Risk Analysis

Page 2: Risk

2

Topics- Risk and Uncertainty- General Risk Categories- Probability- Probability Distributions- Payoff Matrix- Expected Value- Variance and Standard Deviation

(Measurement of Absolute Risk)

- Coefficient of Variation (Measurement of Relative Risk)

Page 3: Risk

3

Topics (Con’t)- Risk Attitudes

Risk AversionRisk NeutralityRisk Loving (Taking)

- Utility Theory and Risk Analysis- Risk Premium- Decision-Making Under Risk- Certainty Equivalent- Game Theory- Maximin Decision Rule- Minimax Regret Decision Rule

Page 4: Risk

4

Readings

Hirschey, Chapter 17 Lecture notes

Page 5: Risk

5

Motivation Risk – a four-letter word

To make effective investment decisions, one must understand risk.

Decision makers sometimes know with certainty the outcomes associated with each possible course of action.

Page 6: Risk

6

Motivation (Con’t.)Example:

A firm with BDT 10,00,000 in cash Decision to make: (1) Invest in a 91-day Treasury bill yielding 5.66% interest (2) Prepay a 15% bank loan

Which course of action to take? Choose (1) => 14,307 interest income after 91 days Choose (2) => 37,916 interest expense savings after 91

days

Choose (2) provides 23,609 additional 3-months return

Page 7: Risk

7

Definition of Risk and Uncertainty

- Risk/Uncertainty: Both concepts deal with the probability of loss or the chance of adverse outcomes

- Risk: All possible outcomes of managerial decisions and their probabilities are completely known

- Uncertainty: The possible outcomes and their probabilities are unknown

Page 8: Risk

8

General Risk CategoriesBusiness Risk – the chance of loss associated with a given

managerial decision; typically a by-product of the unpredictable variation in product demand and cost conditions

Market Risk – the chance that a portfolio of investments can lose money because of overall swings in financial markets

Inflation Risk – the danger that a general increase in the price level will undermine the real economic value of corporate agreements

Interest-rate Risk – another type of market risk that can affect the value of corporate investments and obligations

Credit Risk – the chance that another party will fail to abide by its contractual obligations

Page 9: Risk

9

General Risk Categories (Con’t.)

Liquidity Risk – the difficulty of selling corporate assets or investments that have only a few willing buyers or are otherwise not easily transferable at favorable prices under typical market conditions

Derivative Risk – the chance that volatile financial derivatives such as commodity futures and index options could create losses by increasing rather than decreasing price volatility

Currency Risk – the chance of loss due to changes in the domestic currency value of foreign profits

Page 10: Risk

10

Probability- Probability: likelihood of particular outcome occurring, denoted

by p. The number p is always between zero and one.

- Frequency: estimate of probability, p=n/N, where n is number of times a particular outcome occurred during N trials.

- Subjective probability: If we do not have frequency, we often resort to informed guesses. Subjective probabilities must follow the same rules of the probability calculus, if we are dealing with rational decision-makers.

Page 11: Risk

11

Probability Distribution Discrete probability distribution:

deals with “events” whose “states of nature” are discrete. The “event” is the state of the economy. The “states of nature” are recession, normal, and boom.

Continuous probability distribution: deals with “events” whose “states of nature” are continuous values. The “event” is profits, and the “states of nature” are various profit levels.

Event State of Economy

P (probabilty)

Recession 0.2Normal 0.6Boom 0.2

Page 12: Risk

12

Payoff MatrixA table that shows outcomes associated with each possible state of nature.

State of Economy Project A Project B Probability of State of Economy

Recession $4,000 $0 0.2Normal $5,000 $5,000 0.6Boom $6,000 $12,000 0.2

Project A more desirable in a recession.

Project B more desirable in a boom.

In a normal economy, the projects offer the same profit potential.

Decision to Make:

A firm must choose only one of the two investment projects (choose Project A or Project B). Each calls for an outlay of $10,000.

