrations of outage risk.
CHALLENGE: Clues are needles in voluminous haystacks imprisoned in disparate databases.
Prioritizing undetected outages
Confidential 6
Call Center Connectivity Calls & Repeats
WorkAssure TC = Service Calls & Repeats EC = Refer to Maintenance DI = Voluntary Disconnects Biz/Residential, 1/2/3 Services
Maintenance Activity Planned, Demand
SAA ServAssure Advanced Hourly Degraded CMs US/DS Errors/SNR/Power/Util On/Offline, Node Combining
Find & Fix More Issues,Reduce Calls, TCs, Disconnects
Field Activity
Failed Telemetry
Connectivity Calls
Systematically correlate multiple inputs over time
Confidential 7
RiskView data warehouse architecture
Confidential 8
Problem resolution layered over your services
The outliers represent the most material risks.
Confidential 9
Example Study
Parameters of Blind Comparison Study by Maintenance Department• 1,000,000 subs in Region | 25,000 HFC miles | 180 technicians | 15 supervisors | 4 managers | 1 director • 7,500 nodes in 3,000 DOCSIS Serving Groups (combinations of nodes)
Hypothesis [operating cost without Automation – operating cost with Automation] = Quantifiable Savings
Data Inputs/Outputs Business as Usual “Control Group” (BAU): Inputs from 10 different systems in four categories:
1. Connectivity Calls2. Service Truck Rolls3. Telemetry (ARRIS ServAssure, Home Grown Telemetry)4. Preventative and Demand Maintenance Activities
“Experimental Group” (EG): Correlation and outage analytics of all above BAU data inputs
Departments Impacted by EG Discovered Issues • Service Department focuses on Non-Area Issues• Maintenance Department focuses on Area issues
Operating Cost Savings
• Savings Method• Correlated across DOCSIS Serving Groups then Alerted on unusual costs
• Base Weights applied• Reputational cost was used to Trigger HFC Maintenance Alerts
= Calls + (2*TCs) + RepTC + (3*ECs) + (2*DI) + CHG + TRB + Up&Down(Err + SNR + Power + Resets)
• During Alert Periods, 25% of Financial operating cost was used to calculate savings= $0.55/min Calls, $60 TC and DI, $100 EC, CHG, TRB (set by MSO)
• Example of Savings for a single Node on Next Slide• Alert Period
= Prior Day RepCost >=15 AND (Same Day OR Next Day RepCost >=10)• Total Operating Cost
• $3,228 = 71 Calls + 24 TCs +2 EC + 12 DI + 1 CHG + 2 TRB • Potential Savings based on Alerts driving earlier maintenance actions
• $411 = 7.5 Calls + 2.75 TCs + 0.25 EC + 1.5 DI + 0.25 CGH + 0.5 TRB
• Projected Annual Savings: $0.35 - $0.40 per Sub per year
Typical Serving Group, Node and Street Behavior
18-Day | Total Fin Cost: $3,228 | Potential Cost Savings: $ 411
Next Steps… Include “Other” Savings in Model
Customer Lifetime Value Model: Dr. Ron Rizzuto
• Lingering Issues – don’t cross threshold (yet) but create issues• Example: Trigger Alert based on accumulated cost over 3-days
• Customer Experience / CLV• Knowing Value of Customer helps quantify savings of prevented Disconnects• CLV = Present Value of (ARPU – COGS - Care Costs); Lower Care = Higher CLV
Customer Type ARPU Churn CLVAnalog $45.00 2.50% $222
Digital $67.00 3.00% $599
Video/Data $100.50 2.00% $2,057
Video/Phone $93.50 2.00% $2,062
Data/Phone $71.00 2.00% $1,790
Triple Play $133 1.00% $5,642
Triple Play $133 2.00% $2,972
Transactional Savings Impact on P&L (Proforma)
Maintenance Department: Additional Work 16K Preventative Maintenance Actions Created -4K Saved Tasks/year (2.5K ECs + 0.8K CHG + 0.7K TRB) = 12K Net New Preventative Maintenance Actions/year $1.2M Cost due to additional Tasks @ $100 each
Service Department: Reduce Contractor Head Count Approx 50% of Installs performed by Contractors @ $60.00 As TCs are reduced, Staff do “would be contracted” installs$900K Saved 15K TCs/year @ $60$360K Saved 6K Disconnects/year @ $60
Call Center: Reduce Capacity with normal staff attrition $320K 40K Calls/year @ $8
Summary: $380K Saved per Year for 1M Subs
Deploying RiskView at Cable MSOs
Start Single Server: Gather, Process, Display UI, Email Reports MSO Provides: a) Standalone Hardware, or b) WMware Machine
Microsoft Windows Server 2008 R2 64-bit 64-bit processor, 32GB RAM, 500 GB SATA @ 7200 RPM
Rev2 Provides and Remotely Configures all Software Microsoft .NET Framework 4, SQL Server 2008 Enterprise R2 64-
bit, ActivePerl 5.12+ Connect Data Sources: Customer Care, Field Service & NOC
MSO Provides: a) IP Addresses for “Pull”, or b) Push Daily Files Rev2 Provides: Specific Data Fields and Collaboration on Queries
Call Center: Connectivity Calls Service Department:
TC-Truck Rolls, EC-Escalations to Maintenance, DI-Volun Discos Maintenance Department
Preventative & Demand Maintenance NOC: ServAssure, Telemetry
Confidential 15
Typical Data Sources and Fields
Confidential 16
Thank you!