Page 13: Risk

13

Expected Value

The payoffs of all events: x1, x2, …, xN

The probability of each event: p1, p2, …, pN

Expected value of x:

EV(x) is a weighted-average payoff, where the weights are defined by the probability distribution.

Use the payoff matrix in the previous slide, together with the probability of each state of the economy.

pxpxpxpxxEV i

N

iiNN

1

2211 ...)(

Page 14: Risk

14

000,5$2.0000,6$6.0000,5$2.0000,4$)( AEV

400,5$2.0000,12$6.0000,5$2.00$)( BEV

Expected profit of Project A and B under different

economic states of nature

Page 15: Risk

15

Variance and Standard Deviation

Variance and Standard Deviation: measuring riskThe payoffs of all events: x1, x2, …, xN

The probability of each event: p1, p2, …, pN

Expected value of x:

Variance:

Standard deviation: square root of variance

N

ipiEVxipNEVxNpEVxpEVx

1)( 2)( 2...2)2( 2

1)1( 22

pxpxpxpxxEV i

N

iiNN

1

2211 ...)(

Page 16: Risk

16

For project A, what are the variance and standard deviation? EV(A) = $5,000

Variance (σ2) = ($4,000-5,000)2 (.2) + ($5,000-$5,000)2 (.6) + ($6,000-$5,000)2

(.2)

(σ2) = ($1,000)2 (.2) + ($0)2 (.6) + ($1,000)2 (.2) (σ2) = $400,000 (units are in terms of squared dollars)

σA = $632.46

For project B, what are the variance and standard deviation? EV(B) = $5,400

Variance (σ2) = ($0-5,400)2 (.2) + ($5,000-$5,400)2 (.6) + ($12,000-$5,400)2 (.2) (σ2) = 5,832,000 + 96,000 + 8,712,000 (units are in terms of squared dollars)

(σ2) = 14,640,000 (units are in terms of squared dollars)

σB = $3,826.23

Project B has a larger standard deviation; therefore it is the riskier project

Page 17: Risk

17

Risk Measurement Absolute Risk:

- Overall dispersion of possible payoffs - Measurement: variance, standard deviation- The smaller variance or standard deviation,

the lower the absolute risk.

Relative Risk- Variation in possible returns compared with

the expected payoff amount- Measurement: coefficient of Variation (CV),- The lower the CV, the lower the relative risk.

EVCV

Page 18: Risk

18

Project AEV(A) = $5,000 σA = $632.46

Project BEV(B) = $5,400 σ B = $3,826.23

Coefficient of variation

CVA = = 0.1265

CVB = = 0.7086

Coefficient of variation measures the relative risk; the variation in possible returns compared with the expected payoff amount.

A

E V A( )

C VE V

B

E V B( )

Page 19: Risk

19

Risk Aversioncharacterizes decision makers who seek to avoid or minimize

risk.

Risk Neutralitycharacterizes decision makers who focus on expected returns

and disregard the dispersion of returns.

Risk Seeking (Taking)characterizes decision makers who prefer risk.

Risk Attitudes

Page 20: Risk

20

Scenario: A decision maker has two choices, a sure thing and a risky option, and both yield the same expected value.

Risk-averse behavior:Decision maker takes the sure thing

Risk-neutral behavior:Decision maker is indifferent between the two choices

Risk-loving (or seeking) behavior:Decision maker takes the risky option

Risk Attitudes

Page 21: Risk

21

Typically, consumers and investors display risk-averse behavior, especially when substantial sums of money are involved. Risk aversion is the general assumption behind decision models in managerial economics.

Examples to the contrary:State-run lotteriesCasinos (gaming)

Today, U.S. consumers spend more on legal games of chance than on movie theaters, books, amusement attractions, and recorded music combined!

Source: Wall Street Journal, Ann Davis, September 23, 2004.

Utility Theory and Risk Analysis

Page 22: Risk

22

Risk Attitudes

Risk averter: diminishing MURisk neutral: constant MURisk lover: increasing MU

(MU)

(MU)

(MU)

Page 23: Risk

23

Examples of utility functionsLet w = income (or profit) or more generally wealth, w > 0

U w w

U w w

U w w

U w w

( )

( ) ln

( )

( )

2

3 1 0

M U w ww

M U ww

M U w w

M U w

( )

( )

( )

( )

12

12

1

2

3

12

Which utility function is consistent with risk-seeking behavior?Which utility function is consistent with risk neutrality?Which utility function is consistent with risk aversion?

Page 24: Risk

24

Under risk aversion behavior, the decision rule is to maximize expected utility.

EV[U(risky option)] = U(w1)p1 + U(w2)p2 + U(wn)pn

Also, it is important to find the level of income, profits, or wealth that is consistent with the utility level of the expected value of utility associated with the risky option. Call this level of wealth w*.

The difference between the expected value of the risky option and w* is the risk premium.

Risk premium = EV(risky option) – w*

Page 25: Risk

25

Example:Joshua lives in San Francisco, CA, where the probability of an earthquake is 10%. Suppose that Joshua’s utility function is given by , where w represents total wealth. If Joshua chooses not to buy insurance next year, his wealth is $500,000 if no earthquake occurs, and $300,000 if an earthquake occurs. The reduction in wealth is attributable to the loss of his house due to the earthquake. The risky option is not buying insurance.(a) Is Joshua risk averse, risk loving, or risk neutral?(b) Find the EV of not buying insurance (the risky option).(c) Find EV[U(risky option)].(d) Find the wealth that results in the utility level associated

with the expected value of utility of the risky option.(e) Find the risk premium.

U w w( )

Page 26: Risk

26

(a) Is Joshua risk averse, risk loving, or risk neutral?

MU diminishes with increases in w.Joshua is risk averse

(b) Find the EV of not buying insurance.EV(risky option) = ($500,000)(.9) + ($300,000)(.1) = $480,000

(c) Find EV[U(risky option)].EV[U(risky option)] =EV[U(risky option)] = $636.40 + $54.77 = $691.71

(d) What level of wealth is consistent with the utility level of the EV[U(risky option)]?

(e) Risk premium. EV(risky option) – w* = $480,000 - $477,716Risk premium = $2,284.

U w

M U ww

12

1

2

12

12

$ 5 00 , (. ) $ 3 00 , (. )00 0 9 00 0 1

ww

$6 9 1.$4 77 ,*

1 771 6

Page 27: Risk

27

Graphical AnalysisUtility

Wealth

U(500,000) = 707.11

300,000 477,716 480,000 500,000

0.9U(500,000) + 0.1U(300,000) = 691.17

U(300,000) = 547.72

wU=

risk premium

Page 28: Risk

28

Decision-Making Under Risk Possible Criteria to consider:

- Maximize expected value

- Minimize variance or standard deviation

- Minimize coefficient of variation

- Incorporate risk attitudes: certainty equivalent

- Maximin criterion

Page 29: Risk

29

Maximizing Expected ValueEvent (State of Economy) P Profit

Project A Project BRecession 0.2 $4,000 $0

Normal 0.6 $5,000 $5,000

Boom 0.2 $6,000 $12,000

EV(A)=$5,000 EV(B)=$5,400

Thinking: Which project will you choose based on this criterion?What is ignored using this criterion?

Page 30: Risk

30

Minimizing Variance/Standard Deviation

Event (State of Economy) P ProfitProject A Project B

Recession 0.2 $4,000 $0

Normal 0.6 $5,000 $5,000Boom 0.2 $6,000 $12,000

A = $632.46 = $3,826.23

Thinking: Which project will you choose based on this criterion?What is ignored using this criterion?

B

Page 31: Risk

31

Coefficient of Variation: Standard Deviation Divided by the Expected

Value

A B

Expected value $5,000 $5,400

Standard deviation $632.46 $3,826.23

Coefficient of Variation 0.2265 0.7086

Think: Which project will you choose based on this criterion?What is ignored?

Page 32: Risk

32

Incorporating Risk Attitudes: Certainty

EquivalentSuppose that you face the following choices:

(1) Invest $100,000From a successful project you receive $1,000,000.If the project fails, you receive $0.The probability of success is 0.5.EV(investment) = ($1,000,000)(0.5) + ($0)(.5) = $500,000.

(2) You do not make the investment and keep $100,000.

If you find yourself indifferent between the two alternatives, $100,000 is your certainty equivalent for the risky expected return of $500,000.

A certain or riskless amount of $100,000 provides exactly the same utility as a 50/50 chance to earn $1,000,000 (or $0).

Page 33: Risk

33

In general, any risky investment with a certainty equivalent less than the expected dollar value indicates risk aversion.

In our case, $100,000 < $500,000 => risk aversion.

Certainly Equivalent Adjustment Factor = = Equivalent Certain Sum Expected Value of the Risky Venture

In our case, = $100,000 = .2. $500,000

The “price” of one dollar in this risky venture is equal to 20¢ in certain dollar terms.

Page 34: Risk

34

= Equivalent Certain Sum Expected Value of the Risky Venture

If Then Implies

Equivalent certain sum < Expected Value of the < 1 Risk aversion Risky Venture

Equivalent certain sum = Expected Value of the = 1 Risk indifference Risky Venture (or

neutrality) Equivalent certain sum > Expected Value of the > 1 Risk

preference Risky Venture (or taking)

Page 35: Risk

35

Game Theory

- Game Theory dates back to the 1940s by John von Neuman (Mathematician) and Oskar Morgenstern (Economist)

- Game Theory is a useful decision framework employed to make choices in hostile

environments and under extreme uncertainty.

- Use of maximin decision rule

- Use of minimax regret decision rule (opportunity loss).

Page 36: Risk

36

Maximin Decision Rule

The decision maker should select the alternative that provides the best of the worst possible outcomes. Maximize the minimum possible outcome.

The maximin criterion focuses only on the most pessimistic outcome for each decision alternative. The maximin criterion implicitly assumes a very strong aversion to risk and is quite appropriate for decisions involving the possibility of catastrophic outcomes.

Page 37: Risk

37

Minimax Regret Decision Rule

This decision rule focuses on the opportunity loss associated with a decision rather than on its worst possible outcome.

The decision maker should minimize the maximum possible regret (opportunity loss) associated with a wrong decision after the fact. Minimize the difference between possible outcomes and the best outcome for each state of nature.

Opportunity loss => the difference between a given payoff and the highest possible payoff for the resulting state of nature. So, find the maximum payoff for a given state of nature and then subtract from this amount the payoffs that would result from various decision alternatives.

Page 38: Risk

38

Maximin and Minimax Regret Decision Rules

Event (State of Economy)

Profit

Project A Project B

Recession $4,000 $0

Normal $5,000 $5,000

Boom $6,000 $12,000

Thinking: Which project will you choose?

- Based on Maximin Decision Rule?- Based on Minimax Regret Decision Rule?

What is ignored in the respective decisions?

Page 39: Risk

39

Maximin Decision Rule Example

Minimum possible outcome for project A is $4,000.

Minimum possible outcome for project B is $0.

Therefore by the maximin decision rule, choose project A.

Page 40: Risk

40

Minimax Regret Decision Rule

Calculate the opportunity loss or regret matrix

State of Nature Project A Project B Maximum Payoff

Recession $4,000-$4,000=$0 $4,000-$0=$4,000 $4,000

Normal $5,000-$5,000=$0 $5,000-$5,000=$0 $5,000

Boom $12,000-$6,000=$6,000 $12,000-$12,000=$0 $12,000

Maximum possible regret $6,000Project A

$4,000Project B

Therefore, by the minimax regret decision rule, choose project B.

Page 41: Risk

41

What’s Next? Preparation for Exam I

Exam I Covers:

- Algebra review

- Demand analysis

- Risk analysis